Extent of Reference Acceptance
Sl. No Item Category Type / Method of check Format of record to be Remarks
check document norms
furnished CONTRACTOR TPIA CLIENT
A B C D E F G H I J L
1 Survey
Co-ordinates / Levels of
Site
a) Bench Mark recoding of Critical Visual checks 100% Approved Drg. As per approved Drg. Joint Record Yes P RW W
Verification/Review
all effected working area
2 Surface dressing
Disposal/proper stacking
Specifications/ Specifications/ Site
d) of breaking materials in Minor Visual Checks 60% -- No P RW RW
Methodology Methodology Verification/Review
demarked area.
4 Base preparation
5 Boulder soiling
Site
Checking of vibrating by Specifications/ Verification/Review &
b) Critical Visual Check 80% As per IS 2505/2506 -- No P RW RW
neddle / plate Vibrator Methodology minimum 14 days
Curing reqd.
7 RCC M30 Grade of Concrete as per approved Drg.
Checking vibrating
needle/plate vibrator Specifications/ Site
b) Critical Visual Check 100% As per IS 2505/2506 -- No P RW RW
before & during the Methodology Verification/Review
pouring of concrete
8 Reinforcement (Fe-500 D)
Minimum 28 days
reqd. unless any other
Curing is essential for 28 Specifications/ special cases curing
a) Major Visual Check 100% As per IS 456 As per site surveillance wise Yes P RW RW
days minimum Methodology must be maintain 14
days as per decide the
EIC of VAL
Site
c) Check for final level Critical Visual Checks 100% Drawings Drawings Joint Records Yes P RW RW
Verification/Review
15 IPS (minimum thickness of 60 mm to 75 mm)/ Concrete flooring over RCC Panels (If reqd. as per site conditioned based)
Pouring M-50 grade As per Design mix (certified Specifications/ Specifications/ Site
d) Critical 100% Joint Records Yes P RW RW
concrete as per drawing by NABL Labs) Methodology Methodology Verification/Review
Minimum 28 days
reqd. unless any other
Curing is essential for Specifications/ special cases curing
e) Major Visual Check 100% As per IS 456 Joint Records Yes P RW RW
28 days minimum Methodology must be maintain 14
days as per decide the
EIC of VAL
Checking of
Laboratory Test as per IS 456 Specifications/ As per IS 456 & IS Compressive strength checking Site
f) Compressive Strength of Major 100% Yes P W W
& 516 wise Methodology 516 at 7 & 28 days basis. Verification/Review
taken cube
Legends: P PERFORM
R RANDOM
W WITNESS Prepared By: Sasanka Dey
RW RANDOM WITNESS Genral Manager
RM RANDOM MONITORING
TPIA THIRD PARTY INSPECTION AGENCY
MPDD MODIFIED PROCTOR DRY DENSITY