User manual . concentrate on what is most important for you – your business.

Product description
Delta OutD V outdoor
cabinet
Our InD, OutD and HelpD series are designed to
complement each other. InD stands for indoor power
systems, while OutD solutions are created for demanding
outdoor use. HelpD is our global support team; its task is
to make everything easy for you.

www.deltapowersolutions.com
3791363100_00
Table of contents
1 About this document ........................................................................................... 2
1.1 Preparing for the installation .................................................................... 2
1.1.1 Document content ...................................................................... 2
1.1.2 Contents of packing ................................................................... 2
1.1.3 Before you begin ........................................................................ 3
1.1.4 Unpacking the system ............................................................... 3
2 Safety instructions .............................................................................................. 4
2.1 About legal and safety information ........................................................... 4
2.2 Legal statements ...................................................................................... 4
2.2.1 Statement of compliance ........................................................... 4
2.2.2 Limitations .................................................................................. 4
2.2.3 Third party devices .................................................................... 5
2.3 Safety instructions .................................................................................... 5
2.3.1 General instructions ................................................................... 5
2.3.2 Specific instructions ................................................................... 7
3 Product description ............................................................................................. 8
3.1 Standard ODPS system configuration ..................................................... 8
3.2 AC/DC distribution configuration .............................................................. 9
3.3 Climate control ......................................................................................... 9
3.3.1 Air ventilation ........................................................................... 10
3.3.2 Air conditioner .......................................................................... 12
3.3.3 Heater ...................................................................................... 12
3.3.4 Hybrid cooling system .............................................................. 13
3.3.5 Fan alarm ................................................................................. 14
3.3.6 Climate control setting ............................................................. 15
4 Installation and commissioning ........................................................................ 16
4.1 Installation .............................................................................................. 16
4.1.1 System cabinet installation ...................................................... 16
4.1.2 Cabling ..................................................................................... 17
4.1.2.1 Grounding ................................................................. 18
4.1.2.2 AC main connection ................................................. 18
4.1.2.3 Battery connection .................................................... 19
4.1.2.4 DC-load connections ................................................ 20
4.1.2.5 Alarm connections .................................................... 20
4.2 Commissioning ....................................................................................... 21
4.2.1 Starting up the DC system (if configured) ................................ 21
4.2.2 Controller calibration (systems with PSC 3 controller) ............ 22
4.2.3 Testing the rectifiers (systems with PSC 3 controller) ............. 23
4.2.4 Testing the control and alarm system (systems with PSC 3
controller) ................................................................................. 23
4.2.4.1 Confirming the configuration .................................... 23
4.2.4.2 Testing the alarms .................................................... 24
4.2.4.3 Checking the fuse monitoring ................................... 24
4.2.4.4 Testing the rectifier and mains failure alarms .......... 25
4.2.5 Checking the air ventilation system ......................................... 25
4.2.6 Checking the active cooling system (air conditioner) .............. 26
4.2.7 Checking the heater ................................................................. 27
5 Troubleshooting ................................................................................................ 28
5.1 Troubleshooting rectifiers ....................................................................... 28
5.2 Troubleshooting batteries ....................................................................... 28
6 Technical specification ..................................................................................... 29
7 Contacting Delta customer service................................................................... 31

Product description, Delta OutD V outdoor cabinet Table of contents


1 About this document

1.1 Preparing for the installation

1.1.1 Document content

This document contains the following sections:

• Safety instructions
• Product description, Delta OutD V outdoor cabinet
• Installation and commissioning
• Troubleshooting
• Appendix

1.1.2 Contents of packing

The package contains the following items:

• System
• Documents: user manual, CD “Extras”, circuit diagram(s), component
layout(s) (CD and appendices on the manual pocket)

Figure 1. User manual and CD

• Possible rectifiers, inverters and converters


• Possible cables (battery cables, AC supply cables)

2 Product description, Delta OutD V outdoor cabinet About this document


1.1.3 Before you begin
Step 1 Ensure that you have all the equipment needed to make a proper installation of
the system.

Step 2 Also ensure that grounding terminals, DC and AC distributions are properly
available.

Step 3 Take care that the regulations of IEC 60364 and CENELEC HD384 concerning
installation and assembling of telecommunication and electrical equipment have
been noticed. The local regulations and special instructions must also be noticed
during the work. When choosing the place of the installation, please notice that
the cooling air must flow without restrictions through the ventilation holes. The
system must have enough space in front of it for operation and service functions.
Notice the direction of the cabling and the required space of the other
equipment.

1.1.4 Unpacking the system

Step 1 Check that the received cargo is according to the packing list.

Step 2 Ensure that the rack and the equipment are not damaged during transportation.

Product description, Delta OutD V outdoor cabinet About this document 3


2 Safety instructions

2.1 About legal and safety information


Please read all safety and legal information given provided here before working with any
Delta products. Ignoring these instructions may result in damage to the equipment, health
hazards, or loss of life.

These safety instructions are an extension of any national laws governing health and
safety at work and the applicable standards, as well as any regulations of the statutory
authorities.

Installation shall only be performed by trained persons familiar with the local installation
regulations. The local installation regulations must always be followed (covering
installations in the building and main AC distribution panels). It is also necessary to follow
the instructions provided in the system user manual for installation, commissioning,
operation and maintenance.

2.2 Legal statements

2.2.1 Statement of compliance

Please see the relevant product fact sheet for information.

2.2.2 Limitations

The equipment is mainly intended for telecommunications purposes only. The equipment
is not intended for use in applications in which the failure of the equipment could lead to
death, personal injury, or severe physical or environmental damage.

Delta is not responsible for any danger or damage resulting from incorrect installation,
maintenance, operation or usage of the equipment, use beyond its intended purpose,
failure to observe stated instructions, and/or failure to observe the applicable safety
regulations.

Delta is only responsible for components and services provided by Delta. Third party
components and/or services, such as batteries, repair and/or maintenance used in and/or
conducted for the equipment, are not the responsibility of Delta. Furthermore, Delta is not
responsible for any malfunction or danger of, and/or damage to/resulted from the
equipment caused by such third party components and/or services.

Unauthorised modifications to the equipment may result in incorrect operation and/or


performance. The operator is responsible for the consequences of any modification in the
hardware configuration that is made without an agreement with the manufacturer or
authorised representative.

4 Product description, Delta OutD V outdoor cabinet Safety instructions


Installation, operation and maintenance of the equipment should only be performed by
suitably qualified personnel with appropriate training. The operator is responsible for
ensuring that personnel working with the equipment are provided with appropriate
operation and safety training.

The operator is responsible for ensuring that the location of the system is treated as an
electrical equipment room. These rooms must have appropriate air-conditioning and
restricted access. The operator is also responsible for ensuring that the system rack
doors are securely locked and not accessible to unauthorised persons. The equipment
must be installed on an incombustible base, e.g. on a concrete floor.

If the power supply to the system is not fitted with a disconnecting switch or equivalent
device, the operator is responsible for fitting an appropriate disconnection switch
conforming to the relevant regulations.

2.2.3 Third party devices

Delta is not responsible for devices, such as batteries that are not supplied by Delta.

Delta is not responsible for any danger or damage resulting from devices not supplied by
Delta.

2.3 Safety instructions


Warnings, cautions and notes are used to identify important information. They are
classified as follows:

Warning! A warning means that injury or death is possible if the information or


instructions are not obeyed.

Caution! A caution means that damage to equipment is possible if the


information or instructions are not obeyed.

Note! Notes are additional information which may be useful to the operator.

2.3.1 General instructions

Warning! Hazardous voltages are present within the equipment when a source
of electrical power is applied.

There is the risk of electrical shock from the main power supply and/or batteries.

When working on equipment with power applied, supervision of personnel is required.


The supervisor must be capable of providing first aid in the event of electrical shock.
Provision of an emergency switch or disconnection strap is not sufficient protection.

Product description, Delta OutD V outdoor cabinet Safety instructions 5


There is increased risk of accidents and electrical hazards when working on compact
equipment due to the close proximity of components. Operation of compact equipment
requires extra attention to safety.

Warning! Protective shields and other safety devices provided with the
equipment must be in place when the equipment is operated.

The power system may have dual energy supply. Hazardous voltages may be present at
the main power connector and within the equipment for up to 10 seconds after
disconnecting the power supply. The operator is responsible for securing the proper
precautions for maintenance or service purposes.

During installation and maintenance, protective shields may be temporarily removed. Use
suitable insulated tools and appropriate protective clothing. Handle fuses only with tools
provided for this purpose, for example, load-break switch handles.

Adequate insulation from ground potential (earth) must be provided when working on the
equipment.

Warning! High temperatures present.

Localized areas of high temperature (> 70 °C) may occur within the
rectifier/inverter/distributor rack. Take precautions against accidental burns.

Warning! Moving parts

Devices, such as rectifiers and environmental control for cabinets contain fans. These
may also continue to rotate for some time after the power has been removed.

Warning! Heavy equipment

The weight of the equipment requires suitable safety considerations. Additional personnel
or lifting equipment may be needed. Where required, the weight of equipment is stated on
the front of the unit.

Warning! Sharp edges

Equipment racks may have sharp edges. We recommend you to wear gloves.

Caution! Do not restrict air flow. Fit blank panels for empty rectifier slots to
ensure correct air circulation inside the cabinet.

Caution! Use only suitable measuring devices.


Calibrate measuring devices regularly.

6 Product description, Delta OutD V outdoor cabinet Safety instructions


2.3.2 Specific instructions

Please observe all warning labels and notifications on the equipment.

Additional warnings, cautions and notes specific to certain equipment and/or conditions
are described in the context of the relevant instructions.

Please read all documentation relevant to the given task.

Where devices, such as batteries, that are not supplied by Delta are used, please read
and observe all safety notices and instructions supplied by the appropriate manufacturer
or supplier.

Product description, Delta OutD V outdoor cabinet Safety instructions 7


3 Product description

3.1 Standard ODPS system configuration


The standard system configuration is presented below. The figure shows the maximum
artificial configuration, presenting the location of each component in different variations.
The specific project configuration could be different – this depends on the customer’s
requirements.

Figure 2. Delta Standard OutD V system in maximum configuration in a 1800 mm cabinet

8 Product description, Delta OutD V outdoor cabinet Product description


3.2 AC/DC distribution configuration
The system in its standard version is designed to be supplied via three phases (3 x 230 /
400 Vac; L1, L2, L3, N, PE) or by single phase (1 x 230 Vac; L, N, PE) in TN-S
configuration. AC/DC distribution is located in the upper part of the cabinet. All elements
and modules are fixed on a standard DIN rail and covered by the front panel. Standard
configuration of the AC/DC distribution is presented below. The figure shows the
maximum configuration, presenting the location of each component in different variations.
The specific project configuration could be different – depending on the customer’s
requirements.

FH
Heater protection

FAC
Air Conditioner protection
K1 Air Conditioner relay
(only for hybrid system) FF
Fan protection

AC Line Inputs Connection


L1, L2, L3, N, PE K2 Heter relay
FSD
(only if control from PSC)
Smoke detector protection

FPS1 … FPS3
Power system AC protection DC Terminals

GS
Service socket
AC1
AC main switch
FFS
Service socket protection
OVP Over voltage protection (MCB+RCD)

Figure 3. AC/DC distribution (three-phase version)

3.3 Climate control


An integrated climate management system controls the temperature within the cabinet,
providing optimal operating conditions for the equipment and battery. Different
cooling/heating units (e.g. air conditioners, heat exchangers, fans and air filters, heaters)
are available. Delta OutD V cabinets can also be equipped with an advanced, hybrid
cooling system with Air Ventilation or Active Cooling (Air Conditioner).

The power system controller (PSC 3) can be used as a climate controller to provide
optimal climatic conditions for the equipment by eliminating problems caused by high or
low temperatures, which are normally present in the outdoor environment.

Product description, Delta OutD V outdoor cabinet Product description 9


3.3.1 Air ventilation

Air Ventilation (AV) is the simplest cooling system. It is often used as a basic cooling
system for outdoor application in a non-critical temperature climate environment. It is also
installed in advanced, hybrid systems together with Air Conditioners.

With AV systems the cabinet is equipped with a set of Delta fans installed in the roof
space. They ensure appropriate airflow for cooling the equipment inside. The fresh air is
sucked in through the inlet holes in the front door and the air then passes through an air
filter installed in the internal door surface and passes into the cabinet interior. Finally,
after heating up by internal equipment the air is pushed out via holes between the cabinet
body and the roof.

Fans

Air filter

Front door

Cables

Figure 4. Air Ventilation cooling system

With the simplified application the fans are controlled by a thermal switch TF (ON/OFF
mode) located on the internal right supporter (only systems with 2 or 4 Delta EFB1248
fans). When the fans start their operation the temperature is set by positioning the thermo
switch knob. The logic of this temperature control is presented in Figure 5.

10 Product description, Delta OutD V outdoor cabinet Product description


FAN ON if
Tint > TF

Heater ON if Set Point


Tint < TH - 7 °C TF = 25 ºC Hysteresis ( 7 C°)

Hysteresis ( 7 C°)
Set Point
TH = 5 ºC

-10 0 +10 +20 +30 +40 +50 [°C]

Figure 5. Fan and heater control by thermal switches

In a more advanced system, fan control is embedded into power system controller PSC 3.
There are two methods for how the fans are controlled:

• Simple ON/OFF mode – Useful only for systems with 2 or 4 Delta EFB1248
fans. When the fans start the temperature is set by the PSC 3 parameter TF
(25 °C). The logic of this temperature control is the same as presented in
Figure 5. The only difference is that hysteresis is set (as a parameter) at a
different (smaller) level.
• Speed control mode – The fans’ operation is controlled by PSC 3 via a CTRL-
PWM board using pulse width modulation. This method only applies to a
system with 2 Delta EFB 1748 fans. The speed of both fans is controlled
simultaneously: the control is based on the temperature measured by a Tint
temperature sensor (PSC 3 controller) located inside the cabinet in the user
space. Three setting points T1,T2, T3 (standard settings 20 °C, 25 °C, 30 °C )
are used to set the speed from 0 % to 40 %, 65 % and 100 % of the maximum
fan rotation speed. The logic of this temperature control is presented in
Figure 6.

FANS ON if
Tint > T1 / T2 / T3 Temp. T3 OFF
(28 °C)
100%
Temp. T2 OFF
(23 °C)
65%
Temp. T1 OFF
(18 °C) Set Point
40%
T3 = 30 ºC
0% Set Point
T2 = 25 ºC
FANS SPEED
Set Point
T1 = 20 ºC

-10 0 +10 +20 +30 +40 +50 [°C]

Figure 6. Fan speed control by PSC 3

Product description, Delta OutD V outdoor cabinet Product description 11


3.3.2 Air conditioner

Systems with Air Conditioners AC (active cooling) are very useful for hot environments. In
such conditions, it is the only solution that offers the possibility to have a lower
temperature inside than outside.

Air Conditioners are mounted on the front doors of the cabinets. In the standard
application they are controlled by internal thermostats or integrated (own) controllers. The
standard (factory) setting of such a device is usually 35 °C (return air) when the AC starts
cooling.

For more details, see the specific user manual for the Air Conditioner (included with the
system).

Air Conditioner

Front door

Cables

Figure 7. Air Conditioner cooling system

3.3.3 Heater

OutD V cabinets are equipped with a 230V / 500W heater to protect the equipment
installed inside against low temperatures. The heater is installed on the right internal side
of the cabinet (see Figure 2). It is switched ON/OFF depending upon the temperature
inside the cabinet.

There are two methods for how the heater is controlled:

• Control by thermo switch TH (ON/OFF mode) located on the internal right


supporter. When the heater starts its operation the temperature is set by
positioning the thermo switch knob. The logic of this temperature control is
presented in Figure 5.
Control by a PSC 3 controller (ON/OFF mode) via an additional relay. When
the heater starts the temperature is set by a PSC 3 parameter TH (0 °C). The
logic of this temperature control is similar to that presented in Figure 4. The

12 Product description, Delta OutD V outdoor cabinet Product description


only difference is that the hysteresis is set (as parameter) at a different
(smaller) level. The logic of this temperature control is presented in Figure 9.

3.3.4 Hybrid cooling system

Delta OutD V cabinets are also equipped with an advanced hybrid cooling system with Air
Ventilation or Active Cooling (Air Conditioner). With this combination fan cooling is the
main cooling unit for low and middle temperature conditions.The Air Ventilation is only
suppressed by the Air Conditioner (AC) for high ambient temperatures (a few percent of
the operating annual time).

Hybrid cooling systems with AV and AC provide a significant reduction in energy


consumption compared to standard cooling with only AC units. Additional advantages
include the reduction of maintenance of the AC and an increase in the operational life of
the AC.

Fans AV

Air Conditioner

Air filter

Front door

Cables

Figure 8. Hybrid cooling system

In hybrid systems all climate devices (fans, heater, air conditioner) are controlled by a
PSC controller. The fans are switched ON and increase of rotation (speed control)
depends on the temperature inside the cabinet measured by the Tint sensor (parameters
T1, T2, T3 - standard settings 20 °C, 25 °C, 30 °C). When the temperature inside
increases above the limit T4 (standard setting 35 °C), the Air Conditioner starts its
operation and cooling.
The operation of fans in hybrid systems is additionally related to the outside temperature
measured by a Text PSC 3 sensor. This is located in the door in front of the air filter. Fans
are stopped if the Text is higher than T4 - 2 °C (33 °C). There is no reason to pull warm
outside air (> 35 °C) into the cabinet when the temperature inside is stabilized at the T4
level (around 35 °C) by the Air Conditioner.
It is possible that the Air Conditioner works together with the Air Ventilation until the
external temperature is higher than the temperature stabilized by the Air Conditioner T4
(35 °C) inside.

Product description, Delta OutD V outdoor cabinet Product description 13


The operation and control logic of the hybrid climate system is presented in Figure 7.

AC Unit ON Temp. T4 OFF


(33 °C)
Tint > T4

Set Point
T4 = 35 ºC

FANS ON if
Tint > T1 / T2 / T3 Temp. T3 OFF
(28 °C)
100%
Temp. T2 OFF
(23 °C)
FAN OFF if
65%
Temp. T1 OFF Text > T4 - 2 °C
40%
(18 °C) Set Point & AC Unit is O.k.
T3 = 30 ºC
0% Set Point
T2 = 25 ºC
FANS SPEED
Set Point
T1 = 20 ºC
Set Point
TH = 0 ºC

Heater ON
Heater OFF
Temp. TH OFF
(0 °C)

-10 0 +10 +20 +30 +40 +50 [°C]

Figure 9. Hybrid cooling system control logic

3.3.5 Fan alarm

Fan alarm functionality is available (only for Delta Fans EFB 1748) in OutD V cabinets.
An alarm (stoppage) is activated on the basis of 0/1 signals (R00) supported by the fan
alarm output. This signal is transferred to the PSC 3 controller (via digital alarm input) and
it is signalled by controller alarm LEDs and presented on the display according to the
configuration. Fan alarm can also be monitored by controller alarm relays OUT1 ... OUT5
(dry contacts: C, NO, NC) according to the configuration.

14 Product description, Delta OutD V outdoor cabinet Product description


3.3.6 Climate control setting

Warning! The climate setting applied in the outdoor system ensures the proper
operation of the DC system components and the user equipment installed into
the cabinet. If any adjustment to specific customer requirements is needed
please contact authorised service personnel to make the modification in the
proper and safest way.

This is a summary of the standard climate control settings with different climate control
options.

Cooling system Control device Parameter Standard setting

Air Ventilation (Fans) Thermo switch TF +25 °C


ON/OFF Mode
Air Ventilation (Fans) PSC controller TF +25 °C
ON/OFF Mode with Tint sensor
Air Ventilation (Fans) PSC controller T1 +20 °C
Speed Control Mode with Tint sensor T2 +25 °C
T3 +30 °C
Air Ventilation (Fans) PSC controller T1 +20 °C
Speed Control Mode with Tint & Text T2 +25 °C
with Hybrid System sensors T3 +30 °C
T4 +35 °C
Air Conditioner Air Conditioner +35 °C
ON/OFF Mode Thermo switch
(integral)
Air Conditioner Air Conditioner T4 +35 °C
ON/OFF Mode Integral thermo
with Hybrid System switch and
PSC controller
with Tint sensor
Heater Thermo switch TH +5 °C
ON/OFF Mode
Heater PSC controller TH +0 °C
ON/OFF Mode with Tint sensor

Table 1. Climate control setting

Product description, Delta OutD V outdoor cabinet Product description 15


4 Installation and commissioning

4.1 Installation

4.1.1 System cabinet installation

Step 1 Check if the foundation is well prepared for the installation (horizontal, level,
dimensioning of the mounting holes or screws) (see the plinth dimension
presented in the appendix).

Step 2 If the cabinet has to be lifted into place by a crane, follow the next steps. If not,
go to Step 8.

Step 3 Remove the cabinet roof. In order to unscrew the two bolts located on the top
front of the cabinet ceiling, pull the roof to the front to release the back fixing and
remove the roof from the cabinet.

Step 4 Connect hang lines (length: minimum 1000 mm) to the four lifting eyes installed
in the roof and lift the cabinet into position by crane.

Figure 10.

Figure 11.

Figure 12. Lifting the cabinet by crane

16 Product description, Delta OutD V outdoor cabinet Installation and commissioning


Step 5 Set the system cabinet down, standing it in place and straighten it, if needed,
using aluminium or stainless steel pads.

Step 6 Bolt the cabinet to the ground using four bolts (M10/50mm). It is necessary to
remove the plinth side covers to get access to the plinth mounting holes if there
is no access from the bottom of the plinth base.

Step 7 This step is applied for OutD700 V cabinet only – omit this step when installing
OutD1200 V or OutD1800 V.
Use delivered wall mounting with/without pole mounting kits to install the cabinet
on wall or pole locations. See Figure 11 for details.

Pole mounting kit

Cabinet plinth
Wall mounting kit

Figure 13. OutD 700 V mounting option kits

Step 8 Install the cabinet roof into position (if it was previously removed).

4.1.2 Cabling

Warning! All circuit breakers must be in the OFF position.

Note! The input/output cables can be inserted into the cabinet from the bottom
through the input sleeve packing in the cabinet plinth. In any case, sufficient
cable length has to be ensured to make the connections inside the cabinet.

Product description, Delta OutD V outdoor cabinet Installation and commissioning 17


4.1.2.1 Grounding

Step 1 Connect the protective-grounding screw located on the rear side of the cabinet
plinth to the main grounding bus bar of the site using the proper cable (16 mm²).

Note! In some DC systems installed in the cabinet, the common positive bar
(L+) is not connected to the protecting bar (PE). Check the actual configuration
of your DC system. If such a connection is required according local regulations,
the internal cable (minimum 16 mm²) should be installed by a service
professional to connect the positive bar (L+) to the protective-grounding bar PE
on the right side of the cabinet.

4.1.2.2 AC main connection

The AC input terminals are located on the AC distribution panel (see Figure 3).

The system in its standard version is prepared to be supplied via three phases (L1, L2,
L3, N, PE) or by single phase (L, N, PE) in TN-S configuration (3 x 230 / 400 Vac or 1 x
230 Vac).

There are a few variations of the AC distribution according to the AC line configuration
and system requirement for AC load. The AC line supplying the cabinet and fuses in the
external AC distribution has to be chosen according to the actual variant of AC
distribution installed in the cabinet (See Table 2).

Step 1 Connect the AC line cables to the input terminals in the AC distribution – PE
cable to the PE terminal, phase and neutral cables to the input main switch AC1.

Note! Use the wiring diagram supplied with the installation documentation to
ensure the AC power supply has been correctly connected.

18 Product description, Delta OutD V outdoor cabinet Installation and commissioning


AC distribution AC distribution External fuses AC line cable
type description (cross section)

1PH 25A/C16A One phase, 1 x 25 A 3 x 2.5 mm²


input load - 25A,
DC system phase MCB -
C16A

1PH 32A/C25A One phase, 1 x 32 A 3 x 4 mm²


input load - 32A,
DC system phase MCB –
C25A

1PH 40A/C32A One phase, 1 x 40 A 3 x 6 mm²


input load - 40A,
DC system phase MCB –
C32A

3PH 25A/3xC16A Three phases, 3 x 25 A 5 x 2.5 mm²


input load (per ph) - 25A,
DC system phase MCBs
– 3 x C16A

3PH 32A/3xC25A Three phases, 3 x 32 A 5 x 4 mm²


input load (per ph) - 32A,
DC system phase MCBs
– 3 x C25A

3PH 40A/3xC32A Three phases, 3 x 40 A 5 x 6 mm²


input load (per ph) - 40A,
DC system phase MCBs
– 3 x C32A

Table 2. AC input recommendation

4.1.2.3 Battery connection

Step 1 Install the batteries in their shelves. Connect the internal battery cables so that
the total nominal voltage of the each battery string is 48 V.

Step 2 Connect the system’s pre-installed battery connection cable marked as “+” to the
free plus-pole of the battery string and the cable marked as “-” to the free
negative pole. The battery strings are numbered according to the battery fuse
they are connected to.

Step 3 Place the battery temperature sensor between the batteries in the battery area.
Fasten the sensor cable to the cabinet cable supports.

Product description, Delta OutD V outdoor cabinet Installation and commissioning 19


4.1.2.4 DC-load connections

Step 1 Connect the distribution cables to the DC power supply system.


Plus cables are connected to the positive bus bar (L+) of the system and the
negative cables are connected directly to the terminals of the DC distribution
circuit breakers 1F1 ... 1Fn.

Note! The maximum cable size for the connectors on the positive bus bar is
2 2
16 mm . For the MCBs 1 ... 32 A it is 16 mm , for MCBs 40 ... 120 A it is
2
35 mm .

4.1.2.5 Alarm connections

Step 1 Connect the remote alarm cables to the alarm terminals: screw terminals or
Krone connector. The alarms are usually connected so that the alarm circuit is
closed and where there is a fault the circuit opens.
See the Table 3 for information about the alarm cross connection configuration.

Note! Remote alarms are configured using the PSC 3 I/O assignments in the
PSC3 Configuration and Supervision Tool menu.

Krone connector Screw terminals

Figure 14. Alarm terminals

The standard alarm configuration is presented in Table 2. The specific project


configuration could be different, depending on the customer’s requirements.

20 Product description, Delta OutD V outdoor cabinet Installation and commissioning


Screw KRONE Controller Alarm description
Terminals Connector Output

1, 11 1, 1’ OUT1 -2.3 UA (urgent) system alarm

2, 12 2, 2’ OUT2 -2.3 NUA (not urgent) system alarm

3, 13 3, 3’ OUT3 -2.3 Mains failure alarm

4, 14 4, 4’ OUT4 -2.3 Open door alarm

5, 15 5, 5’ OUT5 -2.3 Smoke alarm (if configured)

6, 16 6, 6’ OUT6 -2.3 Reserve

7, 17 7, 7’ Reserve

8, 18 8, 8’ Reserve

9, 19 9, 9’ Reserve

10, 20 0, 0’ Reserve

Table 3. Alarm terminal – Digital outputs

4.2 Commissioning

4.2.1 Starting up the DC system (if configured)

Step 1 Install the rectifiers to the rectifier shelf. Lift the rectifiers into the cabinet onto
their shelves, starting from the far-left slot and continuing to the right, but do not
connect any cables or connectors at this stage. Fasten the rectifiers using the
latches or screws (this depends on the rectifier type).

Bringing the system into use is presented below step by step.

Warning! Protective shields and other safety devices provided with the
equipment must be in place when the equipment is operational.

During installation and maintenance, protective shields may be temporarily removed.


Suitable insulated tools and appropriate protective clothing must be used. Fuses should
only be handled using the tools provided for this purpose - for example, load-break switch
handles.

Step 2 Switch on the main power supply to the system.

Step 3 Check that all the rectifiers LEDs indicate “OK”.

Product description, Delta OutD V outdoor cabinet Installation and commissioning 21


Note! Save the PSC 3 settings by making a backup of the setup files.

4.2.2 Controller calibration (systems with PSC 3 controller)

The system controller is pre-calibrated (including rectifiers) by Delta Energy Systems.


Calibration is not needed unless changes have been made to the controller hardware or
the controller display is different from the measurements made with calibrated test
equipment during maintenance.

Controller calibration should be performed if the actual measured value differs more than
± 0.1 Volts from the value indicated by the controller.

If the measured actual value is within ± 0.1 Volts of the value indicated by the controller,
go to Step 10.

Calibrate the controller system voltage according to the following instructions.

Step 1 Measure the system voltage between the positive bus bar [1, 3] and negative
terminal on the DC output circuit breaker.

Step 2 Check the value “Usys” from the display.

Note! The default factory setting for output voltage is always 53.5 V.

Step 3 Log in to the PSC3 Configuration and Supervision Tool.

Step 4 Go to Configuration → Signal Processing Engine → Measurements.

Step 5 To open the “Usys” analogue measurement dialogue, click “Edit”.

Step 6 In the new Analogue Measurement dialogue, click “Calibrate”.

Step 7 In the Calibration dialogue, enter the actual measured value and click
“Calibrate”.

Step 8 To permanently save changes made to the PSC 3 parameters, go to


Configuration → Setup Update.

Step 9 In the “User Setup” section of the Setup Update dialogue, click “Save”.

Step 10 Log out of the PSC3 Configuration and Supervision Tool.

Step 11 Check the battery polarity by measuring the voltage over the battery circuit
breaker.

Step 12 The voltage should be at most a few volts. If the voltage increases, the battery
polarity is not correct and must be changed by switching the “+” and “-” cables
connected to the batteries.

Step 13 Switch on the battery circuit breaker(s).

22 Product description, Delta OutD V outdoor cabinet Installation and commissioning


Step 14 Switch on the DC distribution circuit breakers connected to the load.

4.2.3 Testing the rectifiers (systems with PSC 3 controller)

The following must be done with a suitable DC load.

This is to test that the rectifiers can deliver power. The method is to first discharge the
batteries for a while and then recharge them. The controller carries out the procedure
which decreases the rectifier voltages below the discharging voltage of the batteries. As a
result, in the case of battery failure, the system will not fail.

Step 1 Log in to the PSC3 Configuration and Supervision Tool.

Step 2 Go to Battery → Control → Battery Test and click “Start”.

Step 3 The discharge process takes approximately 15 minutes.

Step 4 To stop the battery test from the controller, click “Stop” and exit the controller
Web user interface. The rectifiers will recharge the battery.

4.2.4 Testing the control and alarm system (systems with PSC 3
controller)

Warning! Voltage values must be set according to the battery manufacturer’s


specifications. Incorrect voltage settings may lead to possible damage to the
batteries or danger of explosion.

Caution! Ensure that the equipment settings conform to the specifications for
the system configuration. Incorrect settings may lead to system malfunction or
damage.

Caution! Alarm limit values (trigger thresholds) must be set correctly. Incorrect
settings may trigger false alarms and cause rectifier/inverter modules to switch
off.

4.2.4.1 Confirming the configuration

The values are all pre-set at the factory and should not be changed without a proper
reason.

Check the configuration either from the PSC3 Configuration and Supervision Tool or from
the UIM/UIL display. The Web user interface is protected against unauthorised access by
a username and password.

Step 1 Log in to the PSC3 Configuration and Supervision Tool.

Step 2 Confirm the following settings:

Product description, Delta OutD V outdoor cabinet Installation and commissioning 23


Settings Web user interface UIM/UIL

Alarm limits Configuration > Signal Processing 6.1 THRESHOLDS


Engine > Event Definitions

System voltage Battery > Control > Float Charge 7.1 FLOAT CHARGE

Temperature Battery > Control > Float Charge 7.1 FLOAT CHARGE
Compensation

Battery Test Battery > Control > Battery Test 7.5 BATTERY TEST

Equalise Battery > Control > Equalise 7.2 EQUALISE

Table 4. Confirming the configuration

Note! To permanently save changes to the PSC 3 settings, go to Configuration


→ Setup Update. Otherwise the changes will be lost after rebooting the PSC 3.

4.2.4.2 Testing the alarms

The operation of the alarm relays and LEDs can be checked in the PSC3 Configuration
and Supervision Tool.

Step 1 Go to Maintenance → Alarm.

The Alarm Maintenance dialogue allows manipulation of alarms for maintenance and
testing purposes.

An alarm set in the “Frozen”, “Set” or “Reset” state does not react to the source event as
defined in the event conditions, but stays in the current position in case of “Frozen”, or
changes to “Active” in case of “Set”, or changes to “OK” in case of “Reset”.

4.2.4.3 Checking the fuse monitoring

Step 1 Switch ON all the battery circuit breakers and the DC distribution MCBs which
have loads connected.

Step 2 Switch the first load and battery circuit breaker to OFF.

Step 3 Ensure the alarms are indicated as configured.

Step 4 Switch the circuit breaker to ON.

Repeat Step 1 to Step 4 for all load and battery circuit breakers.

Note! When testing the battery fuse alarm, it may take a few minutes until the
battery voltage decreases sufficiently (>300 mV).
The active alarm can be read from the UIM/UIL display: go to “3.1 ALARM”.

24 Product description, Delta OutD V outdoor cabinet Installation and commissioning


4.2.4.4 Testing the rectifier and mains failure alarms

Test the rectifier failure alarm by removing the rectifiers one by one from the system and
check the following:

Check the battery current from the display:

Step 1 Removing 1 rectifier + battery current (Ibatt) positive -> Non-Urgent Alarm

Step 2 Removing 2 rectifiers or more (not all) + battery current (Ibatt) negative (battery
is discharging) -> Urgent Alarm

Step 3 Removing all rectifiers: load current (Iload) equals battery current (Ibatt)
-> Mains Failure

The active alarm can be read from the display menu “3.1 ALARM”.

Note! During the test Usys Low and Usys High alarms may occur, which should
be omitted at this stage.
If there is no load connected to the system, no module alarm will occur. The
additional module alarm (RF) does not light up any LEDs on the controller. The
alarm can be seen in the menu display, and it is also seen in a remote location.
It can be measured in the alarm cable (see alarm connections).

Step 4 Reconnect all rectifiers.

Note! If there are no load and batteries connected to the system, no mains
failure alarm will occur.

Note! After testing, put all system covers back in their correct places.

4.2.5 Checking the air ventilation system

Testing the fans controlled by the thermal switch TF is described in the following
procedure:

Step 1 Turn to the right the knob of the TF thermal switch to 60 °C – after that the fans
should start.

Step 2 After the test, set the TF thermal switch back to the standard setting (25 °C).

Testing the fans controlled by the PSC 3 controller is described in the following
procedure:

Step 3 Heat up the PSC 3 temperature sensor Tint by external heater to start the fans
when the temperature is above the limit TF (25 °C) for fans controlled in
ON/OFF mode or above the limit T1 (20 °C) for fans with speed control.

Product description, Delta OutD V outdoor cabinet Installation and commissioning 25


Step 4 Continue heating up the sensor Tint and observe the increase in the fans’
rotation up to the limit T3 (30 °C) for fans with speed control.

Step 5 In the hybrid cooling system (AV + AC), heat up the Text sensor
to check if the fans stop when the external temperature is higher than T4
(35 °C).

Step 6 To test turning OFF the fans, you can also freeze the temperature sensors Tint
and Text using a special aerosol (compressed air).

4.2.6 Checking the active cooling system (air conditioner)

The Air Conditioner starts cooling when the inside temperature / return air rises above the
set limit (35 ºC) and turns off when the temperature falls accordingly. Testing the A/C unit
is described in the following procedure:

Systems without hybrid cooling (only AC):

Step 1 Switch ON the AC unit circuit breaker FAC. If the temperature inside the cabinet
is lower than 35 ºC, only the evaporator fan of internal air flow should start.

Step 2 Heat up the air in the AC unit inlet (internal air flow) using any heating device
(i.e. heater gun) and check if the air conditioner starts the cooling – the
condenser fan of the external air flow and compressor should start.

Step 3 If the temperature inside the cabinet is higher than 35 ºC, both airflows, internal
and external of A/C unit, should be in operation – the AC unit should generate
cold air.

Systems with hybrid cooling (AV+AC):

Step 1 Switch ON the AC unit circuit breaker FAC. If the temperature inside the cabinet
is lower than 35 ºC, the AC unit will not start.

Step 2 Heat up by external heater the PSC 3 temperature sensor Tint.


When the temperature is above the limit T4 (35 °C), the AC unit starts – only the
evaporator fan of the internal air flow should be in operation.

Step 3 Heat up the air in the AC unit inlet (internal air flow) using an external heater and
check if the air conditioner starts the cooling – the condenser fan of the external
air flow and compressor should start.

Step 4 If the temperature inside the cabinet is higher than 35 ºC, both airflows, internal
and external of A/C unit, should be in operation – the AC unit should generate
cold air.

26 Product description, Delta OutD V outdoor cabinet Installation and commissioning


4.2.7 Checking the heater

Testing the heater controlled by thermal switch TH is described in the following


procedure:

Step 1 Switch ON the heater circuit breaker FH.

Step 2 Turn to the left the knob of the TH thermal switch to 0 °C – after that the heater
should start.

Step 3 After the test, set the TH thermal switch back to the standard setting (+5 °C).

Testing the heater controlled by the PSC 3 controller is described in the following
procedure:

Step 4 Switch ON the heater circuit breaker FH.

Step 5 Freeze the temperature sensors Tint using special aerosol (compressed air) to
start heater operation when the temperature is below the limit TH (0 °C).

Product description, Delta OutD V outdoor cabinet Installation and commissioning 27


5 Troubleshooting

5.1 Troubleshooting rectifiers


Use the following troubleshooting table if there is a rectifier alarm to find out whether a
rectifier is faulty, or the failure is outside the rectifier module.

LED “ok”: OFF and an alarm signal active:

Event Definition

Mains voltage is missing Check main switch and mains fuses in the system and
main distribution panel

Overvoltage protection (OVP) Reset OVP by pulling out the rectifier for approx. 2
is activated seconds

Overtemperature protection Check air flow at front, clean air filter


(OTP) is activated

Fan failure, air flow blocked Check air flow at front, clean air filter, check fan and
replace the rectifier module if necessary

COM-LED off or blinking Communication failed. Check bus cable to PSC 3.


Check correct IMBUS termination. (Only for systems
with PSC 3 and digital communication.)

Rectifier is faulty Replace rectifier module

Table 5. Troubleshooting rectifiers

Note! Internal failures can only be repaired in Delta Energy Systems factory. A
faulty rectifier module must be replaced. For replacement instructions, see
System maintenance instructions.

5.2 Troubleshooting batteries


Please follow the battery manufacturer’s instructions for troubleshooting batteries. If a
battery is changed or replaced, check the voltage and recalibrate the controller. System
temperature readings must also be checked and recalibrated.

28 Product description, Delta OutD V outdoor cabinet Troubleshooting


6 Technical specification
1. Input

AC connection L + N + PE or 3L + N + PE

Nominal voltage 1 x 230 VRMS (L-N)


3 x 230 VRMS (L-N)

Voltage range 80 - 300 VRMS

Frequency range 45 - 66 Hz

Current nominal / phase According DC system configuration

Mains terminal Main switch & Terminals

2. Output

Voltage range 42 - 58 VDC

Power max. According DC system configuration

Current nom. (n - 1 rects.) According DC system configuration

3. General

Ambient temperature -33 - +50 °C

Acoustic Noise Air Ventilation - 52 dB(A) (at 1 m distance,


100% RPM max rotation speed of fans)
Air Conditioner - 73 dB(A) (at 2 m distance)

Safety IEC/EN 60950

EMC EN 300 386

Maintenance cycle 12 months

4. Ordering information

Product line number 3791421600

Optional equipment AC Overvoltage protection (Class C)


Heater 230 Vac / 500 W
Smoke detector (optical)
Service socket with protection
Service light 48 Vdc

Product description, Delta OutD V outdoor cabinet Technical specification 29


5. Cabinet features

Construction Multi or Single layer


Steel walls
HDGZinc steel internal rails

Thermal insulation Foamed polystyrene 20 mm

Dimensions: OutD V 700:


H 700 mm, W 600 mm, D 500 mm
OutD V 1200:
H 1200 mm, W 700 mm, D 720 mm (without AC)
OutD V 1800:
H 1800 mm, W 700 mm, D 720 mm (without AC)

Weight OutD V 700 ≈ 35 kg


OutD V 1200 ≈ 70 kg
OutD V 1800 ≈ 120 kg

Surface finish Powder-Coat Paint, RAL 7035

Door latches 4 points, cylinder lock

Total inside cabinet space OutD V 700 – 13 U


OutD V 1200 – 22 U
OutD V 1800 – 35 U

Free space for user (19”); Configurable

Battery shelves Configurable


21”, up to 260 kg

Cable entry Front and side access


Configurable
Plastic glands PG
Roxtec
Multigate
Delta universal type

Protection class IP55 (EN 60529) (for cabinet)

Cooling devices Air ventilation 120 W/K (2 x Delta EFB 1248)


Air ventilation 250 W/K (2 x Delta EFB 1748)
Air Conditioner
750 W (L35L35)
1400 W (L35L35)
2000 W (L35L35)
Hybrid combination of above units

Standard Equipment Ground Bar


Box for documentation
Open Door Alarm
Remote Alarm terminals

Subject to change without notice.

30 Product description, Delta OutD V outdoor cabinet Technical specification


7 Contacting Delta customer service
If an alarm or specific problem cannot be resolved, please contact your nearest Delta
office or Delta representative for further assistance. Please have the system type and
serial number ready before contacting Delta.

Product description, Delta OutD V outdoor cabinet Contacting Delta customer service 31
Our mission is to provide
innovative, clean and
energy-efficient solutions
for a better tomorrow.

5012229800_01
*5012229800*

Das könnte Ihnen auch gefallen