JUMLAH JAM KUALITAS JUMLAH JAM

TANGGAL SHIFT OPERATOR NAMA UNIT EFEKTIF


HITAM (H) SEDANG (S) (DREDGING)
12/1/2020 A REZI CSD-10 INCH 4.75 1.92 6.67
12/2/2020 B KUSTONO CSD-10 INCH 12.50 2.00 14.50
12/3/2020 A REZI CSD-10 INCH 4.50 0.75 5.25
12/4/2020 B KUSTONO CSD-10 INCH 0.00 0.00 0.00
12/5/2020 A REZI CSD-10 INCH 3.67 2.33 6.00
12/6/2020 B KUSTONO CSD-10 INCH 8.33 1.58 9.92
12/7/2020 A REZI CSD-10 INCH 6.67 1.50 8.17
12/8/2020 B KUSTONO CSD-10 INCH 4.92 5.25 10.17
12/9/2020 A REZI CSD-10 INCH 0.00 0.00 0.00
12/10/2020 B KUSTONO CSD-10 INCH 0.00 0.00 0.00
12/11/2020 A ANTON CSD-10 INCH 0.00 0.00 0.00
12/12/2020 B KUSTONO CSD-10 INCH 0.00 0.00 0.00
12/13/2020 A ANTON CSD-10 INCH 0.00 0.00 0.00
12/14/2020 B KUSTONO CSD-10 INCH 0.00 0.00 0.00
12/15/2020 A KUSTONO CSD-10 INCH 0.00 0.00 0.00
12/16/2020 B KUSTONO CSD-10 INCH 0.00 0.00 0.00
12/17/2020 A KUSTONO CSD-10 INCH 0.00 0.00 0.00
12/18/2020 B KUSTONO CSD-10 INCH 0.00 0.00 0.00
12/19/2020 A KUSTONO CSD-10 INCH 0.00 0.00 0.00
12/20/2020 B KUSTONO CSD-10 INCH 0.00 0.00 0.00
12/21/2020 B ASMAR CSD-10 INCH 0.00 0.00 0.00
12/22/2020 B REZI CSD-10 INCH 0.00 0.00 0.00
12/23/2020 A KUSTONO CSD-10 INCH 0.00 0.00 0.00
12/24/2020 B REZI CSD-10 INCH 0.00 0.00 0.00
12/25/2020 A KUSTONO CSD-10 INCH 0.00 0.00 0.00
12/26/2020 B REZI CSD-10 INCH 0.00 0.00 0.00
12/27/2020 A ASMAR CSD-10 INCH 0.00 0.00 0.00
12/28/2020 B REZI CSD-10 INCH 0.00 0.00 0.00
12/29/2020 A KUSTONO CSD-10 INCH 3.33 1.17 4.50
12/30/2020 B REZI CSD-10 INCH 1.67 1.42 3.08
12/31/2020 A KUSTONO CSD-10 INCH 3.42 3.83 7.25
TOTAL 53.8 21.8 75.5
JUMLAH
KUBIKASI KETERANGAN H S
(M3)
1333.3 Dredging 57 23
2900.0 Dredging 150 24
1050.0 Dredging 54 9
0.0 Tidak dredging 0 0
1200.0 Dredging 44 28
1983.3 Dredging 100 19
1633.3 Dredging 80 18
2033.3 Dredging 59 63
0.0 Tidak dredging 0 0
0.0 Tidak dredging 0 0
0.0 Tidak dredging 0 0
0.0 Tidak dredging 0 0
0.0 Tidak dredging 0 0
0.0 Tidak dredging 0 0
0.0 Tidak dredging 0 0
0.0 Tidak dredging 0 0
0.0 Tidak dredging 0 0
0.0 Tidak dredging 0 0
0.0 Tidak dredging 0 0
0.0 Tidak dredging 0 0
0.0 Tidak dredging 0 0
0.0 Tidak dredging 0 0
0.0 Tidak dredging 0 0
0.0 Tidak dredging 0 0
0.0 Tidak dredging 0 0
0.0 Tidak dredging 0 0
0.0 Tidak dredging 0 0
0.0 Tidak dredging 0 0
900.0 Dredging 40 14
616.7 Dredging 20 17
1450.0 Dredging 41 46
15100.0 M3
JUMLAH JAM KUALITAS JUMLAH JAM
TANGGAL SHIFT OPERATOR NAMA UNIT
HITAM (H) SEDANG (S) EFEKTIF (DREDGING)
12/1/2020 B M. DENDY A CSD-16 INCH 1.83 0.00 1.83
12/2/2020 A FEBRY CSD-16 INCH 0.00 0.00 0.00
12/3/2020 B M. DENDY A CSD-16 INCH 0.00 0.00 0.00
12/4/2020 A FEBRY CSD-16 INCH 0.00 0.00 0.00
12/5/2020 B M. DENDY A CSD-16 INCH 4.50 0.75 5.25
12/6/2020 A FEBRY CSD-16 INCH 5.00 0.50 5.50
12/7/2020 B M. DENDY A CSD-16 INCH 10.83 1.42 12.25
12/8/2020 A FEBRY CSD-16 INCH 9.33 2.50 11.83
12/9/2020 B M. DENDY A CSD-16 INCH 9.00 0.83 9.83
12/10/2020 A FEBRY CSD-16 INCH 9.00 0.83 9.83
12/11/2020 B M. DENDY A CSD-16 INCH 2.50 0.25 2.75
12/12/2020 A FEBRY CSD-16 INCH 3.00 1.33 4.33
12/13/2020 B M. DENDY A CSD-16 INCH 4.75 0.67 5.42
12/14/2020 A FEBRY CSD-16 INCH 8.33 0.67 9.00
12/15/2020 B M. DENDY A CSD-16 INCH 1.83 0.42 2.25
12/16/2020 A FEBRY CSD-16 INCH 8.33 0.50 8.83
12/17/2020 B M. DENDY A CSD-16 INCH 9.75 1.00 10.75
12/18/2020 A FEBRY CSD-16 INCH 8.33 2.08 10.42
12/19/2020 B M. DENDY A CSD-16 INCH 0.00 0.00 0.00
12/20/2020 A FEBRY CSD-16 INCH 12.00 1.50 13.50
12/21/2020 B M. DENDY A CSD-16 INCH 13.08 1.67 14.75
12/22/2020 A FEBRY CSD-16 INCH 6.67 0.83 7.50
12/23/2020 B M. DENDY A CSD-16 INCH 6.67 0.83 7.50
12/24/2020 A FEBRY CSD-16 INCH 12.50 1.25 13.75
12/25/2020 B M. DENDY A CSD-16 INCH 11.67 0.83 12.50
12/26/2020 A FEBRY CSD-16 INCH 8.33 1.33 9.67
12/27/2020 B M. DENDY A CSD-16 INCH 9.58 1.25 10.83
12/28/2020 A FEBRY CSD-16 INCH 14.17 1.08 15.25
12/29/2020 B M. DENDY A CSD-16 INCH 11.83 1.17 13.00
12/30/2020 A FEBRY CSD-16 INCH 8.33 1.67 10.00
12/31/2020 A EBBY CSD-16 INCH 5.58 1.25 6.83
TOTAL 216.75 28.42 245.17
JUMLAH BBM JUMLAH
KETERANGAN H S
(LITER) KUBIKASI (M3)
137.50 733.3 Dredging 22 0
0.00 0.0 Dredging 0 0
0.00 0.0 Dredging 0 0
0.00 0.0 Dredging 0 0
393.75 2100.0 Dredging 54 9
412.50 2200.0 Dredging 60 6
918.75 4900.0 Dredging 130 17
887.50 4733.3 Dredging 112 30
737.50 3933.3 Dredging 108 10
737.50 3933.3 Dredging 108 10
206.25 1100.0 Dredging 30 3
325.00 1733.3 Dredging 36 16
406.25 2166.7 Dredging 57 8
675.00 3600.0 Dredging 100 8
168.75 900.0 Dredging 22 5
662.50 3533.3 Dredging 100 6
806.25 4300.0 Dredging 117 12
781.25 4166.7 Dredging 100 25
0.00 0.0 tidak dredging 0 0
1012.50 5400.0 Dredging 144 18
1106.25 5900.0 Dredging 157 20
562.50 3000.0 Dredging 80 10
562.50 3000.0 Dredging 80 10
1031.25 5500.0 Dredging 150 15
937.50 5000.0 Dredging 140 10
725.00 3866.7 Dredging 100 16
812.50 4333.3 Dredging 115 15
1143.75 6100.0 Dredging 170 13
975.00 5200.0 Dredging 142 14
750.00 4000.0 Dredging 100 20
512.50 2733.3 Dredging 67 15
18,387.50 98,066.67 M3
CSD 16

CREW PRODUKSI JAM EFEKTIF FUEL


A 54500 136.25 10218.75
B 43567 108.92 8168.75
98067 245 18388

Cost Salary General Cost


CSD 10

CSD 16
CSD 10
9867
Rate Fuel CREW JAM EFEKTIF PRODUKSI FUEL
100,828,406 A 37.8 7566.7 1372.5
80,601,056 B 37.7 7533.33 1372.5
181,429,463 75.5 15100 2745

All Cost
9867
Rate Fuel
13,542,458
13,542,458
27,084,915