Sie sind auf Seite 1von 2

ES-301 Administrative Topics Outline Form ES-301-1

Facility: LaSalle Generating Station Date of Examination: 11/5/18


Examination Level: RO ☒ SRO ☐ Operating Test Number: 2018-301

Administrative Topic (see Note) Type Describe activity to be performed


Code*

Review and Determine if Jet Pump Flow Meets


Required Flow (A-RO-1)
Conduct of Operations NR
2.1.25 – (3.9) Ability to interpret reference
materials, such as graphs, curves tables, etc.

Determine Availability to Assume Shift per Work


Hour Rules application (A-RO-46)
Conduct of Operations MR
2.1.5 – (2.9) Ability to use procedures related to
shift staffing, such as minimum crew
compliment, overtime limitations, etc.

Determine Containment Flood Level during


Containment Flooding (A-RO-48)
Equipment Control
NR 2.2.44 – (4.2) Ability to interpret control room
indications to verify the status and operation of
a system, and understand how operator actions
and directives affect plant and system
conditions
Determine offsite rate (A-RO-47)

Radiation Control MR 2.3.5 – (2.9) Ability to use radiation monitoring


systems, such as fixed radiation monitors and
alarms, portable survey instruments, personnel
monitoring equipment, etc.

Emergency Plan N/A


N/A

NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they
are retaking only the administrative topics (which would require all five items).

* Type Codes and Criteria: (C)ontrol room, (S)imulator, or Class(R)oom


(D)irect from bank (≤ 3 for ROs; ≤ 4 for SROs and RO retakes)
(N)ew or (M)odified from bank (≥ 1)
(P)revious 2 exams (≤ 1, randomly selected)
ES-301 Administrative Topics Outline Form ES-301-1

Facility: LaSalle Generating Station Date of Examination: 11/5/18


Examination Level: RO ☐ SRO ☒ Operating Test Number: 2018-301

Administrative Topic (see Note) Type Describe activity to be performed


Code*

Remote Shutdown Monitoring Instrumentation


D, R Channel Checks (A-SRO-39)
Conduct of Operations
2.1.20 – (4.6) Ability to interpret and execute
procedure steps.
Determine Reportability Requirements (A-SRO-
20)
D, R
Conduct of Operations 2.1.18 – (3.8) Ability to make accurate, clear,
and concise logs, records, status boards, and
reports.
Complete and Approve a Fire Protection
Impairment (A-SRO-102)

M, R 2.2.17 – (3.8) Knowledge of the process for


Equipment Control managing maintenance activities during power
operations, such as risk assessments, work
prioritization, and coordination with the
transmission system operator.
Authorize an Emergency Dose for a Life
D, R Saving Operation (A-SRO-37)
Radiation Control
2.3.4 – (3.7) Knowledge of radiation exposure
limits under normal and emergency conditions.
Classify a GSEP Event and Complete a NARS
Form (SRO-101)

D, R 2.4.30 – (4.1) Knowledge of events related to


Emergency Plan system operation/status that must be reported
to internal organizations or external agencies,
such as State, the NRC, or the transmission
system operator.

NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they
are retaking only the administrative topics (which would require all five items).

* Type Codes and Criteria: (C)ontrol room, (S)imulator, or Class(R)oom


(D)irect from bank (≤ 3 for ROs; ≤ 4 for SROs and RO retakes)
(N)ew or (M)odified from bank (≥ 1)
(P)revious 2 exams (≤ 1, randomly selected)

Das könnte Ihnen auch gefallen