Sie sind auf Seite 1von 2

PENANGGUNG

PROSES DOKUMEN
JAWAB

Mulai

Dept Terkait Permintaan pemilik kapal  Ship Particular


 Technical Spec
Dept Terkait Quotation Price  Draft RAB

Ok / T
Tdk ?
 Drawing for Class Approval
 Production drawing
Y  Detail RAB (Budgeting
Prod)
Design Engineering Tahap
 Detail Technical
Desain
Specification

Pengecekan Material  Material Procurement


Purchasing

Mencari vendor/
Purchasing supplier terkait

T
Ok /
Tdk ?

Y
Prod&Ops
Production  Plan & Work Breakdown
Engineering Schedule of Production
 Mould Loft Line Plan
(1:1)

1. Hull Construction (HC)


Fabrication of
 Marking&cutting Plan
Production Process
 Fit up
 Welding
 Finishing
2. Hull Outfitting (HO)
3. Machinery & Propulsion
Installation (ME)
4. Piping & Pump
Instalation
5. Electrical &Hydroulic
System (ELC)
6. Interior Setting
7. Sandblasting & Painting

Menerima barang
Selesai
 Launching
Fabrication of  Dock &Sea Trial
Production Process  Delivery

selesai

Das könnte Ihnen auch gefallen