CIRED 20th International Conference on Electricity Distribution Prague, 8-11 June 2009

Paper 0306

ANALYSIS OF POWER FREQUENCY ELECTRIC FIELD FOR THE BUILDINGS


UNDER THE HIGH VOLTAGE OVERHEAD LINES

Zhujinglin Mengyu
Shanghai Electric Power Design Institute Co..Ltd. Shanghai Electric Power Design Institute Co..Ltd.
China China
poysin1982@yahoo.com.cn mengy@sepd.com.cn

ABSTRACT PRINCIPLE
With the development of cities and electric power The power frequency electric filed belongs to the quasi-
industry, the power frequency electric field and static field, so it can be simulated by the charge
environmental impact assessment near to the buildings simulation method. The charge simulation method gets
under the high voltage overhead lines have caused wide approximate solution and has a little difference from
public concern. In this paper charge simulation method is actual situation. The way to improve the accuracy of
employed to analyze the distribution of electric field near calculation is choosing suitable type, number and
the typical building in Shanghai under the transmission position of simulation charge. The key to solve the
lines. And some measures to the buildings under the electric field distribution under overhead lines is how to
transmission line validate the results. At last, a deal with overhead line with sag, buildings and impact of
comparison is made between methods to decrease the ground.
electric field surrounding the buildings under the high
voltage overhead lines. Model of overhead lines
As we know, the HV overhead lines have sag because of
INTRODUCTION gravity. The catenary line equation can be carried out
according to the weather condition, tower span and
With the economic development and people's increasing transmission line parameters. In Fig.1 the overhead lines
environment awareness in Shanghai, the electromagnetic
environmental problem caused by HV overhead lines is are divided into small sections which are simulated as
paid more and more attention[1]. Today electromagnetic linear charge. And the mirror charge as shown in Fig.2 is
environment has become the critical factor which considered because of the impact of ground.
determines the construction of power transmission lines.
Therefore, it is necessary to analyze the distribution of
electric field under the HV overhead lines especially in overhead line
the residential area. And how to reduce the electric-field
intensity produced by HV transmission lines has been a
hot issue in the field of environmental protection and linear charge
electromagnetic compatibility technology.
Nowadays most research on electric field under the HV
transmission lines are based on 2-D charge simulation
method[2][3]. This method which considers the overhead Figure 1 Overhead line model
lines as the infinite straight line can calculate the electric
field distribution under HV transmission lines easily and
quickly. But it can’t simulate the complex models such as
buildings under transmission lines. So, 3-D method is
employed in this paper to discuss the electric field
distribution near the buildings under the transmission
lines[4]. This method can not only simulate the complex
models but also consider the affect of transmission lines
sag. The transmission lines are simulated by linear charge
and buildings are simulated by linear charge and point
charge. In the mean time, the software applied in the
same model and the measurements to a transmission line Figure 2 Linear charge calculation diagram
validate the results. At last, this paper also discusses and
compares three methods to decrease the electric filed Model of buildings
surrounding the buildings.
Supposing the frame of buildings is ground conductor,
the frame is simulated as linear charge. Point charge is set
at the surface of buildings’ wall, and the number of

CIRED2009 Session 2 Paper No 0306


CIRED 20th International Conference on Electricity Distribution Prague, 8-11 June 2009

Paper 0306

charge depends on buildings grounding condition. The figure below shows the electric field distribution at
the top of flat roof building (left in the figure) 5m above
ground and 6.5m above ground.

ponit charge
building
Figure 3 Building model

Figure 6 Electric field distribution at 5m above ground

Figure 4 Point charge calculation diagram

MODEL AND CALCULATION


According to the statistics, there is about 3000km HV
(above 220kV) overhead lines in Shanghai until 2009.
The density of buildings under overhead lines is about Figure 7 Electric field distribution at 6.5m above ground
2000m2/km, most of which are under 220kV overhead As it can be seen obviously in two figures above that
lines. According to the difference of roof, the typical distortion electric field near the outline of buildings is
buildings under overhead lines are classified as flat roof much higher than that in other regions, and the distortion
and sharp roof. The two models of buildings are electric field nearer to the outlet is higher. So, a
simulated to analyze the distribution of electric field near conclusion is drawn that the distance between buildings
buildings. and calculated points determines the intensity of
The 220kV double circuits on one tower often seen in distortion electric field.
Shanghai are selected for the model in this paper. The The model without buildings under overhead lines is also
tower height is 27m and tower span is 350m. The type of be simulated to compare the model with buildings. The
conductor lines is called “LGJ-630/45”, the maximum figure below shows the result. The result shows the
sag is 10m. And the arrangement of lines is reversed electric field at height 5m above ground.
phase order. The two kind of building models mentioned
above are simplified as square of which size is 5*5*5 and
5*4*3. The figure below shows the model.
ground lines ground lines

overhead lines overhead lines

Figure 8 Electric field of model without building

building building

Figure 5 Models of buildings under overhead lines

CIRED2009 Session 2 Paper No 0306


CIRED 20th International Conference on Electricity Distribution Prague, 8-11 June 2009

Paper 0306

Figure 9 Electric field of model with flat roof building Figure 11 Result of software(Ansys)
Table 1 Result of calculation and measurement
X(m)
-20 -10 -5 0 1 3 5 10 20 inside the building
E(V/m)
1 382 1035 1133 2615 2533 2874 3442 1061 406 27
2 371 978 1141 2708 2497 2962 4134 986 397 0
3 2160 2012 2352 2947 12
X: parallel distance between calculated or measured point
to the centre of overhead line
Figure 10 Electric field of model with sharp roof building E: electric field at height 5m above ground
The figure above shows that the power frequency electric 1-results of charge simulation method
field near the outline of building is much higher than the 2-results of software (Ansys)
surrounding electric field. The electric field is high at two 3-measurement result (0.25m above roof because the
sharp corners of the flat roof building and also is high at measurement equipment need supporting to the roof)
middle sharp roof of the sharp roof buildings. It is can be The table above shows that the three results almost close
seen in the figure 8 that the environmental electric field is to each other. And the measurement matches the result
higher in the building’s right side. So, when there are calculated by charge simulation method and software. So,
buildings under overhead lines, the distortion electric the electric field distribution carried out by charge
field is also higher in the right side and smaller simulation method is accurate and credible.
comparatively in the left side. So, a conclusion is drawn
that the intensity of distortion electric field near the METHODS TO IMPROVE THE DISTORTION
buildings is determined by the outline shape of the ELECTRIC FIELD
buildings and the environmental electric field.
Also the electric field inside the buildings is carried out. Based on the calculation and measurement results above,
The electric field is about 27V/m inside the middle of the the distortion field become large obviously in the regions
flat roof building, and is 64V/m inside the middle of the of the buildings’ outline where few people could arrive
sharp roof building. Compare to the electric field outside and the average level of the electric field in the area the
the building, it can be ignored. So, a conclusion is drawn residents often live (i.e. inside the houses) seems to be far
that because of the shield of buildings’ frame and wall, less than the national standard limitation 4kV/m.
the electric field in residential region is very small and However, those regions people may stay including the
don’t affect the living environment in the buildings. balconies and roof-top terraces should be focused on by
the environmental impact evaluation, and how to reduce
MEASUREMENT AND VALIDATION the electric field intensity in these region mentioned
above is necessary and meaningful.
According to the measurement to the similar overhead To reduce the electric field distortion for the buildings
lines in Shanghai and the simulation by the under overhead line, currently three methods could be
software(Ansys) in the same model, the figure and table applied for, including raising the tower, installing the
are drawn as follow. shield lines to tower or setting ground lines to building.
Raising the tower
The method of raising the height of tower through
reducing the surrounding electric field under overhead
lines changes the distorted electric field around the
buildings. The relation between lines height and electric

CIRED2009 Session 2 Paper No 0306


CIRED 20th International Conference on Electricity Distribution Prague, 8-11 June 2009

Paper 0306

field is almost linear. At present in Shanghai the distance buildings is much higher than the electric field in other
between overhead lines and buildings is more than 12m, region, but the electric field inside the buildings is very
so raising the tower has no obvious affect to reduce the small. So, the electric filed hardly affect the resident
electric field. In addition, raising the tower need to living in buildings
construct new tower, to consider the power-off. Base on (2) The intensity of distortion electric field near the
the content above, the method of raising the tower is buildings is determined by distance with building, outline
neither economic nor practical. shape of buildings and the environmental electric field.
(3) Comparing three methods to reduce the electric field
Installing the shield lines to the tower distortion, the method of installing the shield lines to the
The method of installing the shield lines to the tower tower and setting ground lines to the buildings is
through reducing the surrounding electric field under recommended.
overhead lines changes the distorted electric field around
the buildings. Comparing to the method of raising the REFERENCES
tower, this method can install shield lines when overhead
lines are operating. Besides this method only need some [1] W. F. Horton, S. Goldberg, 1995, "Power Frequency
shield lines, so it cost much less than method of raising Magnetic Fields and Public Health", CRC Press, Inc.,
the tower. Boca Raton.
The affect of installing the shield lines to the tower due to [2] Nazar H.Malik, Feb.1989, "A review of the charge
the number and arrangement of the shield lines. simulation method and its applications", IEEE
According to the calculation and measurement, the Transaction on Electric Insulation, Vol.24, No.1, 3-20.
environmental electric field under the overhead lines can [3] H. Singer, H. Steinbigler, P. Weiss, 1974, "A Charge
reduce 27% at maximum when installing 2 shield lines. Simulation Method for the Calculation of High Voltage
The shield affect is better when installing more shield Fields", IEEE Trans. on PAS, Vol.93, 1660-1667.
lines. So, the method of installing the shield lines to the [4] W. Krajewski, August 1997, "3-D model of the
tower is considerable in economic and technology. electric field excited by overhead HV lines", Electrical
Engineering, Vol.8, No.1, 55-63.
Setting ground lines to the building
The method of setting ground lines to the buildings is
installing metal shield device such as metal windows in
the region where the distortion electric field may emerge, Zhu jinglin, male, master, engineer, graduate from
and grounding the device using metal lines. This method Shanghai Jiaotong University, China in 2007. Now work
is very effective to reduce the electric field in a local area. in Shanghai electirc power design institute Co..Ltd.
For instance, the environmental electric field measured Research on EMC and transmission line.
under the overhead line is 2.1kV/m, but the level reduces
to 67V/m in the greenhouses which only have a few Mengyu, male, bachelor, director, graduate from
metal frames. The only disadvantage of this method is Shanghai Jiaotong University, China in 1995. Now work
that setting metal shield device and ground lines to the in Shanghai electirc power design institute Co..Ltd.
residential buildings should be agreed by resident. Research on transmission line.
Table 2 Comparison among three methods
Improving
methods effect cost power-off evaluate
region
1 all region poor expensive yes not recommended

2 all region general cheap no considerable


a local
3 effective cheap no recommended
region
1-raising the tower
2-installing the shield lines to the tower
3-setting ground lines to the building

CONCLUSIONS
To cope with electromagnetic environmental issue, this
paper analyzes the electric field near the buildings under
the high voltage overhead lines. Some conclusions are
drawn below:
(1) The distortion electric field near the outline of

CIRED2009 Session 2 Paper No 0306