Beruflich Dokumente
Kultur Dokumente
O O
TP7 - P15
Ch:555.89 m
0.9m
L GAS PIPELI Ch:476.27 m TP8 -
OPOSED STEE IP4/1 - P12
Ch:5 P16
PR
Ch:434.95 m
Southern
71.56 IP8/1 TP11 - P20
TP4 - P11 m
3.44m
N N
-
IP0/4 - P5 TP2 - P9 Ch:59 P17 Ch:699.37 m
Start Point TP1 - P8 TP3 - P10 Ch:403.84 m CS-03 5.21 m
1.76m
CS-
TP0 - P1 IP0/3 - P4 Ch:177.33 m Ch:286.23 m 04
20.96m
IP0/6 - P7 Ch:269.12 m TP10 - P19
Railway(M
d
Ch: 0.00m IP0/5 - P6 Ch:349.19 m Asp.Roa
Ch:164.42 m Ch:209.29 m Ch:688.27 m
IP0/2 - P3 Ch:191.4 m Asp.Road TP9 - P18
IP0/1 - P2
0.43m
0.71m
Ch:683.68 m
0.75m
Ch:113.88 m
7.83m
ettuppala
Ch:37.94 m oad
Asp.R
18.34m
CS-02
CS-01
oad Asp.Road
iyam Bra
M Asp.Road Asp.Road Asp.R M
Asp.Road
TO NH-181 Asp.Road -209
To NH
n
X
X
X
ch)
X
X
X
X
X
SURVEY DETAILS
L L
WHEREVER PIPELINE IS CROSSING 11KV AND ABOVE A/G OR U/G HT LINE CONCRETE SLAB SHALL BE
PROVIDED AS PER STANDARD DRAWING NO. GGNG-D-20707-009.
WHEREVER PIPELINE IS CROSSING THE EXISTING PIPELINES, THE CONCRETE SLAB
SHALL BE PROVIDED AS PER DRAWING NO. GGNG-D-20707-014.
WHEREVER WATER TABLE DURING TRENCHING IS ENCOUNTERED IT SHALL BE BROUGHT DOWN TO MINIMUM 300mm BELOW
THE BOTTOM LEVEL TRENCHING AND KEPT DRY FOR WORKING. FOR OTHER INSTRUCTIONS, REFER PTS (CONSTRUCTION)
K K
MINIMUM COVER SHALL BE MEASURED FROM THE LOWEST LEVEL OF ROAD, RAIL, CANAL, WATER WAYS ETC. INCLUDING ITS
ROU TO THE TOP OF CASING PIPE OR CARRIER PIPE AS PER TYPE OF CROSSING.
J J
I I
GROUND LEVELS
(IN METRES)
OD (mm) / MATERIAL AND GRADE 12" (324 mm) OD API 5L GR. X52, PSL-2 (HFW / SMLS)
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
PIPELINE DETAILS
(000 + 000)
SPECIAL PROVISIONS SV -01
F F
PIPELINE COVER
MINIMUM (METRES)
1.2 1.5 1.2 1.5 1.2 7.0 1.2 1.5 1.2
SPECIAL INSTALLATIONS /
Asphalt Road Asphalt Road Asphalt Road Asphalt Road Broad Gauge Railway (E)
FITTINGS / MARKERS Start Ch: 168.71 End Ch: 176.93 Start Ch: 276.14 End Ch: 284.95 Start Ch: 449.24 CS-003 CS-004
@1.5m Depth
D D
SOIL STRATIFICATION
TOPOGRAPHIC SYMBOLS SOIL SYMBOLS PIPELINE SYMBOLS GENERAL NOTES BILL OF MATERIAL FOR THIS DRAWING REFERENCE DRAWING
CARRIER PIPE OTHER MATERIALS S.
1. ALL FIGURES ARE IN "METERS" UNLESS OTHERWISE SPECIFIED. ALL LEVEL ARE WITH REFERENCE TO MEAN SEA LEVEL DRAWING TITLE DRAWING NO.
(MSL). THE GROUND LEVELS/PROFILE INDICATED IN THE DRAWING IS ALONG THE CENTERLINE OF ROU. NO.
O.D. ∅ WT(mm) COATING
LENGTH DESCRIPTION NUMBER 1 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-001
2. FINAL CHAINAGES, TPs/IPs SECTION, INCLUDING DETOURED SECTION IF ANY, AND EXACT LOCATION & QUANTITIES OF
MARKERS SHALL BE INCORPORATED BY THE CONTRACTOR, IN AS-BUILT SDRAWINGS. 324 7.1 3LPE
700.00 K.M. POST - 2 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-002
C C
3. ALL CROSSINS SHALL MEET THE MIN. REQUIREMENTS OF COMPANY'S STD. DRAWING BASED ON VERIFICATION AT SITE. 324 3LPE
DIRECTIONAL MARKER - 3 SOUTHERN RAILWAY(MET CROSS SECTION IOC-NEELAMBUR-CS-003
TYPE OF CROSSING (CASED OR UNCASED) FOR CANALS AND ROADS SHALL BE DECIDED FOR INDIVIDUAL CASES AFTER 0 10.09.2020 FIRST ISSUE. AS MS
CONSULTATION WITH CONCERNED AUTHORITIES. CROSSINGS FOR WHICH SPECIFIC DETAILS ARE NOT GIVEN, SHALL BE AERIAL MARKER - 4 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-004
EXECUTED AS PER JOB STANDARDS, SITE REQUIREMENTS AND AS PER INSTRUCTIONS OF OWNER/CONCERNED Rev. D M Y Modifications Drawn Checked Approved
AUTHORITIES.
INSULATING JOINT - 5
HOT BENDS - ISSUE RECORD
4. ANTI-BUOYANCY CONTROL, BANK STABILIZATION, SLOPE BREAKERS, SELECT BACKFILL, COVER AT OVER AND SAG 6
BENDS AND OTHER MEASURES NOT SPECIFICALLY SHOWN IN THE DRAWING SHALL BE DECIDED AT THE SITE AS PER TOTAL 700.00 NAVIGABLE WATERWAY - 7
SPECIFICATIONS, SITE REQUIREMENTS AND INSTRUCTIONS OF OWNER/OWNERS REPRESENTATIVE.
CASING (SEE GEN. NOTES 12 AND 13) WARNING SIGN 5 8
INDIAN OIL CORPORATION LIMITED
5. IN CASE THE PROPOSED PIPELINE IS PASSING PARALLEL TO AN EXISTING PIPELINE, A MIN. DISTANCE OF 5.0M SHALL IndianOil
BE MAINTAINED BETWEEN THE TWO. THE MIN. DISTANCE SHALL BE 10.0M. IN CASE OF PARALLEL LAYING BY HDD AND O.D. Ø WT(mm) COATING LENGTH ROU BOUNDARY MARKERS - 9
B 5.0M. IN CASE OF B+C. CGD NETWORK IN COIMBATORE B
X X X X X X X
6. ACTUAL LENGTH OF CONCRETE COATING AND CONCRETE SLABS SHALL BE DECIDED AS PER SITE REQUIREMENTS AND 168 6.4 - - 10
THE SAME SHALL BE PROVIDED WITHOUT ANY COST IMPLICATION. 356 6.0 - - 11
ALIGNMENT SHEET
7. OPTICAL FIBRE CABLE WILL BE LAID PARALLEL TO THE PIPELINE IN A SINGLE TRENCH AS PER RELEVANT STD. AND 12
SPECIFICATIONS. TEMP. CATHODIC PROTECTION SHALL BE PROVIDED AS PER APPROVED DESIGN DOCUMENTS & - SECTION : FROM KOUNDAMPALAYAM TO NEELAMBUR
DRAWINGS. - 13
CHAINAGE : FROM 00+000.00 KM. TO 00+700.00 KM.
8. IN CASE ANY PRIVATE DWELLING, INDUSTRIAL BUILDING OR PLACE OF PUBLIC ASSEMBLY FALLS WITHIN 15 M OF
FOR OTHER REQUIRED MATERIAL SEE 14
PIPELINE, ADDITIONAL COVER OF 300MM SHALL BE PROVIDED OVER AND ABOVE COVER INDICATED HEREIN.
15
9. ALL EXISTING UNDERGROUND UTILITIES SUCH AS PIPELINES, H/T CABLES ETC. SHALL BE IDENTIFIED AND LOCATED BY DRAWING TITLE DRAWING NO.
A THE CONTRACTOR BEFORE START OF ANY EXCAVATION AND TRENCHING WORK. CONTRACTOR SHALL INTIMATE THE 16 A
CONCERNED AUTHORITIES HAVING JURISDICTION AND SHALL CARRY OUT SUCH WORKS TAKING ALL REQUIRED 17 TRACTEBEL Engineering pvt. ltd.
PRECAUTIONS AND SAFETY MEASURES, INCLUDING NECESSARY ENCASEMENT FOR U/G FACILITIES, TO PREVENT ANY
DAMAGE TO EXISTING / PROPOSED INSTALLATIONS, 18
10. ALL NECESSARY MEASURES SHALL BE TAKEN BY CONTRACTOR FOR FAULT LINE CROSSING AND SEISMIC AREA, TO 19 AS SHOWN P.013553-G-21048- M701 0
MITIGATE ITS EFFECT, AS MENTIONED / RECOMMENDED IN RFP DOCUMENT.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
WHEREVER PIPELINE IS CROSSING 11KV AND ABOVE A/G OR U/G HT LINE CONCRETE SLAB SHALL BE
PROVIDED AS PER STANDARD DRAWING NO. GGNG-D-20707-009.
O O
WHEREVER PIPELINE IS CROSSING THE EXISTING PIPELINES, THE CONCRETE SLAB
SHALL BE PROVIDED AS PER DRAWING NO. GGNG-D-20707-014.
d
IP13/ 3.49 m
oa
N N
p.R
23 Ch:8
5 T
3-P CS
Ch P14
As
6
CS-0
TP1 31.17 m -0
7 :9 - P PROP
Ch:8 26 2 O SED
STEE
.8 6 L GA
9
TP15 - m
S PIP
Ch:938
m
DWG NO. P.013553-G-21048-M701 ELIN
- P22
11.88
E
- P38
0.84
Road
MATCH LINE FOR CONT. REFER
0.5m
9. - P37 5
Ch:81 IP18/6 52 m Ch:13
P27
.8
m
m
5
CS-0 TP16 44. CS-12
- Ch:13 P36
M
Ch:97 P28 - M
IP18/5 6.42 m
-209
To NH
X
- P35
X
2.9 m
P21
X
X
IP16/ IP18/4
X
X
0
X
X
/1 - m Ch:13
X
1
X
X
CS-11
X
X
1 ad
X
Ch:126
X
P 7
X
X
I 70.5
o IP18/2 - P33
X
sp.R
X
X
4.3 m
X
X
X
X
: 7 A
X
X
h
X
30
X
X
X
.8
X
Ch:1078 9 6
X
Ch:1 1
X
Ch:1103.59 m
X
.22 m
X
X
X
1.43m
0.44m
X
X
CS-10
SURVEY DETAILS
IP18/1 - P32
X
X
0.33m
X
X
X
X
Asp.Ro
X
a d
Ch:1110.41 m
X
X
16.25m
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
CS-09
X
CS-0
X
L L
X
ad
X
X
8
Asp.Ro
X
X
X
81 Asp.Ro
X
X
X
X
12.29m
H-1 ad
X
N
TO
Asp.Road
K K
J J
I I
GROUND LEVELS
(IN METRES)
OD (mm) / MATERIAL AND GRADE 12" (324 mm) OD API 5L GR. X52, PSL-2 (HFW / SMLS)
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
PIPELINE DETAILS
(000 + 000)
SPECIAL PROVISIONS
F F
PIPELINE COVER
MINIMUM (METRES)
1.2 1.5 1.2 1.5 1.2 1.5 1.2 1.5 1.2 1.5 1.2 1.5 1.2 1.5
Asphalt Road
SPECIAL INSTALLATIONS / End Ch: 921.12
FITTINGS / MARKERS CS-005 CS-006 CS-007 CS-008 CS-009 CS-010 CS-011 CS-012
CATHODIC PROTECTION
IN THE SCOPE OF CONTRACTOR (NOTE-7)
INSTALLATIONS
SOIL RESISTIVITY (OHM - M)
SUB-SOIL
DETAILS
@1.5m Depth
D D
SOIL STRATIFICATION
TOPOGRAPHIC SYMBOLS SOIL SYMBOLS PIPELINE SYMBOLS GENERAL NOTES BILL OF MATERIAL FOR THIS DRAWING REFERENCE DRAWING
CARRIER PIPE OTHER MATERIALS S.
1. ALL FIGURES ARE IN "METERS" UNLESS OTHERWISE SPECIFIED. ALL LEVEL ARE WITH REFERENCE TO MEAN SEA LEVEL DRAWING TITLE DRAWING NO.
(MSL). THE GROUND LEVELS/PROFILE INDICATED IN THE DRAWING IS ALONG THE CENTERLINE OF ROU. NO.
O.D. ∅ WT(mm) COATING
LENGTH DESCRIPTION NUMBER 1 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-005
2. FINAL CHAINAGES, TPs/IPs SECTION, INCLUDING DETOURED SECTION IF ANY, AND EXACT LOCATION & QUANTITIES OF
MARKERS SHALL BE INCORPORATED BY THE CONTRACTOR, IN AS-BUILT SDRAWINGS. 324 7.1 3LPE
700.00 K.M. POST 1 2 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-006
C C
3. ALL CROSSINS SHALL MEET THE MIN. REQUIREMENTS OF COMPANY'S STD. DRAWING BASED ON VERIFICATION AT SITE. 324 3LPE DIRECTIONAL MARKER 3 3 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-007
TYPE OF CROSSING (CASED OR UNCASED) FOR CANALS AND ROADS SHALL BE DECIDED FOR INDIVIDUAL CASES AFTER 0 10.09.2020 FIRST ISSUE. AS MS
CONSULTATION WITH CONCERNED AUTHORITIES. CROSSINGS FOR WHICH SPECIFIC DETAILS ARE NOT GIVEN, SHALL BE AERIAL MARKER - 4 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-008
EXECUTED AS PER JOB STANDARDS, SITE REQUIREMENTS AND AS PER INSTRUCTIONS OF OWNER/CONCERNED Rev. D M Y Modifications Drawn Checked Approved
AUTHORITIES.
INSULATING JOINT - 5 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-009
HOT BENDS - ISSUE RECORD
4. ANTI-BUOYANCY CONTROL, BANK STABILIZATION, SLOPE BREAKERS, SELECT BACKFILL, COVER AT OVER AND SAG 6 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-010
BENDS AND OTHER MEASURES NOT SPECIFICALLY SHOWN IN THE DRAWING SHALL BE DECIDED AT THE SITE AS PER TOTAL 700.00 NAVIGABLE WATERWAY - 7 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-011
SPECIFICATIONS, SITE REQUIREMENTS AND INSTRUCTIONS OF OWNER/OWNERS REPRESENTATIVE.
CASING (SEE GEN. NOTES 12 AND 13) WARNING SIGN 8 8 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-012
INDIAN OIL CORPORATION LIMITED
5. IN CASE THE PROPOSED PIPELINE IS PASSING PARALLEL TO AN EXISTING PIPELINE, A MIN. DISTANCE OF 5.0M SHALL IndianOil
BE MAINTAINED BETWEEN THE TWO. THE MIN. DISTANCE SHALL BE 10.0M. IN CASE OF PARALLEL LAYING BY HDD AND O.D. Ø WT(mm) COATING LENGTH ROU BOUNDARY MARKERS - 9
B 5.0M. IN CASE OF B+C. CGD NETWORK IN COIMBATORE B
X X X X X X X
6. ACTUAL LENGTH OF CONCRETE COATING AND CONCRETE SLABS SHALL BE DECIDED AS PER SITE REQUIREMENTS AND 168 6.4 - - 10
THE SAME SHALL BE PROVIDED WITHOUT ANY COST IMPLICATION. 356 6.0 - - 11
ALIGNMENT SHEET
7. OPTICAL FIBRE CABLE WILL BE LAID PARALLEL TO THE PIPELINE IN A SINGLE TRENCH AS PER RELEVANT STD. AND 12
SPECIFICATIONS. TEMP. CATHODIC PROTECTION SHALL BE PROVIDED AS PER APPROVED DESIGN DOCUMENTS & - SECTION : FROM KOUNDAMPALAYAM TO NEELAMBUR
DRAWINGS. - 13
8. IN CASE ANY PRIVATE DWELLING, INDUSTRIAL BUILDING OR PLACE OF PUBLIC ASSEMBLY FALLS WITHIN 15 M OF 14 CHAINAGE : FROM 00+700.00 KM. TO 01+400.00 KM.
FOR OTHER REQUIRED MATERIAL SEE
PIPELINE, ADDITIONAL COVER OF 300MM SHALL BE PROVIDED OVER AND ABOVE COVER INDICATED HEREIN.
15
9. ALL EXISTING UNDERGROUND UTILITIES SUCH AS PIPELINES, H/T CABLES ETC. SHALL BE IDENTIFIED AND LOCATED BY DRAWING TITLE DRAWING NO.
A THE CONTRACTOR BEFORE START OF ANY EXCAVATION AND TRENCHING WORK. CONTRACTOR SHALL INTIMATE THE 16 A
CONCERNED AUTHORITIES HAVING JURISDICTION AND SHALL CARRY OUT SUCH WORKS TAKING ALL REQUIRED 17 TRACTEBEL Engineering pvt. ltd.
PRECAUTIONS AND SAFETY MEASURES, INCLUDING NECESSARY ENCASEMENT FOR U/G FACILITIES, TO PREVENT ANY
DAMAGE TO EXISTING / PROPOSED INSTALLATIONS, 18
10. ALL NECESSARY MEASURES SHALL BE TAKEN BY CONTRACTOR FOR FAULT LINE CROSSING AND SEISMIC AREA, TO 19 AS SHOWN P.013553-G-21048- M702 0
MITIGATE ITS EFFECT, AS MENTIONED / RECOMMENDED IN RFP DOCUMENT.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
X
IP29 53.04 m
X
X
N N
X
0
Ch:2
X
X
2 TP23
X
P4 m - PROPOSED STEEL GAS PIPELI
X
X
Ch:15 P45
X
X
TP
X
IP18 NE
Ch:14 19 - P41 0 - 2.79
4
/ CS-1 H-209
Ch:1 8 - P39 82.18
2
TP :149
78.85
m TP24 - P46 1 - P5
5 - P56 T oN
402. IP29/ 3.18 m IP29/2 .93 m
X
X
X
m Ch
CS
X
IP18/
X
Ch:1608.6 m
X
X
9 - P4 Ch:19
-1
Ch:1
X
X
X
X
Ch:14 52
X
0 IP25/1 - P48
3
TP27 - P 2 m
X
X
X
X
X
IP25/2 - P49
X
Ch:1633.83 m P54
X
30.52
X
X
TP29 - .63 m
X
TO N
X
X
0.52m
X
H-18
1.04m
X
Ch:1723.04 m
X
0.65m
X
X
1 4
X
Ch:193
X
0.4
X
Ch:1807.08 m
X
X
sp.R
X
Asp.R
X
TP28 - P53
X
X
A
X
oad
X
Ch:1840.86
X
2m
X
0.7
X
9.5m
22
X
X
m
X
Ch:1887.92 m
X
X
X
Asp.Ro
X
X
.46
X
7m
M M
X
X
X X X X X
ad
oad
X
X
X
d
X
X
Roa Asp.R
X
m
X
X
X
X
Asp.
X
Asp.Road
X
X
X
X
X
X
Asp.Road
SURVEY DETAILS
L L
WHEREVER PIPELINE IS CROSSING 11KV AND ABOVE A/G OR U/G HT LINE CONCRETE SLAB SHALL BE
K K
PROVIDED AS PER STANDARD DRAWING NO. GGNG-D-20707-009.
WHEREVER PIPELINE IS CROSSING THE EXISTING PIPELINES, THE CONCRETE SLAB
SHALL BE PROVIDED AS PER DRAWING NO. GGNG-D-20707-014.
WHEREVER WATER TABLE DURING TRENCHING IS ENCOUNTERED IT SHALL BE BROUGHT DOWN TO MINIMUM 300mm BELOW
THE BOTTOM LEVEL TRENCHING AND KEPT DRY FOR WORKING. FOR OTHER INSTRUCTIONS, REFER PTS (CONSTRUCTION)
MINIMUM COVER SHALL BE MEASURED FROM THE LOWEST LEVEL OF ROAD, RAIL, CANAL, WATER WAYS ETC. INCLUDING ITS
ROU TO THE TOP OF CASING PIPE OR CARRIER PIPE AS PER TYPE OF CROSSING.
J J
I I
GROUND LEVELS
(IN METRES)
OD (mm) / MATERIAL AND GRADE 12" (324 mm) OD API 5L GR. X52, PSL-2 (HFW / SMLS)
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
PIPELINE DETAILS
(000 + 000)
SPECIAL PROVISIONS
F F
PIPELINE COVER
1.5
MINIMUM (METRES)
1.2 1.5 1.2 1.5 1.2
SPECIAL INSTALLATIONS /
Asphalt Road
FITTINGS / MARKERS CS-012 CS-013 CS-014 End Ch: 2092.57
Drain Drain Cart track Cart track
Start Ch: 1882.34 End Ch: 1885.69 Start Ch: 2020.6 End Ch: 2025.62
CROSSINGS Asphalt Road
End Ch: 1402.2
Asphalt Road Asphalt Road
11KV Power Line 11KV Power Line
Asphalt Road
Start Ch: 1564.56 End Ch: 1576.95 Start Ch: 2081.73
E Ch: 1639.58 Ch: 1668.32 E
11KV Power Line
COATING EXTERNAL 3 LAYER POLYETHYLINE COATING & INTERNAL EPOXY, FIELD JOINTS BY HEAT SHRINKABLE SLEEVES AS PER SPECIFICATION IN SCOPE OF CONTRACTOR. Ch: 2090.93
CATHODIC PROTECTION
IN THE SCOPE OF CONTRACTOR (NOTE-7)
INSTALLATIONS
SOIL RESISTIVITY (OHM - M)
SUB-SOIL
DETAILS
@1.5m Depth
D D
SOIL STRATIFICATION
TOPOGRAPHIC SYMBOLS SOIL SYMBOLS PIPELINE SYMBOLS GENERAL NOTES BILL OF MATERIAL FOR THIS DRAWING REFERENCE DRAWING
CARRIER PIPE OTHER MATERIALS S.
1. ALL FIGURES ARE IN "METERS" UNLESS OTHERWISE SPECIFIED. ALL LEVEL ARE WITH REFERENCE TO MEAN SEA LEVEL DRAWING TITLE DRAWING NO.
(MSL). THE GROUND LEVELS/PROFILE INDICATED IN THE DRAWING IS ALONG THE CENTERLINE OF ROU. NO.
O.D. ∅ WT(mm) COATING
LENGTH DESCRIPTION NUMBER 1 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-013
2. FINAL CHAINAGES, TPs/IPs SECTION, INCLUDING DETOURED SECTION IF ANY, AND EXACT LOCATION & QUANTITIES OF
MARKERS SHALL BE INCORPORATED BY THE CONTRACTOR, IN AS-BUILT SDRAWINGS. 324 7.1 3LPE
700.00 K.M. POST 1 2 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-014
C C
3. ALL CROSSINS SHALL MEET THE MIN. REQUIREMENTS OF COMPANY'S STD. DRAWING BASED ON VERIFICATION AT SITE. 324 3LPE DIRECTIONAL MARKER 3 3
TYPE OF CROSSING (CASED OR UNCASED) FOR CANALS AND ROADS SHALL BE DECIDED FOR INDIVIDUAL CASES AFTER 0 10.09.2020 FIRST ISSUE. AS MS
CONSULTATION WITH CONCERNED AUTHORITIES. CROSSINGS FOR WHICH SPECIFIC DETAILS ARE NOT GIVEN, SHALL BE AERIAL MARKER - 4
EXECUTED AS PER JOB STANDARDS, SITE REQUIREMENTS AND AS PER INSTRUCTIONS OF OWNER/CONCERNED Rev. D M Y Modifications Drawn Checked Approved
AUTHORITIES.
INSULATING JOINT - 5
HOT BENDS - ISSUE RECORD
4. ANTI-BUOYANCY CONTROL, BANK STABILIZATION, SLOPE BREAKERS, SELECT BACKFILL, COVER AT OVER AND SAG 6
BENDS AND OTHER MEASURES NOT SPECIFICALLY SHOWN IN THE DRAWING SHALL BE DECIDED AT THE SITE AS PER TOTAL 700.00 NAVIGABLE WATERWAY - 7
SPECIFICATIONS, SITE REQUIREMENTS AND INSTRUCTIONS OF OWNER/OWNERS REPRESENTATIVE.
CASING (SEE GEN. NOTES 12 AND 13) WARNING SIGN 2 8
INDIAN OIL CORPORATION LIMITED
5. IN CASE THE PROPOSED PIPELINE IS PASSING PARALLEL TO AN EXISTING PIPELINE, A MIN. DISTANCE OF 5.0M SHALL IndianOil
BE MAINTAINED BETWEEN THE TWO. THE MIN. DISTANCE SHALL BE 10.0M. IN CASE OF PARALLEL LAYING BY HDD AND O.D. Ø WT(mm) COATING LENGTH ROU BOUNDARY MARKERS - 9
B 5.0M. IN CASE OF B+C. CGD NETWORK IN COIMBATORE B
X X X X X X X
6. ACTUAL LENGTH OF CONCRETE COATING AND CONCRETE SLABS SHALL BE DECIDED AS PER SITE REQUIREMENTS AND 168 6.4 - - 10
THE SAME SHALL BE PROVIDED WITHOUT ANY COST IMPLICATION. 356 6.0 - - 11
ALIGNMENT SHEET
7. OPTICAL FIBRE CABLE WILL BE LAID PARALLEL TO THE PIPELINE IN A SINGLE TRENCH AS PER RELEVANT STD. AND 12
SPECIFICATIONS. TEMP. CATHODIC PROTECTION SHALL BE PROVIDED AS PER APPROVED DESIGN DOCUMENTS & - SECTION : FROM KOUNDAMPALAYAM TO NEELAMBUR
DRAWINGS. - 13
8. IN CASE ANY PRIVATE DWELLING, INDUSTRIAL BUILDING OR PLACE OF PUBLIC ASSEMBLY FALLS WITHIN 15 M OF 14 CHAINAGE : FROM 01+400.00 KM. TO 02+100.00 KM.
FOR OTHER REQUIRED MATERIAL SEE
PIPELINE, ADDITIONAL COVER OF 300MM SHALL BE PROVIDED OVER AND ABOVE COVER INDICATED HEREIN.
15
9. ALL EXISTING UNDERGROUND UTILITIES SUCH AS PIPELINES, H/T CABLES ETC. SHALL BE IDENTIFIED AND LOCATED BY DRAWING TITLE DRAWING NO.
A THE CONTRACTOR BEFORE START OF ANY EXCAVATION AND TRENCHING WORK. CONTRACTOR SHALL INTIMATE THE 16 A
CONCERNED AUTHORITIES HAVING JURISDICTION AND SHALL CARRY OUT SUCH WORKS TAKING ALL REQUIRED 17 TRACTEBEL Engineering pvt. ltd.
PRECAUTIONS AND SAFETY MEASURES, INCLUDING NECESSARY ENCASEMENT FOR U/G FACILITIES, TO PREVENT ANY
DAMAGE TO EXISTING / PROPOSED INSTALLATIONS, 18
10. ALL NECESSARY MEASURES SHALL BE TAKEN BY CONTRACTOR FOR FAULT LINE CROSSING AND SEISMIC AREA, TO 19 AS SHOWN P.013553-G-21048- M703 0
MITIGATE ITS EFFECT, AS MENTIONED / RECOMMENDED IN RFP DOCUMENT.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
WHEREVER PIPELINE IS CROSSING 11KV AND ABOVE A/G OR U/G HT LINE CONCRETE SLAB SHALL BE
PROVIDED AS PER STANDARD DRAWING NO. GGNG-D-20707-009.
O WHEREVER PIPELINE IS CROSSING THE EXISTING PIPELINES, THE CONCRETE SLAB O
SHALL BE PROVIDED AS PER DRAWING NO. GGNG-D-20707-014.
WHEREVER WATER TABLE DURING TRENCHING IS ENCOUNTERED IT SHALL BE BROUGHT DOWN TO MINIMUM 300mm BELOW
THE BOTTOM LEVEL TRENCHING AND KEPT DRY FOR WORKING. FOR OTHER INSTRUCTIONS, REFER PTS (CONSTRUCTION)
MINIMUM COVER SHALL BE MEASURED FROM THE LOWEST LEVEL OF ROAD, RAIL, CANAL, WATER WAYS ETC. INCLUDING ITS PROP
OSED
ROU TO THE TOP OF CASING PIPE OR CARRIER PIPE AS PER TYPE OF CROSSING. STEEL
GAS P
IPELIN
TP42 - P E
Ch:2518 73
0.67m
TP35 - P64 68 6
Ch:2392.3 9 Ch:254 75
Ch:2359 3.16 m
0.53m
TP33 - P62 Ch:2271.3 m m 3 m TP39 - P70
1.43m
m
Ch:2173.53
7
IP35/1 - P65 Ch:2416.19 m -1 TP45 - P
X X X X X X X X X
TP34 - P63 76
X X X X X
CS
X X X X
X
CS-16
- P61
ad
Ch:2223.06 m .37 m
X
P59 TP32 4.69 m - P82
X
/1 - .06 m IP49/1
X
TP46 - P
X
0 Ch:21
2 Asp.Road 77 IP46/1 5.77 m
X
3
IP 2102 1 - P60 6
12.16m
- P79 Ch:27
X
Ch:2631 Ch:265 P78
X
TP47 - .29 m
X
CS-18
Ch: TP3 113.84 m .07 m
X
X
M M
X
X
X
5.77 m
X
X
X
X
X
X
1
X
X
Ch:27
X
X
X
X
X
X
Ch:2
X
X
X
-15
X
X
P80
X
X
X
X
CS
TP48 - .91 m
3.25m
CS
0.81m
Asp.R -19
oad
0
Ch:272 - P81
X
oad
X
Asp.R
X
3.2m
9
X
T P 4
X
Asp.Road 9.14 m
X
0.46
Ch:272
X
X
X
X X X
X
CS-20
X X
SURVEY DETAILS
X X
X X X
m
X X
X X
X X
X X
X X
X X
X X
-209
X
X
X
81 To NH
X
X
H-1
X
X
X
X
ON
X
T
X
Asp.Road
X
L X
X
X
L
DWG NO. P.013553-G-21048-M703
MATCH LINE FOR CONT. REFER
K K
J J
I I
GROUND LEVELS
(IN METRES)
OD (mm) / MATERIAL AND GRADE 12" (324 mm) OD API 5L GR. X52, PSL-2 (HFW / SMLS)
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
PIPELINE DETAILS
(000 + 000)
SPECIAL PROVISIONS
F F
PIPELINE COVER
MINIMUM (METRES)
1.2 1.5 1.2 1.5 1.2 1.5 1.2 1.5 1.2 1.5 1.2 1.5 1.2
SPECIAL INSTALLATIONS /
Asphalt Road Asphalt Road Drain Asphalt Road Drain Drain Asphalt Road
FITTINGS / MARKERS Start Ch: 2316.6 CS-016 Start Ch: 2459.11 CS-017 End Ch: 2529.53 CS-018 Start Ch: 2625.27 CS-019 Start Ch: 2721.57 End Ch: 2727.45 CS-020 End Ch: 2774.85
Cart track Cart track Drain Drain Drain
Start Ch: 2212.35 End Ch: 2215.21 Start Ch: 2454.81 Start Ch: 2522.2 End Ch: 2541.73
CROSSINGS 11KV Power Line
Nala
Start Ch: 2274.11
Nala
End Ch: 2287.17
Asphalt Road Asphalt Road
End Ch: 2478.2
Asphalt Road
Start Ch: 2584.45
Asphalt Road
End Ch: 2590.83
Asphalt Road
11KV Power Line
Asphalt Road
11KV Power Line
End Ch: 2348.26 End Ch: 2629.89 Start Ch: 2772.06
E Ch: 2115.24 Ch: 2680.92 Ch: 2779.65 E
CS-015 11KV Power Line Drain 11KV Power Line 11KV Power Line
COATING Ch: 2281.29
EXTERNAL 3 LAYER POLYETHYLINE COATING & INTERNAL EPOXY, FIELD JOINTS BY HEAT SHRINKABLE SLEEVES AS PER SPECIFICATION IN SCOPE OF CONTRACTOR.
Start Ch: 2538.81 Ch: 2719.86 Ch: 2771.11
Drain
11KV Power Line End Ch: 2456.15
CATHODIC PROTECTION Ch: 2316.19
IN THE SCOPE OF CONTRACTOR (NOTE-7)
INSTALLATIONS
SOIL RESISTIVITY (OHM - M)
SUB-SOIL
DETAILS
@1.5m Depth
D D
SOIL STRATIFICATION
TOPOGRAPHIC SYMBOLS SOIL SYMBOLS PIPELINE SYMBOLS GENERAL NOTES BILL OF MATERIAL FOR THIS DRAWING REFERENCE DRAWING
CARRIER PIPE OTHER MATERIALS S.
1. ALL FIGURES ARE IN "METERS" UNLESS OTHERWISE SPECIFIED. ALL LEVEL ARE WITH REFERENCE TO MEAN SEA LEVEL DRAWING TITLE DRAWING NO.
(MSL). THE GROUND LEVELS/PROFILE INDICATED IN THE DRAWING IS ALONG THE CENTERLINE OF ROU. NO.
O.D. ∅ WT(mm) COATINGLENGTH DESCRIPTION NUMBER 1 UNLINED NALA CROSS SECTION IOC-NEELAMBUR-CS-015
2. FINAL CHAINAGES, TPs/IPs SECTION, INCLUDING DETOURED SECTION IF ANY, AND EXACT LOCATION & QUANTITIES OF
MARKERS SHALL BE INCORPORATED BY THE CONTRACTOR, IN AS-BUILT SDRAWINGS. 324 7.1 3LPE 700.00 K.M. POST - 2 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-016
C C
3. ALL CROSSINS SHALL MEET THE MIN. REQUIREMENTS OF COMPANY'S STD. DRAWING BASED ON VERIFICATION AT SITE. 324 3LPE DIRECTIONAL MARKER 8 3 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-017
TYPE OF CROSSING (CASED OR UNCASED) FOR CANALS AND ROADS SHALL BE DECIDED FOR INDIVIDUAL CASES AFTER 0 10.09.2020 FIRST ISSUE. AS MS
CONSULTATION WITH CONCERNED AUTHORITIES. CROSSINGS FOR WHICH SPECIFIC DETAILS ARE NOT GIVEN, SHALL BE AERIAL MARKER - 4 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-018
EXECUTED AS PER JOB STANDARDS, SITE REQUIREMENTS AND AS PER INSTRUCTIONS OF OWNER/CONCERNED Rev. D M Y Modifications Drawn Checked Approved
AUTHORITIES.
INSULATING JOINT - 5 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-019
HOT BENDS - ISSUE RECORD
4. ANTI-BUOYANCY CONTROL, BANK STABILIZATION, SLOPE BREAKERS, SELECT BACKFILL, COVER AT OVER AND SAG 6 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-020
BENDS AND OTHER MEASURES NOT SPECIFICALLY SHOWN IN THE DRAWING SHALL BE DECIDED AT THE SITE AS PER TOTAL 700.00 NAVIGABLE WATERWAY - 7
SPECIFICATIONS, SITE REQUIREMENTS AND INSTRUCTIONS OF OWNER/OWNERS REPRESENTATIVE.
CASING (SEE GEN. NOTES 12 AND 13) WARNING SIGN 6 8
INDIAN OIL CORPORATION LIMITED
5. IN CASE THE PROPOSED PIPELINE IS PASSING PARALLEL TO AN EXISTING PIPELINE, A MIN. DISTANCE OF 5.0M SHALL IndianOil
BE MAINTAINED BETWEEN THE TWO. THE MIN. DISTANCE SHALL BE 10.0M. IN CASE OF PARALLEL LAYING BY HDD AND O.D. Ø WT(mm) COATING LENGTH ROU BOUNDARY MARKERS - 9
B 5.0M. IN CASE OF B+C. CGD NETWORK IN COIMBATORE B
X X X X X X X
6. ACTUAL LENGTH OF CONCRETE COATING AND CONCRETE SLABS SHALL BE DECIDED AS PER SITE REQUIREMENTS AND 168 6.4 - - 10
THE SAME SHALL BE PROVIDED WITHOUT ANY COST IMPLICATION. 356 6.0 - - 11
ALIGNMENT SHEET
7. OPTICAL FIBRE CABLE WILL BE LAID PARALLEL TO THE PIPELINE IN A SINGLE TRENCH AS PER RELEVANT STD. AND 12
SPECIFICATIONS. TEMP. CATHODIC PROTECTION SHALL BE PROVIDED AS PER APPROVED DESIGN DOCUMENTS & - SECTION : FROM KOUNDAMPALAYAM TO NEELAMBUR
DRAWINGS. - 13
8. IN CASE ANY PRIVATE DWELLING, INDUSTRIAL BUILDING OR PLACE OF PUBLIC ASSEMBLY FALLS WITHIN 15 M OF 14 CHAINAGE : FROM 02+100.00 KM. TO 02+800.00 KM.
FOR OTHER REQUIRED MATERIAL SEE
PIPELINE, ADDITIONAL COVER OF 300MM SHALL BE PROVIDED OVER AND ABOVE COVER INDICATED HEREIN.
15
9. ALL EXISTING UNDERGROUND UTILITIES SUCH AS PIPELINES, H/T CABLES ETC. SHALL BE IDENTIFIED AND LOCATED BY DRAWING TITLE DRAWING NO.
A THE CONTRACTOR BEFORE START OF ANY EXCAVATION AND TRENCHING WORK. CONTRACTOR SHALL INTIMATE THE 16 A
CONCERNED AUTHORITIES HAVING JURISDICTION AND SHALL CARRY OUT SUCH WORKS TAKING ALL REQUIRED 17 TRACTEBEL Engineering pvt. ltd.
PRECAUTIONS AND SAFETY MEASURES, INCLUDING NECESSARY ENCASEMENT FOR U/G FACILITIES, TO PREVENT ANY
DAMAGE TO EXISTING / PROPOSED INSTALLATIONS, 18
10. ALL NECESSARY MEASURES SHALL BE TAKEN BY CONTRACTOR FOR FAULT LINE CROSSING AND SEISMIC AREA, TO 19 AS SHOWN P.013553-G-21048- M704 0
MITIGATE ITS EFFECT, AS MENTIONED / RECOMMENDED IN RFP DOCUMENT.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Asp.
TP5 LINE TP59 2.76 m
P86 2
Ch:2 - P88 AS PIPE
/3 - STEEL G Ch:34
6
Road
IP52
m
0 /2 - m m
Asp.Road
1.98
5
I P 49 294 7.4
m
883. 84 Ch: CS-22 Ch:340
0.52
h :2
C /1 - P
IP50 1.73 m H-20
9
m
CS-28
87 TP53 - To N
Ch:2 - P83 P98
3
Ch:30 P90 TP54 - IP58/1 - 4 m
17.5
X
X
X
X
X
TP5 828.09 m
X
X
X
59.05 .0
X
X
m Ch:3 P92 0
X
X
Ch:331
X
X
X
X
X
X
X
X
X
Ch 2
21 TP55 - P
X
:
X
TP57 - P96
X
CS- 120 m
X
X
X
ad
X
Asp
X
9 o
X
X
Ch:3143 3
X
Asp.R
X
IP53/1 -
X
.Roa
X
X
X
X
m
X
Ch:3227.79
5.93m
X
X
TP56 - P95 CS-27
X
d CS-2 P91
X
X
X
X
.1 m
X
X
0.9m
X
3 Ch:3076
X
X
IP55/1 - P9
TP58 - P97
X
.45 m 4 Ch:3211.39 m
X X
M M
Ch:3162.24 m
Ch:3243.78
19.18m
X
m
X X
ad
.Ro
Asp
CS-24
-181
O NH oad
T Asp.Road 26 Asp.R
CS-25 CS-
SURVEY DETAILS
X X X X X X X X X
X
X X X X X
L L
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
K K
J J
I I
GROUND LEVELS
(IN METRES)
OD (mm) / MATERIAL AND GRADE 12" (324 mm) OD API 5L GR. X52, PSL-2 (HFW / SMLS)
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
PIPELINE DETAILS
(000 + 000)
SPECIAL PROVISIONS SV -02
F F
PIPELINE COVER
MINIMUM (METRES)
1.2 1.5 1.2 1.5 1.2 1.5 1.2 1.5 1.2 1.5 1.2 1.5 1.2 1.5 1.2 1.5 1.2
SPECIAL INSTALLATIONS /
Asphalt Road Asphalt Road Asphalt Road
FITTINGS / MARKERS CS-021 CS-022 CS-023 End Ch: 3040.2 CS-024 CS-025 End Ch: 3209.2 CS-026 CS-027 Start Ch: 3446.2 CS-028
Drain Drain Cart track Cart track
Start Ch: 3064.28 End Ch: 3074.53 Start Ch: 3408.79 End Ch: 3415.93
CROSSINGS 11KV Power Line
Asphalt Road Asphalt Road Asphalt Road Asphalt Road
11KV Power Line
Asphalt Road
11KV Power Line
Asphalt Road Asphalt Road Asphalt Road Asphalt Road Asphalt Road Asphalt Road Asphalt Road Asphalt Road
Start Ch: 2890.59 End Ch: 2895.36 Start Ch: 2948.69 End Ch: 2959.02 Start Ch: 3033.21 Start Ch: 3135.8 End Ch: 3142.29 Start Ch: 3203.77 Start Ch: 3229.06 End Ch: 3235.43 Start Ch: 3362.82 End Ch: 3366.88 End Ch: 3453.18
E Ch: 2837.2 Ch: 3005.62 Ch: 3040.38 E
COATING EXTERNAL 3 LAYER POLYETHYLINE COATING & INTERNAL EPOXY, FIELD JOINTS BY HEAT SHRINKABLE SLEEVES AS PER SPECIFICATION IN SCOPE OF CONTRACTOR.
11KV Power Line
CATHODIC PROTECTION Ch: 3201.81
IN THE SCOPE OF CONTRACTOR (NOTE-7)
INSTALLATIONS
SOIL RESISTIVITY (OHM - M)
SUB-SOIL
DETAILS
@1.5m Depth
D D
SOIL STRATIFICATION
TOPOGRAPHIC SYMBOLS SOIL SYMBOLS PIPELINE SYMBOLS GENERAL NOTES BILL OF MATERIAL FOR THIS DRAWING REFERENCE DRAWING
CARRIER PIPE OTHER MATERIALS S.
1. ALL FIGURES ARE IN "METERS" UNLESS OTHERWISE SPECIFIED. ALL LEVEL ARE WITH REFERENCE TO MEAN SEA LEVEL DRAWING TITLE DRAWING NO.
(MSL). THE GROUND LEVELS/PROFILE INDICATED IN THE DRAWING IS ALONG THE CENTERLINE OF ROU. NO.
O.D. ∅ WT(mm) COATING
LENGTH DESCRIPTION NUMBER 1 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-021
2. FINAL CHAINAGES, TPs/IPs SECTION, INCLUDING DETOURED SECTION IF ANY, AND EXACT LOCATION & QUANTITIES OF
MARKERS SHALL BE INCORPORATED BY THE CONTRACTOR, IN AS-BUILT SDRAWINGS. 324 7.1 3LPE700.00 K.M. POST 1 2 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-022
C C
3. ALL CROSSINS SHALL MEET THE MIN. REQUIREMENTS OF COMPANY'S STD. DRAWING BASED ON VERIFICATION AT SITE. 324 3LPE DIRECTIONAL MARKER 2 3 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-023
TYPE OF CROSSING (CASED OR UNCASED) FOR CANALS AND ROADS SHALL BE DECIDED FOR INDIVIDUAL CASES AFTER 0 10.09.2020 FIRST ISSUE. AS MS
CONSULTATION WITH CONCERNED AUTHORITIES. CROSSINGS FOR WHICH SPECIFIC DETAILS ARE NOT GIVEN, SHALL BE AERIAL MARKER - 4 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-024
EXECUTED AS PER JOB STANDARDS, SITE REQUIREMENTS AND AS PER INSTRUCTIONS OF OWNER/CONCERNED Rev. D M Y Modifications Drawn Checked Approved
AUTHORITIES.
INSULATING JOINT - 5 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-025
HOT BENDS - ISSUE RECORD
4. ANTI-BUOYANCY CONTROL, BANK STABILIZATION, SLOPE BREAKERS, SELECT BACKFILL, COVER AT OVER AND SAG 6 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-026
BENDS AND OTHER MEASURES NOT SPECIFICALLY SHOWN IN THE DRAWING SHALL BE DECIDED AT THE SITE AS PER TOTAL 700.00 NAVIGABLE WATERWAY - 7 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-027
SPECIFICATIONS, SITE REQUIREMENTS AND INSTRUCTIONS OF OWNER/OWNERS REPRESENTATIVE.
CASING (SEE GEN. NOTES 12 AND 13) WARNING SIGN 8 8 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-028
INDIAN OIL CORPORATION LIMITED
5. IN CASE THE PROPOSED PIPELINE IS PASSING PARALLEL TO AN EXISTING PIPELINE, A MIN. DISTANCE OF 5.0M SHALL IndianOil
BE MAINTAINED BETWEEN THE TWO. THE MIN. DISTANCE SHALL BE 10.0M. IN CASE OF PARALLEL LAYING BY HDD AND O.D. Ø WT(mm) COATING LENGTH ROU BOUNDARY MARKERS - 9
B 5.0M. IN CASE OF B+C. CGD NETWORK IN COIMBATORE B
X X X X X X X
6. ACTUAL LENGTH OF CONCRETE COATING AND CONCRETE SLABS SHALL BE DECIDED AS PER SITE REQUIREMENTS AND 168 6.4 - - 10
THE SAME SHALL BE PROVIDED WITHOUT ANY COST IMPLICATION. 356 6.0 - - 11
ALIGNMENT SHEET
7. OPTICAL FIBRE CABLE WILL BE LAID PARALLEL TO THE PIPELINE IN A SINGLE TRENCH AS PER RELEVANT STD. AND 12
SPECIFICATIONS. TEMP. CATHODIC PROTECTION SHALL BE PROVIDED AS PER APPROVED DESIGN DOCUMENTS & - SECTION : FROM KOUNDAMPALAYAM TO NEELAMBUR
DRAWINGS. - 13
CHAINAGE : FROM 02+800.00 KM. TO 03+500.00 KM.
8. IN CASE ANY PRIVATE DWELLING, INDUSTRIAL BUILDING OR PLACE OF PUBLIC ASSEMBLY FALLS WITHIN 15 M OF
FOR OTHER REQUIRED MATERIAL SEE 14
PIPELINE, ADDITIONAL COVER OF 300MM SHALL BE PROVIDED OVER AND ABOVE COVER INDICATED HEREIN.
15
9. ALL EXISTING UNDERGROUND UTILITIES SUCH AS PIPELINES, H/T CABLES ETC. SHALL BE IDENTIFIED AND LOCATED BY DRAWING TITLE DRAWING NO.
A THE CONTRACTOR BEFORE START OF ANY EXCAVATION AND TRENCHING WORK. CONTRACTOR SHALL INTIMATE THE 16 A
CONCERNED AUTHORITIES HAVING JURISDICTION AND SHALL CARRY OUT SUCH WORKS TAKING ALL REQUIRED 17 TRACTEBEL Engineering pvt. ltd.
PRECAUTIONS AND SAFETY MEASURES, INCLUDING NECESSARY ENCASEMENT FOR U/G FACILITIES, TO PREVENT ANY
DAMAGE TO EXISTING / PROPOSED INSTALLATIONS, 18
10. ALL NECESSARY MEASURES SHALL BE TAKEN BY CONTRACTOR FOR FAULT LINE CROSSING AND SEISMIC AREA, TO 19 AS SHOWN P.013553-G-21048- M705 0
MITIGATE ITS EFFECT, AS MENTIONED / RECOMMENDED IN RFP DOCUMENT.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
WHEREVER PIPELINE IS CROSSING 11KV AND ABOVE A/G OR U/G HT LINE CONCRETE SLAB SHALL BE
PROVIDED AS PER STANDARD DRAWING NO. GGNG-D-20707-009.
WHEREVER PIPELINE IS CROSSING THE EXISTING PIPELINES, THE CONCRETE SLAB
O SHALL BE PROVIDED AS PER DRAWING NO. GGNG-D-20707-014. O
INE WHEREVER WATER TABLE DURING TRENCHING IS ENCOUNTERED IT SHALL BE BROUGHT DOWN TO MINIMUM 300mm BELOW
L GA S PIPEL
ED STEE THE BOTTOM LEVEL TRENCHING AND KEPT DRY FOR WORKING. FOR OTHER INSTRUCTIONS, REFER PTS (CONSTRUCTION)
PROPOS
MINIMUM COVER SHALL BE MEASURED FROM THE LOWEST LEVEL OF ROAD, RAIL, CANAL, WATER WAYS ETC. INCLUDING ITS
TP61 - P106 ROU TO THE TOP OF CASING PIPE OR CARRIER PIPE AS PER TYPE OF CROSSING.
04 105
IP60/3 - P1 IP60/4 - P m
Ch:3908.23 m
2.03m
10
Ch:3984.5 9 -
Ch:40 P110
10.31m
0.9m
103 CS-30 oad m 38.66
IP60/2 - P
Asp
Asp.R .Ro m
P102 3m ad IP66/1 - P1
IP60/1 - 8 m Ch:3680.6 TP66 - P1
1 12
.3 Ch:4059.4 1 Ch:4085.66 TP67 - P114
X
Ch:3578
X
X
X
X
X
X
m
X
X
X
X
X
X
X
X
X
8m
X
X
X
X
Ch:4197.35 m
X
X
X
X
X
X
X
X
X
X
X
X
X
X
ad
X
X
X
o
X
X
X
X
1 Asp.R
TP60 - P10 IP66/2 - P113
X X
Asp.Road
X X
X X
X
X X
M M
X
X
X X
X X
m
X X
X
8
X X
X X
.4
X
X
Ch:4148.96 m
X
Ch:3516
X
X X
X
X
X
X X
X
X
0.9m
X
X X
X X
X X
X
X X
X X
X X
X
5.56m
X X
X X
X X
X X
X X
X X
X X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X
X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
0.71m
X
X X
Asp.Road
X X
X
X X
X
X X
X
X
X
X X
X
X
X
CS-29
18.43m
X
X X
X
X
X
X
X
X
X
X
X X
X
9.16m
X
X
X
X
X
X
oad
0.58m
To NH-209
Asp.R
X X X X X X X X X X X X X X
SURVEY DETAILS
X
X
X
TO NH-181
X
X
X
X
X
X
X
X
L L
K K
J J
I I
GROUND LEVELS
(IN METRES)
OD (mm) / MATERIAL AND GRADE 12" (324 mm) OD API 5L GR. X52, PSL-2 (HFW / SMLS)
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
PIPELINE DETAILS
(000 + 000)
SPECIAL PROVISIONS
F F
PIPELINE COVER
MINIMUM (METRES)
1.2 1.5 1.2 1.5 1.2
Cart track
SPECIAL INSTALLATIONS / Start Ch: 3565.19
Cart track Cart track Cart track
FITTINGS / MARKERS CS-029 End Ch: 3568.47 Start Ch: 3748.09 End Ch: 3752.46 CS-030
Cart track Cart track
Start Ch: 3927.16 End Ch: 3939.02
CROSSINGS 11KV Power Line
Nala
Start Ch: 3557.5
Asphalt Road
11KV Power Line 11KV Power Line
End Ch: 3780.54
E Ch: 3517.52 Ch: 4057.81 Ch: 4146.28 E
11KV Power Line Nala
COATING Ch: 3563.15 End Ch: 3563.75
EXTERNAL 3 LAYER POLYETHYLINE COATING & INTERNAL EPOXY, FIELD JOINTS BY HEAT SHRINKABLE SLEEVES AS PER SPECIFICATION IN SCOPE OF CONTRACTOR.
11KV Power Line Asphalt Road
CATHODIC PROTECTION Ch: 3761.39 Start Ch: 3776.36
IN THE SCOPE OF CONTRACTOR (NOTE-7)
INSTALLATIONS
SOIL RESISTIVITY (OHM - M)
SUB-SOIL
DETAILS
@1.5m Depth
D D
SOIL STRATIFICATION
TOPOGRAPHIC SYMBOLS SOIL SYMBOLS PIPELINE SYMBOLS GENERAL NOTES BILL OF MATERIAL FOR THIS DRAWING REFERENCE DRAWING
CARRIER PIPE OTHER MATERIALS S.
1. ALL FIGURES ARE IN "METERS" UNLESS OTHERWISE SPECIFIED. ALL LEVEL ARE WITH REFERENCE TO MEAN SEA LEVEL DRAWING TITLE DRAWING NO.
(MSL). THE GROUND LEVELS/PROFILE INDICATED IN THE DRAWING IS ALONG THE CENTERLINE OF ROU. NO.
O.D. ∅ WT(mm) COATING
LENGTH DESCRIPTION NUMBER 1 NALA CROSS SECTION IOC-NEELAMBUR-CS-029
2. FINAL CHAINAGES, TPs/IPs SECTION, INCLUDING DETOURED SECTION IF ANY, AND EXACT LOCATION & QUANTITIES OF
MARKERS SHALL BE INCORPORATED BY THE CONTRACTOR, IN AS-BUILT SDRAWINGS. 324 7.1 3LPE
700.00 K.M. POST 1 2 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-030
C C
3. ALL CROSSINS SHALL MEET THE MIN. REQUIREMENTS OF COMPANY'S STD. DRAWING BASED ON VERIFICATION AT SITE. 324 3LPE DIRECTIONAL MARKER 1 3
TYPE OF CROSSING (CASED OR UNCASED) FOR CANALS AND ROADS SHALL BE DECIDED FOR INDIVIDUAL CASES AFTER 0 10.09.2020 FIRST ISSUE. AS MS
CONSULTATION WITH CONCERNED AUTHORITIES. CROSSINGS FOR WHICH SPECIFIC DETAILS ARE NOT GIVEN, SHALL BE AERIAL MARKER - 4
EXECUTED AS PER JOB STANDARDS, SITE REQUIREMENTS AND AS PER INSTRUCTIONS OF OWNER/CONCERNED Rev. D M Y Modifications Drawn Checked Approved
AUTHORITIES.
INSULATING JOINT - 5
HOT BENDS - ISSUE RECORD
4. ANTI-BUOYANCY CONTROL, BANK STABILIZATION, SLOPE BREAKERS, SELECT BACKFILL, COVER AT OVER AND SAG 6
BENDS AND OTHER MEASURES NOT SPECIFICALLY SHOWN IN THE DRAWING SHALL BE DECIDED AT THE SITE AS PER TOTAL 700.00 NAVIGABLE WATERWAY - 7
SPECIFICATIONS, SITE REQUIREMENTS AND INSTRUCTIONS OF OWNER/OWNERS REPRESENTATIVE.
CASING (SEE GEN. NOTES 12 AND 13) WARNING SIGN 2 8
INDIAN OIL CORPORATION LIMITED
5. IN CASE THE PROPOSED PIPELINE IS PASSING PARALLEL TO AN EXISTING PIPELINE, A MIN. DISTANCE OF 5.0M SHALL IndianOil
BE MAINTAINED BETWEEN THE TWO. THE MIN. DISTANCE SHALL BE 10.0M. IN CASE OF PARALLEL LAYING BY HDD AND O.D. Ø WT(mm) COATING LENGTH ROU BOUNDARY MARKERS - 9
B 5.0M. IN CASE OF B+C. CGD NETWORK IN COIMBATORE B
X X X X X X X
6. ACTUAL LENGTH OF CONCRETE COATING AND CONCRETE SLABS SHALL BE DECIDED AS PER SITE REQUIREMENTS AND 168 6.4 - - 10
THE SAME SHALL BE PROVIDED WITHOUT ANY COST IMPLICATION. 356 6.0 - - 11
ALIGNMENT SHEET
7. OPTICAL FIBRE CABLE WILL BE LAID PARALLEL TO THE PIPELINE IN A SINGLE TRENCH AS PER RELEVANT STD. AND 12
SPECIFICATIONS. TEMP. CATHODIC PROTECTION SHALL BE PROVIDED AS PER APPROVED DESIGN DOCUMENTS & - SECTION : FROM KOUNDAMPALAYAM TO NEELAMBUR
DRAWINGS. - 13
8. IN CASE ANY PRIVATE DWELLING, INDUSTRIAL BUILDING OR PLACE OF PUBLIC ASSEMBLY FALLS WITHIN 15 M OF 14 CHAINAGE : FROM 03+500.00 KM. TO 04+200.00 KM.
FOR OTHER REQUIRED MATERIAL SEE
PIPELINE, ADDITIONAL COVER OF 300MM SHALL BE PROVIDED OVER AND ABOVE COVER INDICATED HEREIN.
15
9. ALL EXISTING UNDERGROUND UTILITIES SUCH AS PIPELINES, H/T CABLES ETC. SHALL BE IDENTIFIED AND LOCATED BY DRAWING TITLE DRAWING NO.
A THE CONTRACTOR BEFORE START OF ANY EXCAVATION AND TRENCHING WORK. CONTRACTOR SHALL INTIMATE THE 16 A
CONCERNED AUTHORITIES HAVING JURISDICTION AND SHALL CARRY OUT SUCH WORKS TAKING ALL REQUIRED 17 TRACTEBEL Engineering pvt. ltd.
PRECAUTIONS AND SAFETY MEASURES, INCLUDING NECESSARY ENCASEMENT FOR U/G FACILITIES, TO PREVENT ANY
DAMAGE TO EXISTING / PROPOSED INSTALLATIONS, 18
10. ALL NECESSARY MEASURES SHALL BE TAKEN BY CONTRACTOR FOR FAULT LINE CROSSING AND SEISMIC AREA, TO 19 AS SHOWN P.013553-G-21048- M706 0
MITIGATE ITS EFFECT, AS MENTIONED / RECOMMENDED IN RFP DOCUMENT.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
O
TP70 - P117 O
0.9m
TP68 - P115
7.17m
Ch:4221.37 m
Asp.Road
CS-32
To NH-209
31
CS-
N TO NH-181 N
X X
X X X X
X X X
X
X X X X
X X X X
X X X X X
X X X X
X X X X
X X
X X
X
TP75 - P123
X X
X X
X X
X
TP76 - P124
X X
X X
X X
X X
X X
X X
21
TP74 - P1 Ch:4635.59 m Ch:4688.54 m
X
TP78 - P126
X
1m
Ch:4535.2 TP77 - P125
X
DWG NO. P.013553-G-21048-M706
IP74/1 - P122
X
Ch:4876.19 m
X
9
X
TP72 - P11 Ch:4797 m
X
S PIPELINE
Ch:4555.96 m
MATCH LINE FOR CONT. REFER
PROPOSED STEEL GA
X
X
7 8.8 m
X
Ch:44
2.31
120
X
X
3 - P 57 m
3.15m
X
0.5m
0.5m
6.26m
7
13.35m
2.91m
P
T 495.
m
M Ch:4 Asp.Road Asp.Road M
Asp.Road
TP71 - P118
3.12m
Ch:4417.23 m
1.32m
0.5m
ad
CS-33 Asp.Ro
SURVEY DETAILS
ad
Asp.Ro
L X
X
X
X
X
X
X
L
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
WHEREVER PIPELINE IS CROSSING 11KV AND ABOVE A/G OR U/G HT LINE CONCRETE SLAB SHALL BE
X
PROVIDED AS PER STANDARD DRAWING NO. GGNG-D-20707-009.
WHEREVER PIPELINE IS CROSSING THE EXISTING PIPELINES, THE CONCRETE SLAB
K K
SHALL BE PROVIDED AS PER DRAWING NO. GGNG-D-20707-014.
WHEREVER WATER TABLE DURING TRENCHING IS ENCOUNTERED IT SHALL BE BROUGHT DOWN TO MINIMUM 300mm BELOW
THE BOTTOM LEVEL TRENCHING AND KEPT DRY FOR WORKING. FOR OTHER INSTRUCTIONS, REFER PTS (CONSTRUCTION)
MINIMUM COVER SHALL BE MEASURED FROM THE LOWEST LEVEL OF ROAD, RAIL, CANAL, WATER WAYS ETC. INCLUDING ITS
ROU TO THE TOP OF CASING PIPE OR CARRIER PIPE AS PER TYPE OF CROSSING.
J J
I I
GROUND LEVELS
(IN METRES)
OD (mm) / MATERIAL AND GRADE 12" (324 mm) OD API 5L GR. X52, PSL-2 (HFW / SMLS)
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
PIPELINE DETAILS
(000 + 000)
SPECIAL PROVISIONS
F F
PIPELINE COVER
MINIMUM (METRES)
1.5 1.2 1.5 1.2 1.5 1.2
SPECIAL INSTALLATIONS /
Asphalt Road Asphalt Road
FITTINGS / MARKERS CS-031 CS-032 End Ch: 4349.41 Start Ch: 4408.86 CS-033
@1.5m Depth
D D
SOIL STRATIFICATION
TOPOGRAPHIC SYMBOLS SOIL SYMBOLS PIPELINE SYMBOLS GENERAL NOTES BILL OF MATERIAL FOR THIS DRAWING REFERENCE DRAWING
CARRIER PIPE OTHER MATERIALS S.
1. ALL FIGURES ARE IN "METERS" UNLESS OTHERWISE SPECIFIED. ALL LEVEL ARE WITH REFERENCE TO MEAN SEA LEVEL DRAWING TITLE DRAWING NO.
(MSL). THE GROUND LEVELS/PROFILE INDICATED IN THE DRAWING IS ALONG THE CENTERLINE OF ROU. NO.
O.D. ∅ WT(mm) COATING
LENGTH DESCRIPTION NUMBER 1 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-031
2. FINAL CHAINAGES, TPs/IPs SECTION, INCLUDING DETOURED SECTION IF ANY, AND EXACT LOCATION & QUANTITIES OF
MARKERS SHALL BE INCORPORATED BY THE CONTRACTOR, IN AS-BUILT SDRAWINGS. 324 7.1 3LPE
700.00 K.M. POST - 2 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-032
C C
3. ALL CROSSINS SHALL MEET THE MIN. REQUIREMENTS OF COMPANY'S STD. DRAWING BASED ON VERIFICATION AT SITE. 324 3LPE DIRECTIONAL MARKER 1 3 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-033
TYPE OF CROSSING (CASED OR UNCASED) FOR CANALS AND ROADS SHALL BE DECIDED FOR INDIVIDUAL CASES AFTER 0 10.09.2020 FIRST ISSUE. AS MS
CONSULTATION WITH CONCERNED AUTHORITIES. CROSSINGS FOR WHICH SPECIFIC DETAILS ARE NOT GIVEN, SHALL BE AERIAL MARKER - 4
EXECUTED AS PER JOB STANDARDS, SITE REQUIREMENTS AND AS PER INSTRUCTIONS OF OWNER/CONCERNED Rev. D M Y Modifications Drawn Checked Approved
AUTHORITIES.
INSULATING JOINT - 5
HOT BENDS - ISSUE RECORD
4. ANTI-BUOYANCY CONTROL, BANK STABILIZATION, SLOPE BREAKERS, SELECT BACKFILL, COVER AT OVER AND SAG 6
BENDS AND OTHER MEASURES NOT SPECIFICALLY SHOWN IN THE DRAWING SHALL BE DECIDED AT THE SITE AS PER TOTAL 700.00 NAVIGABLE WATERWAY - 7
SPECIFICATIONS, SITE REQUIREMENTS AND INSTRUCTIONS OF OWNER/OWNERS REPRESENTATIVE.
CASING (SEE GEN. NOTES 12 AND 13) WARNING SIGN 3 8
INDIAN OIL CORPORATION LIMITED
5. IN CASE THE PROPOSED PIPELINE IS PASSING PARALLEL TO AN EXISTING PIPELINE, A MIN. DISTANCE OF 5.0M SHALL IndianOil
BE MAINTAINED BETWEEN THE TWO. THE MIN. DISTANCE SHALL BE 10.0M. IN CASE OF PARALLEL LAYING BY HDD AND O.D. Ø WT(mm) COATING LENGTH ROU BOUNDARY MARKERS - 9
B 5.0M. IN CASE OF B+C. CGD NETWORK IN COIMBATORE B
X X X X X X X
6. ACTUAL LENGTH OF CONCRETE COATING AND CONCRETE SLABS SHALL BE DECIDED AS PER SITE REQUIREMENTS AND 168 6.4 - - 10
THE SAME SHALL BE PROVIDED WITHOUT ANY COST IMPLICATION. 356 6.0 - - 11
ALIGNMENT SHEET
7. OPTICAL FIBRE CABLE WILL BE LAID PARALLEL TO THE PIPELINE IN A SINGLE TRENCH AS PER RELEVANT STD. AND 12
SPECIFICATIONS. TEMP. CATHODIC PROTECTION SHALL BE PROVIDED AS PER APPROVED DESIGN DOCUMENTS & - SECTION : FROM KOUNDAMPALAYAM TO NEELAMBUR
DRAWINGS. - 13
8. IN CASE ANY PRIVATE DWELLING, INDUSTRIAL BUILDING OR PLACE OF PUBLIC ASSEMBLY FALLS WITHIN 15 M OF 14 CHAINAGE : FROM 04+200.00 KM. TO 04+900.00 KM.
FOR OTHER REQUIRED MATERIAL SEE
PIPELINE, ADDITIONAL COVER OF 300MM SHALL BE PROVIDED OVER AND ABOVE COVER INDICATED HEREIN.
15
9. ALL EXISTING UNDERGROUND UTILITIES SUCH AS PIPELINES, H/T CABLES ETC. SHALL BE IDENTIFIED AND LOCATED BY DRAWING TITLE DRAWING NO.
A THE CONTRACTOR BEFORE START OF ANY EXCAVATION AND TRENCHING WORK. CONTRACTOR SHALL INTIMATE THE 16 A
CONCERNED AUTHORITIES HAVING JURISDICTION AND SHALL CARRY OUT SUCH WORKS TAKING ALL REQUIRED 17 TRACTEBEL Engineering pvt. ltd.
PRECAUTIONS AND SAFETY MEASURES, INCLUDING NECESSARY ENCASEMENT FOR U/G FACILITIES, TO PREVENT ANY
DAMAGE TO EXISTING / PROPOSED INSTALLATIONS, 18
10. ALL NECESSARY MEASURES SHALL BE TAKEN BY CONTRACTOR FOR FAULT LINE CROSSING AND SEISMIC AREA, TO 19 AS SHOWN P.013553-G-21048- M707 0
MITIGATE ITS EFFECT, AS MENTIONED / RECOMMENDED IN RFP DOCUMENT.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
- P141
9 TP90 8.31 m
O
- P13 7 O
TP87 - P137 Ch:52
m TP89 22.76 m
Ch:5181.22 Ch:5
2 40
36 1 - P1
1 5
3
IP85/1 - P m 5278
.31
4
Ch:5112.2
CS
P134
TP85 -
-35
N 9.19 m N
Ch:506
X
X
3
X
X
- P13
X
X
X
X
X
X
IP9 5299.
Ch:5408.72 m IP90/3 - P144 Ch:5594.88 m
Ch
32
0/1 26
:
0 - P1 m Ch:5503.43 m
4.02m
a
27.99 3.46m
CS-34
0.9m
3 1 83
Na l
DWG NO. P.013553-G-21048-M707
1 m 3 P 8
-P m
- P .71 - P1 9 m T h:5002. 0.9
m
142
MATCH LINE FOR CONT. REFER
2
8 7 1 /1 . 2 C 7m
m
09
TP h:49 IP82 984 NH-2 4.1
C :4 CS-36 CS-37
Ch
M M
2.01m
18.57m
Asp.Road Asp.Road Asp.Road
9
-20 6m
NH 0.0
2
SURVEY DETAILS
a
PIPELINE
Nal
TEEL GAS
IP9 5408.
Ch
DS
PROPOSE
0/2 72 m
:
L L
-P
TP79 -
143
P
Ch:491 127 WHEREVER PIPELINE IS CROSSING 11KV AND ABOVE A/G OR U/G HT LINE CONCRETE
Asp
5.1 m SLAB SHALL BE
.Ro
PROVIDED AS PER STANDARD DRAWING NO. GGNG-D-20707-009.
ad
WHEREVER PIPELINE IS CROSSING THE EXISTING PIPELINES, THE CONCRETE SLAB
e r
THE BOTTOM LEVEL TRENCHING AND KEPT DRY FOR WORKING. FOR OTHER
:4 1 - m
23 P1
2. 12
m
93 P
:49 0 -
MINIMUM COVER SHALL BE MEASURED FROM THE LOWEST LEVEL OF ROAD, RAIL,
T
CANAL, WATER WAYS ETC. INCLUDING ITS ROU TO THE TOP OF CASING PIPE OR
CARRIER PIPE AS PER TYPE OF CROSSING.
J J
I I
GROUND LEVELS
(IN METRES)
OD (mm) / MATERIAL AND GRADE 12" (324 mm) OD API 5L GR. X52, PSL-2 (HFW / SMLS)
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
PIPELINE DETAILS
(000 + 000)
SPECIAL PROVISIONS
F F
PIPELINE COVER
MINIMUM (METRES)
1.2 1.5 1.2 2.5 1.2 1.5 1.2
SPECIAL INSTALLATIONS /
Drain Asphalt Road
FITTINGS / MARKERS End Ch: 4917.29 Start Ch: 5074.25 CS-034 CS-035 CS-036 CS-037
Drain
Start Ch: 4915.6
CROSSINGS 11KV Power Line 11KV Power Line 11KV Power Line 11KV Power Line
Asphalt Road
11KV Power Line 11KV Power Line
National Highway-209 National Highway-209 Asphalt Road Nala
End Ch: 5082.18 Start Ch: 5278.31 End Ch: 5299.49 Start Ch: 5509.96 End Ch: 5532.67
E Ch: 4921.55 Ch: 4951.58 Ch: 4975.87 Ch: 5038.14 Ch: 5198.43 Ch: 5234.02 E
11KV Power Line 11KV Power Line Asphalt Road Nala
COATING Ch: 5057.36
EXTERNAL 3 LAYER POLYETHYLINE COATING
Ch: 5180.54
& INTERNAL EPOXY, FIELD JOINTS BY HEAT SHRINKABLE SLEEVES AS PER SPECIFICATION IN SCOPE OF CONTRACTOR. End Ch: 5519.35 Start Ch: 5523.48
@1.5m Depth
D D
SOIL STRATIFICATION
TOPOGRAPHIC SYMBOLS SOIL SYMBOLS PIPELINE SYMBOLS GENERAL NOTES BILL OF MATERIAL FOR THIS DRAWING REFERENCE DRAWING
CARRIER PIPE OTHER MATERIALS S.
1. ALL FIGURES ARE IN "METERS" UNLESS OTHERWISE SPECIFIED. ALL LEVEL ARE WITH REFERENCE TO MEAN SEA LEVEL DRAWING TITLE DRAWING NO.
(MSL). THE GROUND LEVELS/PROFILE INDICATED IN THE DRAWING IS ALONG THE CENTERLINE OF ROU. NO.
O.D. ∅ WT(mm) COATING
LENGTH DESCRIPTION NUMBER 1 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-034
2. FINAL CHAINAGES, TPs/IPs SECTION, INCLUDING DETOURED SECTION IF ANY, AND EXACT LOCATION & QUANTITIES OF
MARKERS SHALL BE INCORPORATED BY THE CONTRACTOR, IN AS-BUILT SDRAWINGS. 324 7.1 3LPE
700.00 K.M. POST - 2 NH-209 ROAD CROSS SECTION IOC-NEELAMBUR-CS-035
C C
3. ALL CROSSINS SHALL MEET THE MIN. REQUIREMENTS OF COMPANY'S STD. DRAWING BASED ON VERIFICATION AT SITE. 324 3LPE DIRECTIONAL MARKER 5 3 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-036
TYPE OF CROSSING (CASED OR UNCASED) FOR CANALS AND ROADS SHALL BE DECIDED FOR INDIVIDUAL CASES AFTER 0 10.09.2020 FIRST ISSUE. AS MS
CONSULTATION WITH CONCERNED AUTHORITIES. CROSSINGS FOR WHICH SPECIFIC DETAILS ARE NOT GIVEN, SHALL BE AERIAL MARKER 1 4 NALA CROSS SECTION IOC-NEELAMBUR-CS-037
EXECUTED AS PER JOB STANDARDS, SITE REQUIREMENTS AND AS PER INSTRUCTIONS OF OWNER/CONCERNED Rev. D M Y Modifications Drawn Checked Approved
AUTHORITIES.
INSULATING JOINT - 5
HOT BENDS - ISSUE RECORD
4. ANTI-BUOYANCY CONTROL, BANK STABILIZATION, SLOPE BREAKERS, SELECT BACKFILL, COVER AT OVER AND SAG 6
BENDS AND OTHER MEASURES NOT SPECIFICALLY SHOWN IN THE DRAWING SHALL BE DECIDED AT THE SITE AS PER TOTAL 700.00 NAVIGABLE WATERWAY - 7
SPECIFICATIONS, SITE REQUIREMENTS AND INSTRUCTIONS OF OWNER/OWNERS REPRESENTATIVE.
CASING (SEE GEN. NOTES 12 AND 13) WARNING SIGN 5 8
INDIAN OIL CORPORATION LIMITED
5. IN CASE THE PROPOSED PIPELINE IS PASSING PARALLEL TO AN EXISTING PIPELINE, A MIN. DISTANCE OF 5.0M SHALL IndianOil
BE MAINTAINED BETWEEN THE TWO. THE MIN. DISTANCE SHALL BE 10.0M. IN CASE OF PARALLEL LAYING BY HDD AND O.D. Ø WT(mm) COATING LENGTH ROU BOUNDARY MARKERS - 9
B 5.0M. IN CASE OF B+C. CGD NETWORK IN COIMBATORE B
X X X X X X X
6. ACTUAL LENGTH OF CONCRETE COATING AND CONCRETE SLABS SHALL BE DECIDED AS PER SITE REQUIREMENTS AND 168 6.4 - - 10
THE SAME SHALL BE PROVIDED WITHOUT ANY COST IMPLICATION. 356 6.0 - - 11
ALIGNMENT SHEET
7. OPTICAL FIBRE CABLE WILL BE LAID PARALLEL TO THE PIPELINE IN A SINGLE TRENCH AS PER RELEVANT STD. AND 12
SPECIFICATIONS. TEMP. CATHODIC PROTECTION SHALL BE PROVIDED AS PER APPROVED DESIGN DOCUMENTS & - SECTION : FROM KOUNDAMPALAYAM TO NEELAMBUR
DRAWINGS. - 13
8. IN CASE ANY PRIVATE DWELLING, INDUSTRIAL BUILDING OR PLACE OF PUBLIC ASSEMBLY FALLS WITHIN 15 M OF 14 CHAINAGE : FROM 04+900.00 KM. TO 05+600.00 KM.
FOR OTHER REQUIRED MATERIAL SEE
PIPELINE, ADDITIONAL COVER OF 300MM SHALL BE PROVIDED OVER AND ABOVE COVER INDICATED HEREIN.
15
9. ALL EXISTING UNDERGROUND UTILITIES SUCH AS PIPELINES, H/T CABLES ETC. SHALL BE IDENTIFIED AND LOCATED BY DRAWING TITLE DRAWING NO.
A THE CONTRACTOR BEFORE START OF ANY EXCAVATION AND TRENCHING WORK. CONTRACTOR SHALL INTIMATE THE 16 A
CONCERNED AUTHORITIES HAVING JURISDICTION AND SHALL CARRY OUT SUCH WORKS TAKING ALL REQUIRED 17 TRACTEBEL Engineering pvt. ltd.
PRECAUTIONS AND SAFETY MEASURES, INCLUDING NECESSARY ENCASEMENT FOR U/G FACILITIES, TO PREVENT ANY
DAMAGE TO EXISTING / PROPOSED INSTALLATIONS, 18
10. ALL NECESSARY MEASURES SHALL BE TAKEN BY CONTRACTOR FOR FAULT LINE CROSSING AND SEISMIC AREA, TO 19 AS SHOWN P.013553-G-21048- M708 0
MITIGATE ITS EFFECT, AS MENTIONED / RECOMMENDED IN RFP DOCUMENT.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
WHEREVER PIPELINE IS CROSSING 11KV AND ABOVE A/G OR U/G HT LINE CONCRETE SLAB SHALL BE
PROVIDED AS PER STANDARD DRAWING NO. GGNG-D-20707-009.
WHEREVER PIPELINE IS CROSSING THE EXISTING PIPELINES, THE CONCRETE SLAB
SHALL BE PROVIDED AS PER DRAWING NO. GGNG-D-20707-014.
O O
WHEREVER WATER TABLE DURING TRENCHING IS ENCOUNTERED IT SHALL BE BROUGHT DOWN TO MINIMUM 300mm BELOW
THE BOTTOM LEVEL TRENCHING AND KEPT DRY FOR WORKING. FOR OTHER INSTRUCTIONS, REFER PTS (CONSTRUCTION)
N N
PROPOSED STEEL GAS PIPELINE
IP90/9 - P150
IP90/5 - P146 IP90/7 - P148 Ch:6164.3 m
IP90/8 - P149
4.07m
Ch:5649.43 m
4.38m
3.52m
0.9m
Ch:5857.6 m
0.9m
0.9m
Ch:6013.12 m
X
X
X
X
IP90/6 - P147
X
X
X X X X X X X X X X X X X X X X X X X X X X X
X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X
X X X X X X X X X X X
Ch:5718.7 m
M CS-38 CS-39 M
18.13m
18.74m
19m
SURVEY DETAILS
L L
K K
J J
I I
GROUND LEVELS
(IN METRES)
OD (mm) / MATERIAL AND GRADE 12" (324 mm) OD API 5L GR. X52, PSL-2 (HFW / SMLS)
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
PIPELINE DETAILS
(000 + 000)
SPECIAL PROVISIONS SV -03
F F
PIPELINE COVER
MINIMUM (METRES)
1.2 1.5 1.2 1.5 1.2
SPECIAL INSTALLATIONS /
Asphalt Road
FITTINGS / MARKERS CS-038 CS-039 End Ch: 6007.78
@1.5m Depth
D D
SOIL STRATIFICATION
TOPOGRAPHIC SYMBOLS SOIL SYMBOLS PIPELINE SYMBOLS GENERAL NOTES BILL OF MATERIAL FOR THIS DRAWING REFERENCE DRAWING
CARRIER PIPE OTHER MATERIALS S.
1. ALL FIGURES ARE IN "METERS" UNLESS OTHERWISE SPECIFIED. ALL LEVEL ARE WITH REFERENCE TO MEAN SEA LEVEL DRAWING TITLE DRAWING NO.
(MSL). THE GROUND LEVELS/PROFILE INDICATED IN THE DRAWING IS ALONG THE CENTERLINE OF ROU. NO.
O.D. ∅ WT(mm) COATING
LENGTH DESCRIPTION NUMBER 1 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-038
2. FINAL CHAINAGES, TPs/IPs SECTION, INCLUDING DETOURED SECTION IF ANY, AND EXACT LOCATION & QUANTITIES OF
MARKERS SHALL BE INCORPORATED BY THE CONTRACTOR, IN AS-BUILT SDRAWINGS. 324 7.1 3LPE
700.00 K.M. POST 1 2 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-039
C C
3. ALL CROSSINS SHALL MEET THE MIN. REQUIREMENTS OF COMPANY'S STD. DRAWING BASED ON VERIFICATION AT SITE. 324 3LPE DIRECTIONAL MARKER - 3
TYPE OF CROSSING (CASED OR UNCASED) FOR CANALS AND ROADS SHALL BE DECIDED FOR INDIVIDUAL CASES AFTER 0 10.09.2020 FIRST ISSUE. AS MS
CONSULTATION WITH CONCERNED AUTHORITIES. CROSSINGS FOR WHICH SPECIFIC DETAILS ARE NOT GIVEN, SHALL BE AERIAL MARKER - 4
EXECUTED AS PER JOB STANDARDS, SITE REQUIREMENTS AND AS PER INSTRUCTIONS OF OWNER/CONCERNED Rev. D M Y Modifications Drawn Checked Approved
AUTHORITIES.
INSULATING JOINT - 5
HOT BENDS - ISSUE RECORD
4. ANTI-BUOYANCY CONTROL, BANK STABILIZATION, SLOPE BREAKERS, SELECT BACKFILL, COVER AT OVER AND SAG 6
BENDS AND OTHER MEASURES NOT SPECIFICALLY SHOWN IN THE DRAWING SHALL BE DECIDED AT THE SITE AS PER TOTAL 700.00 NAVIGABLE WATERWAY - 7
SPECIFICATIONS, SITE REQUIREMENTS AND INSTRUCTIONS OF OWNER/OWNERS REPRESENTATIVE.
CASING (SEE GEN. NOTES 12 AND 13) WARNING SIGN 2 8
INDIAN OIL CORPORATION LIMITED
5. IN CASE THE PROPOSED PIPELINE IS PASSING PARALLEL TO AN EXISTING PIPELINE, A MIN. DISTANCE OF 5.0M SHALL IndianOil
BE MAINTAINED BETWEEN THE TWO. THE MIN. DISTANCE SHALL BE 10.0M. IN CASE OF PARALLEL LAYING BY HDD AND O.D. Ø WT(mm) COATING LENGTH ROU BOUNDARY MARKERS - 9
B 5.0M. IN CASE OF B+C. CGD NETWORK IN COIMBATORE B
X X X X X X X
6. ACTUAL LENGTH OF CONCRETE COATING AND CONCRETE SLABS SHALL BE DECIDED AS PER SITE REQUIREMENTS AND 168 6.4 - - 10
THE SAME SHALL BE PROVIDED WITHOUT ANY COST IMPLICATION. 356 6.0 - - 11
ALIGNMENT SHEET
7. OPTICAL FIBRE CABLE WILL BE LAID PARALLEL TO THE PIPELINE IN A SINGLE TRENCH AS PER RELEVANT STD. AND 12
SPECIFICATIONS. TEMP. CATHODIC PROTECTION SHALL BE PROVIDED AS PER APPROVED DESIGN DOCUMENTS & - SECTION : FROM KOUNDAMPALAYAM TO NEELAMBUR
DRAWINGS. - 13
8. IN CASE ANY PRIVATE DWELLING, INDUSTRIAL BUILDING OR PLACE OF PUBLIC ASSEMBLY FALLS WITHIN 15 M OF 14 CHAINAGE : FROM 05+600.00 KM. TO 06+300.00 KM.
FOR OTHER REQUIRED MATERIAL SEE
PIPELINE, ADDITIONAL COVER OF 300MM SHALL BE PROVIDED OVER AND ABOVE COVER INDICATED HEREIN.
15
9. ALL EXISTING UNDERGROUND UTILITIES SUCH AS PIPELINES, H/T CABLES ETC. SHALL BE IDENTIFIED AND LOCATED BY DRAWING TITLE DRAWING NO.
A THE CONTRACTOR BEFORE START OF ANY EXCAVATION AND TRENCHING WORK. CONTRACTOR SHALL INTIMATE THE 16 A
CONCERNED AUTHORITIES HAVING JURISDICTION AND SHALL CARRY OUT SUCH WORKS TAKING ALL REQUIRED 17 TRACTEBEL Engineering pvt. ltd.
PRECAUTIONS AND SAFETY MEASURES, INCLUDING NECESSARY ENCASEMENT FOR U/G FACILITIES, TO PREVENT ANY
DAMAGE TO EXISTING / PROPOSED INSTALLATIONS, 18
10. ALL NECESSARY MEASURES SHALL BE TAKEN BY CONTRACTOR FOR FAULT LINE CROSSING AND SEISMIC AREA, TO 19 AS SHOWN P.013553-G-21048- M709 0
MITIGATE ITS EFFECT, AS MENTIONED / RECOMMENDED IN RFP DOCUMENT.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
61
- P1 m
4/4 4.6
IP9 IP9 :680 60
Ch
E
Ch: 0/10 - LIN - P1
IPE m
O 630 P15 4/3 .7 O
IP9 :6766
P
7.0 S
5m 1 LG
A
Ch
X
X
To
IP9 EE
X
NH
X
0 T
X
-20
Ch /11 - DS
X
9
X
X
X
:63 E
79. P152
X
S
X
PO
X
97
X
O
X
m PR
X
159
X
ad
X
-P m
Ro
X
2
X
4/ .4
X
p.
X
X
IP9 :6697
X
X
As X
As
X
X
p.R
X
X
X
oa
Ch
N N
2.2 .17m
d
.67
CS
6387
-40
1
3m
X
X
Ser
vice
X
X
X
X
X
X
Ro
ad
X
IP94/6 - P163
IP94/5 - P162 Ch:6950.4 m
Ch:6877.86 m
158
14.
M / 1 -P 1m M
3m
4 .6
IP9 6608 4
: P15 m
CS
X
Ch
X
-41
-
X
X
91 16
X X X X X X
X
TP 6553. P155
CS-43
IP9
m
: - 28 m 7
Ch: 0/12 - h To NH-47
7m
0.9
C 92 5 Asp.Road
651 P15 TP 6565. - P1 3 m
4.9
As : P94 9.6
1.4
4m 3 h
p.R -4 2
C T
SURVEY DETAILS
7 CS
:65
oa d
X X X X X X X X X X X X X X X X
X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X
oa
X
X
Ch .R
X
As
p X
IP94/4 - P161
X
X
X
Ch:6804.6 m
X
X
X
L L
41m
X
56
X
- P1 27 m
X
17.
X
9
TP 6570.
X
X
Ch
X
X
X
X
X
X
X
WHEREVER PIPELINE IS CROSSING 11KV AND ABOVE A/G OR U/G HT LINE CONCRETE SLAB SHALL BE
K PROVIDED AS PER STANDARD DRAWING NO. GGNG-D-20707-009. K
WHEREVER PIPELINE IS CROSSING THE EXISTING PIPELINES, THE CONCRETE SLAB
SHALL BE PROVIDED AS PER DRAWING NO. GGNG-D-20707-014.
WHEREVER WATER TABLE DURING TRENCHING IS ENCOUNTERED IT SHALL BE BROUGHT DOWN TO MINIMUM 300mm BELOW
THE BOTTOM LEVEL TRENCHING AND KEPT DRY FOR WORKING. FOR OTHER INSTRUCTIONS, REFER PTS (CONSTRUCTION)
MINIMUM COVER SHALL BE MEASURED FROM THE LOWEST LEVEL OF ROAD, RAIL, CANAL, WATER WAYS ETC. INCLUDING ITS
ROU TO THE TOP OF CASING PIPE OR CARRIER PIPE AS PER TYPE OF CROSSING.
J J
I I
GROUND LEVELS
(IN METRES)
OD (mm) / MATERIAL AND GRADE 12" (324 mm) OD API 5L GR. X52, PSL-2 (HFW / SMLS)
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
PIPELINE DETAILS
(000 + 000)
SPECIAL PROVISIONS
F F
PIPELINE COVER
MINIMUM (METRES)
1.2 1.5 1.2 1.5 1.2 1.5 1.2 1.5 1.2
SPECIAL INSTALLATIONS /
FITTINGS / MARKERS CS-040 CS-041 CS-042 CS-043
@1.5m Depth
D D
SOIL STRATIFICATION
CLIENT :
TOPOGRAPHIC SYMBOLS SOIL SYMBOLS PIPELINE SYMBOLS GENERAL NOTES BILL OF MATERIAL FOR THIS DRAWING REFERENCE DRAWING
CARRIER PIPE OTHER MATERIALS S.
1. ALL FIGURES ARE IN "METERS" UNLESS OTHERWISE SPECIFIED. ALL LEVEL ARE WITH REFERENCE TO MEAN SEA LEVEL DRAWING TITLE DRAWING NO.
(MSL). THE GROUND LEVELS/PROFILE INDICATED IN THE DRAWING IS ALONG THE CENTERLINE OF ROU. NO.
O.D. ∅ LENGTH WT(mm)
DESCRIPTION COATING NUMBER 1 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-040
2. FINAL CHAINAGES, TPs/IPs SECTION, INCLUDING DETOURED SECTION IF ANY, AND EXACT LOCATION & QUANTITIES OF
MARKERS SHALL BE INCORPORATED BY THE CONTRACTOR, IN AS-BUILT SDRAWINGS. 324 700.00 K.M. POST 7.1 3LPE 1 2 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-041
C C
3. ALL CROSSINS SHALL MEET THE MIN. REQUIREMENTS OF COMPANY'S STD. DRAWING BASED ON VERIFICATION AT SITE. 324 DIRECTIONAL MARKER 3LPE - 3 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-042
TYPE OF CROSSING (CASED OR UNCASED) FOR CANALS AND ROADS SHALL BE DECIDED FOR INDIVIDUAL CASES AFTER 0 10.09.2020 FIRST ISSUE. AS MS
CONSULTATION WITH CONCERNED AUTHORITIES. CROSSINGS FOR WHICH SPECIFIC DETAILS ARE NOT GIVEN, SHALL BE AERIAL MARKER - 4 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-043
EXECUTED AS PER JOB STANDARDS, SITE REQUIREMENTS AND AS PER INSTRUCTIONS OF OWNER/CONCERNED Rev. D M Y Modifications Drawn Checked Approved
AUTHORITIES.
INSULATING JOINT - 5
HOT BENDS - ISSUE RECORD
4. ANTI-BUOYANCY CONTROL, BANK STABILIZATION, SLOPE BREAKERS, SELECT BACKFILL, COVER AT OVER AND SAG 6
BENDS AND OTHER MEASURES NOT SPECIFICALLY SHOWN IN THE DRAWING SHALL BE DECIDED AT THE SITE AS PER TOTAL 700.00 NAVIGABLE WATERWAY - 7
SPECIFICATIONS, SITE REQUIREMENTS AND INSTRUCTIONS OF OWNER/OWNERS REPRESENTATIVE.
CASING (SEE GEN. NOTES 12 AND 13) WARNING SIGN 4 8
INDIAN OIL CORPORATION LIMITED
5. IN CASE THE PROPOSED PIPELINE IS PASSING PARALLEL TO AN EXISTING PIPELINE, A MIN. DISTANCE OF 5.0M SHALL IndianOil
BE MAINTAINED BETWEEN THE TWO. THE MIN. DISTANCE SHALL BE 10.0M. IN CASE OF PARALLEL LAYING BY HDD AND O.D. Ø WT(mm) COATING LENGTH ROU BOUNDARY MARKERS - 9
B 5.0M. IN CASE OF B+C. CGD NETWORK IN COIMBATORE B
X X X X X X X
6. ACTUAL LENGTH OF CONCRETE COATING AND CONCRETE SLABS SHALL BE DECIDED AS PER SITE REQUIREMENTS AND 168 6.4 - - 10
THE SAME SHALL BE PROVIDED WITHOUT ANY COST IMPLICATION. 356 6.0 - - 11
ALIGNMENT SHEET
7. OPTICAL FIBRE CABLE WILL BE LAID PARALLEL TO THE PIPELINE IN A SINGLE TRENCH AS PER RELEVANT STD. AND 12
SPECIFICATIONS. TEMP. CATHODIC PROTECTION SHALL BE PROVIDED AS PER APPROVED DESIGN DOCUMENTS & - SECTION : FROM KOUNDAMPALAYAM TO NEELAMBUR
DRAWINGS. - 13
8. IN CASE ANY PRIVATE DWELLING, INDUSTRIAL BUILDING OR PLACE OF PUBLIC ASSEMBLY FALLS WITHIN 15 M OF 14 CHAINAGE : FROM 06+300.00 KM. TO 07+000.00 KM.
FOR OTHER REQUIRED MATERIAL SEE
PIPELINE, ADDITIONAL COVER OF 300MM SHALL BE PROVIDED OVER AND ABOVE COVER INDICATED HEREIN.
15
9. ALL EXISTING UNDERGROUND UTILITIES SUCH AS PIPELINES, H/T CABLES ETC. SHALL BE IDENTIFIED AND LOCATED BY DRAWING TITLE DRAWING NO.
A THE CONTRACTOR BEFORE START OF ANY EXCAVATION AND TRENCHING WORK. CONTRACTOR SHALL INTIMATE THE 16 A
CONCERNED AUTHORITIES HAVING JURISDICTION AND SHALL CARRY OUT SUCH WORKS TAKING ALL REQUIRED 17 TRACTEBEL Engineering pvt. ltd.
PRECAUTIONS AND SAFETY MEASURES, INCLUDING NECESSARY ENCASEMENT FOR U/G FACILITIES, TO PREVENT ANY
DAMAGE TO EXISTING / PROPOSED INSTALLATIONS, 18
10. ALL NECESSARY MEASURES SHALL BE TAKEN BY CONTRACTOR FOR FAULT LINE CROSSING AND SEISMIC AREA, TO 19 AS SHOWN P.013553-G-21048- M710 0
MITIGATE ITS EFFECT, AS MENTIONED / RECOMMENDED IN RFP DOCUMENT.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
X
Ch:7666.44 m
X
Ch:7534.67 m
X
X
0.9m
X
X
2.23m
X
X
2.34m
X
X
CS-44 CS-45
X
X
0.5m
X X X X X X X X X X X X X X
X X X X X X X X X
CS-49
X
13.75m
X
CS-47
X
CS-46 X
14.68m
To NH-209 CS-48 To NH-47
Asp.Road
Asp.Road Asp.Road Asp.Road
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X
X X X X
X X X X X
X X X X X
X
X
M M
X
X
X
X
X
X X
SURVEY DETAILS
L WHEREVER PIPELINE IS CROSSING 11KV AND ABOVE A/G OR U/G HT LINE CONCRETE SLAB SHALL BE L
PROVIDED AS PER STANDARD DRAWING NO. GGNG-D-20707-009.
WHEREVER PIPELINE IS CROSSING THE EXISTING PIPELINES, THE CONCRETE SLAB
SHALL BE PROVIDED AS PER DRAWING NO. GGNG-D-20707-014.
WHEREVER WATER TABLE DURING TRENCHING IS ENCOUNTERED IT SHALL BE BROUGHT DOWN TO MINIMUM 300mm BELOW
THE BOTTOM LEVEL TRENCHING AND KEPT DRY FOR WORKING. FOR OTHER INSTRUCTIONS, REFER PTS (CONSTRUCTION)
MINIMUM COVER SHALL BE MEASURED FROM THE LOWEST LEVEL OF ROAD, RAIL, CANAL, WATER WAYS ETC. INCLUDING ITS
K ROU TO THE TOP OF CASING PIPE OR CARRIER PIPE AS PER TYPE OF CROSSING. K
J J
I I
GROUND LEVELS
(IN METRES)
OD (mm) / MATERIAL AND GRADE 12" (324 mm) OD API 5L GR. X52, PSL-2 (HFW / SMLS)
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
PIPELINE DETAILS
(000 + 000)
SPECIAL PROVISIONS
F F
PIPELINE COVER
MINIMUM (METRES)
1.2 1.5 1.2 1.5 1.2 1.5 1.2 1.5 1.2 1.5 1.2 1.5 1.2
SPECIAL INSTALLATIONS /
Asphalt Road
FITTINGS / MARKERS Start Ch: 7049.41 CS-044 CS-045 CS-046 CS-047 CS-048 CS-049
CROSSINGS Asphalt Road Asphalt Road Asphalt Road Asphalt Road Asphalt Road Asphalt Road Asphalt Road
11KV Power Line
Asphalt Road Asphalt Road
11KV Power Line
Nala Nala
End Ch: 7056.92 Start Ch: 7160.02 End Ch: 7163.93 Start Ch: 7350.7 End Ch: 7360.31 Start Ch: 7432.32 End Ch: 7437.06 Start Ch: 7528.46 End Ch: 7533.18 Start Ch: 7654.01 End Ch: 7663.88
E Ch: 7464.62 Ch: 7561.06 E
11KV Power Line
COATING Ch: 7046.87
EXTERNAL 3 LAYER POLYETHYLINE COATING & INTERNAL EPOXY, FIELD JOINTS BY HEAT SHRINKABLE SLEEVES AS PER SPECIFICATION IN SCOPE OF CONTRACTOR.
11KV Power Line
CATHODIC PROTECTION Ch: 7359.61
IN THE SCOPE OF CONTRACTOR (NOTE-7)
INSTALLATIONS
SOIL RESISTIVITY (OHM - M)
SUB-SOIL
DETAILS
@1.5m Depth
D D
SOIL STRATIFICATION
TOPOGRAPHIC SYMBOLS SOIL SYMBOLS PIPELINE SYMBOLS GENERAL NOTES BILL OF MATERIAL FOR THIS DRAWING REFERENCE DRAWING
CARRIER PIPE OTHER MATERIALS S.
1. ALL FIGURES ARE IN "METERS" UNLESS OTHERWISE SPECIFIED. ALL LEVEL ARE WITH REFERENCE TO MEAN SEA LEVEL DRAWING TITLE DRAWING NO.
(MSL). THE GROUND LEVELS/PROFILE INDICATED IN THE DRAWING IS ALONG THE CENTERLINE OF ROU. NO.
O.D. ∅ WT(mm) COATINGLENGTH DESCRIPTION NUMBER 1 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-044
2. FINAL CHAINAGES, TPs/IPs SECTION, INCLUDING DETOURED SECTION IF ANY, AND EXACT LOCATION & QUANTITIES OF
MARKERS SHALL BE INCORPORATED BY THE CONTRACTOR, IN AS-BUILT SDRAWINGS. 324 7.1 3LPE 700.00 K.M. POST - 2 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-045
C C
3. ALL CROSSINS SHALL MEET THE MIN. REQUIREMENTS OF COMPANY'S STD. DRAWING BASED ON VERIFICATION AT SITE. 324 3LPE DIRECTIONAL MARKER - 3 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-046
TYPE OF CROSSING (CASED OR UNCASED) FOR CANALS AND ROADS SHALL BE DECIDED FOR INDIVIDUAL CASES AFTER 0 10.09.2020 FIRST ISSUE. AS MS
CONSULTATION WITH CONCERNED AUTHORITIES. CROSSINGS FOR WHICH SPECIFIC DETAILS ARE NOT GIVEN, SHALL BE AERIAL MARKER - 4 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-047
EXECUTED AS PER JOB STANDARDS, SITE REQUIREMENTS AND AS PER INSTRUCTIONS OF OWNER/CONCERNED Rev. D M Y Modifications Drawn Checked Approved
AUTHORITIES.
INSULATING JOINT - 5 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-048
HOT BENDS - ISSUE RECORD
4. ANTI-BUOYANCY CONTROL, BANK STABILIZATION, SLOPE BREAKERS, SELECT BACKFILL, COVER AT OVER AND SAG 6 NALA CROSS SECTION IOC-NEELAMBUR-CS-049
BENDS AND OTHER MEASURES NOT SPECIFICALLY SHOWN IN THE DRAWING SHALL BE DECIDED AT THE SITE AS PER TOTAL 700.00 NAVIGABLE WATERWAY - 7
SPECIFICATIONS, SITE REQUIREMENTS AND INSTRUCTIONS OF OWNER/OWNERS REPRESENTATIVE.
CASING (SEE GEN. NOTES 12 AND 13) WARNING SIGN 6 8
INDIAN OIL CORPORATION LIMITED
5. IN CASE THE PROPOSED PIPELINE IS PASSING PARALLEL TO AN EXISTING PIPELINE, A MIN. DISTANCE OF 5.0M SHALL IndianOil
BE MAINTAINED BETWEEN THE TWO. THE MIN. DISTANCE SHALL BE 10.0M. IN CASE OF PARALLEL LAYING BY HDD AND O.D. Ø WT(mm) COATING LENGTH ROU BOUNDARY MARKERS - 9
B 5.0M. IN CASE OF B+C. CGD NETWORK IN COIMBATORE B
X X X X X X X
6. ACTUAL LENGTH OF CONCRETE COATING AND CONCRETE SLABS SHALL BE DECIDED AS PER SITE REQUIREMENTS AND 168 6.4 - - 10
THE SAME SHALL BE PROVIDED WITHOUT ANY COST IMPLICATION. 356 6.0 - - 11
ALIGNMENT SHEET
7. OPTICAL FIBRE CABLE WILL BE LAID PARALLEL TO THE PIPELINE IN A SINGLE TRENCH AS PER RELEVANT STD. AND 12
SPECIFICATIONS. TEMP. CATHODIC PROTECTION SHALL BE PROVIDED AS PER APPROVED DESIGN DOCUMENTS & - SECTION : FROM KOUNDAMPALAYAM TO NEELAMBUR
DRAWINGS. - 13
CHAINAGE : FROM 07+000.00 KM. TO 07+700.00 KM.
8. IN CASE ANY PRIVATE DWELLING, INDUSTRIAL BUILDING OR PLACE OF PUBLIC ASSEMBLY FALLS WITHIN 15 M OF
FOR OTHER REQUIRED MATERIAL SEE 14
PIPELINE, ADDITIONAL COVER OF 300MM SHALL BE PROVIDED OVER AND ABOVE COVER INDICATED HEREIN.
15
9. ALL EXISTING UNDERGROUND UTILITIES SUCH AS PIPELINES, H/T CABLES ETC. SHALL BE IDENTIFIED AND LOCATED BY DRAWING TITLE DRAWING NO.
A THE CONTRACTOR BEFORE START OF ANY EXCAVATION AND TRENCHING WORK. CONTRACTOR SHALL INTIMATE THE 16 A
CONCERNED AUTHORITIES HAVING JURISDICTION AND SHALL CARRY OUT SUCH WORKS TAKING ALL REQUIRED 17 TRACTEBEL Engineering pvt. ltd.
PRECAUTIONS AND SAFETY MEASURES, INCLUDING NECESSARY ENCASEMENT FOR U/G FACILITIES, TO PREVENT ANY
DAMAGE TO EXISTING / PROPOSED INSTALLATIONS, 18
10. ALL NECESSARY MEASURES SHALL BE TAKEN BY CONTRACTOR FOR FAULT LINE CROSSING AND SEISMIC AREA, TO 19 AS SHOWN P.013553-G-21048- M711 0
MITIGATE ITS EFFECT, AS MENTIONED / RECOMMENDED IN RFP DOCUMENT.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
P188
IP105/4 - m
7
Ch:8053.7 0
86 IP105/6 - P19
/2 - P1
O O
189 Ch:8116 .1 7 m
IP105 6.06 m IP105/5 - P
0 m
Ch:80 - P187 Ch:8063.79
IP105/3 9 m CS-50
.4
X
X X
X X
TP106 - 5 m
X X
X X
X X
X
Ch:8182
X X
85
Ch:79
X
X
X
X
X
X
X
X
X
X
X
X
- P184
X
P191
X
.7
X
X
X
X
TP105 8.99 m
X
X
X
X
X
X
X
X
X
X
X
X
3.1m
X
X
2
X
X
Ch:79
X
X
X
X
X
X
N N
X
X
X
X
X
X
Asp.Roa
d 10.49m
X
X
Asp. Ro
X
X
X
X
X
X
X
1.13m
0.64m
X
IP107/1 - P193
X
X
X
X
X
X
X
X
X
GAS PIPELINE
X
X
X
X
X
X
X
- P183
X
X
EEL
X
X
Ch:8397.88 m
X
PROPOSED ST
X
X
X
X
IP104/2 8 m
X
X
X
d
X
ad
Asp.Roa
X
X
X
X
X
X
X
X
X
X
X
12.21m
X
X
.1
X
X
Ch:7768
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
2.24m
X
X
X
X
X
X
X
X
X
0.9m
X
X
X
X
2.42m
X
X
X
X
X
X
0.9m
X
X
X
X
X
TP107 - P192
X
X
X
X
9.67m
X
X
X
X
X
X
X
X
X
M M
X
X
X
X
X
X
X
X
Ch:8261.08 m
X
X
13.45m
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
To NH-47
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
d Asp. Road
X
Asp.Roa
X
X
X
X
X
X X
X X
X X X
X X
X
X X
X X
X X X
X
X
X X
X X
X X X
X X X
X
X X
X
X
X X
X
X X
X
X X
X X
X X
X X
X X
X
X X
09
X X
X X
X
To NH-2
X X
X X
X
X X
X X
X X
X X
X X
X
X
X X
X X
X X
X X
X X
X
X
X
ad
X X
X X
Asp. Ro
X
X
SURVEY DETAILS
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
L L
WHEREVER PIPELINE IS CROSSING 11KV AND ABOVE A/G OR U/G HT LINE CONCRETE SLAB SHALL BE
PROVIDED AS PER STANDARD DRAWING NO. GGNG-D-20707-009.
WHEREVER PIPELINE IS CROSSING THE EXISTING PIPELINES, THE CONCRETE SLAB
SHALL BE PROVIDED AS PER DRAWING NO. GGNG-D-20707-014.
WHEREVER WATER TABLE DURING TRENCHING IS ENCOUNTERED IT SHALL BE BROUGHT DOWN TO MINIMUM 300mm BELOW
THE BOTTOM LEVEL TRENCHING AND KEPT DRY FOR WORKING. FOR OTHER INSTRUCTIONS, REFER PTS (CONSTRUCTION)
MINIMUM COVER SHALL BE MEASURED FROM THE LOWEST LEVEL OF ROAD, RAIL, CANAL, WATER WAYS ETC. INCLUDING ITS
K ROU TO THE TOP OF CASING PIPE OR CARRIER PIPE AS PER TYPE OF CROSSING. K
J J
I I
GROUND LEVELS
(IN METRES)
OD (mm) / MATERIAL AND GRADE 12" (324 mm) OD API 5L GR. X52, PSL-2 (HFW / SMLS)
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
PIPELINE DETAILS
(000 + 000)
SPECIAL PROVISIONS
F F
PIPELINE COVER
MINIMUM (METRES)
1.2 1.5 1.2
SPECIAL INSTALLATIONS /
FITTINGS / MARKERS CS-050
@1.5m Depth
D D
SOIL STRATIFICATION
TOPOGRAPHIC SYMBOLS SOIL SYMBOLS PIPELINE SYMBOLS GENERAL NOTES BILL OF MATERIAL FOR THIS DRAWING REFERENCE DRAWING
CARRIER PIPE OTHER MATERIALS S.
1. ALL FIGURES ARE IN "METERS" UNLESS OTHERWISE SPECIFIED. ALL LEVEL ARE WITH REFERENCE TO MEAN SEA LEVEL DRAWING TITLE DRAWING NO.
(MSL). THE GROUND LEVELS/PROFILE INDICATED IN THE DRAWING IS ALONG THE CENTERLINE OF ROU. NO.
O.D. ∅ LENGTH WT(mm)
DESCRIPTION COATING NUMBER 1 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-050
2. FINAL CHAINAGES, TPs/IPs SECTION, INCLUDING DETOURED SECTION IF ANY, AND EXACT LOCATION & QUANTITIES OF
MARKERS SHALL BE INCORPORATED BY THE CONTRACTOR, IN AS-BUILT SDRAWINGS. 324 700.00 K.M. POST 7.1 3LPE 1 2
C C
3. ALL CROSSINS SHALL MEET THE MIN. REQUIREMENTS OF COMPANY'S STD. DRAWING BASED ON VERIFICATION AT SITE. 324 DIRECTIONAL MARKER 3LPE 2 3
TYPE OF CROSSING (CASED OR UNCASED) FOR CANALS AND ROADS SHALL BE DECIDED FOR INDIVIDUAL CASES AFTER 0 10.09.2020 FIRST ISSUE. AS MS
CONSULTATION WITH CONCERNED AUTHORITIES. CROSSINGS FOR WHICH SPECIFIC DETAILS ARE NOT GIVEN, SHALL BE AERIAL MARKER - 4
EXECUTED AS PER JOB STANDARDS, SITE REQUIREMENTS AND AS PER INSTRUCTIONS OF OWNER/CONCERNED Rev. D M Y Modifications Drawn Checked Approved
AUTHORITIES.
INSULATING JOINT - 5
HOT BENDS - ISSUE RECORD
4. ANTI-BUOYANCY CONTROL, BANK STABILIZATION, SLOPE BREAKERS, SELECT BACKFILL, COVER AT OVER AND SAG 6
BENDS AND OTHER MEASURES NOT SPECIFICALLY SHOWN IN THE DRAWING SHALL BE DECIDED AT THE SITE AS PER TOTAL 700.00 NAVIGABLE WATERWAY - 7
SPECIFICATIONS, SITE REQUIREMENTS AND INSTRUCTIONS OF OWNER/OWNERS REPRESENTATIVE.
CASING (SEE GEN. NOTES 12 AND 13) WARNING SIGN 1 8
INDIAN OIL CORPORATION LIMITED
5. IN CASE THE PROPOSED PIPELINE IS PASSING PARALLEL TO AN EXISTING PIPELINE, A MIN. DISTANCE OF 5.0M SHALL IndianOil
BE MAINTAINED BETWEEN THE TWO. THE MIN. DISTANCE SHALL BE 10.0M. IN CASE OF PARALLEL LAYING BY HDD AND O.D. Ø WT(mm) COATING LENGTH ROU BOUNDARY MARKERS - 9
B 5.0M. IN CASE OF B+C. CGD NETWORK IN COIMBATORE B
X X X X X X X
6. ACTUAL LENGTH OF CONCRETE COATING AND CONCRETE SLABS SHALL BE DECIDED AS PER SITE REQUIREMENTS AND 168 6.4 - - 10
THE SAME SHALL BE PROVIDED WITHOUT ANY COST IMPLICATION. 356 6.0 - - 11
ALIGNMENT SHEET
7. OPTICAL FIBRE CABLE WILL BE LAID PARALLEL TO THE PIPELINE IN A SINGLE TRENCH AS PER RELEVANT STD. AND 12
SPECIFICATIONS. TEMP. CATHODIC PROTECTION SHALL BE PROVIDED AS PER APPROVED DESIGN DOCUMENTS & - SECTION : FROM KOUNDAMPALAYAM TO NEELAMBUR
DRAWINGS. - 13
8. IN CASE ANY PRIVATE DWELLING, INDUSTRIAL BUILDING OR PLACE OF PUBLIC ASSEMBLY FALLS WITHIN 15 M OF 14 CHAINAGE : FROM 07+700.00 KM. TO 08+400.00 KM.
FOR OTHER REQUIRED MATERIAL SEE
PIPELINE, ADDITIONAL COVER OF 300MM SHALL BE PROVIDED OVER AND ABOVE COVER INDICATED HEREIN.
15
9. ALL EXISTING UNDERGROUND UTILITIES SUCH AS PIPELINES, H/T CABLES ETC. SHALL BE IDENTIFIED AND LOCATED BY DRAWING TITLE DRAWING NO.
A THE CONTRACTOR BEFORE START OF ANY EXCAVATION AND TRENCHING WORK. CONTRACTOR SHALL INTIMATE THE 16 A
CONCERNED AUTHORITIES HAVING JURISDICTION AND SHALL CARRY OUT SUCH WORKS TAKING ALL REQUIRED 17 TRACTEBEL Engineering pvt. ltd.
PRECAUTIONS AND SAFETY MEASURES, INCLUDING NECESSARY ENCASEMENT FOR U/G FACILITIES, TO PREVENT ANY
DAMAGE TO EXISTING / PROPOSED INSTALLATIONS, 18
10. ALL NECESSARY MEASURES SHALL BE TAKEN BY CONTRACTOR FOR FAULT LINE CROSSING AND SEISMIC AREA, TO 19 AS SHOWN P.013553-G-21048- M712 0
MITIGATE ITS EFFECT, AS MENTIONED / RECOMMENDED IN RFP DOCUMENT.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
.33
10
Ch IP10 8606
PROPOS
10 4. 3
CS ED STEE
Ch
:
L GAS PIP
9 - 3 m P19
N ELINE N
P1
Ch
98
As
m
:
0.9
p
X
96
.R
X
X
-
1
X
10
oa
X
-P 2m IP109/4 - P2 7 TP115 - P2
X
X
8m P20 P212
X
IP109/5 - P20
X
02
m TP117 - 6 m
X
d
X
IP109/6 - 12 - .7 m 208
X
4
7 3.3 2.7 3
X
/
X
Ch:8738.02 m .2 7
X
X
P 1 3-P1m 4
9 IP h:86
0
Ch:8861.9 204
X
X
Ch:8815.53 m .0
11 Ch:9073
X
T 7
X
X
TP110 - P205 6 1 1
X
X
53 9
P
Ch:8
P 6 TP116 - P2
X
I h: - P - 1m T
026.
X
CS
3.62m
X
C /3 4 m Ch:8902.56 m Ch:9 7m
0.9m
Ch:9053.3
C
.
10 29.
7 m
X
10 96 .52
X
CS
9/2 55
IP h:84 17 -5
X
6
X
TP111 - P206
X
X
X
X
-P m
C
X
X
X
M M
Ch:8938.89 m
X
X
Road
X
20
X
Asp.
X
X
X
X
0
X
X
X
X
0.57m
X
X
Asp. Road
21.4m
1.74m22.97m
X
X
X
DWG NO. P.013553-G-21048-M712
X
To NH-47
19
X
CS-55
X X X X X X X X X X X X X X X X X X X X X
P
MATCH LINE FOR CONT. REFER
TP114 - P2
- 5m
Ch:9042.9
52
7/2 8.7
-
CS
1 0 4
IP h:84
SURVEY DETAILS
C X X X X X X X X X X X X X X X X X X X X X X X
3m
X X X X X X X X X
09
X X X X X X X X X X X X X
IP 87 P2
X X X X X X X X X X
X X X X X X X X X X X
IP :868
X X
10 38 01
X X X X X X
Ch 9/3 .3 m
X X
L L
X
X
X
Ch
10
X
9/4 .0
X
X
X
:
X
X
X
X
X
-P 2m
X
1
X
-5
X
20
3
CS
X
X
2
X
X
X
X
X
X
X
X
X
WHEREVER PIPELINE IS CROSSING 11KV AND ABOVE A/G OR U/G HT LINE CONCRETE SLAB SHALL BE
X
X
X
WHEREVER WATER TABLE DURING TRENCHING IS ENCOUNTERED IT SHALL BE BROUGHT DOWN TO MINIMUM 300mm BELOW
THE BOTTOM LEVEL TRENCHING AND KEPT DRY FOR WORKING. FOR OTHER INSTRUCTIONS, REFER PTS (CONSTRUCTION)
MINIMUM COVER SHALL BE MEASURED FROM THE LOWEST LEVEL OF ROAD, RAIL, CANAL, WATER WAYS ETC. INCLUDING ITS
ROU TO THE TOP OF CASING PIPE OR CARRIER PIPE AS PER TYPE OF CROSSING.
J J
I I
GROUND LEVELS
(IN METRES)
OD (mm) / MATERIAL AND GRADE 12" (324 mm) OD API 5L GR. X52, PSL-2 (HFW / SMLS)
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
PIPELINE DETAILS
(000 + 000)
SPECIAL PROVISIONS SV -04
F F
PIPELINE COVER
MINIMUM (METRES)
1.2 1.5 1.2 1.5 1.2 1.5 1.2 1.5 1.2 1.5 1.2 1.5 1.2
SPECIAL INSTALLATIONS /
Asphalt Road
FITTINGS / MARKERS CS-051 CS-052 CS-053 CS-054 CS-055 End Ch: 8936.72 CS-056
Drain
Start Ch: 8577.5
CROSSINGS Asphalt Road Asphalt Road Asphalt Road Asphalt Road Asphalt Road Asphalt Road Drain Asphalt Road Asphalt Road
1KV Power Line (Height:5.620m) 11KV Power Line
Asphalt Road Asphalt Road
Start Ch: 8443.04 End Ch: 8447.45 Start Ch: 8489.89 End Ch: 8493.55 Start Ch: 8535.45 End Ch: 8539.28 End Ch: 8578.36 End Ch: 8591.34 Start Ch: 8930.54 Start Ch: 9028.81 End Ch: 9039.7
E Ch: 8938.04 Ch: 8972.84 E
Asphalt Road 11KV Power Line 11KV Power Line (Height:6.5m)
COATING Start Ch: 8581.09
EXTERNAL 3 LAYER POLYETHYLINE COATING & INTERNAL EPOXY, FIELD JOINTS BY HEAT SHRINKABLE SLEEVES AS PER SPECIFICATION IN SCOPE OF CONTRACTOR. Ch: 8935.29 Ch: 9029.71
CATHODIC PROTECTION
IN THE SCOPE OF CONTRACTOR (NOTE-7)
INSTALLATIONS
SOIL RESISTIVITY (OHM - M)
SUB-SOIL
DETAILS
@1.5m Depth
D D
SOIL STRATIFICATION
TOPOGRAPHIC SYMBOLS SOIL SYMBOLS PIPELINE SYMBOLS GENERAL NOTES BILL OF MATERIAL FOR THIS DRAWING REFERENCE DRAWING
CARRIER PIPE OTHER MATERIALS S.
1. ALL FIGURES ARE IN "METERS" UNLESS OTHERWISE SPECIFIED. ALL LEVEL ARE WITH REFERENCE TO MEAN SEA LEVEL DRAWING TITLE DRAWING NO.
(MSL). THE GROUND LEVELS/PROFILE INDICATED IN THE DRAWING IS ALONG THE CENTERLINE OF ROU. NO.
O.D. ∅ WT(mm) COATINGLENGTH DESCRIPTION NUMBER 1 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-051
2. FINAL CHAINAGES, TPs/IPs SECTION, INCLUDING DETOURED SECTION IF ANY, AND EXACT LOCATION & QUANTITIES OF
MARKERS SHALL BE INCORPORATED BY THE CONTRACTOR, IN AS-BUILT SDRAWINGS. 324 7.1 3LPE 700.00 K.M. POST 1 2 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-052
C C
3. ALL CROSSINS SHALL MEET THE MIN. REQUIREMENTS OF COMPANY'S STD. DRAWING BASED ON VERIFICATION AT SITE. 324 3LPE DIRECTIONAL MARKER 4 3 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-053
TYPE OF CROSSING (CASED OR UNCASED) FOR CANALS AND ROADS SHALL BE DECIDED FOR INDIVIDUAL CASES AFTER 0 10.09.2020 FIRST ISSUE. AS MS
CONSULTATION WITH CONCERNED AUTHORITIES. CROSSINGS FOR WHICH SPECIFIC DETAILS ARE NOT GIVEN, SHALL BE AERIAL MARKER - 4 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-054
EXECUTED AS PER JOB STANDARDS, SITE REQUIREMENTS AND AS PER INSTRUCTIONS OF OWNER/CONCERNED Rev. D M Y Modifications Drawn Checked Approved
AUTHORITIES.
INSULATING JOINT - 5 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-055
HOT BENDS - ISSUE RECORD
4. ANTI-BUOYANCY CONTROL, BANK STABILIZATION, SLOPE BREAKERS, SELECT BACKFILL, COVER AT OVER AND SAG 6 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-056
BENDS AND OTHER MEASURES NOT SPECIFICALLY SHOWN IN THE DRAWING SHALL BE DECIDED AT THE SITE AS PER TOTAL 700.00 NAVIGABLE WATERWAY - 7
SPECIFICATIONS, SITE REQUIREMENTS AND INSTRUCTIONS OF OWNER/OWNERS REPRESENTATIVE.
CASING (SEE GEN. NOTES 12 AND 13) WARNING SIGN 6 8
INDIAN OIL CORPORATION LIMITED
5. IN CASE THE PROPOSED PIPELINE IS PASSING PARALLEL TO AN EXISTING PIPELINE, A MIN. DISTANCE OF 5.0M SHALL IndianOil
BE MAINTAINED BETWEEN THE TWO. THE MIN. DISTANCE SHALL BE 10.0M. IN CASE OF PARALLEL LAYING BY HDD AND O.D. Ø WT(mm) COATING LENGTH ROU BOUNDARY MARKERS - 9
B 5.0M. IN CASE OF B+C. CGD NETWORK IN COIMBATORE B
X X X X X X X
6. ACTUAL LENGTH OF CONCRETE COATING AND CONCRETE SLABS SHALL BE DECIDED AS PER SITE REQUIREMENTS AND 168 6.4 - - 10
THE SAME SHALL BE PROVIDED WITHOUT ANY COST IMPLICATION. 356 6.0 - - 11
ALIGNMENT SHEET
7. OPTICAL FIBRE CABLE WILL BE LAID PARALLEL TO THE PIPELINE IN A SINGLE TRENCH AS PER RELEVANT STD. AND 12
SPECIFICATIONS. TEMP. CATHODIC PROTECTION SHALL BE PROVIDED AS PER APPROVED DESIGN DOCUMENTS & - SECTION : FROM KOUNDAMPALAYAM TO NEELAMBUR
DRAWINGS. - 13
8. IN CASE ANY PRIVATE DWELLING, INDUSTRIAL BUILDING OR PLACE OF PUBLIC ASSEMBLY FALLS WITHIN 15 M OF 14 CHAINAGE : FROM 08+400.00 KM. TO 09+100.00 KM.
FOR OTHER REQUIRED MATERIAL SEE
PIPELINE, ADDITIONAL COVER OF 300MM SHALL BE PROVIDED OVER AND ABOVE COVER INDICATED HEREIN.
15
9. ALL EXISTING UNDERGROUND UTILITIES SUCH AS PIPELINES, H/T CABLES ETC. SHALL BE IDENTIFIED AND LOCATED BY DRAWING TITLE DRAWING NO.
A THE CONTRACTOR BEFORE START OF ANY EXCAVATION AND TRENCHING WORK. CONTRACTOR SHALL INTIMATE THE 16 A
CONCERNED AUTHORITIES HAVING JURISDICTION AND SHALL CARRY OUT SUCH WORKS TAKING ALL REQUIRED 17 TRACTEBEL Engineering pvt. ltd.
PRECAUTIONS AND SAFETY MEASURES, INCLUDING NECESSARY ENCASEMENT FOR U/G FACILITIES, TO PREVENT ANY
DAMAGE TO EXISTING / PROPOSED INSTALLATIONS, 18
10. ALL NECESSARY MEASURES SHALL BE TAKEN BY CONTRACTOR FOR FAULT LINE CROSSING AND SEISMIC AREA, TO 19 AS SHOWN P.013553-G-21048- M713 0
MITIGATE ITS EFFECT, AS MENTIONED / RECOMMENDED IN RFP DOCUMENT.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
O O
1.13m
1.51m
4 m
1.52m
0.5m
Ch:9 1 7 7 .6 CS-64 CS-65
IP117/1 - P213 P216
X
IP118/1 - m
CS-63
CS-62 IP122/4 - P234
Ch:9110.5 m 9
Ch:9196.1 Ch:9732.55 m
16.31m
Asp. Road
CS-61
.54
9277
Asp. Road CS-66
5.02m
.39
CS-60
.33
.54
0.5m
9226
9229
14.86m
9235
17.6m
M CS-58 CS-59 Asp. Road M
CS-57
To NH-4
X
X
X
X
X
Asp. Road
X
X
7
X
X
X X
X
X
X
X
To Vilangurichi
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
SURVEY DETAILS
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
L L
X
WHEREVER PIPELINE IS CROSSING 11KV AND ABOVE A/G OR U/G HT LINE CONCRETE
SLAB SHALL BE
PROVIDED AS PER STANDARD DRAWING NO. GGNG-D-20707-009.
WHEREVER PIPELINE IS CROSSING THE EXISTING PIPELINES, THE CONCRETE SLAB
K SHALL BE PROVIDED AS PER DRAWING NO. GGNG-D-20707-014. K
I I
GROUND LEVELS
(IN METRES)
OD (mm) / MATERIAL AND GRADE 12" (324 mm) OD API 5L GR. X52, PSL-2 (HFW / SMLS)
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
PIPELINE DETAILS
(000 + 000)
SPECIAL PROVISIONS
F F
PIPELINE COVER
1.5 1.2 1.5 1.2 1.5 1.2 1.5 1.2 1.5 1.2 1.5 1.2 1.5 1.2 1.5 1.2 1.5 1.2 1.5 1.2
1.2
MINIMUM (METRES)
11KV Power Line
SPECIAL INSTALLATIONS / Ch: 9477.51
Drain Asphalt Road Asphalt Road Asphalt Road Asphalt Road METAL ROAD
FITTINGS / MARKERS CS-057 CS-058 CS-059 CS-060 End Ch: 9238.1 CS-061 End Ch: 9283.13 Start Ch: 9330.16 CS-062 Start Ch: 9404.23 CS-063 CS-064 End Ch: 9458.85 CS-065 CS-066 End Ch: 9665.83
CROSSINGS Asphalt Road Asphalt Road Asphalt Road Asphalt Road Asphalt Road Asphalt Road Asphalt Road
11KV Power Line
Asphalt Road Asphalt Road Asphalt Road Asphalt Road Asphalt Road
11KV Power Line
METAL ROAD
TELEPHONE CABLE TELEPHONE CABLE
End Ch: 9106.88 Start Ch: 9145.77 Start Ch: 9171.33 End Ch: 9175.43 Start Ch: 9226.39 End Ch: 9235.54 Start Ch: 9277.54 End Ch: 9334.44 End Ch: 9410.31 Start Ch: 9455.79 Start Ch: 9478.69 End Ch: 9489.33 Start Ch: 9661
E Ch: 9306.82 Ch: 9515.46 Ch: 9673.69 Ch: 9727.58 E
Asphalt Road Asphalt Road
11KV Power Line (Height:5.532m) Drain 11KV Power Line (Height:6.250m) 11KV Power Line
COATING Start Ch: 9102.46 End Ch: 9149.76
Ch: 9175.43 Start Ch: 9232.38 Ch: 9276.81 Ch: 9291.34
EXTERNAL 3 LAYER POLYETHYLINE COATING & INTERNAL EPOXY, FIELD JOINTS BY HEAT SHRINKABLE SLEEVES AS PER SPECIFICATION IN SCOPE OF CONTRACTOR.
11KV Power Line 11KV Power Line (Height:6.120m) 11KV Power Line
11KV Power Line
CATHODIC PROTECTION Ch: 9314 Ch: 9322.91 Ch: 9403.67 Ch: 9459.86
IN THE SCOPE OF CONTRACTOR (NOTE-7)
INSTALLATIONS
SOIL RESISTIVITY (OHM - M)
SUB-SOIL
DETAILS
@1.5m Depth
D D
SOIL STRATIFICATION
TOPOGRAPHIC SYMBOLS SOIL SYMBOLS PIPELINE SYMBOLS GENERAL NOTES BILL OF MATERIAL FOR THIS DRAWING REFERENCE DRAWING
CARRIER PIPE OTHER MATERIALS S.
1. ALL FIGURES ARE IN "METERS" UNLESS OTHERWISE SPECIFIED. ALL LEVEL ARE WITH REFERENCE TO MEAN SEA LEVEL DRAWING TITLE DRAWING NO.
(MSL). THE GROUND LEVELS/PROFILE INDICATED IN THE DRAWING IS ALONG THE CENTERLINE OF ROU. NO.
O.D. ∅ WT(mm) COATING
LENGTH DESCRIPTION NUMBER 1 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-057
2. FINAL CHAINAGES, TPs/IPs SECTION, INCLUDING DETOURED SECTION IF ANY, AND EXACT LOCATION & QUANTITIES OF
MARKERS SHALL BE INCORPORATED BY THE CONTRACTOR, IN AS-BUILT SDRAWINGS. 324 7.1 3LPE
700.00 K.M. POST - 2 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-058
C C
3. ALL CROSSINS SHALL MEET THE MIN. REQUIREMENTS OF COMPANY'S STD. DRAWING BASED ON VERIFICATION AT SITE. 324 3LPE DIRECTIONAL MARKER - 3 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-059
TYPE OF CROSSING (CASED OR UNCASED) FOR CANALS AND ROADS SHALL BE DECIDED FOR INDIVIDUAL CASES AFTER 0 10.09.2020 FIRST ISSUE. AS MS
CONSULTATION WITH CONCERNED AUTHORITIES. CROSSINGS FOR WHICH SPECIFIC DETAILS ARE NOT GIVEN, SHALL BE AERIAL MARKER - 4 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-060
EXECUTED AS PER JOB STANDARDS, SITE REQUIREMENTS AND AS PER INSTRUCTIONS OF OWNER/CONCERNED Rev. D M Y Modifications Drawn Checked Approved
AUTHORITIES.
INSULATING JOINT - 5 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-061
HOT BENDS - ISSUE RECORD
4. ANTI-BUOYANCY CONTROL, BANK STABILIZATION, SLOPE BREAKERS, SELECT BACKFILL, COVER AT OVER AND SAG 6 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-062
BENDS AND OTHER MEASURES NOT SPECIFICALLY SHOWN IN THE DRAWING SHALL BE DECIDED AT THE SITE AS PER TOTAL 700.00 NAVIGABLE WATERWAY - 7 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-063
SPECIFICATIONS, SITE REQUIREMENTS AND INSTRUCTIONS OF OWNER/OWNERS REPRESENTATIVE.
CASING (SEE GEN. NOTES 12 AND 13) WARNING SIGN 10 8 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-064
INDIAN OIL CORPORATION LIMITED
5. IN CASE THE PROPOSED PIPELINE IS PASSING PARALLEL TO AN EXISTING PIPELINE, A MIN. DISTANCE OF 5.0M SHALL IndianOil
BE MAINTAINED BETWEEN THE TWO. THE MIN. DISTANCE SHALL BE 10.0M. IN CASE OF PARALLEL LAYING BY HDD AND O.D. Ø WT(mm) COATING LENGTH ROU BOUNDARY MARKERS - 9 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-065
B 5.0M. IN CASE OF B+C. CGD NETWORK IN COIMBATORE B
X X X X X X X
6. ACTUAL LENGTH OF CONCRETE COATING AND CONCRETE SLABS SHALL BE DECIDED AS PER SITE REQUIREMENTS AND 168 6.4 - - 10 METAL ROAD CROSS SECTION IOC-NEELAMBUR-CS-066
THE SAME SHALL BE PROVIDED WITHOUT ANY COST IMPLICATION. 356 6.0 - - 11
ALIGNMENT SHEET
7. OPTICAL FIBRE CABLE WILL BE LAID PARALLEL TO THE PIPELINE IN A SINGLE TRENCH AS PER RELEVANT STD. AND 12
SPECIFICATIONS. TEMP. CATHODIC PROTECTION SHALL BE PROVIDED AS PER APPROVED DESIGN DOCUMENTS & - SECTION : FROM KOUNDAMPALAYAM TO NEELAMBUR
DRAWINGS. - 13
8. IN CASE ANY PRIVATE DWELLING, INDUSTRIAL BUILDING OR PLACE OF PUBLIC ASSEMBLY FALLS WITHIN 15 M OF 14 CHAINAGE : FROM 09+100.00 KM. TO 09+800.00 KM.
FOR OTHER REQUIRED MATERIAL SEE
PIPELINE, ADDITIONAL COVER OF 300MM SHALL BE PROVIDED OVER AND ABOVE COVER INDICATED HEREIN.
15
9. ALL EXISTING UNDERGROUND UTILITIES SUCH AS PIPELINES, H/T CABLES ETC. SHALL BE IDENTIFIED AND LOCATED BY DRAWING TITLE DRAWING NO.
A THE CONTRACTOR BEFORE START OF ANY EXCAVATION AND TRENCHING WORK. CONTRACTOR SHALL INTIMATE THE 16 A
CONCERNED AUTHORITIES HAVING JURISDICTION AND SHALL CARRY OUT SUCH WORKS TAKING ALL REQUIRED 17 TRACTEBEL Engineering pvt. ltd.
PRECAUTIONS AND SAFETY MEASURES, INCLUDING NECESSARY ENCASEMENT FOR U/G FACILITIES, TO PREVENT ANY
DAMAGE TO EXISTING / PROPOSED INSTALLATIONS, 18
10. ALL NECESSARY MEASURES SHALL BE TAKEN BY CONTRACTOR FOR FAULT LINE CROSSING AND SEISMIC AREA, TO 19 AS SHOWN P.013553-G-21048- M714 0
MITIGATE ITS EFFECT, AS MENTIONED / RECOMMENDED IN RFP DOCUMENT.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
O O
249
IP132/2 - P m
3
Ch:10480.4
2.63m
0.5m
INE
0.5m
STEEL GAS PIPEL IP132/1 - P2
48
PROPOSED 3m
TP132 - P24
7 Ch:10373.4
17 .7 6 m
TO Ch:103
m m
0.5 3.44
991 4
0.53 38 C P1 97 7 .88
T h:9 12 85
-
m
TP h:99
10052.59
TP12 C Asp. Roa
d
4 - P2 C
Ch:99 3 Rcc R
23.21 9
m
68 d
S-
oad Asp. Roa
.53
m C Divid
19
SURVEY DETAILS
er
Rcc R
oad
-67
CS
L L
Asp. Road
Divider
Asp. Road
WHEREVER PIPELINE IS CROSSING 11KV AND ABOVE A/G OR U/G HT LINE CONCRETE SLAB SHALL BE
K PROVIDED AS PER STANDARD DRAWING NO. GGNG-D-20707-009. K
WHEREVER PIPELINE IS CROSSING THE EXISTING PIPELINES, THE CONCRETE SLAB
SHALL BE PROVIDED AS PER DRAWING NO. GGNG-D-20707-014.
WHEREVER WATER TABLE DURING TRENCHING IS ENCOUNTERED IT SHALL BE BROUGHT DOWN TO MINIMUM 300mm BELOW
THE BOTTOM LEVEL TRENCHING AND KEPT DRY FOR WORKING. FOR OTHER INSTRUCTIONS, REFER PTS (CONSTRUCTION)
MINIMUM COVER SHALL BE MEASURED FROM THE LOWEST LEVEL OF ROAD, RAIL, CANAL, WATER WAYS ETC. INCLUDING ITS
ROU TO THE TOP OF CASING PIPE OR CARRIER PIPE AS PER TYPE OF CROSSING.
J J
I I
GROUND LEVELS
(IN METRES)
OD (mm) / MATERIAL AND GRADE 12" (324 mm) OD API 5L GR. X52, PSL-2 (HFW / SMLS)
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
PIPELINE DETAILS
(000 + 000)
SPECIAL PROVISIONS
F F
PIPELINE COVER
MINIMUM (METRES)
1.2 1.5 1.2
SPECIAL INSTALLATIONS /
FITTINGS / MARKERS CS-067 CS-068
@1.5m Depth
D D
SOIL STRATIFICATION
TOPOGRAPHIC SYMBOLS SOIL SYMBOLS PIPELINE SYMBOLS GENERAL NOTES BILL OF MATERIAL FOR THIS DRAWING REFERENCE DRAWING
CARRIER PIPE OTHER MATERIALS S.
1. ALL FIGURES ARE IN "METERS" UNLESS OTHERWISE SPECIFIED. ALL LEVEL ARE WITH REFERENCE TO MEAN SEA LEVEL DRAWING TITLE DRAWING NO.
(MSL). THE GROUND LEVELS/PROFILE INDICATED IN THE DRAWING IS ALONG THE CENTERLINE OF ROU. NO.
O.D. ∅ WT(mm) COATING LENGTH DESCRIPTION NUMBER 1 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-067
2. FINAL CHAINAGES, TPs/IPs SECTION, INCLUDING DETOURED SECTION IF ANY, AND EXACT LOCATION & QUANTITIES OF
MARKERS SHALL BE INCORPORATED BY THE CONTRACTOR, IN AS-BUILT SDRAWINGS. 324 7.1 3LPE 700.00 K.M. POST - 2 RCC ROAD CROSS SECTION IOC-NEELAMBUR-CS-068
C C
3. ALL CROSSINS SHALL MEET THE MIN. REQUIREMENTS OF COMPANY'S STD. DRAWING BASED ON VERIFICATION AT SITE. 324 3LPE DIRECTIONAL MARKER 1 3
TYPE OF CROSSING (CASED OR UNCASED) FOR CANALS AND ROADS SHALL BE DECIDED FOR INDIVIDUAL CASES AFTER 0 10.09.2020 FIRST ISSUE. AS MS
CONSULTATION WITH CONCERNED AUTHORITIES. CROSSINGS FOR WHICH SPECIFIC DETAILS ARE NOT GIVEN, SHALL BE AERIAL MARKER 1 4
EXECUTED AS PER JOB STANDARDS, SITE REQUIREMENTS AND AS PER INSTRUCTIONS OF OWNER/CONCERNED Rev. D M Y Modifications Drawn Checked Approved
AUTHORITIES.
INSULATING JOINT - 5
HOT BENDS - ISSUE RECORD
4. ANTI-BUOYANCY CONTROL, BANK STABILIZATION, SLOPE BREAKERS, SELECT BACKFILL, COVER AT OVER AND SAG 6
BENDS AND OTHER MEASURES NOT SPECIFICALLY SHOWN IN THE DRAWING SHALL BE DECIDED AT THE SITE AS PER TOTAL 700.00 NAVIGABLE WATERWAY - 7
SPECIFICATIONS, SITE REQUIREMENTS AND INSTRUCTIONS OF OWNER/OWNERS REPRESENTATIVE.
CASING (SEE GEN. NOTES 12 AND 13) WARNING SIGN 2 8
INDIAN OIL CORPORATION LIMITED
5. IN CASE THE PROPOSED PIPELINE IS PASSING PARALLEL TO AN EXISTING PIPELINE, A MIN. DISTANCE OF 5.0M SHALL IndianOil
BE MAINTAINED BETWEEN THE TWO. THE MIN. DISTANCE SHALL BE 10.0M. IN CASE OF PARALLEL LAYING BY HDD AND O.D. Ø WT(mm) COATING LENGTH ROU BOUNDARY MARKERS - 9
B 5.0M. IN CASE OF B+C. CGD NETWORK IN COIMBATORE B
X X X X X X X
6. ACTUAL LENGTH OF CONCRETE COATING AND CONCRETE SLABS SHALL BE DECIDED AS PER SITE REQUIREMENTS AND 168 6.4 - - 10
THE SAME SHALL BE PROVIDED WITHOUT ANY COST IMPLICATION. 356 6.0 - - 11
ALIGNMENT SHEET
7. OPTICAL FIBRE CABLE WILL BE LAID PARALLEL TO THE PIPELINE IN A SINGLE TRENCH AS PER RELEVANT STD. AND 12
SPECIFICATIONS. TEMP. CATHODIC PROTECTION SHALL BE PROVIDED AS PER APPROVED DESIGN DOCUMENTS & - SECTION : FROM KOUNDAMPALAYAM TO NEELAMBUR
DRAWINGS. - 13
CHAINAGE : FROM 09+800.00 KM. TO 10+500.00 KM.
8. IN CASE ANY PRIVATE DWELLING, INDUSTRIAL BUILDING OR PLACE OF PUBLIC ASSEMBLY FALLS WITHIN 15 M OF
FOR OTHER REQUIRED MATERIAL SEE 14
PIPELINE, ADDITIONAL COVER OF 300MM SHALL BE PROVIDED OVER AND ABOVE COVER INDICATED HEREIN.
15
9. ALL EXISTING UNDERGROUND UTILITIES SUCH AS PIPELINES, H/T CABLES ETC. SHALL BE IDENTIFIED AND LOCATED BY DRAWING TITLE DRAWING NO.
A THE CONTRACTOR BEFORE START OF ANY EXCAVATION AND TRENCHING WORK. CONTRACTOR SHALL INTIMATE THE 16 A
CONCERNED AUTHORITIES HAVING JURISDICTION AND SHALL CARRY OUT SUCH WORKS TAKING ALL REQUIRED 17 TRACTEBEL Engineering pvt. ltd.
PRECAUTIONS AND SAFETY MEASURES, INCLUDING NECESSARY ENCASEMENT FOR U/G FACILITIES, TO PREVENT ANY
DAMAGE TO EXISTING / PROPOSED INSTALLATIONS, 18
10. ALL NECESSARY MEASURES SHALL BE TAKEN BY CONTRACTOR FOR FAULT LINE CROSSING AND SEISMIC AREA, TO 19 AS SHOWN P.013553-G-21048- M715 0
MITIGATE ITS EFFECT, AS MENTIONED / RECOMMENDED IN RFP DOCUMENT.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
To
PROPOSED STEEL GAS PIPELINE
TP137 - P255 61 TP14 3.42 m
N
2 - P2
H-4
TP14 19.26 m 10
IP136/1 - P254 Ch:10796.81 m Ch:11 To Sa
lem
7
0
2.85m
TP136 - P253 Ch:10702.1 m Ch:11
0.5m
P1310556.47 m
TP TPT1Ch:
Ch 1C33h:Ch3:4 - 5P - P252 TP138 - P256 - P260
:10 -1051055251 IP141/1 .47 m
1.83m
53 P2547.141.88 m Ch:10811.57 m 8 NH-47
7.7 0 m Asp. Road Ch:1094
4m TP139 - P257
Ch:10830.96 m P259
TP141 - .66 m
M NH-47 M
Asp. Road
30.14
2
Asp. Road TP140 - P258 Ch:1090
Ch:10840.24 m
m
Asp. Road
SURVEY DETAILS
NH-47
L NH-47 L
K WHEREVER PIPELINE IS CROSSING 11KV AND ABOVE A/G OR U/G HT LINE CONCRETE SLAB SHALL BE K
PROVIDED AS PER STANDARD DRAWING NO. GGNG-D-20707-009.
WHEREVER PIPELINE IS CROSSING THE EXISTING PIPELINES, THE CONCRETE SLAB
SHALL BE PROVIDED AS PER DRAWING NO. GGNG-D-20707-014.
WHEREVER WATER TABLE DURING TRENCHING IS ENCOUNTERED IT SHALL BE BROUGHT DOWN TO MINIMUM 300mm BELOW
THE BOTTOM LEVEL TRENCHING AND KEPT DRY FOR WORKING. FOR OTHER INSTRUCTIONS, REFER PTS (CONSTRUCTION)
MINIMUM COVER SHALL BE MEASURED FROM THE LOWEST LEVEL OF ROAD, RAIL, CANAL, WATER WAYS ETC. INCLUDING ITS
J ROU TO THE TOP OF CASING PIPE OR CARRIER PIPE AS PER TYPE OF CROSSING. J
I I
GROUND LEVELS
(IN METRES)
OD (mm) / MATERIAL AND GRADE 12" (324 mm) OD API 5L GR. X52, PSL-2 (HFW / SMLS)
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
PIPELINE DETAILS
(000 + 000)
SPECIAL PROVISIONS
F F
PIPELINE COVER
MINIMUM (METRES)
1.2
SPECIAL INSTALLATIONS /
FITTINGS / MARKERS
Drain Drain
Start Ch: 10837.21 End Ch: 10839.6
CROSSINGS
E E
COATING EXTERNAL 3 LAYER POLYETHYLINE COATING & INTERNAL EPOXY, FIELD JOINTS BY HEAT SHRINKABLE SLEEVES AS PER SPECIFICATION IN SCOPE OF CONTRACTOR.
CATHODIC PROTECTION
IN THE SCOPE OF CONTRACTOR (NOTE-7)
INSTALLATIONS
SOIL RESISTIVITY (OHM - M)
SUB-SOIL
DETAILS
@1.5m Depth
D D
SOIL STRATIFICATION
TOPOGRAPHIC SYMBOLS SOIL SYMBOLS PIPELINE SYMBOLS GENERAL NOTES BILL OF MATERIAL FOR THIS DRAWING REFERENCE DRAWING
CARRIER PIPE OTHER MATERIALS S.
1. ALL FIGURES ARE IN "METERS" UNLESS OTHERWISE SPECIFIED. ALL LEVEL ARE WITH REFERENCE TO MEAN SEA LEVEL DRAWING TITLE DRAWING NO.
(MSL). THE GROUND LEVELS/PROFILE INDICATED IN THE DRAWING IS ALONG THE CENTERLINE OF ROU. NO.
O.D. ∅ WT(mm) COATING
LENGTH DESCRIPTION NUMBER 1
2. FINAL CHAINAGES, TPs/IPs SECTION, INCLUDING DETOURED SECTION IF ANY, AND EXACT LOCATION & QUANTITIES OF
MARKERS SHALL BE INCORPORATED BY THE CONTRACTOR, IN AS-BUILT SDRAWINGS. 324 7.1 3LPE 700.00 K.M. POST 1 2
C C
3. ALL CROSSINS SHALL MEET THE MIN. REQUIREMENTS OF COMPANY'S STD. DRAWING BASED ON VERIFICATION AT SITE. 324 3LPE DIRECTIONAL MARKER 5 3
TYPE OF CROSSING (CASED OR UNCASED) FOR CANALS AND ROADS SHALL BE DECIDED FOR INDIVIDUAL CASES AFTER 0 10.09.2020 FIRST ISSUE. AS MS
CONSULTATION WITH CONCERNED AUTHORITIES. CROSSINGS FOR WHICH SPECIFIC DETAILS ARE NOT GIVEN, SHALL BE AERIAL MARKER - 4
EXECUTED AS PER JOB STANDARDS, SITE REQUIREMENTS AND AS PER INSTRUCTIONS OF OWNER/CONCERNED Rev. D M Y Modifications Drawn Checked Approved
AUTHORITIES.
INSULATING JOINT - 5
HOT BENDS - ISSUE RECORD
4. ANTI-BUOYANCY CONTROL, BANK STABILIZATION, SLOPE BREAKERS, SELECT BACKFILL, COVER AT OVER AND SAG 6
BENDS AND OTHER MEASURES NOT SPECIFICALLY SHOWN IN THE DRAWING SHALL BE DECIDED AT THE SITE AS PER TOTAL 700.00 NAVIGABLE WATERWAY - 7
SPECIFICATIONS, SITE REQUIREMENTS AND INSTRUCTIONS OF OWNER/OWNERS REPRESENTATIVE.
CASING (SEE GEN. NOTES 12 AND 13) WARNING SIGN - 8
INDIAN OIL CORPORATION LIMITED
5. IN CASE THE PROPOSED PIPELINE IS PASSING PARALLEL TO AN EXISTING PIPELINE, A MIN. DISTANCE OF 5.0M SHALL IndianOil
BE MAINTAINED BETWEEN THE TWO. THE MIN. DISTANCE SHALL BE 10.0M. IN CASE OF PARALLEL LAYING BY HDD AND O.D. Ø WT(mm) COATING LENGTH ROU BOUNDARY MARKERS - 9
B 5.0M. IN CASE OF B+C. CGD NETWORK IN COIMBATORE B
X X X X X X X
6. ACTUAL LENGTH OF CONCRETE COATING AND CONCRETE SLABS SHALL BE DECIDED AS PER SITE REQUIREMENTS AND 168 6.4 - - 10
THE SAME SHALL BE PROVIDED WITHOUT ANY COST IMPLICATION. 356 6.0 - - 11
ALIGNMENT SHEET
7. OPTICAL FIBRE CABLE WILL BE LAID PARALLEL TO THE PIPELINE IN A SINGLE TRENCH AS PER RELEVANT STD. AND 12
SPECIFICATIONS. TEMP. CATHODIC PROTECTION SHALL BE PROVIDED AS PER APPROVED DESIGN DOCUMENTS & - SECTION : FROM KOUNDAMPALAYAM TO NEELAMBUR
DRAWINGS. - 13
8. IN CASE ANY PRIVATE DWELLING, INDUSTRIAL BUILDING OR PLACE OF PUBLIC ASSEMBLY FALLS WITHIN 15 M OF 14 CHAINAGE : FROM 10+500.00 KM. TO 11+200.00 KM.
FOR OTHER REQUIRED MATERIAL SEE
PIPELINE, ADDITIONAL COVER OF 300MM SHALL BE PROVIDED OVER AND ABOVE COVER INDICATED HEREIN.
15
9. ALL EXISTING UNDERGROUND UTILITIES SUCH AS PIPELINES, H/T CABLES ETC. SHALL BE IDENTIFIED AND LOCATED BY DRAWING TITLE DRAWING NO.
A THE CONTRACTOR BEFORE START OF ANY EXCAVATION AND TRENCHING WORK. CONTRACTOR SHALL INTIMATE THE 16 A
CONCERNED AUTHORITIES HAVING JURISDICTION AND SHALL CARRY OUT SUCH WORKS TAKING ALL REQUIRED 17 TRACTEBEL Engineering pvt. ltd.
PRECAUTIONS AND SAFETY MEASURES, INCLUDING NECESSARY ENCASEMENT FOR U/G FACILITIES, TO PREVENT ANY
DAMAGE TO EXISTING / PROPOSED INSTALLATIONS, 18
10. ALL NECESSARY MEASURES SHALL BE TAKEN BY CONTRACTOR FOR FAULT LINE CROSSING AND SEISMIC AREA, TO 19 AS SHOWN P.013553-G-21048- M716 0
MITIGATE ITS EFFECT, AS MENTIONED / RECOMMENDED IN RFP DOCUMENT.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
X
N IP145/3 - P269 N
X
X
X
Ch:11677.03 m
X
X
IP144/2 - P265 IP145/4 - P270
X
IP145/2 - P268
X
7.15m
X
Ch:11253.16 m Ch:11739.89 m
X
IP145/5 - P271 TP146 - P272
X
IP145/1 - P267 Ch:11573.74 m
X
3.32m
X
X
TP145 - P266 Ch:11428.36 m Ch:11805.33 mCh:11874.43 m
6.64m
X
5.31m
X
X
X
X
Ch:11373.65 m
X
X X X X X X
X X X X
X X
X
X X
5.51m
X X X X
X X X X
X
X X X X X
X X X X X
X X X X X
X X X X X
X X X X X
X
X X
X X
X X
X X
X X
X X X
X X X
X
X
X X X
X X X
X X X
X X X
X X X
X X X
X X X
X
X
X X X
X X X
X X X
X X X
X X X
X X X
X X X
X
X
X X X
X X X
X X X
X X X
X X
CS-70
X X X
X X X
X X X
X
X X X
X X X
X X X
X X X
X X X
X X X
16.45m
CS-71
CS-69
M M
41.15m
NH-47
5.38m
37.85m
To Coimbatore NH-47
NH-47 Divider
Divider
DIVIDER NH-47
NH-47
NH-47
To Salem
SURVEY DETAILS
X X X X
X X X
X X X X
X X X X
X X X X
X X X X
X X X
X X X
L L
WHEREVER PIPELINE IS CROSSING 11KV AND ABOVE A/G OR U/G HT LINE CONCRETE SLAB SHALL BE
PROVIDED AS PER STANDARD DRAWING NO. GGNG-D-20707-009.
K K
WHEREVER PIPELINE IS CROSSING THE EXISTING PIPELINES, THE CONCRETE SLAB
SHALL BE PROVIDED AS PER DRAWING NO. GGNG-D-20707-014.
WHEREVER WATER TABLE DURING TRENCHING IS ENCOUNTERED IT SHALL BE BROUGHT DOWN TO MINIMUM 300mm BELOW
THE BOTTOM LEVEL TRENCHING AND KEPT DRY FOR WORKING. FOR OTHER INSTRUCTIONS, REFER PTS (CONSTRUCTION)
MINIMUM COVER SHALL BE MEASURED FROM THE LOWEST LEVEL OF ROAD, RAIL, CANAL, WATER WAYS ETC. INCLUDING ITS
ROU TO THE TOP OF CASING PIPE OR CARRIER PIPE AS PER TYPE OF CROSSING.
J J
I I
GROUND LEVELS
(IN METRES)
OD (mm) / MATERIAL AND GRADE 12" (324 mm) OD API 5L GR. X52, PSL-2 (HFW / SMLS)
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
PIPELINE DETAILS
(000 + 000)
SPECIAL PROVISIONS
F F
PIPELINE COVER
MINIMUM (METRES)
1.2 1.5 1.2 1.5 1.2 1.5 1.2
SPECIAL INSTALLATIONS /
FITTINGS / MARKERS CS-069 CS-070 CS-071
CROSSINGS Asphalt Road Asphalt Road ROAD ROAD Asphalt Road Asphalt Road
Start Ch: 11383.19 End Ch: 11416.68 Start Ch: 11667.5 End Ch: 11674.6 Start Ch: 11796.76 End Ch: 11803.15
E E
COATING EXTERNAL 3 LAYER POLYETHYLINE COATING & INTERNAL EPOXY, FIELD JOINTS BY HEAT SHRINKABLE SLEEVES AS PER SPECIFICATION IN SCOPE OF CONTRACTOR.
CATHODIC PROTECTION
IN THE SCOPE OF CONTRACTOR (NOTE-7)
INSTALLATIONS
SOIL RESISTIVITY (OHM - M)
SUB-SOIL
DETAILS
@1.5m Depth
D D
SOIL STRATIFICATION
TOPOGRAPHIC SYMBOLS SOIL SYMBOLS PIPELINE SYMBOLS GENERAL NOTES BILL OF MATERIAL FOR THIS DRAWING REFERENCE DRAWING
CARRIER PIPE OTHER MATERIALS S.
1. ALL FIGURES ARE IN "METERS" UNLESS OTHERWISE SPECIFIED. ALL LEVEL ARE WITH REFERENCE TO MEAN SEA LEVEL DRAWING TITLE DRAWING NO.
(MSL). THE GROUND LEVELS/PROFILE INDICATED IN THE DRAWING IS ALONG THE CENTERLINE OF ROU. NO.
O.D. ∅ LENGTH WT(mm)
DESCRIPTION COATING NUMBER 1 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-069
2. FINAL CHAINAGES, TPs/IPs SECTION, INCLUDING DETOURED SECTION IF ANY, AND EXACT LOCATION & QUANTITIES OF
MARKERS SHALL BE INCORPORATED BY THE CONTRACTOR, IN AS-BUILT SDRAWINGS. 324 700.00 K.M. POST7.1 3LPE - 2 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-070
C C
3. ALL CROSSINS SHALL MEET THE MIN. REQUIREMENTS OF COMPANY'S STD. DRAWING BASED ON VERIFICATION AT SITE. 324 DIRECTIONAL MARKER 3LPE - 3 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-071
TYPE OF CROSSING (CASED OR UNCASED) FOR CANALS AND ROADS SHALL BE DECIDED FOR INDIVIDUAL CASES AFTER 0 10.09.2020 FIRST ISSUE. AS MS
CONSULTATION WITH CONCERNED AUTHORITIES. CROSSINGS FOR WHICH SPECIFIC DETAILS ARE NOT GIVEN, SHALL BE AERIAL MARKER - 4
EXECUTED AS PER JOB STANDARDS, SITE REQUIREMENTS AND AS PER INSTRUCTIONS OF OWNER/CONCERNED Rev. D M Y Modifications Drawn Checked Approved
AUTHORITIES.
INSULATING JOINT - 5
HOT BENDS - ISSUE RECORD
4. ANTI-BUOYANCY CONTROL, BANK STABILIZATION, SLOPE BREAKERS, SELECT BACKFILL, COVER AT OVER AND SAG 6
BENDS AND OTHER MEASURES NOT SPECIFICALLY SHOWN IN THE DRAWING SHALL BE DECIDED AT THE SITE AS PER TOTAL 700.00 NAVIGABLE WATERWAY - 7
SPECIFICATIONS, SITE REQUIREMENTS AND INSTRUCTIONS OF OWNER/OWNERS REPRESENTATIVE.
CASING (SEE GEN. NOTES 12 AND 13) WARNING SIGN 3 8
INDIAN OIL CORPORATION LIMITED
5. IN CASE THE PROPOSED PIPELINE IS PASSING PARALLEL TO AN EXISTING PIPELINE, A MIN. DISTANCE OF 5.0M SHALL IndianOil
BE MAINTAINED BETWEEN THE TWO. THE MIN. DISTANCE SHALL BE 10.0M. IN CASE OF PARALLEL LAYING BY HDD AND O.D. Ø WT(mm) COATING LENGTH ROU BOUNDARY MARKERS - 9
B 5.0M. IN CASE OF B+C. CGD NETWORK IN COIMBATORE B
X X X X X X X
6. ACTUAL LENGTH OF CONCRETE COATING AND CONCRETE SLABS SHALL BE DECIDED AS PER SITE REQUIREMENTS AND 168 6.4 - - 10
THE SAME SHALL BE PROVIDED WITHOUT ANY COST IMPLICATION. 356 6.0 - - 11
ALIGNMENT SHEET
7. OPTICAL FIBRE CABLE WILL BE LAID PARALLEL TO THE PIPELINE IN A SINGLE TRENCH AS PER RELEVANT STD. AND 12
SPECIFICATIONS. TEMP. CATHODIC PROTECTION SHALL BE PROVIDED AS PER APPROVED DESIGN DOCUMENTS & - SECTION : FROM KOUNDAMPALAYAM TO NEELAMBUR
DRAWINGS. - 13
8. IN CASE ANY PRIVATE DWELLING, INDUSTRIAL BUILDING OR PLACE OF PUBLIC ASSEMBLY FALLS WITHIN 15 M OF 14 CHAINAGE : FROM 11+200.00 KM. TO 11+900.00 KM.
FOR OTHER REQUIRED MATERIAL SEE
PIPELINE, ADDITIONAL COVER OF 300MM SHALL BE PROVIDED OVER AND ABOVE COVER INDICATED HEREIN.
15
9. ALL EXISTING UNDERGROUND UTILITIES SUCH AS PIPELINES, H/T CABLES ETC. SHALL BE IDENTIFIED AND LOCATED BY DRAWING TITLE DRAWING NO.
A THE CONTRACTOR BEFORE START OF ANY EXCAVATION AND TRENCHING WORK. CONTRACTOR SHALL INTIMATE THE 16 A
CONCERNED AUTHORITIES HAVING JURISDICTION AND SHALL CARRY OUT SUCH WORKS TAKING ALL REQUIRED 17 TRACTEBEL Engineering pvt. ltd.
PRECAUTIONS AND SAFETY MEASURES, INCLUDING NECESSARY ENCASEMENT FOR U/G FACILITIES, TO PREVENT ANY
DAMAGE TO EXISTING / PROPOSED INSTALLATIONS, 18
10. ALL NECESSARY MEASURES SHALL BE TAKEN BY CONTRACTOR FOR FAULT LINE CROSSING AND SEISMIC AREA, TO 19 AS SHOWN P.013553-G-21048- M717 0
MITIGATE ITS EFFECT, AS MENTIONED / RECOMMENDED IN RFP DOCUMENT.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
3.57m
Ch:12386.45 m Ch:12560.12
4.41m
Ch:11930.66 m IP147/1 - P274 Ch:12136.37 m m
8.63m
IP147/5 - P278
X
X
IP147/4 - P277
7.19m
Ch:12006.63 m
X
X
Ch:12203.53 m
X X
X X
X X
X X
X X
Ch:12162.55 m
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X
X X X
X X X X
X X X X
X X X
X X X
X X X X
X X X X
X X X
X X X
X X X X
X X X X
X X X
X X
CS-73
X X X
M M
X X X
X X X X
X X X X
X X X
X X X
X X X X
X X X X
X X X
X X X
X X X X
X X X X
X X X
X X X
X X X X
X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
6.05m
To Coimbatore CS-72
NH-47
NH-47
33.31m
35.08m
Divider NH-47 Divider
NH-47
Divider
SURVEY DETAILS
NH-47 To Salem
NH-47
L L
K WHEREVER PIPELINE IS CROSSING 11KV AND ABOVE A/G OR U/G HT LINE CONCRETE SLAB SHALL BE K
PROVIDED AS PER STANDARD DRAWING NO. GGNG-D-20707-009.
WHEREVER PIPELINE IS CROSSING THE EXISTING PIPELINES, THE CONCRETE SLAB
SHALL BE PROVIDED AS PER DRAWING NO. GGNG-D-20707-014.
WHEREVER WATER TABLE DURING TRENCHING IS ENCOUNTERED IT SHALL BE BROUGHT DOWN TO MINIMUM 300mm BELOW
THE BOTTOM LEVEL TRENCHING AND KEPT DRY FOR WORKING. FOR OTHER INSTRUCTIONS, REFER PTS (CONSTRUCTION)
MINIMUM COVER SHALL BE MEASURED FROM THE LOWEST LEVEL OF ROAD, RAIL, CANAL, WATER WAYS ETC. INCLUDING ITS
J
ROU TO THE TOP OF CASING PIPE OR CARRIER PIPE AS PER TYPE OF CROSSING. J
I I
GROUND LEVELS
(IN METRES)
OD (mm) / MATERIAL AND GRADE 12" (324 mm) OD API 5L GR. X52, PSL-2 (HFW / SMLS)
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
PIPELINE DETAILS
(000 + 000)
SPECIAL PROVISIONS SV -05
F F
PIPELINE COVER
MINIMUM (METRES)
1.2 1.5 1.2 1.5 1.2
SPECIAL INSTALLATIONS /
FITTINGS / MARKERS CS-072 CS-073
@1.5m Depth
D D
SOIL STRATIFICATION
TOPOGRAPHIC SYMBOLS SOIL SYMBOLS PIPELINE SYMBOLS GENERAL NOTES BILL OF MATERIAL FOR THIS DRAWING REFERENCE DRAWING
CARRIER PIPE OTHER MATERIALS S.
1. ALL FIGURES ARE IN "METERS" UNLESS OTHERWISE SPECIFIED. ALL LEVEL ARE WITH REFERENCE TO MEAN SEA LEVEL DRAWING TITLE DRAWING NO.
(MSL). THE GROUND LEVELS/PROFILE INDICATED IN THE DRAWING IS ALONG THE CENTERLINE OF ROU. NO.
O.D. ∅ LENGTH WT(mm)
DESCRIPTION COATING NUMBER 1 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-072
2. FINAL CHAINAGES, TPs/IPs SECTION, INCLUDING DETOURED SECTION IF ANY, AND EXACT LOCATION & QUANTITIES OF
MARKERS SHALL BE INCORPORATED BY THE CONTRACTOR, IN AS-BUILT SDRAWINGS. 324 700.00 K.M. POST7.1 3LPE 1 2 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-073
C C
3. ALL CROSSINS SHALL MEET THE MIN. REQUIREMENTS OF COMPANY'S STD. DRAWING BASED ON VERIFICATION AT SITE. 324 DIRECTIONAL MARKER 3LPE - 3
TYPE OF CROSSING (CASED OR UNCASED) FOR CANALS AND ROADS SHALL BE DECIDED FOR INDIVIDUAL CASES AFTER 0 10.09.2020 FIRST ISSUE. AS MS
CONSULTATION WITH CONCERNED AUTHORITIES. CROSSINGS FOR WHICH SPECIFIC DETAILS ARE NOT GIVEN, SHALL BE AERIAL MARKER - 4
EXECUTED AS PER JOB STANDARDS, SITE REQUIREMENTS AND AS PER INSTRUCTIONS OF OWNER/CONCERNED Rev. D M Y Modifications Drawn Checked Approved
AUTHORITIES.
INSULATING JOINT - 5
HOT BENDS - ISSUE RECORD
4. ANTI-BUOYANCY CONTROL, BANK STABILIZATION, SLOPE BREAKERS, SELECT BACKFILL, COVER AT OVER AND SAG 6
BENDS AND OTHER MEASURES NOT SPECIFICALLY SHOWN IN THE DRAWING SHALL BE DECIDED AT THE SITE AS PER TOTAL 700.00 NAVIGABLE WATERWAY - 7
SPECIFICATIONS, SITE REQUIREMENTS AND INSTRUCTIONS OF OWNER/OWNERS REPRESENTATIVE.
CASING (SEE GEN. NOTES 12 AND 13) WARNING SIGN 2 8
INDIAN OIL CORPORATION LIMITED
5. IN CASE THE PROPOSED PIPELINE IS PASSING PARALLEL TO AN EXISTING PIPELINE, A MIN. DISTANCE OF 5.0M SHALL IndianOil
BE MAINTAINED BETWEEN THE TWO. THE MIN. DISTANCE SHALL BE 10.0M. IN CASE OF PARALLEL LAYING BY HDD AND O.D. Ø WT(mm) COATING LENGTH ROU BOUNDARY MARKERS - 9
B 5.0M. IN CASE OF B+C. CGD NETWORK IN COIMBATORE B
X X X X X X X
6. ACTUAL LENGTH OF CONCRETE COATING AND CONCRETE SLABS SHALL BE DECIDED AS PER SITE REQUIREMENTS AND 168 6.4 - - 10
THE SAME SHALL BE PROVIDED WITHOUT ANY COST IMPLICATION. 356 6.0 - - 11
ALIGNMENT SHEET
7. OPTICAL FIBRE CABLE WILL BE LAID PARALLEL TO THE PIPELINE IN A SINGLE TRENCH AS PER RELEVANT STD. AND 12
SPECIFICATIONS. TEMP. CATHODIC PROTECTION SHALL BE PROVIDED AS PER APPROVED DESIGN DOCUMENTS & - SECTION : FROM KOUNDAMPALAYAM TO NEELAMBUR
DRAWINGS. - 13
8. IN CASE ANY PRIVATE DWELLING, INDUSTRIAL BUILDING OR PLACE OF PUBLIC ASSEMBLY FALLS WITHIN 15 M OF 14 CHAINAGE : FROM 11+900.00 KM. TO 12+600.00 KM.
FOR OTHER REQUIRED MATERIAL SEE
PIPELINE, ADDITIONAL COVER OF 300MM SHALL BE PROVIDED OVER AND ABOVE COVER INDICATED HEREIN.
15
9. ALL EXISTING UNDERGROUND UTILITIES SUCH AS PIPELINES, H/T CABLES ETC. SHALL BE IDENTIFIED AND LOCATED BY DRAWING TITLE DRAWING NO.
A THE CONTRACTOR BEFORE START OF ANY EXCAVATION AND TRENCHING WORK. CONTRACTOR SHALL INTIMATE THE 16 A
CONCERNED AUTHORITIES HAVING JURISDICTION AND SHALL CARRY OUT SUCH WORKS TAKING ALL REQUIRED 17 TRACTEBEL Engineering pvt. ltd.
PRECAUTIONS AND SAFETY MEASURES, INCLUDING NECESSARY ENCASEMENT FOR U/G FACILITIES, TO PREVENT ANY
DAMAGE TO EXISTING / PROPOSED INSTALLATIONS, 18
10. ALL NECESSARY MEASURES SHALL BE TAKEN BY CONTRACTOR FOR FAULT LINE CROSSING AND SEISMIC AREA, TO 19 AS SHOWN P.013553-G-21048- M718 0
MITIGATE ITS EFFECT, AS MENTIONED / RECOMMENDED IN RFP DOCUMENT.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
X X
IP152/1 - P292 IP152/3 - P294 IP152/4 - P295
X
IP154/4 - P30
X
Ch:13457.29 m 1
X
Ch:13319.34 m Ch:13541.76 m Ch:13597.55 m TP154 - P297 IP154/3 - P300
X
Ch:13965.18
X
N N
IP154/1 - P298
X
Ch:13699.72 m IP154/2 - P299 Ch:13889.65 m m
X
1.37m
X
Ch:13806.44 m
X
TP155 - P302
X
Ch:13848.75 m
X
4.41m
X
X
Ch:13995.06 m
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
0.3m
X X X X
X
X X X X X X X X X
X X X X X X X X X
X X X
X
X X X X X X X X X
X X X X X
CS-82
X X X
2.26m
12.28m
X
X
X X X X X X X X X X X X X X X
X X X
X X X
X
X
X
NH-47 CS-83
30.68m
X X X X X X X
X
14.33m
X
X
X
X
CS-81
X
X
X
X
X
CS-80
X
X
X
X
CS-84
X
X
X
X
X
X
X
NH-47
NH-47
31.82m
NH-47
M M
NH-47 X X X X X X X X X X
NH-47 To Salem
batore
X X X
X X X
X X X
X X X
X X X
X X X
X X
To Coim
X X X
X X X
X X X
X X X
X X X
X X X
X X X
X X X
X X X
X X X
X X X
X X X
X X X
X X X
X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
SURVEY DETAILS
X
X
X
X
X
X
X
X
X
X
L L
X
X
X
X
X
X
X
X
X
X
X
WHEREVER PIPELINE IS CROSSING 11KV AND ABOVE A/G OR U/G HT LINE CONCRETE SLAB SHALL BE
PROVIDED AS PER STANDARD DRAWING NO. GGNG-D-20707-009.
WHEREVER PIPELINE IS CROSSING THE EXISTING PIPELINES, THE CONCRETE SLAB
SHALL BE PROVIDED AS PER DRAWING NO. GGNG-D-20707-014.
K WHEREVER WATER TABLE DURING TRENCHING IS ENCOUNTERED IT SHALL BE BROUGHT DOWN TO MINIMUM 300mm BELOW K
THE BOTTOM LEVEL TRENCHING AND KEPT DRY FOR WORKING. FOR OTHER INSTRUCTIONS, REFER PTS (CONSTRUCTION)
MINIMUM COVER SHALL BE MEASURED FROM THE LOWEST LEVEL OF ROAD, RAIL, CANAL, WATER WAYS ETC. INCLUDING ITS
ROU TO THE TOP OF CASING PIPE OR CARRIER PIPE AS PER TYPE OF CROSSING.
J J
I I
GROUND LEVELS
(IN METRES)
OD (mm) / MATERIAL AND GRADE 12" (324 mm) OD API 5L GR. X52, PSL-2 (HFW / SMLS)
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
PIPELINE DETAILS
(000 + 000)
SPECIAL PROVISIONS
F F
PIPELINE COVER
MINIMUM (METRES)
1.5 1.2 1.5 1.2 1.5 1.2 1.5 1.2 1.5
SPECIAL INSTALLATIONS /
FITTINGS / MARKERS CS-080 CS-081 CS-082 CS-083 CS-084
CROSSINGS Nala Asphalt Road Asphalt Road Asphalt Road Asphalt Road Asphalt Road
End Ch: 13350.17 Start Ch: 13481.1 End Ch: 13486.58 Start Ch: 13919.99 End Ch: 13929.98 Start Ch: 13996.68
E E
Asphalt Road Nala
COATING End Ch: 13315.15 Start Ch: 13330.39
EXTERNAL 3 LAYER POLYETHYLINE COATING & INTERNAL EPOXY, FIELD JOINTS BY HEAT SHRINKABLE SLEEVES AS PER SPECIFICATION IN SCOPE OF CONTRACTOR.
CATHODIC PROTECTION
IN THE SCOPE OF CONTRACTOR (NOTE-7)
INSTALLATIONS
SOIL RESISTIVITY (OHM - M)
SUB-SOIL
DETAILS
@1.5m Depth
D D
SOIL STRATIFICATION
TOPOGRAPHIC SYMBOLS SOIL SYMBOLS PIPELINE SYMBOLS GENERAL NOTES BILL OF MATERIAL FOR THIS DRAWING REFERENCE DRAWING
CARRIER PIPE OTHER MATERIALS S.
1. ALL FIGURES ARE IN "METERS" UNLESS OTHERWISE SPECIFIED. ALL LEVEL ARE WITH REFERENCE TO MEAN SEA LEVEL DRAWING TITLE DRAWING NO.
(MSL). THE GROUND LEVELS/PROFILE INDICATED IN THE DRAWING IS ALONG THE CENTERLINE OF ROU. NO.
O.D. ∅ WT(mm)
LENGTH COATING
DESCRIPTION NUMBER 1 NALA CROSS SECTION IOC-NEELAMBUR-CS-081
2. FINAL CHAINAGES, TPs/IPs SECTION, INCLUDING DETOURED SECTION IF ANY, AND EXACT LOCATION & QUANTITIES OF
MARKERS SHALL BE INCORPORATED BY THE CONTRACTOR, IN AS-BUILT SDRAWINGS. 324 7.1 3LPE
700.00 K.M. POST 1 2 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-082
C C
3. ALL CROSSINS SHALL MEET THE MIN. REQUIREMENTS OF COMPANY'S STD. DRAWING BASED ON VERIFICATION AT SITE. 324 3LPE
DIRECTIONAL MARKER - 3 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-083
TYPE OF CROSSING (CASED OR UNCASED) FOR CANALS AND ROADS SHALL BE DECIDED FOR INDIVIDUAL CASES AFTER 0 10.09.2020 FIRST ISSUE. AS MS
CONSULTATION WITH CONCERNED AUTHORITIES. CROSSINGS FOR WHICH SPECIFIC DETAILS ARE NOT GIVEN, SHALL BE AERIAL MARKER - 4 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-084
EXECUTED AS PER JOB STANDARDS, SITE REQUIREMENTS AND AS PER INSTRUCTIONS OF OWNER/CONCERNED Rev. D M Y Modifications Drawn Checked Approved
AUTHORITIES.
INSULATING JOINT - 5
HOT BENDS - ISSUE RECORD
4. ANTI-BUOYANCY CONTROL, BANK STABILIZATION, SLOPE BREAKERS, SELECT BACKFILL, COVER AT OVER AND SAG 6
BENDS AND OTHER MEASURES NOT SPECIFICALLY SHOWN IN THE DRAWING SHALL BE DECIDED AT THE SITE AS PER TOTAL 700.00 NAVIGABLE WATERWAY - 7
SPECIFICATIONS, SITE REQUIREMENTS AND INSTRUCTIONS OF OWNER/OWNERS REPRESENTATIVE.
CASING (SEE GEN. NOTES 12 AND 13) WARNING SIGN 4 8
INDIAN OIL CORPORATION LIMITED
5. IN CASE THE PROPOSED PIPELINE IS PASSING PARALLEL TO AN EXISTING PIPELINE, A MIN. DISTANCE OF 5.0M SHALL IndianOil
BE MAINTAINED BETWEEN THE TWO. THE MIN. DISTANCE SHALL BE 10.0M. IN CASE OF PARALLEL LAYING BY HDD AND O.D. Ø WT(mm) COATING LENGTH ROU BOUNDARY MARKERS - 9
B 5.0M. IN CASE OF B+C. CGD NETWORK IN COIMBATORE B
X X X X X X X
6. ACTUAL LENGTH OF CONCRETE COATING AND CONCRETE SLABS SHALL BE DECIDED AS PER SITE REQUIREMENTS AND 168 6.4 - - 10
THE SAME SHALL BE PROVIDED WITHOUT ANY COST IMPLICATION. 356 6.0 - - 11
ALIGNMENT SHEET
7. OPTICAL FIBRE CABLE WILL BE LAID PARALLEL TO THE PIPELINE IN A SINGLE TRENCH AS PER RELEVANT STD. AND 12
SPECIFICATIONS. TEMP. CATHODIC PROTECTION SHALL BE PROVIDED AS PER APPROVED DESIGN DOCUMENTS & - SECTION : FROM KOUNDAMPALAYAM TO NEELAMBUR
DRAWINGS. - 13
8. IN CASE ANY PRIVATE DWELLING, INDUSTRIAL BUILDING OR PLACE OF PUBLIC ASSEMBLY FALLS WITHIN 15 M OF 14 CHAINAGE : FROM 13+300.00 KM. TO 14+000.00 KM.
FOR OTHER REQUIRED MATERIAL SEE
PIPELINE, ADDITIONAL COVER OF 300MM SHALL BE PROVIDED OVER AND ABOVE COVER INDICATED HEREIN.
15
9. ALL EXISTING UNDERGROUND UTILITIES SUCH AS PIPELINES, H/T CABLES ETC. SHALL BE IDENTIFIED AND LOCATED BY DRAWING TITLE DRAWING NO.
A THE CONTRACTOR BEFORE START OF ANY EXCAVATION AND TRENCHING WORK. CONTRACTOR SHALL INTIMATE THE 16 A
CONCERNED AUTHORITIES HAVING JURISDICTION AND SHALL CARRY OUT SUCH WORKS TAKING ALL REQUIRED 17 TRACTEBEL Engineering pvt. ltd.
PRECAUTIONS AND SAFETY MEASURES, INCLUDING NECESSARY ENCASEMENT FOR U/G FACILITIES, TO PREVENT ANY
DAMAGE TO EXISTING / PROPOSED INSTALLATIONS, 18
10. ALL NECESSARY MEASURES SHALL BE TAKEN BY CONTRACTOR FOR FAULT LINE CROSSING AND SEISMIC AREA, TO 19 AS SHOWN P.013553-G-21048- M720 0
MITIGATE ITS EFFECT, AS MENTIONED / RECOMMENDED IN RFP DOCUMENT.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
X X
IP152/1 - P292 IP152/3 - P294 IP152/4 - P295
X
IP154/4 - P30
X
Ch:13457.29 m 1
X
Ch:13319.34 m Ch:13541.76 m Ch:13597.55 m TP154 - P297 IP154/3 - P300
X
Ch:13965.18
X
N N
IP154/1 - P298
X
Ch:13699.72 m IP154/2 - P299 Ch:13889.65 m m
X
1.37m
X
Ch:13806.44 m
X
TP155 - P302
X
Ch:13848.75 m
X
4.41m
X
X
Ch:13995.06 m
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
0.3m
X X X X
X
X X X X X X X X X
X X X X X X X X X
X X X
X
X X X X X X X X X
X X X X X
CS-82
X X X
2.26m
12.28m
X
X
X X X X X X X X X X X X X X X
X X X
X X X
X
X
X
NH-47 CS-83
30.68m
X X X X X X X
X
14.33m
X
X
X
X
CS-81
X
X
X
X
X
CS-80
X
X
X
X
CS-84
X
X
X
X
X
X
X
NH-47
NH-47
31.82m
NH-47
M M
NH-47 X X X X X X X X X X
NH-47 To Salem
batore
X X X
X X X
X X X
X X X
X X X
X X X
X X
To Coim
X X X
X X X
X X X
X X X
X X X
X X X
X X X
X X X
X X X
X X X
X X X
X X X
X X X
X X X
X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
SURVEY DETAILS
X
X
X
X
X
X
X
X
X
X
L L
X
X
X
X
X
X
X
X
X
X
X
WHEREVER PIPELINE IS CROSSING 11KV AND ABOVE A/G OR U/G HT LINE CONCRETE SLAB SHALL BE
PROVIDED AS PER STANDARD DRAWING NO. GGNG-D-20707-009.
WHEREVER PIPELINE IS CROSSING THE EXISTING PIPELINES, THE CONCRETE SLAB
SHALL BE PROVIDED AS PER DRAWING NO. GGNG-D-20707-014.
K WHEREVER WATER TABLE DURING TRENCHING IS ENCOUNTERED IT SHALL BE BROUGHT DOWN TO MINIMUM 300mm BELOW K
THE BOTTOM LEVEL TRENCHING AND KEPT DRY FOR WORKING. FOR OTHER INSTRUCTIONS, REFER PTS (CONSTRUCTION)
MINIMUM COVER SHALL BE MEASURED FROM THE LOWEST LEVEL OF ROAD, RAIL, CANAL, WATER WAYS ETC. INCLUDING ITS
ROU TO THE TOP OF CASING PIPE OR CARRIER PIPE AS PER TYPE OF CROSSING.
J J
I I
GROUND LEVELS
(IN METRES)
OD (mm) / MATERIAL AND GRADE 12" (324 mm) OD API 5L GR. X52, PSL-2 (HFW / SMLS)
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
PIPELINE DETAILS
(000 + 000)
SPECIAL PROVISIONS
F F
PIPELINE COVER
MINIMUM (METRES)
1.5 1.2 1.5 1.2 1.5 1.2 1.5 1.2 1.5
SPECIAL INSTALLATIONS /
FITTINGS / MARKERS CS-080 CS-081 CS-082 CS-083 CS-084
CROSSINGS Nala Asphalt Road Asphalt Road Asphalt Road Asphalt Road Asphalt Road
End Ch: 13350.17 Start Ch: 13481.1 End Ch: 13486.58 Start Ch: 13919.99 End Ch: 13929.98 Start Ch: 13996.68
E E
Asphalt Road Nala
COATING End Ch: 13315.15 Start Ch: 13330.39
EXTERNAL 3 LAYER POLYETHYLINE COATING & INTERNAL EPOXY, FIELD JOINTS BY HEAT SHRINKABLE SLEEVES AS PER SPECIFICATION IN SCOPE OF CONTRACTOR.
CATHODIC PROTECTION
IN THE SCOPE OF CONTRACTOR (NOTE-7)
INSTALLATIONS
SOIL RESISTIVITY (OHM - M)
SUB-SOIL
DETAILS
@1.5m Depth
D D
SOIL STRATIFICATION
TOPOGRAPHIC SYMBOLS SOIL SYMBOLS PIPELINE SYMBOLS GENERAL NOTES BILL OF MATERIAL FOR THIS DRAWING REFERENCE DRAWING
CARRIER PIPE OTHER MATERIALS S.
1. ALL FIGURES ARE IN "METERS" UNLESS OTHERWISE SPECIFIED. ALL LEVEL ARE WITH REFERENCE TO MEAN SEA LEVEL DRAWING TITLE DRAWING NO.
(MSL). THE GROUND LEVELS/PROFILE INDICATED IN THE DRAWING IS ALONG THE CENTERLINE OF ROU. NO.
O.D. ∅ WT(mm)
LENGTH COATING
DESCRIPTION NUMBER 1 NALA CROSS SECTION IOC-NEELAMBUR-CS-081
2. FINAL CHAINAGES, TPs/IPs SECTION, INCLUDING DETOURED SECTION IF ANY, AND EXACT LOCATION & QUANTITIES OF
MARKERS SHALL BE INCORPORATED BY THE CONTRACTOR, IN AS-BUILT SDRAWINGS. 324 7.1 3LPE
700.00 K.M. POST 1 2 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-082
C C
3. ALL CROSSINS SHALL MEET THE MIN. REQUIREMENTS OF COMPANY'S STD. DRAWING BASED ON VERIFICATION AT SITE. 324 3LPE
DIRECTIONAL MARKER - 3 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-083
TYPE OF CROSSING (CASED OR UNCASED) FOR CANALS AND ROADS SHALL BE DECIDED FOR INDIVIDUAL CASES AFTER 0 10.09.2020 FIRST ISSUE. AS MS
CONSULTATION WITH CONCERNED AUTHORITIES. CROSSINGS FOR WHICH SPECIFIC DETAILS ARE NOT GIVEN, SHALL BE AERIAL MARKER - 4 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-084
EXECUTED AS PER JOB STANDARDS, SITE REQUIREMENTS AND AS PER INSTRUCTIONS OF OWNER/CONCERNED Rev. D M Y Modifications Drawn Checked Approved
AUTHORITIES.
INSULATING JOINT - 5
HOT BENDS - ISSUE RECORD
4. ANTI-BUOYANCY CONTROL, BANK STABILIZATION, SLOPE BREAKERS, SELECT BACKFILL, COVER AT OVER AND SAG 6
BENDS AND OTHER MEASURES NOT SPECIFICALLY SHOWN IN THE DRAWING SHALL BE DECIDED AT THE SITE AS PER TOTAL 700.00 NAVIGABLE WATERWAY - 7
SPECIFICATIONS, SITE REQUIREMENTS AND INSTRUCTIONS OF OWNER/OWNERS REPRESENTATIVE.
CASING (SEE GEN. NOTES 12 AND 13) WARNING SIGN 4 8
INDIAN OIL CORPORATION LIMITED
5. IN CASE THE PROPOSED PIPELINE IS PASSING PARALLEL TO AN EXISTING PIPELINE, A MIN. DISTANCE OF 5.0M SHALL IndianOil
BE MAINTAINED BETWEEN THE TWO. THE MIN. DISTANCE SHALL BE 10.0M. IN CASE OF PARALLEL LAYING BY HDD AND O.D. Ø WT(mm) COATING LENGTH ROU BOUNDARY MARKERS - 9
B 5.0M. IN CASE OF B+C. CGD NETWORK IN COIMBATORE B
X X X X X X X
6. ACTUAL LENGTH OF CONCRETE COATING AND CONCRETE SLABS SHALL BE DECIDED AS PER SITE REQUIREMENTS AND 168 6.4 - - 10
THE SAME SHALL BE PROVIDED WITHOUT ANY COST IMPLICATION. 356 6.0 - - 11
ALIGNMENT SHEET
7. OPTICAL FIBRE CABLE WILL BE LAID PARALLEL TO THE PIPELINE IN A SINGLE TRENCH AS PER RELEVANT STD. AND 12
SPECIFICATIONS. TEMP. CATHODIC PROTECTION SHALL BE PROVIDED AS PER APPROVED DESIGN DOCUMENTS & - SECTION : FROM KOUNDAMPALAYAM TO NEELAMBUR
DRAWINGS. - 13
8. IN CASE ANY PRIVATE DWELLING, INDUSTRIAL BUILDING OR PLACE OF PUBLIC ASSEMBLY FALLS WITHIN 15 M OF 14 CHAINAGE : FROM 13+300.00 KM. TO 14+000.00 KM.
FOR OTHER REQUIRED MATERIAL SEE
PIPELINE, ADDITIONAL COVER OF 300MM SHALL BE PROVIDED OVER AND ABOVE COVER INDICATED HEREIN.
15
9. ALL EXISTING UNDERGROUND UTILITIES SUCH AS PIPELINES, H/T CABLES ETC. SHALL BE IDENTIFIED AND LOCATED BY DRAWING TITLE DRAWING NO.
A THE CONTRACTOR BEFORE START OF ANY EXCAVATION AND TRENCHING WORK. CONTRACTOR SHALL INTIMATE THE 16 A
CONCERNED AUTHORITIES HAVING JURISDICTION AND SHALL CARRY OUT SUCH WORKS TAKING ALL REQUIRED 17 TRACTEBEL Engineering pvt. ltd.
PRECAUTIONS AND SAFETY MEASURES, INCLUDING NECESSARY ENCASEMENT FOR U/G FACILITIES, TO PREVENT ANY
DAMAGE TO EXISTING / PROPOSED INSTALLATIONS, 18
10. ALL NECESSARY MEASURES SHALL BE TAKEN BY CONTRACTOR FOR FAULT LINE CROSSING AND SEISMIC AREA, TO 19 AS SHOWN P.013553-G-21048- M720 0
MITIGATE ITS EFFECT, AS MENTIONED / RECOMMENDED IN RFP DOCUMENT.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
X
TP157 - .95 m
X
TP158 - P308 6
IP157/1 - P306 IP157/2 - P307 IP162/1 - P31
X
X
4 TP160 - P310 IP160/1 - P311
Ch:1407
X
Ch:14178.14 m Ch:14260.91 m 7. 88 m
X
Ch:14108.43 m Ch:14 67
X
Ch:14319.96 m Ch:14371.75 m TP161 - P313
X
TP159 - P309
X
TP162 - P315
X
Ch:14531.86 m
X
IP155/1 - P303 Ch:14282.78 m
0.26m
X
IP160/2 - P312 m
Ch:14626.91
X
X
X
X
Ch:14004.75 m
X
X
Ch:14402.98 m
X
X
X
X
X
X
X
X
X
X
0.55m
X
CS-87
X
X
X
X
2.27m
X
CS-86
X
0.3m
2.01m
X
X
X
CS-85
0.91m
X
X X
X X X
X
X X
X X
X
X
X
X
X
X
X X X X X
X
X X X X X X
X X X
X
X X
X X X
X
13.99m
X
X
X X
X X X
CS-88
X
X
X X X
X X X X
X X
14.18m
13.31m
M NH-47 M
NH-47
NH-47 To Salem
tore
To Coimba NH-47
X X X X X X X X X X X
X
X X
SURVEY DETAILS
X
X
X
X X X
X
X X X
X
X X X X X X X X
X
X X X X X
X
X X
X
X X X X X X X
X
X
X
X
X
X
X
X
X
X
L L
X
X
X
X
X
X
X
X
WHEREVER PIPELINE IS CROSSING 11KV AND ABOVE A/G OR U/G HT LINE CONCRETE SLAB SHALL BE
K K
PROVIDED AS PER STANDARD DRAWING NO. GGNG-D-20707-009.
WHEREVER PIPELINE IS CROSSING THE EXISTING PIPELINES, THE CONCRETE SLAB
SHALL BE PROVIDED AS PER DRAWING NO. GGNG-D-20707-014.
WHEREVER WATER TABLE DURING TRENCHING IS ENCOUNTERED IT SHALL BE BROUGHT DOWN TO MINIMUM 300mm BELOW
THE BOTTOM LEVEL TRENCHING AND KEPT DRY FOR WORKING. FOR OTHER INSTRUCTIONS, REFER PTS (CONSTRUCTION)
MINIMUM COVER SHALL BE MEASURED FROM THE LOWEST LEVEL OF ROAD, RAIL, CANAL, WATER WAYS ETC. INCLUDING ITS
ROU TO THE TOP OF CASING PIPE OR CARRIER PIPE AS PER TYPE OF CROSSING.
J J
I I
GROUND LEVELS
(IN METRES)
OD (mm) / MATERIAL AND GRADE 12" (324 mm) OD API 5L GR. X52, PSL-2 (HFW / SMLS)
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
PIPELINE DETAILS
(000 + 000)
SPECIAL PROVISIONS
F F
PIPELINE COVER
MINIMUM (METRES)
1.5 1.2 1.5 1.2 1.5 1.2 1.5 1.2 1.5 1.2
SPECIAL INSTALLATIONS /
FITTINGS / MARKERS CS-084 CS-085 CS-086 CS-087 CS-088
Cart track Cart track
Start Ch: 14682.26 End Ch: 14686.31
CROSSINGS Asphalt Road Asphalt Road Asphalt Road Asphalt Road Asphalt Road Asphalt Road Asphalt Road Asphalt Road Asphalt Road
End Ch: 14000.86 Start Ch: 14091.36 End Ch: 14095.77 Start Ch: 14149.23 End Ch: 14153.31 Start Ch: 14247.05 End Ch: 14252.21 Start Ch: 14575.31 End Ch: 14582.95
E E
COATING EXTERNAL 3 LAYER POLYETHYLINE COATING & INTERNAL EPOXY, FIELD JOINTS BY HEAT SHRINKABLE SLEEVES AS PER SPECIFICATION IN SCOPE OF CONTRACTOR.
CATHODIC PROTECTION
IN THE SCOPE OF CONTRACTOR (NOTE-7)
INSTALLATIONS
SOIL RESISTIVITY (OHM - M)
SUB-SOIL
DETAILS
@1.5m Depth
D D
SOIL STRATIFICATION
TOPOGRAPHIC SYMBOLS SOIL SYMBOLS PIPELINE SYMBOLS GENERAL NOTES BILL OF MATERIAL FOR THIS DRAWING REFERENCE DRAWING
CARRIER PIPE OTHER MATERIALS S.
1. ALL FIGURES ARE IN "METERS" UNLESS OTHERWISE SPECIFIED. ALL LEVEL ARE WITH REFERENCE TO MEAN SEA LEVEL DRAWING TITLE DRAWING NO.
(MSL). THE GROUND LEVELS/PROFILE INDICATED IN THE DRAWING IS ALONG THE CENTERLINE OF ROU. NO.
O.D. ∅ WT(mm) COATINGLENGTH DESCRIPTION NUMBER 1 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-085
2. FINAL CHAINAGES, TPs/IPs SECTION, INCLUDING DETOURED SECTION IF ANY, AND EXACT LOCATION & QUANTITIES OF
MARKERS SHALL BE INCORPORATED BY THE CONTRACTOR, IN AS-BUILT SDRAWINGS. 324 7.1 3LPE 700.00 K.M. POST - 2 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-086
C C
3. ALL CROSSINS SHALL MEET THE MIN. REQUIREMENTS OF COMPANY'S STD. DRAWING BASED ON VERIFICATION AT SITE. 324 3LPE DIRECTIONAL MARKER - 3 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-087
TYPE OF CROSSING (CASED OR UNCASED) FOR CANALS AND ROADS SHALL BE DECIDED FOR INDIVIDUAL CASES AFTER 0 10.09.2020 FIRST ISSUE. AS MS
CONSULTATION WITH CONCERNED AUTHORITIES. CROSSINGS FOR WHICH SPECIFIC DETAILS ARE NOT GIVEN, SHALL BE AERIAL MARKER - 4 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-088
EXECUTED AS PER JOB STANDARDS, SITE REQUIREMENTS AND AS PER INSTRUCTIONS OF OWNER/CONCERNED Rev. D M Y Modifications Drawn Checked Approved
AUTHORITIES.
INSULATING JOINT - 5
HOT BENDS - ISSUE RECORD
4. ANTI-BUOYANCY CONTROL, BANK STABILIZATION, SLOPE BREAKERS, SELECT BACKFILL, COVER AT OVER AND SAG 6
BENDS AND OTHER MEASURES NOT SPECIFICALLY SHOWN IN THE DRAWING SHALL BE DECIDED AT THE SITE AS PER TOTAL 700.00 NAVIGABLE WATERWAY - 7
SPECIFICATIONS, SITE REQUIREMENTS AND INSTRUCTIONS OF OWNER/OWNERS REPRESENTATIVE.
CASING (SEE GEN. NOTES 12 AND 13) WARNING SIGN 4 8
INDIAN OIL CORPORATION LIMITED
5. IN CASE THE PROPOSED PIPELINE IS PASSING PARALLEL TO AN EXISTING PIPELINE, A MIN. DISTANCE OF 5.0M SHALL IndianOil
BE MAINTAINED BETWEEN THE TWO. THE MIN. DISTANCE SHALL BE 10.0M. IN CASE OF PARALLEL LAYING BY HDD AND O.D. Ø WT(mm) COATING LENGTH ROU BOUNDARY MARKERS - 9
B 5.0M. IN CASE OF B+C. CGD NETWORK IN COIMBATORE B
X X X X X X X
6. ACTUAL LENGTH OF CONCRETE COATING AND CONCRETE SLABS SHALL BE DECIDED AS PER SITE REQUIREMENTS AND 168 6.4 - - 10
THE SAME SHALL BE PROVIDED WITHOUT ANY COST IMPLICATION. 356 6.0 - - 11
ALIGNMENT SHEET
7. OPTICAL FIBRE CABLE WILL BE LAID PARALLEL TO THE PIPELINE IN A SINGLE TRENCH AS PER RELEVANT STD. AND 12
SPECIFICATIONS. TEMP. CATHODIC PROTECTION SHALL BE PROVIDED AS PER APPROVED DESIGN DOCUMENTS & - SECTION : FROM KOUNDAMPALAYAM TO NEELAMBUR
DRAWINGS. - 13
CHAINAGE : FROM 14+000.00 KM. TO 14+700.00 KM.
8. IN CASE ANY PRIVATE DWELLING, INDUSTRIAL BUILDING OR PLACE OF PUBLIC ASSEMBLY FALLS WITHIN 15 M OF
FOR OTHER REQUIRED MATERIAL SEE 14
PIPELINE, ADDITIONAL COVER OF 300MM SHALL BE PROVIDED OVER AND ABOVE COVER INDICATED HEREIN.
15
9. ALL EXISTING UNDERGROUND UTILITIES SUCH AS PIPELINES, H/T CABLES ETC. SHALL BE IDENTIFIED AND LOCATED BY DRAWING TITLE DRAWING NO.
A THE CONTRACTOR BEFORE START OF ANY EXCAVATION AND TRENCHING WORK. CONTRACTOR SHALL INTIMATE THE 16 A
CONCERNED AUTHORITIES HAVING JURISDICTION AND SHALL CARRY OUT SUCH WORKS TAKING ALL REQUIRED 17 TRACTEBEL Engineering pvt. ltd.
PRECAUTIONS AND SAFETY MEASURES, INCLUDING NECESSARY ENCASEMENT FOR U/G FACILITIES, TO PREVENT ANY
DAMAGE TO EXISTING / PROPOSED INSTALLATIONS, 18
10. ALL NECESSARY MEASURES SHALL BE TAKEN BY CONTRACTOR FOR FAULT LINE CROSSING AND SEISMIC AREA, TO 19 AS SHOWN P.013553-G-21048- M721 0
MITIGATE ITS EFFECT, AS MENTIONED / RECOMMENDED IN RFP DOCUMENT.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
X
X
X
X
X X
X
IP163/1 - P323
X
X
IP163/2 - P324 IP163/3 - P325
X
IP162/6 - P321 Ch:15149.84 m
X
IP162/3 - P318 IP162/5 - P320 TP163 - P322
X
Ch:15188.77 m Ch:15252.23 m
X
X
IP162/2 - P317 Ch:14791.86 m Ch:14995.17 m Ch:15044.25 m IP163/4 - P326
X
Ch:14950.17 m
X
X
X
X
N Ch:14707.53 m IP162/4 - P319 Ch:15335.04 m N
X
X
3.22m
5.07m
X
X
X
X
X
0.3m
X X
X X
Ch:14873.49 m
X X X X X X X X X X
X
X
X
X
0.3m
X
X
X
4.93m
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X X X X
X
X X X X
X
X X X
X
X
X X
X
X X X
X X X
X
X X
X
0.3m
X
X
X
CS-89
X
16.31m
X
X
X
X
X
X X X X X X X X X X
X
X X X X X
X X X X X X X
X
X X X X X X X X
15.14m
NH-47 NH-47
NH-47
33.69m
Divider
NH-47
M To Coimbatore NH-47 M
NH-47 X X X X X X X X X X To Salem
X X
X
X X X X X X X
X
X X X X X X X
X
X X X X X X X X X X X X X X X
X X X X X
X X X X
X
X X X X X
X X X
X
X X X
X X X X X X X X
X
X X X X X X X X X
X
X X X X X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
SURVEY DETAILS
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
L L
X
X
X
X
X
X
WHEREVER PIPELINE IS CROSSING 11KV AND ABOVE A/G OR U/G HT LINE CONCRETE SLAB SHALL BE
X
X
X
X
PROVIDED AS PER STANDARD DRAWING NO. GGNG-D-20707-009.
X
X
X
X
X
WHEREVER PIPELINE IS CROSSING THE EXISTING PIPELINES, THE CONCRETE SLAB
X
X
X
SHALL BE PROVIDED AS PER DRAWING NO. GGNG-D-20707-014.
WHEREVER WATER TABLE DURING TRENCHING IS ENCOUNTERED IT SHALL BE BROUGHT DOWN TO MINIMUM 300mm BELOW
THE BOTTOM LEVEL TRENCHING AND KEPT DRY FOR WORKING. FOR OTHER INSTRUCTIONS, REFER PTS (CONSTRUCTION)
K MINIMUM COVER SHALL BE MEASURED FROM THE LOWEST LEVEL OF ROAD, RAIL, CANAL, WATER WAYS ETC. INCLUDING ITS K
ROU TO THE TOP OF CASING PIPE OR CARRIER PIPE AS PER TYPE OF CROSSING.
J J
I I
GROUND LEVELS
(IN METRES)
OD (mm) / MATERIAL AND GRADE 12" (324 mm) OD API 5L GR. X52, PSL-2 (HFW / SMLS)
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
PIPELINE DETAILS
(000 + 000)
SPECIAL PROVISIONS SV -06
F F
PIPELINE COVER
MINIMUM (METRES)
1.2 1.5 1.2
SPECIAL INSTALLATIONS /
FITTINGS / MARKERS CS-089
@1.5m Depth
D D
SOIL STRATIFICATION
TOPOGRAPHIC SYMBOLS SOIL SYMBOLS PIPELINE SYMBOLS GENERAL NOTES BILL OF MATERIAL FOR THIS DRAWING REFERENCE DRAWING
CARRIER PIPE OTHER MATERIALS S.
1. ALL FIGURES ARE IN "METERS" UNLESS OTHERWISE SPECIFIED. ALL LEVEL ARE WITH REFERENCE TO MEAN SEA LEVEL DRAWING TITLE DRAWING NO.
(MSL). THE GROUND LEVELS/PROFILE INDICATED IN THE DRAWING IS ALONG THE CENTERLINE OF ROU. NO.
O.D. ∅ WT(mm) COATING
LENGTH DESCRIPTION NUMBER 1 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-089
2. FINAL CHAINAGES, TPs/IPs SECTION, INCLUDING DETOURED SECTION IF ANY, AND EXACT LOCATION & QUANTITIES OF
MARKERS SHALL BE INCORPORATED BY THE CONTRACTOR, IN AS-BUILT SDRAWINGS. 324 7.1 3LPE 700.00 K.M. POST - 2
C C
3. ALL CROSSINS SHALL MEET THE MIN. REQUIREMENTS OF COMPANY'S STD. DRAWING BASED ON VERIFICATION AT SITE. 324 3LPE DIRECTIONAL MARKER - 3
TYPE OF CROSSING (CASED OR UNCASED) FOR CANALS AND ROADS SHALL BE DECIDED FOR INDIVIDUAL CASES AFTER 0 10.09.2020 FIRST ISSUE. AS MS
CONSULTATION WITH CONCERNED AUTHORITIES. CROSSINGS FOR WHICH SPECIFIC DETAILS ARE NOT GIVEN, SHALL BE AERIAL MARKER 1 4
EXECUTED AS PER JOB STANDARDS, SITE REQUIREMENTS AND AS PER INSTRUCTIONS OF OWNER/CONCERNED Rev. D M Y Modifications Drawn Checked Approved
AUTHORITIES.
INSULATING JOINT - 5
HOT BENDS - ISSUE RECORD
4. ANTI-BUOYANCY CONTROL, BANK STABILIZATION, SLOPE BREAKERS, SELECT BACKFILL, COVER AT OVER AND SAG 6
BENDS AND OTHER MEASURES NOT SPECIFICALLY SHOWN IN THE DRAWING SHALL BE DECIDED AT THE SITE AS PER TOTAL 700.00 NAVIGABLE WATERWAY - 7
SPECIFICATIONS, SITE REQUIREMENTS AND INSTRUCTIONS OF OWNER/OWNERS REPRESENTATIVE.
CASING (SEE GEN. NOTES 12 AND 13) WARNING SIGN 1 8
INDIAN OIL CORPORATION LIMITED
5. IN CASE THE PROPOSED PIPELINE IS PASSING PARALLEL TO AN EXISTING PIPELINE, A MIN. DISTANCE OF 5.0M SHALL IndianOil
BE MAINTAINED BETWEEN THE TWO. THE MIN. DISTANCE SHALL BE 10.0M. IN CASE OF PARALLEL LAYING BY HDD AND O.D. Ø WT(mm) COATING LENGTH ROU BOUNDARY MARKERS - 9
B 5.0M. IN CASE OF B+C. CGD NETWORK IN COIMBATORE B
X X X X X X X
6. ACTUAL LENGTH OF CONCRETE COATING AND CONCRETE SLABS SHALL BE DECIDED AS PER SITE REQUIREMENTS AND 168 6.4 - - 10
THE SAME SHALL BE PROVIDED WITHOUT ANY COST IMPLICATION. 356 6.0 - - 11
ALIGNMENT SHEET
7. OPTICAL FIBRE CABLE WILL BE LAID PARALLEL TO THE PIPELINE IN A SINGLE TRENCH AS PER RELEVANT STD. AND 12
SPECIFICATIONS. TEMP. CATHODIC PROTECTION SHALL BE PROVIDED AS PER APPROVED DESIGN DOCUMENTS & - SECTION : FROM KOUNDAMPALAYAM TO NEELAMBUR
DRAWINGS. - 13
8. IN CASE ANY PRIVATE DWELLING, INDUSTRIAL BUILDING OR PLACE OF PUBLIC ASSEMBLY FALLS WITHIN 15 M OF 14 CHAINAGE : FROM 14+700.00 KM. TO 15+400.00 KM.
FOR OTHER REQUIRED MATERIAL SEE
PIPELINE, ADDITIONAL COVER OF 300MM SHALL BE PROVIDED OVER AND ABOVE COVER INDICATED HEREIN.
15
9. ALL EXISTING UNDERGROUND UTILITIES SUCH AS PIPELINES, H/T CABLES ETC. SHALL BE IDENTIFIED AND LOCATED BY DRAWING TITLE DRAWING NO.
A THE CONTRACTOR BEFORE START OF ANY EXCAVATION AND TRENCHING WORK. CONTRACTOR SHALL INTIMATE THE 16 A
CONCERNED AUTHORITIES HAVING JURISDICTION AND SHALL CARRY OUT SUCH WORKS TAKING ALL REQUIRED 17 TRACTEBEL Engineering pvt. ltd.
PRECAUTIONS AND SAFETY MEASURES, INCLUDING NECESSARY ENCASEMENT FOR U/G FACILITIES, TO PREVENT ANY
DAMAGE TO EXISTING / PROPOSED INSTALLATIONS, 18
10. ALL NECESSARY MEASURES SHALL BE TAKEN BY CONTRACTOR FOR FAULT LINE CROSSING AND SEISMIC AREA, TO 19 AS SHOWN P.013553-G-21048- M722 0
MITIGATE ITS EFFECT, AS MENTIONED / RECOMMENDED IN RFP DOCUMENT.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
O O
2.1m
TP16 536.53 m 343 Ch:16068.08 m
Ch:16027.3
5.46m
Ch:15923.43 m
IP163/5 - P327 TP165 - P329 Ch:1
5
32 IP168/1 - P333 IP168/2 - P3
34 6m
Ch:15500.05 m 8 - P3 Ch:15591.6
7 m IP172/5 - P3
TP16 549.01 m Ch:15572.33 m
1.26m
Ch:15416.02 m 44
0.5m
X
Ch:16046.1
X
5
X X
X
X
TP166 - P330
X
Ch:1
X X
X X
X
X X
X X
X X
5m
X
X
NH-47
X
X
X
TP164 - P328 Ch:15511.26 m
X
X
X
X
X
X
Ch:15434 m
X
X
CS-90
X
X
M M
X
X
X
NH-47
X
X
X
X
0.3m
X
NH-47
TP174 - CS-91
5.95m
X
X
Ch:1607 P346
X
X
X
17.36m
NH-47 0.88 m TP175 - P347
NH-47
Ch:16077.66 m
To Salem
SURVEY DETAILS
NH-47 X
X
X
X
X
X
X
X
X
X
X
X
X
To Coimbatore
X
X
L L
X
X
X
X
X
X
X X X X X X X
X X X X X X X
X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
WHEREVER PIPELINE IS CROSSING 11KV AND ABOVE A/G OR U/G HT LINE CONCRETE SLAB SHALL BE
K PROVIDED AS PER STANDARD DRAWING NO. GGNG-D-20707-009. K
I I
GROUND LEVELS
(IN METRES)
OD (mm) / MATERIAL AND GRADE 12" (324 mm) OD API 5L GR. X52, PSL-2 (HFW / SMLS)
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
PIPELINE DETAILS
(000 + 000)
SPECIAL PROVISIONS
F F
PIPELINE COVER
MINIMUM (METRES)
1.2 1.5 1.2 1.5 1.2
SPECIAL INSTALLATIONS /
FITTINGS / MARKERS CS-090 CS-091
@1.5m Depth
D D
SOIL STRATIFICATION
TOPOGRAPHIC SYMBOLS SOIL SYMBOLS PIPELINE SYMBOLS GENERAL NOTES BILL OF MATERIAL FOR THIS DRAWING REFERENCE DRAWING
CARRIER PIPE OTHER MATERIALS S.
1. ALL FIGURES ARE IN "METERS" UNLESS OTHERWISE SPECIFIED. ALL LEVEL ARE WITH REFERENCE TO MEAN SEA LEVEL DRAWING TITLE DRAWING NO.
(MSL). THE GROUND LEVELS/PROFILE INDICATED IN THE DRAWING IS ALONG THE CENTERLINE OF ROU. NO.
O.D. ∅ WT(mm) COATING LENGTH DESCRIPTION NUMBER 1 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-090
2. FINAL CHAINAGES, TPs/IPs SECTION, INCLUDING DETOURED SECTION IF ANY, AND EXACT LOCATION & QUANTITIES OF
MARKERS SHALL BE INCORPORATED BY THE CONTRACTOR, IN AS-BUILT SDRAWINGS. 324 7.1 3LPE 700.00 K.M. POST 1 2 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-091
C C
3. ALL CROSSINS SHALL MEET THE MIN. REQUIREMENTS OF COMPANY'S STD. DRAWING BASED ON VERIFICATION AT SITE. 324 3LPE DIRECTIONAL MARKER - 3
TYPE OF CROSSING (CASED OR UNCASED) FOR CANALS AND ROADS SHALL BE DECIDED FOR INDIVIDUAL CASES AFTER 0 10.09.2020 FIRST ISSUE. AS MS
CONSULTATION WITH CONCERNED AUTHORITIES. CROSSINGS FOR WHICH SPECIFIC DETAILS ARE NOT GIVEN, SHALL BE AERIAL MARKER - 4
EXECUTED AS PER JOB STANDARDS, SITE REQUIREMENTS AND AS PER INSTRUCTIONS OF OWNER/CONCERNED Rev. D M Y Modifications Drawn Checked Approved
AUTHORITIES.
INSULATING JOINT - 5
HOT BENDS - ISSUE RECORD
4. ANTI-BUOYANCY CONTROL, BANK STABILIZATION, SLOPE BREAKERS, SELECT BACKFILL, COVER AT OVER AND SAG 6
BENDS AND OTHER MEASURES NOT SPECIFICALLY SHOWN IN THE DRAWING SHALL BE DECIDED AT THE SITE AS PER TOTAL 700.00 NAVIGABLE WATERWAY - 7
SPECIFICATIONS, SITE REQUIREMENTS AND INSTRUCTIONS OF OWNER/OWNERS REPRESENTATIVE.
CASING (SEE GEN. NOTES 12 AND 13) WARNING SIGN 2 8
INDIAN OIL CORPORATION LIMITED
5. IN CASE THE PROPOSED PIPELINE IS PASSING PARALLEL TO AN EXISTING PIPELINE, A MIN. DISTANCE OF 5.0M SHALL IndianOil
BE MAINTAINED BETWEEN THE TWO. THE MIN. DISTANCE SHALL BE 10.0M. IN CASE OF PARALLEL LAYING BY HDD AND O.D. Ø WT(mm) COATING LENGTH ROU BOUNDARY MARKERS - 9
B 5.0M. IN CASE OF B+C. CGD NETWORK IN COIMBATORE B
X X X X X X X
6. ACTUAL LENGTH OF CONCRETE COATING AND CONCRETE SLABS SHALL BE DECIDED AS PER SITE REQUIREMENTS AND 168 6.4 - - 10
THE SAME SHALL BE PROVIDED WITHOUT ANY COST IMPLICATION. 356 6.0 - - 11
ALIGNMENT SHEET
7. OPTICAL FIBRE CABLE WILL BE LAID PARALLEL TO THE PIPELINE IN A SINGLE TRENCH AS PER RELEVANT STD. AND 12
SPECIFICATIONS. TEMP. CATHODIC PROTECTION SHALL BE PROVIDED AS PER APPROVED DESIGN DOCUMENTS & - SECTION : FROM KOUNDAMPALAYAM TO NEELAMBUR
DRAWINGS. - 13
8. IN CASE ANY PRIVATE DWELLING, INDUSTRIAL BUILDING OR PLACE OF PUBLIC ASSEMBLY FALLS WITHIN 15 M OF 14 CHAINAGE : FROM 15+400.00 KM. TO 16+100.00 KM.
FOR OTHER REQUIRED MATERIAL SEE
PIPELINE, ADDITIONAL COVER OF 300MM SHALL BE PROVIDED OVER AND ABOVE COVER INDICATED HEREIN.
15
9. ALL EXISTING UNDERGROUND UTILITIES SUCH AS PIPELINES, H/T CABLES ETC. SHALL BE IDENTIFIED AND LOCATED BY DRAWING TITLE DRAWING NO.
A THE CONTRACTOR BEFORE START OF ANY EXCAVATION AND TRENCHING WORK. CONTRACTOR SHALL INTIMATE THE 16 A
CONCERNED AUTHORITIES HAVING JURISDICTION AND SHALL CARRY OUT SUCH WORKS TAKING ALL REQUIRED 17 TRACTEBEL Engineering pvt. ltd.
PRECAUTIONS AND SAFETY MEASURES, INCLUDING NECESSARY ENCASEMENT FOR U/G FACILITIES, TO PREVENT ANY
DAMAGE TO EXISTING / PROPOSED INSTALLATIONS, 18
10. ALL NECESSARY MEASURES SHALL BE TAKEN BY CONTRACTOR FOR FAULT LINE CROSSING AND SEISMIC AREA, TO 19 AS SHOWN P.013553-G-21048- M723 0
MITIGATE ITS EFFECT, AS MENTIONED / RECOMMENDED IN RFP DOCUMENT.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
CS-
8 2 SHALL BE PROVIDED AS PER DRAWING NO. GGNG-D-20707-014.
TP1 6262.4 TP
9
Ch 184
4
1 TP1
Ch: :16 - P WHEREVER WATER TABLE DURING TRENCHING IS ENCOUNTERED IT SHALL BE BROUGHT DOWN TO MINIMUM 300mm BELOW
42 358 Ch: 86 - P3 THE BOTTOM LEVEL TRENCHING AND KEPT DRY FOR WORKING. FOR OTHER INSTRUCTIONS, REFER PTS (CONSTRUCTION)
2.9 164
TP18 83.0 60
53 Ch:1 5 - P359 m 6m MINIMUM COVER SHALL BE MEASURED FROM THE LOWEST LEVEL OF ROAD, RAIL, CANAL, WATER WAYS ETC. INCLUDING ITS
6437
1 - P3 m .53 m TP
187 ROU TO THE TOP OF CASING PIPE OR CARRIER PIPE AS PER TYPE OF CROSSING.
8 . 2 54
TP1 16202 1 - P3 m Ch
:16 - P36
Ch: 81/ .05 510 1
N IP1 16219 -47
.52
m
N
Ch: 3 NH TP188
-
S-9
Ch:165 P362
0.3
C
51 2
- P3 4 m - P35 m
3.2
2
TP189 3.32 m
m
7 9 8 8 -
.
TP1 16162 P180 187.8 Ch:165 P363
9m
IP19
DWG NO. P.013553-G-21048-M723
4 .
654 TP191 - P 58 m
526
16
IP191/1 -
33.
- 2.39 P3
176 2.3 349 m Ch:16568 6
36 Ch:16609 67
71m
TP :1611 7 - P 29 m .29 m .39 m
Ch TP17 6126.
11.95m
M TP1 M
Ch
:1 50 Ch: 92 - P
P3 m 7
0.64m
166 368 IP
1.15m
- H-4
8 .22 N 46.4 19
17 5 m Ch:1 2/2 - P
TP 6155 6 3
Ch
:1
-92 IP1 715.55 70
CS X
X
X
9
Ch: 2/1 - m PROPOSED STEEL GAS PIPELINE
166 P3
X
X
X
X
X
X
X
X
X
79. 69
X
X
X
X
X
X
X
SURVEY DETAILS
X
X
X
X
X
X
X
25
X
m IP192/2 - P370
Ch:16715.55 m
L L
0.37m
4.75m
atore Asp.Road
imb
Co X X
To
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X
X
X
X
X
X
K K
J J
I I
GROUND LEVELS
(IN METRES)
OD (mm) / MATERIAL AND GRADE 12" (324 mm) OD API 5L GR. X52, PSL-2 (HFW / SMLS)
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
PIPELINE DETAILS
(000 + 000)
SPECIAL PROVISIONS
F F
PIPELINE COVER
MINIMUM (METRES)
1.2 1.5 1.2 1.5 1.2 1.5 1.2
SPECIAL INSTALLATIONS /
Drain Cart track
FITTINGS / MARKERS CS-092 Start Ch: 16193.42 CS-093 End Ch: 16363.83 CS-094
Drain Cart track
End Ch: 16197.76 Start Ch: 16357.83
CROSSINGS Asphalt Road Asphalt Road Asphalt Road Asphalt Road National Highway-47 National Highway-47
11KV Power Line 11KV Power Line
Start Ch: 16156.71 End Ch: 16162.48 Start Ch: 16267.39 End Ch: 16270.99 Start Ch: 16393.4 End Ch: 16422.9
E Ch: 16526.93 Ch: 16578.07 E
COATING EXTERNAL 3 LAYER POLYETHYLINE COATING & INTERNAL EPOXY, FIELD JOINTS BY HEAT SHRINKABLE SLEEVES AS PER SPECIFICATION IN SCOPE OF CONTRACTOR.
CATHODIC PROTECTION
IN THE SCOPE OF CONTRACTOR (NOTE-7)
INSTALLATIONS
SOIL RESISTIVITY (OHM - M)
SUB-SOIL
DETAILS
@1.5m Depth
D D
SOIL STRATIFICATION
TOPOGRAPHIC SYMBOLS SOIL SYMBOLS PIPELINE SYMBOLS GENERAL NOTES BILL OF MATERIAL FOR THIS DRAWING REFERENCE DRAWING
CARRIER PIPE OTHER MATERIALS S.
1. ALL FIGURES ARE IN "METERS" UNLESS OTHERWISE SPECIFIED. ALL LEVEL ARE WITH REFERENCE TO MEAN SEA LEVEL DRAWING TITLE DRAWING NO.
(MSL). THE GROUND LEVELS/PROFILE INDICATED IN THE DRAWING IS ALONG THE CENTERLINE OF ROU. NO.
O.D. ∅ WT(mm) COATING
LENGTH DESCRIPTION NUMBER 1 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-092
2. FINAL CHAINAGES, TPs/IPs SECTION, INCLUDING DETOURED SECTION IF ANY, AND EXACT LOCATION & QUANTITIES OF
MARKERS SHALL BE INCORPORATED BY THE CONTRACTOR, IN AS-BUILT SDRAWINGS. 324 7.1 3LPE
700.00 K.M. POST - 2 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-093
C C
3. ALL CROSSINS SHALL MEET THE MIN. REQUIREMENTS OF COMPANY'S STD. DRAWING BASED ON VERIFICATION AT SITE. 324 3LPE DIRECTIONAL MARKER 3 3 NH-47 ROAD CROSS SECTION IOC-NEELAMBUR-CS-094
TYPE OF CROSSING (CASED OR UNCASED) FOR CANALS AND ROADS SHALL BE DECIDED FOR INDIVIDUAL CASES AFTER 0 10.09.2020 FIRST ISSUE. AS MS
CONSULTATION WITH CONCERNED AUTHORITIES. CROSSINGS FOR WHICH SPECIFIC DETAILS ARE NOT GIVEN, SHALL BE AERIAL MARKER - 4
EXECUTED AS PER JOB STANDARDS, SITE REQUIREMENTS AND AS PER INSTRUCTIONS OF OWNER/CONCERNED Rev. D M Y Modifications Drawn Checked Approved
AUTHORITIES.
INSULATING JOINT - 5
HOT BENDS - ISSUE RECORD
4. ANTI-BUOYANCY CONTROL, BANK STABILIZATION, SLOPE BREAKERS, SELECT BACKFILL, COVER AT OVER AND SAG 6
BENDS AND OTHER MEASURES NOT SPECIFICALLY SHOWN IN THE DRAWING SHALL BE DECIDED AT THE SITE AS PER TOTAL 700.00 NAVIGABLE WATERWAY - 7
SPECIFICATIONS, SITE REQUIREMENTS AND INSTRUCTIONS OF OWNER/OWNERS REPRESENTATIVE.
CASING (SEE GEN. NOTES 12 AND 13) WARNING SIGN 4 8
INDIAN OIL CORPORATION LIMITED
5. IN CASE THE PROPOSED PIPELINE IS PASSING PARALLEL TO AN EXISTING PIPELINE, A MIN. DISTANCE OF 5.0M SHALL IndianOil
BE MAINTAINED BETWEEN THE TWO. THE MIN. DISTANCE SHALL BE 10.0M. IN CASE OF PARALLEL LAYING BY HDD AND O.D. Ø WT(mm) COATING LENGTH ROU BOUNDARY MARKERS - 9
B 5.0M. IN CASE OF B+C. CGD NETWORK IN COIMBATORE B
X X X X X X X
6. ACTUAL LENGTH OF CONCRETE COATING AND CONCRETE SLABS SHALL BE DECIDED AS PER SITE REQUIREMENTS AND 168 6.4 - - 10
THE SAME SHALL BE PROVIDED WITHOUT ANY COST IMPLICATION. 356 6.0 - - 11
ALIGNMENT SHEET
7. OPTICAL FIBRE CABLE WILL BE LAID PARALLEL TO THE PIPELINE IN A SINGLE TRENCH AS PER RELEVANT STD. AND 12
SPECIFICATIONS. TEMP. CATHODIC PROTECTION SHALL BE PROVIDED AS PER APPROVED DESIGN DOCUMENTS & - SECTION : FROM KOUNDAMPALAYAM TO NEELAMBUR
DRAWINGS. - 13
8. IN CASE ANY PRIVATE DWELLING, INDUSTRIAL BUILDING OR PLACE OF PUBLIC ASSEMBLY FALLS WITHIN 15 M OF 14 CHAINAGE : FROM 16+100.00 KM. TO 16+800.00 KM.
FOR OTHER REQUIRED MATERIAL SEE
PIPELINE, ADDITIONAL COVER OF 300MM SHALL BE PROVIDED OVER AND ABOVE COVER INDICATED HEREIN.
15
9. ALL EXISTING UNDERGROUND UTILITIES SUCH AS PIPELINES, H/T CABLES ETC. SHALL BE IDENTIFIED AND LOCATED BY DRAWING TITLE DRAWING NO.
A THE CONTRACTOR BEFORE START OF ANY EXCAVATION AND TRENCHING WORK. CONTRACTOR SHALL INTIMATE THE 16 A
CONCERNED AUTHORITIES HAVING JURISDICTION AND SHALL CARRY OUT SUCH WORKS TAKING ALL REQUIRED 17 TRACTEBEL Engineering pvt. ltd.
PRECAUTIONS AND SAFETY MEASURES, INCLUDING NECESSARY ENCASEMENT FOR U/G FACILITIES, TO PREVENT ANY
DAMAGE TO EXISTING / PROPOSED INSTALLATIONS, 18
10. ALL NECESSARY MEASURES SHALL BE TAKEN BY CONTRACTOR FOR FAULT LINE CROSSING AND SEISMIC AREA, TO 19 AS SHOWN P.013553-G-21048- M724 0
MITIGATE ITS EFFECT, AS MENTIONED / RECOMMENDED IN RFP DOCUMENT.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
6.42m
Ch:174
1 Ch:17
CS
ur
-9
90 olatt
7 - P3
6
72 To K
/1 - P3 89
TP1
- P3 m TP20 381.38 m
Ch:1
IP193 1.63 m / 1
:1690 oad 6
IP20 7354.2
2 Ch:17 CS-98 395
97 - 7.7 m
P371 C h Asp.R 2-P m
7
3 - : 1 0 9 /
Ch IP2 480.91
0
N
TP 1 9 m N
P383
2
837.23
P37
TP202 - Ch:1
7
TP1 7044.0
Ch:16 - P382 /1 - P3
87
Ch:1
0.22m
IP201/1 1.35 m 88
Ch:1720 IP205 06.09 m 06 - P3 9 m
7
oad
3.11m
CS-95 4.85 m Asp.R
98 -
Ch:1
5.47m
Ch:1716
2.09m
5 3 2
TP1 086.92
P384 - P38 m Ch:17 TP 7332.4
TP203 - 0 4
Ch:1
Asp
7.01 m TP 2 .07
P3 7 m
Ch:172 1 7262
7
99 -
25
8.
oad
1736
TP200 - P380 Ch:1 6
.Ro
Asp.R
- P38 m
X X X X X X X X X X X X
X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X
8
X
4
X
X
5
X
X
X
X
Ch:17092.54 m 0
X
1.0m
P37
X
2
X
ad
1
X
X
X
TP .6
X
X
X
X
7273
X
X
X
X
X
X
X
X
P381
X
X
X
Ch:1
X
X
X
X
TP201 - .74 m
X
X
X
X
9
X
X
m
X
X
X
X
X
X
X
-47
X
X
X
X
To NH
X
X
7
X
X
9.09
Ch:1709
X
X
X
X
X
1721
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
M M
X
X
12.58m
X
d
Asp.Roa
X
X
X
X
X
X
X
CS-97
X
X
X
X
X
X
oad
X
Asp.R
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
WHEREVER PIPELINE IS CROSSING 11KV AND ABOVE A/G OR U/G HT LINE CONCRETE SLAB SHALL BE
X
X
X
X
X
X
SURVEY DETAILS
X
X
WHEREVER WATER TABLE DURING TRENCHING IS ENCOUNTERED IT SHALL BE BROUGHT DOWN TO MINIMUM 300mm BELOW
THE BOTTOM LEVEL TRENCHING AND KEPT DRY FOR WORKING. FOR OTHER INSTRUCTIONS, REFER PTS (CONSTRUCTION)
MINIMUM COVER SHALL BE MEASURED FROM THE LOWEST LEVEL OF ROAD, RAIL, CANAL, WATER WAYS ETC. INCLUDING ITS
ROU TO THE TOP OF CASING PIPE OR CARRIER PIPE AS PER TYPE OF CROSSING.
K K
J J
I I
GROUND LEVELS
(IN METRES)
OD (mm) / MATERIAL AND GRADE 12" (324 mm) OD API 5L GR. X52, PSL-2 (HFW / SMLS)
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
PIPELINE DETAILS
(000 + 000)
SPECIAL PROVISIONS
F F
PIPELINE COVER
MINIMUM (METRES)
1.2 1.5 1.2 1.5 1.2 1.5 1.2 1.5 1.2
11KV Power Line
SPECIAL INSTALLATIONS / Ch: 17022.03
ROAD Drain
FITTINGS / MARKERS Start Ch: 16903.27 CS-095 End Ch: 16994.61 CS-096 CS-097 CS-098
Drain
Start Ch: 16993.38
CROSSINGS 11KV Power Line
ROAD RCC ROAD
11KV Power Line
Asphalt Road Asphalt Road
11KV Power Line 11KV Power Line
Asphalt Road Asphalt Road
End Ch: 16907.35 End Ch: 17025.19 Start Ch: 17248.15 End Ch: 17255.08 Start Ch: 17448.93 End Ch: 17454.28
E Ch: 16832.11 Ch: 17219.09 Ch: 17349.16 Ch: 17368.25 E
11KV Power Line 11KV Power Line
COATING Ch: 16900.66 Ch: 17012.66
EXTERNAL 3 LAYER POLYETHYLINE COATING & INTERNAL EPOXY, FIELD JOINTS BY HEAT SHRINKABLE SLEEVES AS PER SPECIFICATION IN SCOPE OF CONTRACTOR.
RCC ROAD
CATHODIC PROTECTION Start Ch: 17022.23
IN THE SCOPE OF CONTRACTOR (NOTE-7)
INSTALLATIONS
SOIL RESISTIVITY (OHM - M)
SUB-SOIL
DETAILS
@1.5m Depth
D D
SOIL STRATIFICATION
TOPOGRAPHIC SYMBOLS SOIL SYMBOLS PIPELINE SYMBOLS GENERAL NOTES BILL OF MATERIAL FOR THIS DRAWING REFERENCE DRAWING
CARRIER PIPE OTHER MATERIALS S.
1. ALL FIGURES ARE IN "METERS" UNLESS OTHERWISE SPECIFIED. ALL LEVEL ARE WITH REFERENCE TO MEAN SEA LEVEL DRAWING TITLE DRAWING NO.
(MSL). THE GROUND LEVELS/PROFILE INDICATED IN THE DRAWING IS ALONG THE CENTERLINE OF ROU. NO.
O.D. ∅ WT(mm) COATING
LENGTH DESCRIPTION NUMBER 1 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-095
2. FINAL CHAINAGES, TPs/IPs SECTION, INCLUDING DETOURED SECTION IF ANY, AND EXACT LOCATION & QUANTITIES OF
MARKERS SHALL BE INCORPORATED BY THE CONTRACTOR, IN AS-BUILT SDRAWINGS. 324 7.1 3LPE 700.00 K.M. POST - 2 RCC ROAD CROSS SECTION IOC-NEELAMBUR-CS-096
C C
3. ALL CROSSINS SHALL MEET THE MIN. REQUIREMENTS OF COMPANY'S STD. DRAWING BASED ON VERIFICATION AT SITE. 324 3LPE DIRECTIONAL MARKER 3 3 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-097
TYPE OF CROSSING (CASED OR UNCASED) FOR CANALS AND ROADS SHALL BE DECIDED FOR INDIVIDUAL CASES AFTER 0 10.09.2020 FIRST ISSUE. AS MS
CONSULTATION WITH CONCERNED AUTHORITIES. CROSSINGS FOR WHICH SPECIFIC DETAILS ARE NOT GIVEN, SHALL BE AERIAL MARKER - 4 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-098
EXECUTED AS PER JOB STANDARDS, SITE REQUIREMENTS AND AS PER INSTRUCTIONS OF OWNER/CONCERNED Rev. D M Y Modifications Drawn Checked Approved
AUTHORITIES.
INSULATING JOINT - 5
HOT BENDS - ISSUE RECORD
4. ANTI-BUOYANCY CONTROL, BANK STABILIZATION, SLOPE BREAKERS, SELECT BACKFILL, COVER AT OVER AND SAG 6
BENDS AND OTHER MEASURES NOT SPECIFICALLY SHOWN IN THE DRAWING SHALL BE DECIDED AT THE SITE AS PER TOTAL 700.00 NAVIGABLE WATERWAY - 7
SPECIFICATIONS, SITE REQUIREMENTS AND INSTRUCTIONS OF OWNER/OWNERS REPRESENTATIVE.
CASING (SEE GEN. NOTES 12 AND 13) WARNING SIGN 4 8
INDIAN OIL CORPORATION LIMITED
5. IN CASE THE PROPOSED PIPELINE IS PASSING PARALLEL TO AN EXISTING PIPELINE, A MIN. DISTANCE OF 5.0M SHALL IndianOil
BE MAINTAINED BETWEEN THE TWO. THE MIN. DISTANCE SHALL BE 10.0M. IN CASE OF PARALLEL LAYING BY HDD AND O.D. Ø WT(mm) COATING LENGTH ROU BOUNDARY MARKERS - 9
B 5.0M. IN CASE OF B+C. CGD NETWORK IN COIMBATORE B
X X X X X X X
6. ACTUAL LENGTH OF CONCRETE COATING AND CONCRETE SLABS SHALL BE DECIDED AS PER SITE REQUIREMENTS AND 168 6.4 - - 10
THE SAME SHALL BE PROVIDED WITHOUT ANY COST IMPLICATION. 356 6.0 - - 11
ALIGNMENT SHEET
7. OPTICAL FIBRE CABLE WILL BE LAID PARALLEL TO THE PIPELINE IN A SINGLE TRENCH AS PER RELEVANT STD. AND 12
SPECIFICATIONS. TEMP. CATHODIC PROTECTION SHALL BE PROVIDED AS PER APPROVED DESIGN DOCUMENTS & - SECTION : FROM KOUNDAMPALAYAM TO NEELAMBUR
DRAWINGS. - 13
CHAINAGE : FROM 16+800.00 KM. TO 17+500.00 KM.
8. IN CASE ANY PRIVATE DWELLING, INDUSTRIAL BUILDING OR PLACE OF PUBLIC ASSEMBLY FALLS WITHIN 15 M OF
FOR OTHER REQUIRED MATERIAL SEE 14
PIPELINE, ADDITIONAL COVER OF 300MM SHALL BE PROVIDED OVER AND ABOVE COVER INDICATED HEREIN.
15
9. ALL EXISTING UNDERGROUND UTILITIES SUCH AS PIPELINES, H/T CABLES ETC. SHALL BE IDENTIFIED AND LOCATED BY DRAWING TITLE DRAWING NO.
A THE CONTRACTOR BEFORE START OF ANY EXCAVATION AND TRENCHING WORK. CONTRACTOR SHALL INTIMATE THE 16 A
CONCERNED AUTHORITIES HAVING JURISDICTION AND SHALL CARRY OUT SUCH WORKS TAKING ALL REQUIRED 17 TRACTEBEL Engineering pvt. ltd.
PRECAUTIONS AND SAFETY MEASURES, INCLUDING NECESSARY ENCASEMENT FOR U/G FACILITIES, TO PREVENT ANY
DAMAGE TO EXISTING / PROPOSED INSTALLATIONS, 18
10. ALL NECESSARY MEASURES SHALL BE TAKEN BY CONTRACTOR FOR FAULT LINE CROSSING AND SEISMIC AREA, TO 19 AS SHOWN P.013553-G-21048- M725 0
MITIGATE ITS EFFECT, AS MENTIONED / RECOMMENDED IN RFP DOCUMENT.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
hway
01
P 21 3/1 - P 4 m
I 8
728.0
TP2 7765.38
X
Ch:1 1 - P40
X
1.449m
0.5 m
X X
X
X X
X
N N
X
X
X
TP21 806.1 m
IP21 7771.9
X
Ch:1
X
X
X
X
Ch:
X
X
18 -
P396
X
X
X
X
X
X
X
X
X
X
X
10 - .03 m
X
X
X
Asp.
2
11.84m
8/
X
P
7
X
ad
9-P
T 7512 Asp.Ro
P40 m
X
X
ad
1.04m
Asp.Ro
Ch:1
X
Roa
X
X
X
X
- P397
X
X
X
X
X
X
X
X
X
X
6
X
X
X
TP211 8.91 m
408
X
X
X
X
X
X
X
0.77m
X
X
X
X
X
X
d
X
4m
1
X
Ch:175
X
X
X
7
X
X
X
X
X
X
X
X
X
ad
X
X
X
Asp.Ro CS-100
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
10.21m
X
X
X
X
End Point
X
X
X
X
X
X
P413
X X
X
X X
X
X
X
X
X X
IP220/4 -
X
X
X X
X
TP222 - P415
X X
X X
ad
X X
X
X X
X
Asp.Ro
X X
X
TP224 - P417
X X
X
X X
X
X
X
X
X
P412
X
X
X
X
X
.71 m
X
X
X
X X
IP220/3 - 3 m
X X
X
X X
chi Highway
X
X X
Ch:1794
X X
Ch:18034.4 m
X
X
X
X
X
Ch: 18085.15m
X
X X
X
X X
X
X
X X
X
X
X
X
CS-99
X
X
X
X
X
X
X
X
X
.1
X
X
Ch:17917
X
X
X
X
M M
X
X
X
X
X
X
X
X
X
X
0.9m
X
X
TP223 - P416
X
X
X
X
X
X
X
X
X
X
X
X
X
TP221 - P414
X
X
X
X
X
X
X
H-47
X
X
X
X
X
X
X
Ch:18043.67 m
X
X
X
X
To N
X
X X
X X
X X
X
- P410
X X
X X X
Ch:17975.23 m
X X X
X
X
- P411
X
X
X
IP220/1
X
NH-47 Salem Ko
1.3 m IP220/2 6 m
Ch:1782 Ch:1790
1.5
9
TP220 - P40
m
SURVEY DETAILS
Ch:17817 .3 5
L L
WHEREVER PIPELINE IS CROSSING 11KV AND ABOVE A/G OR U/G HT LINE CONCRETE SLAB SHALL BE
PROVIDED AS PER STANDARD DRAWING NO. GGNG-D-20707-009.
WHEREVER PIPELINE IS CROSSING THE EXISTING PIPELINES, THE CONCRETE SLAB
K
SHALL BE PROVIDED AS PER DRAWING NO. GGNG-D-20707-014. K
WHEREVER WATER TABLE DURING TRENCHING IS ENCOUNTERED IT SHALL BE BROUGHT DOWN TO MINIMUM 300mm BELOW
THE BOTTOM LEVEL TRENCHING AND KEPT DRY FOR WORKING. FOR OTHER INSTRUCTIONS, REFER PTS (CONSTRUCTION)
MINIMUM COVER SHALL BE MEASURED FROM THE LOWEST LEVEL OF ROAD, RAIL, CANAL, WATER WAYS ETC. INCLUDING ITS
ROU TO THE TOP OF CASING PIPE OR CARRIER PIPE AS PER TYPE OF CROSSING.
J J
I I
GROUND LEVELS
(IN METRES)
OD (mm) / MATERIAL AND GRADE 12" (324 mm) OD API 5L GR. X52, PSL-2 (HFW / SMLS)
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
PIPELINE DETAILS
(000 + 000)
SPECIAL PROVISIONS SV -07
F F
PIPELINE COVER
MINIMUM (METRES)
1.2 1.5 1.2 1.5
SPECIAL INSTALLATIONS /
Asphalt Road
FITTINGS / MARKERS Start Ch: 17806.10 CS-099 CS-100
Cart track Cart track
Start Ch: 17977.97 End Ch: 17984.53
CROSSINGS 11KV Power Line 11KV Power Line
Asphalt Road National Highway-47 National Highway-47
End Ch: 17817.38 Start Ch: 18043.7 End Ch: 18085.15
E Ch: 17513.74 Ch: 17762.31 E
COATING EXTERNAL 3 LAYER POLYETHYLINE COATING & INTERNAL EPOXY, FIELD JOINTS BY HEAT SHRINKABLE SLEEVES AS PER SPECIFICATION IN SCOPE OF CONTRACTOR.
11KV 11KV Power Line
CATHODIC PROTECTION Ch: 17755.45 Ch: 17794.99
IN THE SCOPE OF CONTRACTOR (NOTE-7)
INSTALLATIONS
SOIL RESISTIVITY (OHM - M)
SUB-SOIL
DETAILS
@1.5m Depth
D D
SOIL STRATIFICATION
TOPOGRAPHIC SYMBOLS SOIL SYMBOLS PIPELINE SYMBOLS GENERAL NOTES BILL OF MATERIAL FOR THIS DRAWING REFERENCE DRAWING
CARRIER PIPE OTHER MATERIALS S.
1. ALL FIGURES ARE IN "METERS" UNLESS OTHERWISE SPECIFIED. ALL LEVEL ARE WITH REFERENCE TO MEAN SEA LEVEL DRAWING TITLE DRAWING NO.
(MSL). THE GROUND LEVELS/PROFILE INDICATED IN THE DRAWING IS ALONG THE CENTERLINE OF ROU. NO.
O.D. ∅ LENGTH DESCRIPTION WT(mm) COATING NUMBER 1 ASPHALT ROAD CROSS SECTION IOC-NEELAMBUR-CS-099
2. FINAL CHAINAGES, TPs/IPs SECTION, INCLUDING DETOURED SECTION IF ANY, AND EXACT LOCATION & QUANTITIES OF
MARKERS SHALL BE INCORPORATED BY THE CONTRACTOR, IN AS-BUILT SDRAWINGS. 324 585.16 K.M. POST 7.1 3LPE 1 2 NH-47 SALEM KOCHI HI CROSS SECTION IOC-NEELAMBUR-CS-100
C C
3. ALL CROSSINS SHALL MEET THE MIN. REQUIREMENTS OF COMPANY'S STD. DRAWING BASED ON VERIFICATION AT SITE. 324 DIRECTIONAL MARKER 3LPE 5 3
TYPE OF CROSSING (CASED OR UNCASED) FOR CANALS AND ROADS SHALL BE DECIDED FOR INDIVIDUAL CASES AFTER 0 10.09.2020 FIRST ISSUE. AS MS
CONSULTATION WITH CONCERNED AUTHORITIES. CROSSINGS FOR WHICH SPECIFIC DETAILS ARE NOT GIVEN, SHALL BE AERIAL MARKER - 4
EXECUTED AS PER JOB STANDARDS, SITE REQUIREMENTS AND AS PER INSTRUCTIONS OF OWNER/CONCERNED Rev. D M Y Modifications Drawn Checked Approved
AUTHORITIES.
INSULATING JOINT - 5
HOT BENDS - ISSUE RECORD
4. ANTI-BUOYANCY CONTROL, BANK STABILIZATION, SLOPE BREAKERS, SELECT BACKFILL, COVER AT OVER AND SAG 6
BENDS AND OTHER MEASURES NOT SPECIFICALLY SHOWN IN THE DRAWING SHALL BE DECIDED AT THE SITE AS PER TOTAL 585.16 NAVIGABLE WATERWAY - 7
SPECIFICATIONS, SITE REQUIREMENTS AND INSTRUCTIONS OF OWNER/OWNERS REPRESENTATIVE.
CASING (SEE GEN. NOTES 12 AND 13) WARNING SIGN 3 8
INDIAN OIL CORPORATION LIMITED
5. IN CASE THE PROPOSED PIPELINE IS PASSING PARALLEL TO AN EXISTING PIPELINE, A MIN. DISTANCE OF 5.0M SHALL IndianOil
BE MAINTAINED BETWEEN THE TWO. THE MIN. DISTANCE SHALL BE 10.0M. IN CASE OF PARALLEL LAYING BY HDD AND O.D. Ø WT(mm) COATING LENGTH ROU BOUNDARY MARKERS - 9
B 5.0M. IN CASE OF B+C. CGD NETWORK IN COIMBATORE B
X X X X X X X
6. ACTUAL LENGTH OF CONCRETE COATING AND CONCRETE SLABS SHALL BE DECIDED AS PER SITE REQUIREMENTS AND 168 6.4 - - 10
THE SAME SHALL BE PROVIDED WITHOUT ANY COST IMPLICATION. 356 6.0 - - 11
ALIGNMENT SHEET
7. OPTICAL FIBRE CABLE WILL BE LAID PARALLEL TO THE PIPELINE IN A SINGLE TRENCH AS PER RELEVANT STD. AND 12
SPECIFICATIONS. TEMP. CATHODIC PROTECTION SHALL BE PROVIDED AS PER APPROVED DESIGN DOCUMENTS & - SECTION : FROM KOUNDAMPALAYAM TO NEELAMBUR
DRAWINGS. - 13
8. IN CASE ANY PRIVATE DWELLING, INDUSTRIAL BUILDING OR PLACE OF PUBLIC ASSEMBLY FALLS WITHIN 15 M OF 14 CHAINAGE : FROM 17+500.00 KM. TO 18+085.16 KM.
FOR OTHER REQUIRED MATERIAL SEE
PIPELINE, ADDITIONAL COVER OF 300MM SHALL BE PROVIDED OVER AND ABOVE COVER INDICATED HEREIN.
15
9. ALL EXISTING UNDERGROUND UTILITIES SUCH AS PIPELINES, H/T CABLES ETC. SHALL BE IDENTIFIED AND LOCATED BY DRAWING TITLE DRAWING NO.
A THE CONTRACTOR BEFORE START OF ANY EXCAVATION AND TRENCHING WORK. CONTRACTOR SHALL INTIMATE THE 16 A
CONCERNED AUTHORITIES HAVING JURISDICTION AND SHALL CARRY OUT SUCH WORKS TAKING ALL REQUIRED 17 TRACTEBEL Engineering pvt. ltd.
PRECAUTIONS AND SAFETY MEASURES, INCLUDING NECESSARY ENCASEMENT FOR U/G FACILITIES, TO PREVENT ANY
DAMAGE TO EXISTING / PROPOSED INSTALLATIONS, 18
10. ALL NECESSARY MEASURES SHALL BE TAKEN BY CONTRACTOR FOR FAULT LINE CROSSING AND SEISMIC AREA, TO 19 AS SHOWN P.013553-G-21048- M726 0
MITIGATE ITS EFFECT, AS MENTIONED / RECOMMENDED IN RFP DOCUMENT.