Beruflich Dokumente
Kultur Dokumente
6Sigma(6σ)is the Greek letter used to designate the estimated standard deviation
or
variation in a process. This theory is a kind of quality management aimed at pursuing zero
only focuses on the quality of production and service, but also concerned about the
process of improvement. 6σ is a target, this level of quality means that in all of the
processes and results,99.99966% is not defective. That is, less than 3.4 defects or
mistakes per million. It is evolved from Total Quality Management( TQM) and
becomes the statistical tools to analyze the causes of product defects. The higher
the
“sigma level”, the lower the amount of variation.) 6σ is the highly standard process
of
assisting companies focus on developing and providing the nearly perfect products
and services.
The History of 6σ
developed by Bill Smith( Motorola. Inc, 1986.) It was formed and put into practice.
Three years later, the Motorola got great success: the product failure rate decreased
from 6210 per million(about 4σ)to 32 per million.(about 5.5σ). General Electric
Company make the highly effective strategy into management philosophy and
practice, and eventually form the corporate culture. At present, 6σ management
The characters of 6σ
characters:
Statistic data is an important tool to measure 6σ. The numbers, data are useful for
The traditional quantity management just focus on the results, not seriously deal with the
Processes are as important as results. After sales of service and repair cause more cost of
4, No border cooperation
Opportunities of cooperate, eliminates barriers between high and lower levels at the
The advantages of 6σ
The levels of 6σ
competitive.
waste everyday.
the business can be done successfully. In the past ,almost 80% implementer of TQM
got failed. The biggest reason of failures is that the management lacks of a
personnel organization.
The committee is the highest leadership agency. Its main duty is setting kinds of
positions at the beginning stage, distributing resources and instruct the projects. When the
teams meet some barriers, the members assist them to work out.
(2) Executives
This position is very essential for the whole processes. The detailed responsibilities
are: set goals, directions and scope for projects; coordinate resources for each terms
needs
Black belt are the backbone of reform. They are voted out from internal selection
with Six Sigma Black Belt Certification(CSSBB). They take charge of their programs and
training the green belt. They could demonstrate teamwork ability and take their
responsibilities seriously.
(4 ) Green Belt
Green Belt take charge of some little difficult teamwork. Their training includes
Program Management, Quality Management tools and date analysis, which are involved
DMAIC means the five stages when people implement a program. The
five
Define
Define the definite problems, know the target of the project and hear the
Analysis
Analysis and understand which methods and tools can use to reduce the
current sales to target sales. Take advantage of statistic tools to guide analysis. Make sure
Improvement
Improve the current processes based on the analysis data. Improve the
Control
Control the further stages of process, reduce the defect rate. Keep the
Citation
http://www.asq.org/certification/six-sigma/
http://www.asq.org/certification/six-sigma-green-belt/
http://en.wikipedia.org/wiki/Six_Sigma#DMAIC