Beruflich Dokumente
Kultur Dokumente
1
Energy Systems Pvt. Ltd. – Company Profile
SEC: TABLE OF CONTENTS Page
01 Corporate Data 03
a. Registration with SECP 04
b. NTN Certificate 05
c. GST 06
d. LCC 07
02 Services offered by Energy Systems 08
03 Energy Services 09
04 Energy Trading and Contracting 14
05 Organizational Chart 19
06 Prequalification Documents 20
07 ANNEX-I Introduction of the Firm 21
08 ANNEX-II Curriculum Vitae of Professionals 23
09 ANNEX-III Inventory of available Energy Instruments 50
10 ANNEX-IV Why Would I like to participate in Program 58
11 ANNEX-V Other Information 60
12 Local Affiliation 82
2
Energy Systems Pvt. Ltd. – Company Profile
Corporate Data
Head Office:
Address of the Firm 310-Q, First Floor, Commercial Area, Phase II,
DHA Lahore, Pakistan
N.T.N. 3358269-6
URL: www.energysystems.com.pk
3
Energy Systems Pvt. Ltd. – Company Profile
Registration with Security and Exchange Commission of Pakistan
4
Energy Systems Pvt. Ltd. – Company Profile
National Tax Number Certificate
5
Energy Systems Pvt. Ltd. – Company Profile
6
Energy Systems Pvt. Ltd. – Company Profile
7
Energy Systems Pvt. Ltd. – Company Profile
SERVICES OFFERED BY ENERGY SYSTEMS PVT. LIMITED
1. Energy Services
• Energy Auditing
• Security Systems;
8
Energy Systems Pvt. Ltd. – Company Profile
ENERGY SERVICES
ENERGY AUDITING:
As a result of changes in the energy
marketplace, the role of energy audit has
greatly expanded. There is an increasing
need in business and industry to more
effectively manage energy use. Reducing
utility costs is still one of the most effective
and achievable strategies for lowering the
operating costs. Keeping in view the same,
Energy Systems Pvt. Limited has launched
Energy Efficiency (EE) Projects through
Energy Audit (EA) to set a new horizon in
the field of Energy Conservation & adoption
of Renewable Energy Solutions in Industrial
Sector of Pakistan.
Energy audit can mean different things to different individuals. But Energy Systems
believe that for an Organization:
“An Energy Audit can save your money, compare your energy cost with the competitors
and gather information to support the improvements”
. Energy Audit should always remain an integral part of Annual Commercial & Industrial
activities for sustainable development.
. Energy Audit often explores opportunities to improve productivity, comfort and safety.
10
Energy Systems Pvt. Ltd. – Company Profile
After this baseline is built, the Energy Systems will then suggest changes/modifications
to improve efficiency of various systems and measure the effect compared to baseline.
This method also accounts for interactions between systems to help prevent
overestimation of savings. Because of the time involved in collecting detailed equipment
information, operation data, and setting up an accurate computer mode, this is most
expansive level of energy audit but may be warranted if the facility or systems are more
complex in nature.
Contractor
Budget Pricing
Detailed Develop Scope of Prepare
Audit and Scope of Work Draft Audit
Trending Work Review Finalize Report
Savings
Level 4 – Reporting
The general flow of audit activities is to
identify all energy systems, evaluate the
condition of the systems, analyze the impact
of improvements to those systems, and write
up an energy audit report. This report
explains the existing conditions of the
building and/or industrial facility in terms of
the envelop, equipment, lighting, and
occupancy, followed by recommendations to
improve efficiency through improvement in
operation and maintenance items, and
through installation of energy conservation
measures, or ECMs.
Energy Systems effectively communicates audit findings and recommendations to
increase the chance of action being taken to reduce energy consumption. Audit Report
includes Executive Summary, Building Information, Utility Summary, Energy
11
Energy Systems Pvt. Ltd. – Company Profile
Conservation Measures (ECMs), Operation and Maintenance Measures (O&Ms),
Appendices
The above services will be bundled into project’s cost and are repaid through monetary
Savings guaranteed.
All energy efficiency measures are implemented without compromising the comfort,
efficiency, safety and quality of building and equipment.
12
Energy Systems Pvt. Ltd. – Company Profile
ENERGY PEFFORMANCE CONTRACT
When long term savings in electricity can be
achieved by installing additional equipment
or when the equipment in your building
and/or industrial plant is due for
replacement, Energy Systems Pvt. Limited is
prepared to participate in capital
expenditure.
Energy Systems Pvt. Limited provides a service package that includes design, supply, install,
financing and maintenance of energy saving capital improvements, for example retrofitting
and replacement of chillers/ancillary equipment, Heat exchanger; Hear recovery unit,
Thermal energy storage, District cooling and Cogeneration.
Guaranteed Energy savings is used to finance retrofitting and replacement of old equipment
and undertaking a major capital expenditure for a long term contracting period.
Scheduled
Progress
Inspections
Deliver
Commissioning
ES and Customer ES Commissioning of Customer Training Report and O&M
Develop Punch list Retrofits
Manuals to
customer
ES Performs M&V
Start Measurement Services at Intervals Present Annual M&V Report
and Verification Phase during Contract
Development
13
Energy Systems Pvt. Ltd. – Company Profile
ENERGY TRADING & CONTRACTING
Energy Systems is leading in developing the people, systems and expertise those allow us
focus on our clients needs. Our expertise span over nation and overseas in multiple industrial
& commercial sectors. Our commitment is to provide high quality & innovative engineering
designs and consultancy services. With a mission to be engineering firm of choice in the
market we serve, the value added services we deliver are as:
Cogeneration is a consecutive
(simultaneous) production and
exploitation of two energy sources,
Electricity (or mechanical) and thermal,
from a system utilizing the same fuel.
Combined heat and power production
(CHP) is applied in industry and building
where there is simultaneous demand of
electricity and heat and, usually, when the
annual hours of operation exceed 4000.
In warmer climates the need for heating is limited to few winter months. There is,
however, significant need for cooling (air conditioning) during the summer months.
Heat by a cogeneration plant is this case is used to produce cooling, via absorption
cycle. This “expanded” cogeneration process is known as trigeneration or combined
heat, cooling and power production (CHCP). By adoption of CHCP over 90% of the
fuel energy is put into the useful electrical & thermal energy and eliminates the
requirements of multiple energy resources, e.g. purchasing electricity from Electric
Supply Companies and burning fossils in a furnace to produce heat or steam.
14
Energy Systems Pvt. Ltd. – Company Profile
actuators connected to application software
running on a local or remote processor.
Which includes, Advance HVAC and
lighting controls, Smart metering
capabilities, allowing central access to real
time utility data, A structure cabling
infrastructure with high bandwidth and
connectivity, Adaptability to changing
technology and tenant needs.
15
Energy Systems Pvt. Ltd. – Company Profile
thermal cycling. In addition, the waste-
heat source and the site for use of the
recovered heat should be reasonably close. In a process that requires heat as an input,
using waste heat can displace fuel or electricity that would otherwise have to be
purchased.
- Energy Meters
- VAV Boxes
- Frequency Converters
16
Energy Systems Pvt. Ltd. – Company Profile
potential for facilitating energy savings and
reducing environmental impact.
6. SECURITY SYSTEMS;
18
Energy Systems Pvt. Ltd. – Company Profile
Chain of Command
Chairman
(M. Saghir Khan)
Elect. Engineer
19
Energy Systems Pvt. Ltd. – Company Profile
Prequalification
Documents
20
Energy Systems Pvt. Ltd. – Company Profile
ANNEX-I
Introduction of the Firm
21
Energy Systems Pvt. Ltd. – Company Profile
ENERGY SYSTEMS (PVT) LIMITED
Our Company offers dedicated professional assistance in solving the complete range
of energy problems causing disturbance to production and energy cost in existing
and upcoming projects of clients “Energy Services” & a supply chain of versatile
and state of art Electrical, Mechanical, Security Solutions, Water Sewage Treatment
Plants & Smart Building Systems. A comprehensive brief of services provided by
Energy Systems Pvt. Limited under “Energy Services” are as below:
ENERGY SERVICES
As an established Energy Service Company (ESCO) with proven record of benefiting the
clients in below mentioned services, our commitments include the following:
22
Energy Systems Pvt. Ltd. – Company Profile
ANNEX-II
Curriculum Vitae of Professional
23
Energy Systems Pvt. Ltd. – Company Profile
BRIEF PROFILE OF KEY STAFF
24
Energy Systems Pvt. Ltd. – Company Profile
8. Name: Mohammad Irfan
Designation: Environmental and Project Manager
Qualification: M.Sc.
Experience: 6 - Years
Relevant field of experience: Swerage and Treatment Plant.
25
Energy Systems Pvt. Ltd. – Company Profile
CURRICULUM VITAE
KEY QUALIFICATIONS
Over 23 year of experience, in the design, installation, testing & commissioning of Building Services
Engineering and Energy Saving studies for major building projects, including corporate office buildings (High
and Low price) commercial development, shopping malls, Hospitals, Recreation / Sport facilities, Educational
facilities, Telecommunications buildings, Building Material Testing Laboratories, Bank Building, Irrigation
Systems, Diplomatic Buildings, Residential Palaces, Printing Presses Buildings, Amusement Parks.
Sewage and water treatment plants, Thermal Energy storages systems, Smart Building systems, Designing of
Infrastructure systems, such as External electrifications, water supply, Fire fighting, Drainage , low current
systems, security systems.
EDUCATION
(i) M. Sc. in Building Services Engineering from Brunel University of West London
U.K. in 2000.
Course Module:
Dissertation
Total Energy saving and Environmental benefits of Ice Thermal Storage System
26
Energy Systems Pvt. Ltd. – Company Profile
Major Course Module
• Thermo Dynamics
• Fluid Mechanics
• Steam Generation Steam Turbines
• Industrial Engineering
• Production Engineering
• Mechanical Engineering Design Project
• Engineering Mechanics
Technical Affiliation
• Monitor and control all necessary internal management and administrative procedures
to set up in the company.
• Organize weekly coordination meetings with the Office Projects Manager; ensure
accurate minutes of meeting are recorded and issue a confidential copy to its
subsidiaries and associated companies.
◊ Personnel Administration
• Recruit technical and administrative staff, in line with the recruitment policies
established by Energy Groups of companies; ensure preparation of staff appointment
letters.
• Monitor performance of technical and administrative staff; prepare recommendations
as to salary levels, bonuses etc.
• Manage technical and administrative staff, including preparation of manpower
projections and schedules.
• Prepare timely recommendations to Management to increase/decrease staff levels in
relation to project requirements
◊ Technical Management
• Set up systems and subsequently ensure all necessary technical and quality assurance
procedures are met to ensure all design documentation issued by the Office is to the
standards required.
• Ensure work during the design stages is executed in accordance with both contractual
requirements and internal projections in terms of man-hours and other expenditures.
• Ensure Client relations and provide all necessary reports, schedules and programs as
requested by the Client.
Projects completed and involved as Chief Executive of Energy Associates, which include: -
28
Energy Systems Pvt. Ltd. – Company Profile
• Mr. Khalid Al Ghunim Private Residence Riyadh Kingdom of Saudi Arabia.
• Saudi Embassy School Islamabad, Pakistan.
• Blue Water Villas, Lahore, Pakistan.
• Royal Embassy of Saudi Arabia, Islamabad Pakistan.
• Marvida Tower, Bahrai.
• Emaar Mirador Villas Islamabad Pakistan.
• Attock Oil Head office Building, Rawalpindi.
Working with M/S Omrania and Associates, a Leading Consulting Architectural & Engineering
Firm in Riyadh, K.S.A.
As a Senior Engineer, I reports to the Head of Building Services Department for direction and supervision of
Multi – National technical staff within the Department, including establishment of Mechanical Services, Design
concept and criteria, design development and detailed design activities.
♦ Reviewing work produced by the staff under my control to ensure conformance with
established criteria and standards including formal quality controls review.
♦ Reviewing of the Engineering Shop Drawings and Material Submittal for Constructional
approval.
♦ Familiar with relevant International codes and standards, strong communicative and
presentation skills and having a flexible approach to problem solving in multi –
disciplines environmental and competent in all relevant software applications.
♦ Making cooling load calculations, HVAC systems selections, designing of Duct Work,
pipe sizing of Chilled Water Circulating Systems selections of Equipment, Automatic
controls and Building Management System, Fume Exhaust Systems for Laboratories,
Raised Floor Air Conditioning System for Telecommunication Buildings, selection of
Refrigeration Systems for Cold Storage Equipment, special study on Thermal Energy
Storage Systems, Vibration + Acoustical studies for Buildings.
29
Energy Systems Pvt. Ltd. – Company Profile
♦ Designing of Public Health Services, such as Building Water Supply, Sanitary Drainage
System, Laboratories Drainage System, Control Compressed Air system, Distilled and
Ionized water distribution systems, LP Gas systems, designing and installation of Sewage
treatment plant, Water Treatment Plant, Designing of Swimming Pools, Fountains,
Jacuzzi etc.
♦ Designing of Fire Fighting Systems, such as Automatic Sprinkler System, Fire Hose Reel, Gases based
Systems such as Carbon Dioxide (Co2) and Clean Agent Gases (FM 200), replacement of Halon1301 etc.
♦ Additional knowledge of Electrical Services and Systems, such as Light and Power
distribution, Emergency Power Generation from Diesel Driven Generators, Fire Alarm
System, Uninterruptible Power Supplies (UPS) Security System, Vertical transportation
Systems, Nurse Call System etc.
30
Energy Systems Pvt. Ltd. – Company Profile
February 1987 – January 1989:
Worked with Mechanical Contracting Est.
(AICO Group Company)
Project Engineer
Responsibilities include:
♦ Preparation of Shop Drawings for HVAC and Mechanical works, sewage treatment plant, flume ride lake
filtration and automatic irrigation system.
♦ Selection of HVAC and Mechanical equipment and Preparation of Equipment Submittals for Client’s
approval.
♦ Installation and Commissioning of sewage treatment plant of 150 m3/day ,capacity Manufacturer by
M/S N.S.W. Germany.
Installation and Commissioning of Pumping Station of Irrigation and Domestic Water System, Fire Fighting
Pumping Station for Hydrant System
♦ Supervised the Installation and Commissioning of HVAC System. A Chilled Water Air Conditioning
System of community area comprising on community Girls and Boys School, community market 1 & 2,
community Mosque, community recreation facility 1 & 2 with total 1250 tons of Refrigeration capacity
Plant was installed and commissioned.
Split Air Conditioning System for 310 Housing Units each unit having 12 tons of Refg. Capacity.
♦ Supervised the installation and commissioning of Fire Fighting Sprinkler System and Fire Hose reels
system with pressure booster set.
♦ Supervised the installation of Plumbing system consisting all community areas as mentioned above and
housing units, including Villas with Jacuzzi Pumps.
31
Energy Systems Pvt. Ltd. – Company Profile
CURRICULUM VITAE
Name of Firm : ENERGY SYSTEMS Pvt. Ltd.
Profession : Engineering
Professional Membership :
KEY QUALIFICATIONS
- Managing several performance contracts/ energy projects with civil constructions amounting to
multi-million dollars
- New project development in the institutional, power plant and industrial markets.
- Completed several capital projects in a melt-shop including instrumentation and PLC’s using
6200 series A.B. Software.
- Knowledgeable about HVAC, lighting, boilers, PLC’s (industrial) and chillers.
- Installed a power plant with 85.4 MW output for 60 Hz power generation and with 115,630 HP
mechanical drive.
- Installed High Efficiency Lighting System in various industries, replacing T-12 lamps and
Magnetic Ballasts with T-8 lamps and electronic ballasts.
- Used PERT and CPM techniques to estimate, schedule and execute the project.
- Worked with Steam Boilers up to 130 Lbs per hour, high temperature, high pressure along with
their ancillaries.
- Installed 12 “Cutler-Hammer” power demand controllers using state of the art software, web-
page/data base set-up and book-up to existing AS/400 LAN system.
-
EDUCATION
Name of Institution Year Degree/Diploma
32
Energy Systems Pvt. Ltd. – Company Profile
EXPERIENCE
II. Name of Employing Agency Havel & Son, An EMCOR Company, IN.
Title of Position Energy Project Manager
2002 - 2008
VII. Name of Employing Agency ITT Technical Institute, Fort Wayne, IN.
Title of Position Senior Instructor
1982 - 1984
VIII. Name of Employing Agency Magnavox Electronic Systems Co., Fort Wayne, IN.
Title of Position Senior Electrical Engineer
1980 - 1982
33
Energy Systems Pvt. Ltd. – Company Profile
IX. Name of Employing Agency General Tire & Rubber Co., Bryan, Ohio
Title of Position Electrical Engineer/ Senior Staff Engineer
1975 - 1980
34
Energy Systems Pvt. Ltd. – Company Profile
CURRICULUM VITAE
[
KEY QUALIFICATIONS
Over 6 years of experience, in the installation, operation, maintenance, testing & commissioning of
Controls for major building projects, including Factories, Golf course and Residential Buildings.
EDUCATION
EXPERIENCE
LANGUAGE CAPABILITY
English and Urdu - Excellent in speaking reading and writing.
37
Energy Systems Pvt. Ltd. – Company Profile
CURRICULUM VITAE
Name of Firm : ENERGY Systems Pvt. Ltd.
Nationality : Pakistani
KEY QUALIFICATIONS
Over 06 year of experience, in the design and installation of Mechanical Engineering Building
Services for major building projects such as Plumbing, Fire Fighting Central Air Conditioning,
Heating, Ventilation System, Water Cooled Water Chiller, Air Cooled Packaged A/C Units and Split
Type A/C Units including corporate office buildings (High and Low price) commercial development,
Hospitals, Shopping Plaza, Factories, Pharmaceuticals, Health Clubs, Residential Buildings and
Societies, Hospitals Embassies and Air Bases.
EDUCATION
Name of Institution Year Degree/Diploma
EXPERIENCE
II. Name of Employing Agency Royal Palm Golf and Country Club, Lahore.
Title of Position Acting Chief Engineer
Dec 09, 2003 to Jan 26, 2008
Supervision of HVAC, Fire Fighting, Sanitary and
Plumbing System.
Review of Technical Submittals.
Checking and coordinating of Shop Drawings.
LANGUAGE CAPABILITY
39
Energy Systems Pvt. Ltd. – Company Profile
CURRICULUM VITAE
Name of Firm : ENERGY SYSTEMS Pvt. Ltd.
Profession : Engineering
Nationality : Pakistani
KEY QUALIFICATIONS
Three year of experience, in the field of Power & Energy including Design, Plant Engineering,
Operation & Maintenance, Engineering Management & Energy Conservation.
EDUCATION
Name of Institution Year Degree/Diploma
EXPERIENCE
40
Energy Systems Pvt. Ltd. – Company Profile
O&M of Power Plant
Erection & Commissioning of Generation Units
Interconnection with National Grid for energy
dispatch to Wapda
Energy Reports (Billing, Generation Duty
Monitoring, Gas & Steam Billing etc)
PROFESSIONAL AFFILIATIONS
LANGUAGE CAPABILITY
41
Energy Systems Pvt. Ltd. – Company Profile
CURRICULUM VITAE
[
KEY QUALIFICATIONS
Over 20 year of experience, in the design, installation ,maintenance, Testing & commissioning of
Electrical Engineering Services for major building projects, including corporate office buildings
(High and Low price) commercial development, Hospitals, Shopping Plaza, Hotels, Health Clubs,
Gymnasiums and Residential Buildings. Complete Central Air Conditioning, Heating, Ventilation
System, Absorption Chiller, Water Cooled Water Chiller, Air Cooled Packaged A/C Units and Split
Type A/C Units, Laundry machines &kitchen equipments.
EDUCATION
EXPERIENCE
42
Energy Systems Pvt. Ltd. – Company Profile
III. Name of Employing Agency M/S RIO Trading and Contracting Co. K .S.A
Title of Position Project Engineer Electrical
Jan 2006 to Aug 2007 As a Project Engineer Electrical, my duties are
Installation and supervision of all electrical related
items, i.e Conducting network, Wiring, Cabling
high and low voltage, Cable trays and cable
ladders, Generators Transformers, Switch gears,
ATS, HT, LT Panels, Fire alarm and protection
system, PA system, CCTV&BMS, Manage and
assign the duties to staff.
IV. Name of Employing Agency M/S P.I.M.S Complex Hospitals Islamabad
Title of Position Asst. Electrical Engineer
May 1995 to Jan 1998 As a Asst. Electrical Engineer, my duties are
Operation &Maintenance of Electrical and
Mechanical equipments, i.e generators,
Transformers, electrical panels, Absorption Chillers
Boilers, cooling towers, AHUs, FCUs & Split
units. Preparation of preventive maintenance
schedules. Manage and assign the duties to staff.
V. Name of Employing Agency M/S Marriott Hotels Islamabad
Title of Position Maintenance Engineer
May 1992 to Jan 1994 As Maintenance Engineer, my duties are
Operation & Maintenance of Electrical and
Mechanical equipments, i.e. generators,
Transformers, electrical panels, Absorption
Chillers Boilers, cooling towers, AHU,s, FCU,s
& Split units. Laundry machines, kitchen
equipments, Fire alarm and detection system,
MATV system, CCTV and PA system. Preparation
of preventive maintenance schedules. Manage and
assign the duties to staff.
LANGUAGE CAPABILITY
English and Urdu - Excellent in speaking reading and writing and good working knowledge of
Speaking & Understanding Arabic.
43
Energy Systems Pvt. Ltd. – Company Profile
CURRICULUM VITAE
Name of Firm : ENERGY SYSTEMS Pvt. Ltd.
Profession : Engineering
Nationality : Pakistani
KEY QUALIFICATIONS
Over 16 years of experience, in the installation, operation, maintenance, testing & commissioning of
Mechanical Engineering Services for major building projects, including Factories, Golf course and
Residential Buildings. Split Air Conditioning, Air Compressors, Diesel Generator set, Heat
Exchanger, water pumps, conveyors, Recycling plant, Engine test Benches, Pneumatic and Hydraulics
test benches.
EDUCATION
EXPERIENCE
44
Energy Systems Pvt. Ltd. – Company Profile
III. Name of Employing Agency M/S Al-Ghazi Tractors (Pvt.) Ltd
Title of Position Dy. Manager, Plant Engineering Deptt.
August 1992 to March 2007 as a Dy. Manager, Plant Engineering
Installation, operation and maintenance of Diesel
Generator set, Air Compressors, water pumps,
Dynamometers, conveyors, heat exchangers, cooling
tower, pneumatic tools and hydraulic test benches.
LANGUAGE CAPABILITY
English and Urdu - Excellent in speaking reading and writing and good working knowledge of
Speaking & Understanding Turkish.
45
Energy Systems Pvt. Ltd. – Company Profile
CURRICULUM VITAE
[
KEY QUALIFICATIONS
Research, working and having excellent experience in providing Technical Services to potable
/ Wastewater treatment plants in different Chemical & Bio-Chemical wastewater treatment
Plants of Tanneries, Textile, Pulp & Paper and food industries in Sitara Chemical Industries
(Largest Chlor – Alkali plant in Pakistan).Having more than 1.5 Year Experience in Plant
Designing & commissioning of Waste Water Treatment Plant, WHR & Fired tube Boilers in
DDFC group of industries.
EDUCATION
EXPERIENCE
46
Energy Systems Pvt. Ltd. – Company Profile
making comparison of different advanced
technologies used for water/waste water
treatment. To check the required test for quality
of water like TDS, TSS, BOD, COD, PH and
Conductivity.
47
Energy Systems Pvt. Ltd. – Company Profile
CURRICULUM VITAE
[
KEY QUALIFICATIONS
Over 6 years of experience, in the installation, operation, maintenance, testing & commissioning of
Controls for major building projects, including Factories, Golf course and Residential Buildings.
EDUCATION
EXPERIENCE
48
Energy Systems Pvt. Ltd. – Company Profile
Title of Position System Engineer
Jun 2006 to July 2007 Learned about procedure of Automation and
got hands on experience of programming
LANGUAGE CAPABILITY
English and Urdu - Excellent in speaking reading and writing.
49
Energy Systems Pvt. Ltd. – Company Profile
ANNEX-III
Inventory of Available Energy Metering Instruments
And
Other Audit Equipment
50
Energy Systems Pvt. Ltd. – Company Profile
E
nergy Systems Pvt. Limited keeps its workshop well equipped to tackle the
requirement of the clients’ system. For precise measurements and case study,
we have equipped its engineers with versatile tools for Electrical, Mechanical,
Thermal, HVAC and Compressed Air Systems inspection. Those include as under:
ELECTRICAL TOOLS
- 82 parameters
- AC and DC
- Built in programmable printer,
- 2 alarm outputs
- RS232 output
- Memory Pack option
- Harmonic analyzer option
51
Energy Systems Pvt. Ltd. – Company Profile
3- Panel Mounted Multipurpose Power Analyzer
4- Light Testers
5- Insulation Tester
6- Earthing Tester
53
Energy Systems Pvt. Ltd. – Company Profile
2- Flue Gas Analyzer
54
Energy Systems Pvt. Ltd. – Company Profile
4- Multi Gas Emission Analyzer
The KANE940 measures O2, flue and net temperature and calculates CO2, boiler
efficiency, excess air and losses. CO is measured with a hydrogen compensated
sensor for increased accuracy. It also measures CO and calculates CO/CO2 ratio.
The Poison Index’ - to give complete readings for effective boiler analysis and
safety.
55
Energy Systems Pvt. Ltd. – Company Profile
6- Temperature Gun
The Fluke 63 thermometer makes troubleshooting quick and easy. The single dot
laser sighting system guides measurements to the right target and in less than a
second, the large temperature display provides current and MAX surface
temperatures. The locking trigger and tripod mount capability allow for continuous
temperature monitoring.
ENVIRONMENT TESTER
1- Particles Counter
57
Energy Systems Pvt. Ltd. – Company Profile
ANNEX-IV
Why Would I Like to Participate in Program?
58
Energy Systems Pvt. Ltd. – Company Profile
WHY WOULD I LIKE TO PARTICIPATE IN PROGRAM?
nergy crisis is one of the most concerned aspects of today’s time and age.
E The fact that the world is under one of the most worst global recession, it is
important for us to work together to find a solution that saves energy for future
use. Pakistan is one of the leading nations facing shortage of power supply
the goes up to 16 hours per day in certain areas. In one of my presentations at
the HVACR society meeting 2008, I suggested a mathematical assumption that
helped save and generate 10% of the energy required. However, with the increase in
shortage of generation and usage of power, new methods of conserving and
generating energy should be found.
The main reason why I would like to participate in the meeting is the fact that I have
the experience and knowledge of energy crisis and saving. I’ve mastered these
techniques with the help of researching foreign publications and my own interaction
and experience in making energy saving buildings and constituting a team which I
can lead to help create a way to at least lessen the already heavy burden on the
people of Pakistan and its citizens. Pakistan is amongst the top 5 countries of the
world to produce the highest production of power however due to the negligence of
the uninformed citizens we waste a large amount of power which is leading our
country to destruction. This problem can only be sorted out if people, like me come
forward and present their ideas and methods on conserving and saving energy. My
main aim is to conserve as much power as humanly possible and help this world
have a better future. My firm aims to establish a platform for energy conservation in
Pakistan and preferably in the entire world. There is no shortage of ideas in Pakistan
but these ideas can only come into being if there is a platform for them to flourish
and using my knowledge, experience and expertise, my team and I can establish this
platform and help Pakistan and this world face a better energy conserved future!
X
Muhammad Saghir Khan
Chairman
59
Energy Systems Pvt. Ltd. – Company Profile
ANNEX-V
Other Information Regarding:
1- Chairman’s Professional Background
2- Articles
3- List of Projects done by Chairman
4- Joint Venture with International Energy
Consultants
60
Energy Systems Pvt. Ltd. – Company Profile
Chairman’s Professional
Background
61
Energy Systems Pvt. Ltd. – Company Profile
M r. Mohammad Saghir is the Chairman of “Energy Group of Companies” is
heading “Energy Systems Pvt. Limited, offering the services in Energy Sector to
variety of potential customers in the region as discussed in details in Annex-I &
Company Brochure attached herewith.
Before establishing the Energy Group (Energy Associates Pvt. Ltd & Energy
Systems Pvt. Ltd), Mr. Saghir was senior consultant on HVAC and Energy studies in
Kingdom of Saudi Arabia over eighteen years.
Mr. Saghir holds BSC. in Mechanical Engineering and a MSC. in Building Services
Engineering from BRUNEL University West London U.K. and presented a number of
Technical papers on Energy Savings. Some important articles published in different
journals and presented in various seminars over energy are attached herewith for
your review and consideration. This will surely highlight the Company’s interest in the
Energy Business to your esteemed authority and will help in making decision
regarding the qualification of our Company.
62
Energy Systems Pvt. Ltd. – Company Profile
Articles
63
Energy Systems Pvt. Ltd. – Company Profile
Energy Saving Through DSM:
A New Concept
(Article)
64
Energy Systems Pvt. Ltd. – Company Profile
65
Energy Systems Pvt. Ltd. – Company Profile
66
Energy Systems Pvt. Ltd. – Company Profile
Energy Efficiency Business in
Pakistan
(Article)
67
Energy Systems Pvt. Ltd. – Company Profile
68
Energy Systems Pvt. Ltd. – Company Profile
69
Energy Systems Pvt. Ltd. – Company Profile
List of Projects
70
Energy Systems Pvt. Ltd. – Company Profile
The list of the some of the Projects by Energy
Systems (PVT) Ltd.:
71
Energy Systems Pvt. Ltd. – Company Profile
72
Energy Systems Pvt. Ltd. – Company Profile
73
Energy Systems Pvt. Ltd. – Company Profile
Joint Venture
With
International
Energy Consultants
74
Energy Systems Pvt. Ltd. – Company Profile
75
Energy Systems Pvt. Ltd. – Company Profile
76
Energy Systems Pvt. Ltd. – Company Profile
77
Energy Systems Pvt. Ltd. – Company Profile
78
Energy Systems Pvt. Ltd. – Company Profile
79
Energy Systems Pvt. Ltd. – Company Profile
80
Energy Systems Pvt. Ltd. – Company Profile
81
Energy Systems Pvt. Ltd. – Company Profile
82
Energy Systems Pvt. Ltd. – Company Profile
83
Energy Systems Pvt. Ltd. – Company Profile
Affiliation with ENERCON
84
Energy Systems Pvt. Ltd. – Company Profile
85
Energy Systems Pvt. Ltd. – Company Profile
86
Energy Systems Pvt. Ltd. – Company Profile