Operating Instructions

Table of contents

1. Equipment safty

1.1 Manage accurately ………………………………………………… 2


1.2 Aptitude of operators……………………………………………… 2
1.3 Operate mode…………………………………………………………… 2
1.4 Maintain………………………………………………………………… 2
1.5 System status ………………………………………………………… 2
2. Description

2.1 Types explain……………………………………………………………2


2.2 Technique parameter explain…………………………………………3
2.3 Dimensions ………………………………………………………………4
2.4 Operate panel……………………………………………………………4
2.5 Configuring on the low voltage side………………………………5
2.6 Configuring on the high voltage side…………………………… 5
3. Installation、Operation、Running

3.1 Installation ……………………………………………………………6


3.2 Prepare before the first running………………………………… 6
3.3 Secondary loop switch on…………………………………………… 6
3.4 Primarily loop switch on…………………………………………… 6
3.5 Operation in manual mode ……………………………………………7
3.5.1 Display with high voltage…………………………………………7
3.6 Notices of the operation and maintain……………………………7

1
Operating Instructions

1. Equipment safety

In order to avoid accidents,please read the safety notices and


operating instructions carefully,before installation and operation of the
equipment.
1.1 Manage accurately
Do not use this product for any other purpose than it is designed for.It
will be damaged for the wrong using. For the safety, users and operators are
not allowed to do any amendment with the equipment.
1.2 Aptitude of operators
The operation and maintenance of the equipment must be performed by a
qualified electrician. The operators should be familiar with
fixing,commissioning and general knowledge about electrical equipment.
1.3 Operate mode
Avoid any operating modes which will affect the safety.
Do not tear down and stop the safety. Safety must be resumed after the
necessary removing, when do some setting, maintenance and repair to the
equipment.
1.4 Maintain
The maintenance of the equipment must be performed by a qualified
electrician;
The equipment must be in stop status and the superior breaker and switch
must be locked in “OFF”station to prevent startup by accident.
Do not change the short protect circuit(fuse , over-load
protect,switch, sensor and so on).
When relocate the wire,obeying the former colour marker is necessary.
Before remove the equipment, discharging the capacitor and make sure
the
voltage have dropped to zero.
1.5 System status

2
Operating Instructions

Operator should make sure the equipment in the best work status and make
sure it cleanly and usable.

2. Description

2.1 Types explain

DR MSC HL-□-□
Rated
Work ( KVAR )
capacity
High (voltage
voltage KV ) local
compensation
Mechanical switch on-off
Derun electric

2.2 Description of technique parameter


Rated frequency: 50 Hz。

Rated capacity:150 kvar、210 kvar、240 kvar、300 kvar、540


kvar 、690 kvar、1500 kvar。

Rated current:

Item 210 240 300 540 690 1500


150
kvar kvar kvar kvar kvar kvar
kvar
capacity

Current(A 18.4 21.0 26.2 47.2 60.4 131.2


13.1

Equipment is allow to using continuous under the root-mean-square value


not exceed the 1.3In of over current in the steady state, which be
synthesized by 1.1Un, a worth deviation of capacitor and high harmonious
current.

Work temperature-rise: ≤30℃(the environmental temperature

3
Operating Instructions

under 35℃).

Intensity between terminals: AC 2.15Un 10S(Un rated voltage


of capacitor)or DC voltage U=4.3Un 10S。

Dielectric Loss: ≤0.08W/kvar,tgδ≤0.015%

Partial discharge:partial discharge for every capacitor≤10Pc

Discharge time: break and discharge to a value under 50V

Insulation resistance: ≥ 1000 MΩ。

Protective levels:IP30

Capacity Tolerance: ≤-5%~+5%(single-phase),≤0%~+3%


(Three-phase)

Leakage: no leakage phenomenon

Creepage distance: ≥25 mm/kV

Insulation Level: Primary circuit power-frequency withstand


voltage: 50kV(AC)/min

Primary circuit lightning impulse withstand voltage (1×40μs): 125kV


(max.) / 3 times.
2.3 Dimensions diagram
(a)150 kvar、210 kvar、240 kvar、300 kvar、540 kvar、690 kvar dimensions
diagram is shown as fig 2.1.1(Take 150 kvar as example)

4
Operating Instructions

电缆进线孔? 152

Fig 2.1.1 dimensions diagram

(b) 1500kvar dimensions diagram is shown as fig 2.1.2

DRMSCHG6.6-1500-1C DRMSCHG6.6-1500-2C

Fig 2.1.2 dimensions diagram

5
Operating Instructions

2.4 Operate panel

(a) Operate panel is shown as fig2.2

Fig 2.2 operate panel

1. Display with high voltage


2. Temperature controller
3. Zero- sequence protect display
4. Zero- sequence protect reset button(green)
(b) Cabinet illumination,observe window are shown as fig2.3

8 7

图 2.3 Cabinet panel

5. observe window
6. head lamp
7. nameplate
8. electromagnetic lock

2.5 Configuring on the low voltage side


6
Operating Instructions

(a) Configuring in the low voltage cabinet

1. Line channel
2. Junction port
3. Minitype breaker
4. Low voltage fuse
5. AC contactor
6. Relay
7. Time relay
8. Voltage relay

2.6 Configuring on the high voltage side


1. High voltage disconnecting switch (Jiangsu Yizheng Electrical Appliance)
2. Over voltage protector (Shanghai Delixi)
5. Transducer of voltage (Jiangsu Zhenjiang)
6. Series core reactor (Foshan Yige’er)
7 High voltage fuses (Wujiang Shengjiang)
8. Hight-voltage capacitor (FRANKE GMKP)

3.Installation、Operation、Run
3.1 Installation of equipment
(a) Open the wrapping box and check the integrality of all parts,
technique data,spare and store,according to the technique agreement;
(b) Installation the equipment comply the technique plan , put all
parts in order and weld the floor slotware;
(c) Installation the whole set device according the assemble diagram
and schematic diagram;
(d) Measure any two port of the whole set equipment, the maximum ratio
the minimum should not exceed 1.06;

7
Operating Instructions

(e) Connect the grounded station to the ground.


3.2 Prepare before the first running
(a) Do the tests according to the regulations;
(b) Check the interior electric equipment is in standby status,every
electric junction is fixed hard;
(c) Check all the cabinet doors are closed and locked, electromagnetic
lock is locked;
(d) Make sure the electrical source line is in the correct station.
3.3 Secondary loop switch on
(a) Switch on the AC 220V control electrical source after make sure
the secondary circuit connection is in normal status.
(b) Check every circuit, illumination, radiator,electromagnetic lock
is in normal status.
3.4 Primarily loop switch on
(a) Do the tests according to the regulations;
(b) Check the interior electric equipment is in standby status;
(c) Check all the cabinet doors are closed and locked, electromagnetic
lock is locked.
3.5 Display with high voltage
(1) Indicator light with high voltage
(2) Locked power indicator light
1

(3) Key switch 2

3
4

(4) Locked indicator light

3.6 Notices of the operation and maintain


(a) Watch should go on a tour of inspection to equipment
termly,dispose in good time if discover some abnormal phenomena;
(b) Remove dust deposits from the enclosure , clean all parts and
paint metalwork as required,avoid the accident caused by dust;
(c) Do the precautionary electric checking,check isolator connections
and operation termly;

8
Operating Instructions

(d) In power cut period and normal condition , it should cut the
superior breaker first and cut the other breakers , reverse the electrify
sequence when resume the power supply;
(e) In accident condition , it must cut off the capacitor superior
breaker;
(f) Power supply is forbidden when have not find the fault reason and
just instead the fuse,when the fuse was fused break;
(g) Capacitor must be discharged when examine and repair them,and it
should be grounded by the special grounding wire.