Correction Slip 1

LIST OF ADDITIONAL DOCUMENTS TO BE READ IN CONTINUATION TO SL.


NO.25
PAGE-3 OF HAND BOOK - BUILDING PERMIT - PROCEDURE - 2006

PARTICULARS OF DOCUMENTS

25.A Undertaking for additional FAR/Betterment charges as (specimen Annexed) duly


signed by the Owner/Arch./Engineer.
25.B Specimen signature of owner attested by Magistrate-1st Class.
25.C Copy of ' 0 form/OC
' in case of additional sanction duly signed by the Architect.
2 5 . Demolition
0 plan in case of revised sanction after demolition duly signed by the
Owner/Architect.
25.E Photograph of existing building (to be demolished) to be signed by the owner/Arch.
on reverse side.
25.F Undertaking for using wooder:/Steel ladder (specimen Annexed) on Nonjudicial
Stamp Paper of Rs. 10/- duly attested by the Oath Commissioner/Notary (Specimen
Annexed).
25.G Undertaking for not constructing extra dwelling unit on Non-judicial Stamp Paper of
Rs. 10/- duly attested by the Oath Commissioner/Notary (Specimen Annexed).
25.H Indemnity Bond for Structural Stability constructing Additional SF & TF on Non-judicial
Stamp Paper of Rs. 100/- duly attested by the Oath Commissioner/Notary (Specimen
Annexed).
2 5 . 1Cess charges undertaking duly signed by the owner, attested by notary and cess
Performa duly signed by the Architect (specimen Annexed).
25.J Indemnity Bond for Health hazard, safety concerned including fire safety on Non-
judicial Stamp Paper of Rs. 100/- duly attested by the Oath Commissioner/Notary
(Specimen Annexure-III).
25.K Undertaking/Affidavit for penalty/special compounding as per Govt. Notification dt.
22.09.06 & 20.11.06 on Non-judicial Stamp Paper of Rs. 10/duly attested by the oath
Commissioner/Notary (Specimen Annexure-I).
25.L
Undertaking/Affidavit for ventilation by mechanical means for Add!. FAR and zero set
backs on Non-judicial Stamp paper of Rs. 10/- duly attested by the Oath
Commissioner/Notary (Specimen Annexure-II).
25.M Undertaking/Affidavit regarding construction will be carried out as per sanctioned plan
and not to occupy the building till it is declared fit for occupancy by DDA. on Non-
judicial Stamp Paper of Rs. 10/- duly attested by the oat~.Commissioner/Notary
(Specimen Annexed).
25.N Underta~ing/Affidavit for non-availability of water and electricity on Nonjudicial Stamp
Paper of Rs. ~ 0/- duly attested by the Oath Commissioner/Notary (Specimen
Annexed).
2 5 . 0Copy of possession letter duly signed by the Architect.
Correction Slip 2

Documents Retd. in continuation to S. No. 30 at page 3 of Hand Book

31. Appointment letter of Structural Engineer.


32. Development Area No. (Details) and whether denotified or not. along with
NOC from Land Deptt, DDA.

Correction Slip 3

Documents Re~d. in continuation to S. No. 12 at page 3 of Hand Book

13. Undertaking for EWS (Economic Vicker section), for proposal based on MPD -
2021:- An undertaking that minimum 15% of FAR 35% of the dwelling units,
Which ever is more, are constructed for community service proposal/EWS and
Lower Income Category.

Correction Slip 4

Documents Re"d. in continuation to S. No.3 at page 4 of Hand Book

4. N.O.C. from M.O.E.F, if required, where applicable.


5. N.O.C. from Archeological Survey of India / Heritage, where ever I S
applicable.
6. Certificate duly signed by the owner, structural Engineer, Architect &
Supervisor for tentative cost of project for assessing CESS Tax (Note: 1 % of
the tentative project cost shall have to be deposit at the time of submission of
proposal).
7. After sanction of proposal, the services i.e. Water Supply, Sewerage and
strom water Drains etc. shall be submitted to DDA of forwarding to concern
local body for their approval, where ever applicable.
Correction Slip 5

Documents Re~d. in co'ntinuation to S. No. AlII at page 4 of Hand Book

( M FOR
V ) SANCTION OF BUILDING PLANT FOR COMMERCIAUINDUSTRIAL
BUILDINGS

PARTICULARS OF DOCUMENTS
1 .
Form of first Application-Appendix 'A', (Bye Law 6.1)
2 .
Specification form Proposal duly signed by owner and Architect/Engineer
Appendix 'A' (Bye Law 6.2.6) .
3 . Certificate of Supervision-1, Appendix 'B' (Bye Law 6.2.7) by Arch. Engineer.
4. Certificate of Supervision-II, by Plumber/Engineer-Appendix 'B' (Bye Law 6.2.6).
Appointment of letter of Architect/Engineer duly signed by the owner.
5 . Copy of valid Registration- certificate of the Architect/Engineer duly signed by the
6 . Architect.
Copy of valid Registration Certificate of Plumber/Engineer duly signed by the
7 Architect.
. Affidavit for ownership and plot lying vacant on Rs. 10/- Non-judicial Stamp Paper
duly attested by the Oath Commissioner/Notary (Specimen Annexed).
8 . Affidavit/Undertaking for non-stacking of building materials on public land, App.
'M' duly attested by the Oath Commissioner/Notar:y.
9 Valid EOT - (if required) upto the date of submission of building permit. Indemnity
. Bond in case of proposal for constructions of basement on a Nonjudicial Stamp
Paper of Rs. 100/- duly attested by 1 st class Magistrate
1 0 . (Appendix 'N). ~~
1 1 . Undertaking under section 29(1) of D.O. Act 1957 on Non-judicial Stamp Eaer of
Rs. 10/- duly attested by the oath Commissioner/Notary (Specimen Annexed).
13. Copy of Possession plan/Lease deed/Mutation/sale deed/GPA duly signed by
~ the Architect.
" <
; e ~ '
14 Copy of NOC from Lessor duly signed by the Architect.
i :" .

. Building plans including Water Harvesting proposal (4 sets i/c one cloth
: r :
-
: -!; .;
15.
mounted) duly signed by owner/Architect.
~ 16. Landscape plan (4 sets i/c one cloth mounted) duly signed by owner/Architect.
~ .
17 Parking plan (4 sets i/c one cloth mounted) duly signed by owner/Architect.
~.
.
18 Layout plan for the plot under reference duly signed by the Owner/Architect.
t " .
19 Certifioote by Owner/Architect/Engineer/Structural Engineer for Safety from
i ; : .20 natural hazards,.Annexure-'B'-(Bye L e 6.2.9). i w
Qualification Certificate of Structural Engineer duly signed by the Architect.
~ , ' .

tt o : < , , . Certificate for water harvesting prescribed format (specimen Annexed) duly
~. 21
f signed by the Owner/Arch./Engineer.
:! ; . .
• . . .

~ N.O.C. from competent authority regarding land use as per Master Plan/Zonal
22. Plan if ~equired.

,
~
t:i
23 Approval of Delhi Fire Service in case of schools, guidelines of Directorate of
i t ' ~
;
!
: . Education, GNCTD dt. 17.01.05 are to be followed. Undertaking on Rs. 10/-
v

"
j , >
9
~
t
i .
\
1 2 .
duly attested by the Oath Commissioner/Notary (Specimen Annexed) be
submitted by the owner at the time of sanction of bldg plan.
2 4 . Additional 3 sets of plan are to be submitted if the scheme requires the c'earance
trom Delhi Fire Services and two additional sets of plans are to be submitted, if
clearance from DUAC is required.
25. Undertaking for additional FAR/Betterment charges as (specimen Annexed) d l J } y
$ w » )e ; . DW/?8PAl'ck/E/?§'il?c9c91:
1 d . . 9b y
2 6 . Specimen signature of owner attested by Magistrate 1 st Class.
2 7 . Copy of '0' form/OC in case of additional sanction duly signed by the Architect.
Demolition plan in case of revised sanction after demolition duly signed by the
28. Owner/Architect.
Photograph of existing building (to be demolished) to be signed by the
29. owner/Arch. on reverse side.
Copy of allotment letter duly signed by the Architect.
3 0 . Undertaking for not constructing extra area beyond sanctioned plan on Non -
31. judicial Stamp Paper of Rs. 10/- duly attested by the Oath Commissioner/Notary
(Specimen Annexed).
Indemnity Bond for Structural Stability 0 Non-judicial
D Stamp Paper of Rs. 1 0 - 0 /
3 2 . duly attested by the Oath Commissioner/Notary (Specimen Annexed). Cess
charges Undertaking duly signed by the owner, attested by Notary and cess
33. Performa duly signed by the Architect (Specimen Annexed).
Indemnity Bond for Health hazard, safety concerned including fire safety on Non -
34. judicial Stamp Paper of Rs. 1 0 - 0duly / attested by the Oath Commissioner /Notary
(Specimen Annexed).
General Body Resolution for appointment of Architect & Structural Engineer, (as
35. defined in NBC of India).
Authorization letter for siq-lJing the documents.
3 6 . Undertaking Affidavit regarding construction will be carried out as p er sanctioned
3 7 . plan and not to occupy the building till it is declared fit for occupancy by DDA.· on
Non-judicial Stamp Paper of Rs. 101- duly attested by the Oath
Commissioner/Notary (Specimen Annexed).
Copy of Registration of the Society with Govt. along with the detail of its
3 8 . goveming body signed by the Architect.
Copy of possession letter duly signed by the Architect.
3 9 . Chief Fire Officer (CFO questionnaire in duplicate (in original), wherever
40. applicable.
Delhi Urban Art Commission (DUAC) Proforma in d uplicate (in original) i required
f
41. (Ref. memorandum of DUAC dt. 0 7 . 0 7 . 2 0 0 5 ) .
Architectural Control Drawings, wherever applicable.
42. Clearance from A.A.!. to be obtained by the Architect/Owner of through DDA.
43. Provisions for physically handicapped pdrsons as per Govt. Notification vide No.
44. F. 12016/5/79/DDIANI/IBNoI.IX (Pt.) dt. 2 8 . 0 8 . 0 2 .
NOC for environmental clearance from DPCC/MOEF as applicable as per the
45. Govt. Circular No .
Undertaking 'from Delhi Metro.
Undertaking stating that 1 % of the project cost will be spent on 'Works of Art' in
. 46.
the building s per DUAC.
4 7 . Architectural Control Drawings, wherever applicable.
Approval from the Chief Inspector of Factories in case of Industrial 8uilding~.
4 8 .
49.
50. Approval from the Chief Controller of Explosives, Nagpur and Chief fire
Officer, 8ettti in case of hazardous buildings.
51. Clearance from Archaeological Survey of India.
52. Clearance from N.H.A.1.
53. Any other documents/information that the authority may deem fit.
5 4 . L "-~'r .
a \ ) ~ v\ " \ ,'C"'i:.S '- \ 1 : - '- s ~- " 8 = < ' . l l . . . ~ - ~~ " "

Correction Slip 6

LIST OF ADDITIONAL DOCUMENTS TO BE READ IN CONTINUATION TOSL.


NO.12
PAGE-4 OF HAND BOOK-BUILDING PERMIT - PROCEDURE-2006

13. Photograph of water harvesting chamber duly signed by the owner/Arch. on


the reverse.
14. Appendix 'F'
15. Appendix 'G'
16. Annexure 'C'
17. Letter for change of Architect/Engineer if applicable.
18. Appendix 'B' 6.2.7 (Supervision No. I) if applicable.
19. Appendix 'B' 6.2.8. (Supervision No. II) if applicable.
20. Original sanction plan in case of deviations from the original plan duly signed
by the owner/Arch.
21. Cess charges Undertaking duly signed by the owner, attested by Notary and
cess performa duly signed by the Architect (specimen Annexed).
22. Indemnity Bond for Health hazard, safety concerned including fire safety on
non-judicial Stamp Paper of Rs. 1 0 - 0 duly / attested by the Oath
Commissioner/Notary (Specimen Annexed).
23. Undertaking/Affidavit for penalty/special compounding as per Govt.
Notification dt. 2 2 . 0 & 9 2 . 00 . 6 1 on
1 Non-judicial
. 0 6 Stamp Paper of Rs. 1 0duly
/
attested by the Oath Commissioner/Notary (Specimen Annexed).
24. Undertaking/Affidavit for ventilation by mechanical means for Add!. FAR and
zero set backs on Non-judicial Stamp Paper of Rs. 10/- duly attested by the
Oath Commissioner/Notary (Specimen Annexed).
25. Undertaking/Affidavit regarding regularization of existing bldg. plans in view of
Govt. Notification dt. 2 2 . 0 9 . 0 6 .
26. Copy of Possession letter duly signed by the Arch.
27. N.O.C./c1earance from N.H.A.1. if applicable.
28. N.O.C./c1earance from Archaeological Survey of India if applicable.
Correction Slip 7

Documents Re'f,d. in continuation to S. No. 17 at page 6 of Hand Book DUAC

1. perfoma in duplicate (in original) for completion certificate duly filled, signed by the
Owner / Architect.
2. & 2 set of Building photographs, Coloured (8 * 10 in size) duly signed by Owner /
Architect on back side.
3. 2 set of Model Photographs, Coloured (8 * 10 in size) duly signed by Owner /
Architect on back side
4. 2 set of Model Photographs, Coloured (8 * 10 in size) duly signed by Owner /
Architect on back side.
5. External finish Certificate in duplicate (in Original) from the Architect. Qualification
6. CESS TAX:-
a. The Labour cess has to be deported at the time of Sanction of the Building
Plans @ 1 % of total estimated Cost of project duly verified by Architect,
Owner, Structural Engineer and Supervision Engineer (Performa etc. are at
page No. 53 to 59).
b. If the Labour cess already deposited at that time of sanction then the final cost
along with difference of Initial Cost and Final/Actual Cost of Cess Tax @ 1 %
has to be deposited before release of compition. certificate.
Correction Slip 8

ANNEXURE ' 0 '

LIST OF ADDITIONAL DOCUMENTS TO BE READ IN CONTINUATION TO SL.


NO. 18
P AGE-5 HAND BOOK - BUILDING PERMIT - PROCEDURE-2006
1.
DESCRIPTION OF DOCUMENTS
1 9 Provision s for physically handicapped persons as per Govt. Notification vide No.
. F - 1 2 0 1 6 / 5 /B 7 N 9 /o(Pt.) D I . dt.
DI X28.08.02.
I A / V I / I
20 NOC for environmental clearance from DPCC/MOEF as applicable.
. NOC from Delhi Metro.
21. Undertaking stating that 1 % of the project cost has been spent on 'Works of Art'
22. in the building as per DUAC.
23 Authorization letter for signi ng the documents.
. Architectural Control Drawings, wherever applicable.
24. Architectural Control Drawings, wherever applicable.
25. Clearance from Archaeological Survey of India wherever applicable.
26. Clearance from N.H.A.I. wherever applicable ..
27.

C o r r e c t i o n S l ip 9

D o c u m e n t s R e ~ d . i n c o n t i n u a t i o n t o S . N o . 8 a t

9. Numbering plan of the CGHS.


10. 2 set of Completion plans for towarding to DUAC duly signed by the
Owner/Architect. (layout Plan, Building Plans, Sections and Ellevents along
with actual area of side Le. ground converge, FAR, Parking, Green & Other
Details.
11. One set of attested copies of Sanctioned Plan.

Correction Slip 10

CHECK LIST OF DOCUMENTS REQUIRED FOR OCCUPANCY


CERTIFICA TEIREGULARIZA TION
OF COMMERCIAUINDUSTRIAL BUILDINGS

To be Read After C-IV

DESCRIPTION OF DOCUMENTS

1. Appendix B-3 duly signed by owner, architect/engineer, structural engineer and


supervisor (Bye law 7.5.2).
2. One set of structural drawing duly signed by owner, arch itect/engineer, structural
engineer and supervisor.
3. Copy of Extension to time valid up to date of applying of CC/OC duly signed by
the Architect.
4. Copy of sanctioned plans valid up to the date of applying of CC/OC duly signed
by the Architect/Owner.
5. Valid certificate of Architect/License of Engineer duly signed by the Architect.
6. copy of certificate of qualification of Structural Engineer duly signed by the
Architect.
7. Certificate from Architect/Engineer regarding deviations if any w.r.t. the
sanctioned plan in duplicate.
8. (a) Two sets of building photographs (coloured) front & rear (8" x 10") duly
signed by the owner/Arch. on the reverse.
(b) Two sets of model photographs (coloured) size (8" x 10") ..
9. Three sets (one cloth mounted) of Completion Plan(s) duly singed by the
Architect/owner, showing Ground Coverage, FAR, green area, parking with other
detail based on actual site execution.
10. Detail of water harvesting system duly signed by the owner/Arch.
11. Appendix 'F' (Bye-laws No. 7.5.2).
12. Appendix 'G' (Bye-laws No. 7.5.2).
13. Annexure 'C' (Specimen Annexed).
14. Letter for change of Architect/Engineer if applicable.
15. Appendix 'B' 6.2.7 (Supervision No. I).
1 6 . Appendix 'B' 6.2.8 (Supervision No. 1 1 ) .
17. Cess charges Undertaking duly signed by the owner, attested by Notary and cess
perfoma duly signed by the Architect (specimen Annexed).
18. Indemnity Bond for Health hazard, safety con cerned including fire safety on Non -
jt,Jdicial Stamp Paper of Rs. 100/ - duly attested by the Oath
Commissioner/Notary (Specimen Annexed).
19. External finish certificate in duplicate' duly signed by the Architect.
20. 4 set of parking/landscape plan (one cloth mounted) duly signed by the
Architect/owner.
21. Superimposed layout and bldg. plans duly signed by the Architect/owner.
22. Copy of Possession and allotment letter duly signed by the Arch.
23. Sewer and water connection permission from DDAIMCD/DJB in case ' 0 form ' is
already issued duly signed by the Architect.

24. Copy of Possession plan/Lease deed/Mutation/sale deed/GPA duly signed by
the Architect.
25. Copy of Approval of sewerage/water supply/storm water drainage scheme
from DJB/MCD/DD.
26. Layout plan (if required) duly dully signed by the Owner/Architect.
27. Certificate from Lift manufacturer for high rise building.
28. Additional 3 sets of plan are to be submitted if the scheme requires the
clearance from Delhi Fire Services and two additional sets of plans are to be
submitted, if clearance from DUAC is required.
29. Chief Fire Officer (CFO) questionnaire in duplicate (in original), wherever
applicable.
30. Delhi Urban Art Commission (DUAC) proforma in duplicate (in original) if
required (Ref. memorandum of DUAC dt. 07.07.2005.
31. Clearance from A.A.!. to be obtained by the Architect/Owner or through DDA.
32. provisions for physically handicapped persons as per Govt. Notification vide
No. F-12016/5/7DDIANI/IBNoI.IX (pt.) dt. 28.08.02.
33. NOC for environmental clearance from DPCC/MOEF as applicable as per the-
Govt. Circular.
34. NOC from Delhi Metro.
35. Undertaking stating that 1 % of the project cost has been spent on 'Works of
Art' in the building as per DUAC. _
36. General Body Resolution of appointment of Architect & Structural Engineer,
as defined in NBC of India).
37. Authorization letter for signing the documents. '
38. Architectural Control Drawings, wherever applicable.
39. NOC from Local Elect. Body for ESS wherever applicable
40.' Certificate from Lift Inspector, GNCTD in case if lift is provided.
41. Architectural Control Drawings, wherever applicable.
42. Approval from the Chief Inspector of Factories in case of Industrial Building.
43. Approval from the chief Controller of Explosives, Nagpur and Chief fire
Officer, Delhi in case of hazardous buildings.
44. Clearance from Archeological Survey of India.
45. Clearance from N.H.A.1.
46. Any other documents (s)/information(s) that the Authority may deem fit.

Correction Slip 11 (6 Page)

L e . . sP < e ; O r f , o r m a t o b e s u b t m- . ' it t i t oe dn P / a eo t r. mct h . i et . t i m e o f


J o- .
Schedule-II
Original/DuplicatefTriplicate

Note: For item 1 and 2 please fill in the appropriate code in the respective blocks

1 . Nature of Construction New Construction Addition to existing


. Building
2 . Type of Construction
Total Plinth Area Total Floor Area Sqm.

D
Sam.
*Code

**Code I
3. Number of Storey in the
Building
4 . Number and type of 1 Room 2 Room- 3 Room 4
dwelling units Unit Unit Unit Unit
Room

New Construction/Addition Existing Buildings resulting in dwellings. P a r t i c u l a r s f o r t h e


f o l l o w i n g i t e m s s h o u l d b e g iv e n w h il e a p p l y i n g f o r o c c u p a n

5.Estimated Construction cost (if available) Rs ..................................................................


.
6.Number and date of issue of Authorisation Certificate .
7. Date of commencement of Construction ................................................................ .

8. Date of completion of construction ......................................................................... .

Date: ......................... Signature of Applicant .......................................... .

Name and address of applicant in Block letters ............................................................... .

(For Office Use Only)

Reference number of application ........................................................................................


, ; . '
* Total plinth area means the sum tota~of plinth area of all the floors in case the
building has more that one floor.
* * (a) (i) Dwelling (I) Other residential places (2) (b) Industrial (3) (c) Commercial (4)
(d) Institutional (5) (b) Others.

PROFORMA

(PLEASE ALSO SEE EXPLANATION BEFORE PREPARING THE AFFIDAVIT)

Affidavit

I, ................. ' ..........................., S/O ............................... , Aged ................."Years,


resident of ............. ............................ ..............................................., registered under
Section 7 of the Building and Other Construction Workers' (RE &CS) Act, 1 9 vide 9 6
registration no ..............................dated ................................ for construction work at
............................... , do hereby solemnly affirm that the details of aforesaid construction
work furnished below are true and correct to the best of my knowledge and relief:
~

1 . The type of building is

2 The date of commencement


. of construction ........................................................................................................ .

3 Date of completion of work: ................................................................................... .


.
4. Total' constructed covered
area (in qs. meters) (up to
four storeys including mezzanine
floor but excluding
basement).

5 Additional constructed
. covered are constructed
beyong four storeys
(in sq. meters)

6 Total constructed
. covered are of basement
(in sq. meters).

7 . Total cost of civil work incase


of repairs/alteration/
maintenance : Rs ............................ (Rupess ............................. )

8 T ot~1 cost of demolition


. work of old structure : Rs ... t . • . . • . • . • . (Rupess
• . • . • . • • ...................................)

9.Type of flooring is .................................. having total area of ................ sq. meters with
cost @ Rs .............................. (Rupess ............................ ) per sq. mtr.

1 O Total
. cost of wood paneling
work is Rs ............................ (Rupess ............................ )

11 . Total cost of wood work


other than wood
1 2 . Total cost of false ceiling
work is

13 The
Total cost of total cost
Central Airof Central Ai
Conditioning is

14. Cost incurred in


installation of lift is

15. Total cost


incurred on
Boundary wall
and
the contents of the above affidavit are true and correct to the best of my knowledge.
No part of at is~false and nothing material has been concealed therefore .
DEPONENT

1. For SL. No.1, th


applicable:
a)Residential
b)School
c)Hospital
d) Guest House

2. for type of floori


furnished within 30 days

• financial year under sect


Cess Act, 1996)

PRO

1 . Name of owner/e
(T
o
2. Address of the
be
owner/employer

3. Registration No.
(If registered und
section 7 of Build
Construction Wor
&CS) Act, 1996)
9. Amount & date of A
cess deposited with
local authorities (At
a copy of receipt)
Stage Amount
Cess
st
1 year
na
2 year
ra
3 year
Total

1 0 Indicate if construc
. building has been c
Correction Slip 12
\b ~E ~E'A-O
fully during the prev
D'~. in continuation to S. No. 13F at page 16 of Hand Book
DELHI DEVELOPMENT AUTHORITY (LEVY/CHARGES FOR

financial year
RESIDENTIAL DEVELOPMENT) REGULATIONS, 2006
(13G) In exercise of powers conferred by Section 57 of the Delhi
Development Act, 1957 (61 of 1957), the Delhi Development Authority with the
previous approval of the Central Government, hereby makes the following
Regulation:-
1. SHORT TITLE AND COMMENCEMENT
1.1 These Regulations shall be called "The Delhi Development Authority
(Levy/Charges for residential plotted development) Regulation, 2006".
1.2 These Regulations shall come into force from the date of publication of
this notification in the Gazette of India.
1.3 All words and expression used in these Regulation but not defined
shall have the meaning assigned to them in the Delhi Development
Act, 1957 or the Master Plan Prepared and approved under the said
Act or the Delhi Municipal Corporation Act, 1957 or the New Delhi
Municipal Council Act, 1994, as the case may be.
1.4 If any, question arises relating to the interpretation of these
, Regulations, it shall be decided by the Central Government.
2.
DEFINITIONS
In these regulations, unless the context otherwise requires,
(a) "Act" means the Delhi Development Act, 1957 as amended from to
time.
(b) "Betterment Levy or Additional FAR Charges" means the levy payable
on the additional FAR allowed vide notification dated 23.07.98 and over the
FAR allowed vide notification dated 15.05.95.
(c) "Category of colonies" means categorization of colonies from (A) to (G)
as adopted by the Municipal Corporation of Delhi (MCD) for unit area method
of property tax assessment.
(d) "Development Norms" means the norms prescribed in Master Plan for
Delhi for Delhi for constructions of Residential Plotted Development as per
modified norms laid down in the Notification SO (1591 (E) dated 22.09.2006.
(e) ,..' "Escrow Account" means a dedicated savings account held by the Local Body
concerned not peing operative unless the conditions for which it has been
opened are fulfilled in accordance with the provisions of these Regulations.
(f) '''Local Authority" means the local authority concerned such as
Municipal Council (NDMC) and the Delhi Development Authority (DDA), in
their respective jurisdiction.
(g) "Master Plant" means Master Plan for Delhi framed and notified under
the provisions of Delhi Development Act, 1957.
3. APPLICATION
These Regulations shall apply to all plotted development in the areas covered under
Municipal Corporation of Delhi, New Delhi Municipal Council, and the Delhi Development
Authority subject to certain terms and conditions laid down in the Master Plan of Delhi as
amended vide Notification No. 8.0. 1591 (E) dated 22.09.2006.
4. BETTERMENT LEVY/ADDITIONAL FOR
CHARGES AND
PENALTY/COMPOUNDING CHARGES/SPECIAL COMPOUNDING
CHARGES.
4.1 "the plot owners/allottees seeking extra coverage, additional floor or
part thereof, over the above Gazette Notification dated 23.07.1998, as per the norms
defined in the notification dated 22.09.2006, shall be charged betterment levy (or
additional FAR Charges.)
4.2 Plot owners/allottees seeking regularization of construction over the
coverage allowed as per notification dated 23.07.1998 in terms of the additional
coverage allowed under the notification dated 22.09.2006, shall have to pay penalty
and compounding charges over and above the betterment levy referred to in para
4.1 above.
4.3 Plot owners/allottees seeking sanction/regularization of additional
coverage over the development control norms as per 15.05~ 1995, shall also be liable
to pay penalty and compounding charges over and above the betterment levy
referred to in para 4.1 above, at the rates hereinafter prescribed, for availing of
additional coverage permissible vide notification dated 23.07.1998.
44. Plot owners/allottees seeking regularization of additional height in terms of
notification dated 22.09.2006, will have to pay penalty and special compounding
charges, in addition to the betterment levy referred to in para 4.1 above.
5.
RATE OF PAYMENT OF BETTERMENT LEVY/ADDITIONAL·· FAR CHARGES AND PENAL
TV/COMPOUNDING CHARGES/SPECIAL COMPOUNDING CHARGES.
5.1 As per sub-para (ix) to (xi) of Notification dated 22.09.2006, the Plot
owner/allottees shall be subject to levy of:-
i) Betterment Levy or Additional FAR charges in respect of new
construction;
Compounding Charges/Penalty/Special Compounding Charges for regularization of
following unauthorized construction:
a) Additional Coverage within sanctioned height;
b) Additional coverage above sanctioned height but within
permissible limit as per notification dated 23.07.98; and Additional Coverage
beyong permissible height as per notification dated 23.07.1998, but within 15
m.
ii)
,..
c)
5.2 The Charges for the financial year 2006-07 as approval by the
Government of India shall be as follows.

(Rates in Rs. per sqrn)

S.No. "
Purpose A&B C&D E,F&G E,F&G
Colonies Colonies Colonies: in Colonies:
plots of plots of upt
. more than 50sqm .
50sQm.
1. New Construction 3500/- 1400/- 700/- 490/-
2. Regularization of unauthorized
construction
(a) Additional Coverage within 4020/- 1750/- 805/- 564/-
sanctioned heiqht
(b) Additional Coverage above 4375/- 1750/- 875/- 613/-
sanctioned but within permissible
heiqht (as per 23.07.98)
(C) Additional Coverage beyond-. 49001- 1960/*- 9801- 686/-
permissible height as per 23.07.1998
but within 15 meters
5.3 These rates will remain in force in respect of subsequent years unless
specifically revised and notified with the approval of the central
Government.

6. UTILIZATION
6.1 The amount so collected shall be deposited in an ESCROW
ACCOUNT by the local authority concerned for incurring expenditure for
developing parking sites, augmentation of amenities/infrastructure and
environmental improvement programmes.
6.2 A separate account of the income and expenditure of the Escrow
Amount shall be maintained by the local authority and quarterly statement
of the same shall be rendered by the local authority to the Government.

7. CONDITIONS FOR REGULARIZATION OF ADDITIONAL CONSTRUCTION. 7.1


Encroachment on public land shall not be regularized and shall be removed first
before the local authority grants sanction for regularization of additional
construction/height.
7.2 Every applicant seeking sanction or regularization of additional FAR
and/or height shall submit a certificate of structural engineer. Where such
certificate is not submitted or the Building is otherwise found to be
structurally unsafe, formal notice shall be given to the owner buy the local
authority concerned, to rectify the structural weakness within a
re_asonable stipulated period, failing which, the building shall be declared
unsafe by the local authority concerned and shall be demolished by the
owner or the Ibcal authority.

(V.M. BANSAL) PR. COMMR.-CUM-


SECRET ARY DELHI DEVELOPMENT
AUTHORITY
F .20(4 )05/MP/Pt.I I/Pt.
1.
I -

---- . .------.-------------------------------------------------
(To be submitted on Non-Judicial Stamp Paper of Rs. 10/- duly attested by Notary
Public)
Annexure-}
AFFIDA VIT/UNDERT AKING
5.
................................Affidavit of Sh .............S/o Sh .....................age .
......................RIo Hose on Plot no ..............................Blcok/Pkt. No .. .
.....................................................Situated at do hereby solemnly affirm and
declare as under:-
That I/We have submitted building plans for regularization of construction that was
carried out in contravention of Section 12 of D.O. Act, 1957 in Building on
...............Plot No ...............................Block/Pkct. No .........................Located at .
to theD.O.A.
That covered area and FAR as shown in building plan of portion of construction that
was carried out with a valid sanction/regularized by O.D.A.
........................................vide file No .......................dated the construction
raised in contravention of Section 12 of govt. of India Notification No. K-
13011/9/2006-00(8) dated
22.09.2006. A
That construction as shown in yellow colour on the plan is beyon~the norms
. of Notification No. K-13011/9/2006-00(B) Dated 22.09.2006.
That I/We hereby undertake that portion of building shown in yellow colour shall be
demolished by me/us within two months from the date of regularization of the
construction carried out in the aforementioned premises, failing which D.O.A. shall free
to take demolition action without any notice and I/We hereby solemnly undertake to
pay the demolition charges as raised by O.O.A.
That the charges as dep[osited by me/us in O.O.A. towards betterment levy/additional
FAR charges and penalty/compounding charges/special compounding charges has
been worked out on the basis of Notification No. F20(4)/2005/MP/Pt.lI/PC dated 20th
Nov, 2006 of O.O.A.
That I/We hereby given an undertaking that in case of any shortfall in the amount of betterment
levy/additional FAR charges and penalty/compounding charges/special compounding charges if
pointed out by O.O.A. at any point of time, the same shall be deposited by me/us within stipulated
time and in case of failure to do so, O.O.A. will be free to take action as deemed fit.
That I/We hereby given an undertaking that in case of any willful misrepresentation either in the
regularization plans or charges deposited. O.O.A. will be free to file a case of perjury against me/us
besides other actions as per law.
6.
7.
DEPONENT
Verification:-
I/We the above named deponent do hereby affirm and verify that I/We have voluntarily made the above
affidavit and its content are true to the best of my . knowledge.

y
~
2.
3.

(To be submitted on Non-judicial Stamp Paper of Rs. 10/- duly attested by Notary
Public)
Annexure-II

UNDERTAKING

This undertaking is made on .........................by Sh./Smt. ......................................


S/o, W/o, % ................................................................
and Sh.lSmt. . ...........................................
0/0 ........................................... both r/o .............................................................
1. That I/We am/are owners of Plot No .......................................Pkt. No ...................Sector
No ............................of .......................................Residential Scheme.
2. That I/We wish to construct permitted area on GF, FF, SF & TF as allowed vide
Notification No. K-13011/9/2006-00(B) dated 22.09.2006 of the above said
property.
3. That I/We shall pay the amount as & when demanded by the Authority on ale of
development/services/betterment charges in addition to the levy for additional
FAR within the stipulated time failing which I/We shall have no objection to
initiation of action against me/us as deemed fit by the Authority Le.O.O.A.
4. That I/We shall provide mechanical means for ventilation as per N.S.C. provisions
should the need be felt in view of sanction being accorded to the proposal as per
permitted FAR &Zero set-backs as allowed in the Notification dated 22.09.2006.
5. That pipes of suitable material/specifications that require almost Nil maintenance
shall be used for making connections of the in-house Mahhole (to be constructed
in the open area of the plot) to the service of the civic agencies.
6. That suitable open areas will be provided to accommodate sunshades for windows
etc. & manhole for services within the plot area.
7. That I/We shall not create any extra dwelling unit beyong the limit as permitted in the
Notification No. K-13011 /9/2006-00(B) dated 22.09.2006
8. That all doors/windows provided at the periphery of the plot in the case of Zero set
backs as allowed shall open on the inside.

EXECUTATNT
,

To be submitted on Non-Judicial Stamp Paper of Rs. 100/- duly attested by


Notary Public)
Annexure-III

INDEMNITY BOND

This deed is indemnity is made on .............................. .by Sh. /Smt. .....................


S/o, W/o, % ...............................................................
and Sh./Smt. . ..........................................
S/o W/o, % ......................................................................
both RIo ..............................................

1. That l!We am/are holders of plot No .................................Pkt. No. : .....................


Sector No ..................in ...........................Residential Scheme, Delhi.
2. And whereas I/We propose to construct a building over the said plot of land an
whereas l!We have submitted the building plan for construction of building over
the said plot of land for sanction with O.O.A.
3. And whereas the O.D.A. has agreed to sanction the building plan of the aforesaid
proposal as per MOUO Notification No. K-13011/9/2006-00(B) dated 22.09.2006.
Now this deed witnesses that in pursuance of the aforesaid Indemnity Bond and i
4. in consideration of O.O.A. having agreed to sanction the building plan I
submitted vide my/our application No ....................................dated ...................... I
in RIo the plot of land situated at ............................................................Delhi and
.~. .
; 1
:
referred to above. l!We hereby undertake to indemnify and keep harmless the ) O.O.A.
f /~

from all proceedings in Court and other Authorities of all expenses, losses/claims which
the O.D.A. may incur or become liable to pay it to the building plan in respect of the
i
aforesaid plot.
It is further added that l!We full indemnify the sanctioning Authority Le. O.O.A.
5. from assuming any responsibility in RIo the following on account of accord of the
sanction as per MOUO Notification No. K. 13011/9/2006-00(B) dated 22.09.2006.
i Health hazard of any kind.
ii Safety concerns i/c fire safety, of all kinds.
iii Adverse effects of non providing adequate ventilation/light.
iv Any other discomfort/hazardllitJgation arising out of
regularization/sanction of the building/building plan as per relaxed norms
as permitted in MOUO's Notification No. K-13011/9/2006-00(B) dated
22.09.2006.
v Structural soundness of the building during/after construction.

l!We further state that I/we and all my/our successors in interest shall abide by
the aforesaid terms & conditions of this deed of Indemnity.

Witness
1 ...................................................... .

2 ……………………………………….
9. Amount & date of A
cess deposited with
local authorities (A
a copy of receipt)

Stage Amount
Cess
st
1 year
na
2 year
ra
3 year
Total

9. Amount & date of
cess deposited wi
local authorities (A
a copy of receipt)

Stage Amoun
Cess
st
1 year
na
2 year
ra
3 year
Total

Das könnte Ihnen auch gefallen