CLIENT
Chemical plant (Japan)
APLICATION DATE
July, 2005
SCOPE OF WORK
The scope of this project was to avoid the overload problems and match the original duty point (2100 cub.m/h ~ 40 m head)
in a centrifugal cooling water pump for a Chemical plant. The graph below shows the test data of pump manufacturer, and
test data by Corrocoat Japan using the thermodynamic method for total head, kw to motor and pump effciency vs. total flow.
The beside tableau reports the data comparisons of tested data at desing rated point.
80
C.W.P. (2100 m3/h 40m 300 kW)
PUMP HEAD m
70
┼ Manufacture Test data June ’90
60
X CCJ Test before coating Feb ’04
50
□ CCJ Test after coating Jul ’05
40
30
POWER to MOTOR kW