1) This class of components is geared toward several goals, the major ones
being the control of development and maintenance activities and the
introduction of early managerial support actions that mainly prevent or
minimize schedule and budget failures and their outcomes.This description
about?

a. Components of software quality management


b. Components of standardization, certification, and SQA system assessment
c. Pre-project component
d. Component of software quality management

2) Which of the following is a SQA system component classes?

i. Pre-project quality components


ii. Project life cycle quality components
iii. Infrastructure error preventive and improvement components
iv. Software quality management components
v. Standardization, certification and SQA assessment components

a. i
b. i, iii
c. ii, iv, v
d. All Above

3) Software maintenance services vary in range and are provided for extensive
periods, often several years. These services divide into the following categories:

i. Corrective maintenance
ii. Adaptive maintenance
iii. Functionality improvement maintenance
iv. Software maintenance

a. i
b. i, iii
c. ii, iv
d. All Above

Page 1 of 15
Question & Answer

4) Who will perfoms the contract review?

i. The leader or another member of the proposal team


ii. The members of the proposal team
iii. An outside professional or company staff member who is not member of the
proposal team
iv. A team of outside experts

a. i

b. i, ii

c. i, ii, iii

d. All Above

5) Which of these describe the activity of a contract review?

a. Evaluation of the target market


b. Evaluation of the development risks
c. Evaluation of the weather during the software development
d. Evaluation of the staff’s personal background

6) What should include in contract review activities?

i. Clarification of the customer’s requirements


ii. Review of the project’s schedule and resource requirement estimates
iii. Evaluation of the professional staff’s capacity to carry out the proposed project
iv. Evaluation of the customer’s capacity to fulfill his obligations
v. Evaluation of development risks.

a. i
b. i,ii
c. ii,iii
d. All Above

7) Which of the main issues treated in the project development plan are?

i. Schedules

Page 2 of 15
Question & Answer

ii. Required manpower and hardware resources


iii. Risk evaluations
iv. Organizational issues: team members, subcontractors and partnerships
v. Project methodology, development tools, etc.
vi. Software reuse plans.

a. i
b. ii, iii
c. iii, iv
d. All Above

8) Which is the purpose about pre-project component?

i. The project commitments have been adequately defined considering the resources
required, the schedule and budget
ii. The development and quality plans have been correctly determined.
iii. Applied mainly for functionality improving maintenance tasks.
iv. Eliminate or at least reduce the rate of errors,based on the organization’s accumulated
SQA experience

a. i
b. i,ii
c. ii, iii, iv
d. All Above

9) What should be include in the activities of pre-project component?

i. project proposal draft


ii. contract draft
iii. development and quality plans
iv. contract review

a. i,ii
b. ii,iii
c. iii,iv
d All Above

10) In term in contract review what the equivalent have been done inside
of them?

i.clarification of customer requirement


ii.review project schedule and resources requirement estimates
iii.evaluation development risks
iv.evaluation customer capacity (fulfill obligations)

Page 3 of 15
Question & Answer

a. i,ii
b. ii,iii
c. iii,iv
d. All Above

11) Which of the issue required in issue project quality on pre-project


component?

i.quality goals ,epressed in the appropriate measurable terms


ii.criteria for starting and ending for staffing and ending project stage.
iii.list of the review ,test and other scheduled V&V a activities
iv.include manpower and software resources

a. i,ii,iii
b. ii,iii
c. iii,iv
d. All Above

12) What should involved in the issue project development?

i. Schedule

ii. risk evaluation

iii. software reuse plan

iv. project methodology development tools

a. i,ii,iii
b. ii,iii
c. i,ii,iii,iv
d. i,ii,iv

13) What a suitable include in the organization issue?

i. Team

ii. Members

iii. Subcontractor

iv. Partnership

a. i,ii,iii

Page 4 of 15
Question & Answer

b. ii,iii

c. i,ii,iii,iv

d. i,ii,iv

14) A key concept of quality control is that all work products:

a. are delivered on time and under budget

b. have complete documentation

c. have measureable specifications for process outputs

d. are throughly tested before delivery to the customer

15) Quality costs may be divided into costs associated with

a. prevention,appraisal and failure


b. people,process and product
c. customers,developers and maintenance
d. all of above

16) Which of these activities is not one of the activities recommended to be performed by
an independent SQA group?

a. prepare SQA plan for the project


b. review software engineering activities to verify process compliance
c. report any evidence of noncompliance to senior management
d. serve as the sole test team for any software produced.

17) Which of the following are objective for formal technical reviews?

a. allow senior staff members to correct errors


b. assess programmer productivity
c. determining who introduced an error into a program
d. uncover error in software work products.

18) Which of the following is not asection in the standard for SQA plans recommended by
IEEE?

a. budget
b. documentation
c. review and audits

Page 5 of 15
Question & Answer

d. test

19) This specification is about?

Detect design and programming component divide by three


• Review

• Expert opinions

• Software testing

a. Development life cycle stages

b. Operation-maintenance stages

c. Component of software quality management

d. Component of standardization,certification and SQA system assessment

20) Which of the following is to deals with assuring the quality of project
parts performed by subcontractors and other external participants during
project development and maintenance?

a. Pre-project component
b. Components of infrastructure error prevention and improvement
c. Components of project life cycle activities assessment
d. Components of standardization

21) What should required in the Software project life cycle components?

i. Reviews

ii. Expert opinions

iii. Software testing

iv. Software maintenance

v. Assurance of the quality of the subcontractors’ work and the customer


supplied parts

a. i,ii,iii,iv

Page 6 of 15
Question & Answer

b. i,ii,iii,iv
c. ii,iii
d. All Above

22) In term of review of software project life cycle component,what is the printed product
should be include?

i. design reports
ii. software test document
iii. software installation plan
iv. software manual

a. i,ii
b. ii,iii
c. iii,iv
d. i,ii,iii,iv

23) How many type of reviews software project life cycle component?

a. two
b. three
c. four
d. five

24)Which of the following is not true statement except?

i. operation–maintenance stage is one of the project life cycle


ii. Several SQA components enter the software development project life cycle at different
points.
iii. A variety of documents include on the design phase of development process.
iv. formal design reviews not include in in review

a. i,ii
b. ii,iii
c. iii,iv
d. i,ii,iii

25) Which of the statement is relation on the box?

• Immediate approval of the Design Review document and


continuation to the next development phase.
• Approval to proceed to the next development phase after all the
action
items have been completed and inspected by the committee’s
representative.
• An additional Design Review is required and scheduled to take

Page 7 of 15
Question & Answer

i. Formal professional approval of their quality as stipulated in the development


contract and demanded by the procedures applied by the software developer

ii. This is a what we can consider when a design review committee sits in order
to decide upon the continuation of the work completed

iii. The committees are composed of senior professionals, including the project
leader and, usually, the department manager, the chief software engineer,
and heads of other related departments.

iv. The majority of participants hold professional and administrative ranks higher
than the project leader.

a. All Above
b. ii,iii
c. iii,iv
d. i,ii,iii

26)Who can make a evaluation for peer view?

a. people provide professional assistance to colleagues


b. people that contribute the idea
c. people that come out with the proposal project
d. people that involved in certain part of the project

27)Sinonim for Peer reviews?

a. inspections and walkthroughs


b. inspections
c. walkthroughs
d. evaluation

28) Detect as many design and programming


faults as possible.

Focus on the box,which of the statement is true?

i) The output is a list of detected faults and, for inspections,also a defect summary
and statistics to be used as a database for reviewing and improving development
methods.
ii) usually voluntarily and viewed as a supplement to the regular workload,
“reciprocity considerations frequently enter.

Page 8 of 15
Question & Answer

iii) are directed at reviewing short documents, chapters or parts of a report, a coded
printout of a software module, and the like.
iv) Statement inside the box about the main objective for peer reviews

a. All Above
b. ii,iii
c. iii,iv
d. i,ii,iii

29)What is the purpose for expert opinions?

a) support quality assessment efforts by introducing additional external capabilities


into the organization’s in-house development process.
b) To generate the relevant idea
c) To make powerful project
d) To avoid overload of the error implementation error

30)What is the meaning for Recurrent tests in term of software testing?

v.usually termed for “regression tests”

vi.carried out after correction of previous test findings, are continued till
satisfactory

vii.results are obtained

viii.include block and white block testing

ix.Software testing programs are constructed from a variety of tests

a. i,ii
b. ii,iii
c. iii,iv
d. i,ii,iii,iv

31)What is the purpose Corrective maintenance ?

i. User’s support services

ii. correction of software code

iii. documentation failures

iv. Not All Above

a. i,ii,iii
b. ii,iii

Page 9 of 15
Question & Answer

c. iii,iv
d. i,ii,iii,iv

32)Which of the type of software maintenance component is equivalent for this following
statement?

• Adaptation of current software to new circumstances and


customers without changing the basic software product.

• These adaptations are usually required when the hardware


system or its components undergo modification (additions or
changes).

a. Corrective maintenance
b. Adaptive maintenance
c. Incorrective maintenance
d. Functionality improvement maintenance

33)What is the important thing that will considered of Assurance of the quality of the external
participant’s work?

i. Subcontractors and customers frequently join the directly contracted


developers (the “supplier”) in carrying out software development projects.

ii. Most of the SQA controls applied to external participants are defined in the contracts
signed between the relevant parties.
iii. Special SQA efforts are needed to assure the quality of the hardware, software, staff and
training supplied by the customer.
iv. special software assurance efforts are required to establish effective controls over the
external participant’s work.

a. i,ii,iii
b. ii,iii
c. iii,iv
d. i,ii,iii,iv

34) Which of them is the statement about Infrastructure components for error
prevention and improvement?

i. These components are devised to serve a wide range of projects and software
maintenance services.

ii. Templates and checklists is one of the component of infrastructure


components for error prevention and improvement

Page 10 of 15
Question & Answer

iii. Procedures are planned to be generally applicable and to serve the entire organization
iv. Continuously updating staff with respect to professional developments and the in house, hands-
on experience acquired.

a. i, ii
b. i,ii,iii,iv
c) iv
d) i,iii

35) Managerial SQA components support the managerial control development


projects and maintenance services. The following are the control components
except:

a. Project progress control


b. Software quality matrics
c. Software quality costs
d. Software quality devices

36) What is main objective of component of standardization,certification and SQA


system assessment?

i. Utilization of international professional knowledge


ii. Improvement of coordination of the organizational quality systems with other
organizations
iii. Assessment of the achievements of quality systems according to a common scale.
iv. not All Above

a. iv
b. i,ii
c. ii,iii
d. i,ii,iii

37) Which of them is include in standard?

i. Quality management standards


ii. Project process standards
iii. Quality standard
iv. Project standard

a. iv
b. i,ii
c. ii,iii
d. i,ii,iii

Page 11 of 15
Question & Answer

38)What is the Organizing for SQA?

a. The human components


b. The company components
c. The system components
d. The human and system components

39)What is the attribute for Organizing for SQA?

i. Managers
ii. Testing personnel
iii. The SQA unit
iv. And practitioners interested in software quality

a. iv
b. i,ii
c. ii,iii
d. i,ii,iii,iv

40) What is the main objective of Organizing for SQA?

i. To initiate and support the implementation of SQA components

ii. Detect deviations from SQA procedures and methodology

iii. Suggest improvements

iv. Quality plans have been correctly determined

a. iv
b. i,ii
c. ii,iii
d. i,ii,iii

41) What is the main issues treated in the project’s quality plan are?

i. Quality goals, expressed in the appropriate measurable terms

ii. Criteria for starting and ending each project stage

Page 12 of 15
Question & Answer

iii. Lists of reviews, tests, and other scheduled verification and validation
activities

iv. Maintaince

a. i,ii
b. i,ii,iii
c. ii,iii
d. All Above

42) Project progress control activities focus on?

i. Resource usage
ii. Schedules
iii.Risk management activities
iv.The budget

a. i and ii

b. i and iii

c. i, ii and iii

d. All of the above

43)Management Software Quality Assurance components include :

i. Project progress control

ii. Software quality metrics

iii. Software quality costs.

iv. Software testing

a. i and ii

b. i and iii

c. i, ii and iii

d. All of the above

Page 13 of 15
Question & Answer

44) What are the goals of Software Quality Assurance infrastructure?

a. prevention of software faults or, at least, the lowering of


software fault rates, together with the improvement of
productivity
b. should meet all kinds of quality requirements
c. All tests have to be designed, planned and approved according to
development procedures
d. the completed software system can be delivered and installed.

45) Software maintenance services should meet all kinds of quality


requirements except:

a. functionality requirements

b. scheduling requirements
c. Configuration management
d. budget limitations

46) Which one of the following is not a managerial control SQA


component :

a. Maintenance service control

b. Maintenance quality control


c. Maintenance quality metrics
d. Maintenance quality costs.

47) Documentation control activities requirements are as follows:

i. Definition of the types of controlled documents needed


ii. Specification of the formats, document identification methods
iii. Definition of review and approval processes for each controlled
document
iv. Definition of the archive storage methods

a. i and ii

b. ii, iii and iv

c. i, ii and iii

d. All of the above

Page 14 of 15
Question & Answer

48) All of the project and maintenance service considerations are true
except:

a. The level of software complexity and difficulty.

b. The degree of staff experience with project


c. The extent of software reuse in new projects.
d. The professional qualifications