1) This class of components is geared toward several goals, the major ones
being the control of development and maintenance activities and the
introduction of early managerial support actions that mainly prevent or
minimize schedule and budget failures and their outcomes.This description
about?
a. i
b. i, iii
c. ii, iv, v
d. All Above
3) Software maintenance services vary in range and are provided for extensive
periods, often several years. These services divide into the following categories:
i. Corrective maintenance
ii. Adaptive maintenance
iii. Functionality improvement maintenance
iv. Software maintenance
a. i
b. i, iii
c. ii, iv
d. All Above
Page 1 of 15
Question & Answer
a. i
b. i, ii
c. i, ii, iii
d. All Above
a. i
b. i,ii
c. ii,iii
d. All Above
7) Which of the main issues treated in the project development plan are?
i. Schedules
Page 2 of 15
Question & Answer
a. i
b. ii, iii
c. iii, iv
d. All Above
i. The project commitments have been adequately defined considering the resources
required, the schedule and budget
ii. The development and quality plans have been correctly determined.
iii. Applied mainly for functionality improving maintenance tasks.
iv. Eliminate or at least reduce the rate of errors,based on the organization’s accumulated
SQA experience
a. i
b. i,ii
c. ii, iii, iv
d. All Above
a. i,ii
b. ii,iii
c. iii,iv
d All Above
10) In term in contract review what the equivalent have been done inside
of them?
Page 3 of 15
Question & Answer
a. i,ii
b. ii,iii
c. iii,iv
d. All Above
a. i,ii,iii
b. ii,iii
c. iii,iv
d. All Above
i. Schedule
a. i,ii,iii
b. ii,iii
c. i,ii,iii,iv
d. i,ii,iv
i. Team
ii. Members
iii. Subcontractor
iv. Partnership
a. i,ii,iii
Page 4 of 15
Question & Answer
b. ii,iii
c. i,ii,iii,iv
d. i,ii,iv
16) Which of these activities is not one of the activities recommended to be performed by
an independent SQA group?
17) Which of the following are objective for formal technical reviews?
18) Which of the following is not asection in the standard for SQA plans recommended by
IEEE?
a. budget
b. documentation
c. review and audits
Page 5 of 15
Question & Answer
d. test
• Expert opinions
• Software testing
b. Operation-maintenance stages
20) Which of the following is to deals with assuring the quality of project
parts performed by subcontractors and other external participants during
project development and maintenance?
a. Pre-project component
b. Components of infrastructure error prevention and improvement
c. Components of project life cycle activities assessment
d. Components of standardization
21) What should required in the Software project life cycle components?
i. Reviews
a. i,ii,iii,iv
Page 6 of 15
Question & Answer
b. i,ii,iii,iv
c. ii,iii
d. All Above
22) In term of review of software project life cycle component,what is the printed product
should be include?
i. design reports
ii. software test document
iii. software installation plan
iv. software manual
a. i,ii
b. ii,iii
c. iii,iv
d. i,ii,iii,iv
23) How many type of reviews software project life cycle component?
a. two
b. three
c. four
d. five
a. i,ii
b. ii,iii
c. iii,iv
d. i,ii,iii
Page 7 of 15
Question & Answer
ii. This is a what we can consider when a design review committee sits in order
to decide upon the continuation of the work completed
iii. The committees are composed of senior professionals, including the project
leader and, usually, the department manager, the chief software engineer,
and heads of other related departments.
iv. The majority of participants hold professional and administrative ranks higher
than the project leader.
a. All Above
b. ii,iii
c. iii,iv
d. i,ii,iii
i) The output is a list of detected faults and, for inspections,also a defect summary
and statistics to be used as a database for reviewing and improving development
methods.
ii) usually voluntarily and viewed as a supplement to the regular workload,
“reciprocity considerations frequently enter.
Page 8 of 15
Question & Answer
iii) are directed at reviewing short documents, chapters or parts of a report, a coded
printout of a software module, and the like.
iv) Statement inside the box about the main objective for peer reviews
a. All Above
b. ii,iii
c. iii,iv
d. i,ii,iii
vi.carried out after correction of previous test findings, are continued till
satisfactory
a. i,ii
b. ii,iii
c. iii,iv
d. i,ii,iii,iv
a. i,ii,iii
b. ii,iii
Page 9 of 15
Question & Answer
c. iii,iv
d. i,ii,iii,iv
32)Which of the type of software maintenance component is equivalent for this following
statement?
a. Corrective maintenance
b. Adaptive maintenance
c. Incorrective maintenance
d. Functionality improvement maintenance
33)What is the important thing that will considered of Assurance of the quality of the external
participant’s work?
ii. Most of the SQA controls applied to external participants are defined in the contracts
signed between the relevant parties.
iii. Special SQA efforts are needed to assure the quality of the hardware, software, staff and
training supplied by the customer.
iv. special software assurance efforts are required to establish effective controls over the
external participant’s work.
a. i,ii,iii
b. ii,iii
c. iii,iv
d. i,ii,iii,iv
34) Which of them is the statement about Infrastructure components for error
prevention and improvement?
i. These components are devised to serve a wide range of projects and software
maintenance services.
Page 10 of 15
Question & Answer
iii. Procedures are planned to be generally applicable and to serve the entire organization
iv. Continuously updating staff with respect to professional developments and the in house, hands-
on experience acquired.
a. i, ii
b. i,ii,iii,iv
c) iv
d) i,iii
a. iv
b. i,ii
c. ii,iii
d. i,ii,iii
a. iv
b. i,ii
c. ii,iii
d. i,ii,iii
Page 11 of 15
Question & Answer
i. Managers
ii. Testing personnel
iii. The SQA unit
iv. And practitioners interested in software quality
a. iv
b. i,ii
c. ii,iii
d. i,ii,iii,iv
a. iv
b. i,ii
c. ii,iii
d. i,ii,iii
41) What is the main issues treated in the project’s quality plan are?
Page 12 of 15
Question & Answer
iii. Lists of reviews, tests, and other scheduled verification and validation
activities
iv. Maintaince
a. i,ii
b. i,ii,iii
c. ii,iii
d. All Above
i. Resource usage
ii. Schedules
iii.Risk management activities
iv.The budget
a. i and ii
b. i and iii
c. i, ii and iii
a. i and ii
b. i and iii
c. i, ii and iii
Page 13 of 15
Question & Answer
a. functionality requirements
b. scheduling requirements
c. Configuration management
d. budget limitations
a. i and ii
c. i, ii and iii
Page 14 of 15
Question & Answer
48) All of the project and maintenance service considerations are true
except: