CEMENTO ARENA GRAVILLA PIEDRA LADRILLO BLOQUE VA Ø 1/2 VA Ø 3/8 VA Ø 1/4 PVC TABLA
DESCRIPCION UNID.
KG M3 / LT M3 / LT M3 UN UN UN UN UN UN UN
CONCRETOS
MATERIALES VALOR VALOR MANO DE OBRA
Resist. Cemento Arena Grava Agua MATER. Oficial Ayudante TOTAL
Relacion
psi KG M3 M3 LT $ $ $ $
1:2:2 3500 420 0.670 0.670 250 306,300 7,285 52,982 60,268
1:2:2.5 3500 380 0.600 0.760 250 287,700 7,285 52,982 60,268
1:2:3 3000 350 0.555 0.835 250 274,800 7,285 52,982 60,268
1:2:3.5 3000 320 0.515 0.900 250 261,550 7,285 52,982 60,268
1:2:4 2,500 300 0.475 0.950 250 252,250 7,285 52,982 60,268
1:2.5:4 2,700 280 0.555 0.890 250 243,650 7,285 52,982 60,268
1:3:3 2500 300 0.715 0.715 250 252,600 7,285 52,982 60,268
1:3:4 2,000 260 0.625 0.835 250 234,700 7,285 52,982 60,268
1:3:5 1,800 230 0.555 0.920 250 220,750 7,285 52,982 60,268
CEMENTO 500 / KG SALARIO
ARENA 70,000 / M3 OBRERO
TRITURADO 70,000 / M3 OFICIAL
AGUA 10 / LT MAESTRO
MEZCLADORA +Transporte 160,000 / DIA HERRAMIENTAS
ETOS PREPARADOS EN OBRA
FECHA: 10 de febrero de 2021
VALOR EQUIPO VALOR
EQUIPO HERR. TOTAL TOTAL
$ $ $ $
2,500 2,500 438,168
2,500 2,500 368,568
2,500 2,500 328,468 Mamposteria, 140 Kg/cm2
2,500 2,500 298,868
2,500 2,500 279,768 Revoque (pañete); Bloques 230 lts / Sc
2,500 2,500 267,768
2,500 2,500 257,768
2,500 2,500 239,268 Pisos 105 Kg/cm2