Beruflich Dokumente
Kultur Dokumente
BACnet Europe
Journal
Copyright
© BIG-EU 2012 – Further editorial use of ISSN 1614-9572
Journal
encouraged (!) with reference to the source. Titelbild
Please send a specimen copy to the editor,
Cover picture
Skalierbare Lösungen für jeden Bedarf
Auf www.bacnetjournal.org
Scalable Solutions for Every Need
or if published online, send the URL per Frankfurt / Main, April 15 – 20, 2012
Hall 9.0 Stand B 60
Dillingen, Germany
Global Harmonization of
(ASHRAE)
BACnet Solutions for
Hospital Management 19 & 23
Profitability
Adaptability
Ease-of-use
Reliability
ISO 16484-5
• Basics of interoperability
• Why BACnet? Come and visit us at Light+Building!
• Object types and services Distech Controls
• Project planning Hall 9.0 - Stand B49
www.bacnetacademy.org Distech Controls and the Distech Controls logo are registered
trademarks of Distech Controls, Inc. BACnet is a registered
trademark of the ASHRAE; BTL is a registered trademark of BACnet
International. © Distech Controls, 2012
ACnet unbegrenzt skalierbar
B
Scalable BACnet
Warum kann BACnet skalierbare Lösungen für eine brei How is it that BACnet can realize provide scalable solutions for a
te Palette von Bedürfnissen realisieren? Weil die Skalierbar wide range of needs? It is because scalability is one of its most im
keit als eine der wichtigsten Funktionen bereits von Anfang portant capabilities and has been designed into the protocol from
an ins Protokoll integriert wurde. „Skalierbare Lösungen its earliest days. “Scalable solutions for every need” is the guiding
für jeden Bedarf“ ist das Leitmuster unseres Stands auf der theme of our booth at the light+building show.
light+building.
ACnet is scalable in two ways. First, the protocol can be imple
B
ACnet ist in zweierlei Hinsicht skalierbar: Zum einen kann
B mented in devices of any size, from the smallest fixed-program
das Protokoll in Geräten jeder Größe umgesetzt werden, vom application specific devices to the largest, most full-featured
kleinsten anwendungsspezifischen Gerät mit festgelegten controllers. BACnet can also be used in different operator inter
Programmeigenschaften, bis hin zu den größten, voll aus faces, from dedicated handheld devices to the most sophisticated
gestatteten Steuerungen. BACnet kann auch in allen mögli graphical workstations. In recent years, the ability of BACnet
chen Bedienoberflächen eingesetzt werden – von dedizierten servers to provide web access to BACnet systems has meant that
Handheld-Geräten bis hin zu anspruchsvollsten grafischen any device with a web browser, including smart phones and tab
Arbeitsplätzen. In den letzten Jahren bedeutete die Fähig lets, is now, for all practical purposes, “BACnet-enabled.”
keit der BACnet-Server, Web-Zugriff auf BACnet-Systeme
zu ermöglichen, dass jedes Gerät mit Web-Browser, ein While the details of BACnet installations are as different as the
schließlich Smartphones und Tablets, praktisch „BACnet- buildings in which they are deployed, I can give you an exam
fähig“ ist. ple of scalability here at my home base, Cornell University, in
upstate New York: We currently have 6,160 BACnet devices on
Weil die Besonderheiten der BACnet-Installationen so un our BACnet internetwork. (An “internetwork” is a collection
terschiedlich sind wie die Gebäude, in denen sie eingesetzt of two or more networks, possibly of different types, connect
werden, kann ich Ihnen ein Beispiel für die Skalierbarkeit ed by routers). 372 of these are system-level controllers using
geben, hier an meinem Heimatstandort, der Cornell Uni BACnet / IP over our campus fiber-optic backbone network. The
versity im Bundesstaat New York: Wir haben derzeit 6.160 other 5,788 are much smaller devices that communicate over
BACnet-Geräte in unserem BACnet-Internetzwerk. (Ein „In ARCNET or MS / TP networks. Most of these devices are dedi
ternetzwerk“ ist eine Sammlung von zwei oder mehr Netz cated to room control, the monitoring of electricity, or some
werken, möglicherweise unterschiedlicher Art, die durch other relatively simple task. Each device only to needs to sup
Router verbunden sind). 372 davon sind Steuerungen auf port that subset of BACnet’s comprehensive capabilities that are
Systemebene, die BACnet / IP über unser Campus-Glasfaser- appropriate to its application.
Backbone-Netzwerk nutzen. Die anderen 5.788 sind viel klei
nere Geräte, die via ARCNET oder über MS / TP-Netzwerke Second, BACnet’s network and device numbering schemes are
kommunizieren. Die meisten dieser Geräte dienen der Raum also highly scalable. A particular BACnet internetwork can have
steuerung, der Stromüberwachung oder einer anderen relativ up to 65,535 individual networks. That’s a large number of net
einfachen Aufgabe. Jedes Gerät muss lediglich die Teilmenge works! At Cornell, again as an example of a real-world installa
der umfassenden Funktionen von BACnet unterstützen, die tion, we only have 345 networks although we have BACnet de
für das jeweilige Anwendungsgebiet notwendig ist. vices in 223 buildings at last count. The number of devices in a
BACnet internetwork can be as large as 4,194,303. Again, this is
Zum anderen sind auch BACnet-Netzwerke und Geräte a large number and is probably big enough to deal with almost
nummerierung gut skalierbar. Ein BACnet-Internetzwerk any practical situation.
kann bis zu 65.535 einzelne Netzwerke umfassen. Eine be
trächtliche Anzahl! An der Cornell University beispiels To sum up, BACnet’s modular design, allowing it to be imple
weise haben wir nur 345 Netzwerke, obwohl wir nach dem mented in devices of any size, and its ability to address millions
letzten Stand BACnet-Geräte in 223 Gebäuden hatten. Ein of devices on tens of thousands of networks, allows it to be
BACnet-Internetzwerk kann bis zu 4.194.303 Geräte enthal scaled to virtually any application.
ten. Wiederum eine eindrucksvolle Zahl – und wahrscheinlich
groß genug, um fast jede Situation zu meistern. I wish you enjoyable reading! See you at the light+building.
acceptance
uments for the test results also to review the RRT after
Exchange of information initial modification process
among the testing labora es and procedures of the en
tories (without third-party tire test procedure.
involvement)
Products for the highest demands
Continuous improvement Just as the BACnet standard
of test processes based on is evolving, so are the require
» Suitable for worldwide implementation
the experiences of all ments and processes within
those involved in the con the framework of conform
» Tested in ISO-accredited laboratories
formity test ance testing. We will not rest
on our laurels, but continue
» Meet requirements of conformance
Many of these experiences to improve and harmonize testing according to ISO 16484-6
are included in the Certifi the global BACnet conform
cation Handbook, which is ance tests. » Comply with European directives
currently being completely
revised and will be published
later this year in the new ver
sion. But this was only the
first important step, the next
are already underway.
www.big-eu.org
BACnet Interest Group Europe
Skalierbare Lösungen
für jeden Bedarf
Scalable Solutions
for Every Need
Nachdem die Tests für son Controls Systems & Ser itself at the international wealth of expertise and know-
BACnet Produkte weltweit vices GmbH, Kieback&Peter building technology trade how, as well as ample oppor
harmonisiert sind, gehen die GmbH & Co. KG, MBS fair with live presentations, tunity for networking. At the
BACnet-Anbieter gestärkt GmbH, Novar Bereich top references and a BACnet stand, which was expanded to
auf die light+building 2012. Trend, Pc-Vue, Saia-Bur technology calendar. Under 200 square meters this year,
Mit Live-Vorträgen, Top-Re gess Controls AG, SAMSON the main theme “Scalable companies with outstanding
ferenzen und einem BACnet AG, Sauter-Cumulus GmbH, solutions for every need”, BACnet expertise: ABB, DI
Technologiekalender präsen SE-Elektronic und Siemens the manufacturers will be AL GmbH, HERMOS Ltd.,
tiert sich die BACnet Interest Building Technologies. showing trade-spanning in Honeywell Building Solu
Group Europe vom 15.-20. teroperability. Here mar tions, Honeywell, Invensys,
April auf der Weltleitmes ket researchers will see the ITENOS Ltd., Johnson Con
se der Gebäudetechnik in Strengthened by the world- vast potential of the BACnet trols Systems & Services
Frankfurt. Zum Leitthema wide harmonization of standard ISO 16484-5, in GmbH, Kieback&Peter Gm
„Skalierbare Lösungen für BACnet tests for products, trade-spanning integration. bH & Co. KG, MBS, Novar
jeden Bedarf“ zeigen die Her BACnet vendors approach trend area, Pc-Vue, Saia-Bur
steller gewerkeübergreifende the light+building 2012 Expanded exhibition area gess Controls AG, SAMSON
Interoperabilität – und damit with new vigor. From April The BIG-EU booth will be AG, Sauter-Cumulus GmbH,
das unerschöpfliche Potenzi 15-20th in Frankfurt, the providing building engineers, Electronic SE and Siemens
al des BACnet Standards ISO BACnet Interest Group Eu planning engineers and facil Building Technologies will be
16484-5. rope (BIG-EU) will present ity managers with a unique involved.
Erweiterte Standfläche
Der BIG-EU Gemeinschafts
stand bietet Gebäudetechni
kern, Planungsingenieuren
und Facility Managern ei
ne einmalige Fülle an Ex
perten-Know-how und aus
reichend Gelegenheit zum
Networking. Am Stand, der
dieses Jahr auf 200 qm er
weitert wurde, beteiligen
sich Unternehmen mit he
rausragender BACnet Ex
pertise: ABB, DIAL GmbH,
HERMOS AG, Honeywell
Building Solutions GmbH,
Honeywell GmbH, Inven
sys, ITENOS GmbH, John
ACnet.Live@light+building:
B
Vorträge und Bücher am BACnet Stand
Presentations and Books at BACnet Booth
Während der Ausstellungs treter der Stadt Köln und der During the exhibition week, of Köln and of the Deutsche
woche erwarten den Besucher Deutschen Bundesbank, die visitors to the BIG-EU joint Bundesbank, will present 15
des BIG-EU Gemeinschafts Besonderheiten des Weltstan booth can look forward to minute speeches on special
stands interessante Präsen dards der Gebäudeautoma interesting BACnet presenta features of the world’s build
tationen zu BACnet-Themen tion und Anwendungen, die tions on topics such as cloud ing automation standards and
wie Cloud-Computing, Smart mit BACnet realisiert wur computing, smart grids and applications that have been re
Grids und Niedrigenergie den. „Im fortschrittlichen low-energy buildings, as well alized with BACnet. “In ad
gebäude, aber auch kurze Ein Gebäudemanagement ist as brief introductions to the vanced building management
führungen in den Standard. BACnet unverzichtbar. Wir standard. A large number of BACnet is essential. We will
Angekündigt haben sich zahl bieten auf dem Messestand users, researchers and promi offer short presentations at the
reiche Anwender, Forscher Kurzvorträge, die den aktu nent members, such as the booth, describing the current
und Prominente, wie der ellen Stand der Entwicklung BACnet inventor and honor state of development and ap
BACnet Erfinder und BIG-EU und Anwendung beschrei ary BIG-EU member, Mike plication,” Volker Röhl,
Ehrenmitglied Mike New ben“, erklärt BIG-EU Präsi Newman of Cornell Univer BIG-EU president explains
man von der Cornell Univer dent Volker Röhl das neue sity, Ithaca, New York, have about the new presentation
sity Ithaka, New York. Vortragskonzept. announced their participa concept.
tion.
In 15-minütigen Vorträgen Das tagesaktuelle Programm The latest program can be
präsentieren zahlreiche Ex ist im Internet unter Numerous experts, includ found online at:
perten, darunter auch Ver www.big-eu.org zu finden. ing representatives of the city www.big-eu.org.
Am BIG-EU Stand erhalten Interessier- den aktuellen Stand der Normung wie deautomation 1.12. Grundlagen in ry member of the BIG-EU, the aut-
te auch umfassende Informationen zu auch Neuentwicklungen in der Bran- Deutscher Sprache (BACnet build hor Hans Kranz will be frequently
neuer BACnet-Fachliteratur. Darunter che. Als Ehrenmitglied der BIG-EU ing automation 1.12. basics in available at the booth and happy to
zum einen das im Februar 2012 beim wird der Autor Hans Kranz häufig am German)" by Hans Kranz will be answer any questions.
CCI-Verlag veröffentlichte Fachbuch Messestand anzutreffen sein und Fra- available at the BIG-EU booth the
„Systeme der Gebäudeautomation. gen gerne beantworten. entire time. This BACnet specialist
Ein Handbuch zum Planen, Errichten, book has already become an indus-
Nutzen“ von Jörg Balow. Nach sei- trial standard reference. The updated
nem Vortrag am Messe-Dienstag, den Comprehensive information about and completely revised 3rd edition
17.4. um 14 Uhr gibt der Autor eine new BACnet literature will also published by CCI Publishing, will ap-
Signierstunde am BIG-EU Stand. be available at the BIG-EU booth pear in the summer of 2012 taking
for everyone interested, including the current state of standardization
Am Messe-Donnerstag, den 19.4. the book: “Systeme der Gebäude as well as new developments in the
ab 11 Uhr haben die Besucher dann automation (building automation industry into account. As an honora-
Gelegenheit, sich das druckfrische systems) – A manual on planning,
Fachbuch „Raumfunktionen – Ganz- construction and utility „written by
heitliche Konzeption und Integrations- Jörg Balow and published by CCI
planung zeitgemäßer Gebäude“ von Publishing in February, 2012. After
Achim Heidemann und Peer Schmidt his presentation at the fair Tuesday,
signieren zu lassen. Dann wird der April 17th, there will be a book si-
Buchautor und VDI-Mitglied Achim gning at 2 p.m. at the BIG-EU booth.
Heidemann am BIG-EU Stand einen
Vortrag halten und danach für Inte- On Thursday April 19th at 11 a.m.,
ressierte zur Verfügung stehen. visitors will have the opportunity to
get the new book „Room Functions
Darüber hinaus liegt am BIG-EU Stand – Comprehensive Conception and
permanent eine Leseprobe des neu Integration Planning of Modern
aufgelegten Fachbuches „BACnet Buildings“ by Achim Heidemann
Gebäudeautomation 1.12. Grundla- and Peer Schmidt signed. Then the
gen in Deutscher Sprache“ von Hans author and VDI member Achim Hei-
Kranz aus. Die BACnet Publikation hat demann will give a speech at the
sich bereits zu einem Standardwerk BACnet booth and be available for
der Branche entwickelt. Die aktuali- questions afterwards.
sierte und vollständig überarbeitete
3. Auflage erscheint im Sommer 2012 Moreover, an extract of the newly
beim CCI-Verlag und berücksichtigt launched book: “BACnet Gebäu-
Anwendungen Solutions
Skalierbare Lösungen:
BACnet ist für jede Projektgröße sinnvoll
Scalable Solutions:
BACnet Makes Sense for Every Project Size
© Fraport AG
decisive factor for their use
in Frankfurt Airport. For ex
ample, in the new A-Plus ter
minal building, CMS electric
GmbH from Flörsheim used
BACnet-IP to network about
30 000 hardware data points
via 250 PCD3.M5340 con
trollers. The data points
are connected by field bus
systems (LonWorks, Mod
bus, ASI-Bus and S-Bus)
© Fraport AG
and via conventional I / O
modules. The application
covers almost all BA facili
ties, such as heating, cooling
Der Neubau „A-Plus Terminal“ am Frankfurter Flughafen. and distribution, ventilati
The new building “A-Plus Terminal” at Frankfurt Airport. on plant, smoke extraction
equipment and zone control.
Neubau ist es heute noch luftkühlgeräten. Zur Anla the 1:1 exchange of auto Application example:
nicht wirtschaftlich, aus gensteuerung wurde ein Saia mation systems from diffe rebuilding “transformer
schließlich BACnet von der PCD Controller verwen rent producers. Although station east”
Feldebene bis zur Manage det. Die 56 konventionel for the last 5 years BACnet The fact that the benefits
ment-Bedien-Ebene einzuset len Hardware-Datenpunkte in Europe has been mainly of BACnet apply equally
zen. Vielmehr ist es wichtig, sowie 38 weitere kommu used to connect automation to small installations is de
dass ein Automationssystem nikative Datenpunkte über stations via IP to manage monstrated by the following
eine Vielzahl an Kommuni Modbus-Kommunikation ment systems, since 2011 it example, involving the ex
kationsprotokollen und kon wurden mittels BACnet an has also been increasingly tension of the eastern trans
ventionellen Ein / Ausgabe das Managementsystem an employed to exchange data former station in building
Baugruppen in sich vereint. gebunden. be-tween different manufac- 217 of Fraport AG. This pro
Nicht zuletzt hat diese Ei turers’ controllers. At the ject includes two air-condi
genschaft von Saia PCD Sys Fazit: field level, however, BACnet tioning systems with a to
temen den Ausschlag für BACnet ist skalierbar! use is still just beginning. But tal of 12 fire dampers and
den Einsatz am Flughafen Es ist erwiesen, dass BACnet with ever more field compo two cooling units. One Saia
Frankfurt gegeben. So hat für jede Anlagengröße geeig nents on offer, such as room PCD controller was used to
die CMS electric GmbH aus net ist und dies umso mehr, controllers and remote I / O control the system. With the
Flörsheim zum Beispiel im je besser sich die gewählten modules, there is obviously a help of BACnet, 56 conven
A-Plus Neubau ca. 30.000 Automationsstationen in ein clear trend towards one ful tional hardware data points
Hardware-Datenpunkte über heterogenes GA-System inte ly integrated BACnet system and 38 additional data
250 PCD3.M5340 Steue grieren lassen. for all facilities. points via Modbus commu
rungen mit BACnet-IP ver nication were linked to the
netzt. Die Datenpunkte sind Application example: management system.
über die Feldbussysteme When large properties, such new building
LonWorks, Modbus, ASI- as Frankfurt Airport, are re “A-Plus Terminal” Conclusion:
Bus und S-Bus kommuni built or extended with new At present, the only IP-based BACnet is scalable!
kativ sowie über konventi buildings, it has been noticed protocol approved by Fra It has been proved that
onelle Ein / Ausgabemodule that savings can be made on port for communication be- BACnet is suitable for any
angeschlossen. Der Einsatz investment if the vendors in tween the automation sta size of installation, and even
erstreckt sich über nahezu volved are in genuine compe tion and the management more so if the chosen auto
alle GA Gewerke wie Hei tition with each other. Such control level at Frankfurt mation stations are well
zung, Kälteerzeugung und fair competition can only Rhine-Main Airport is suited to integration within a
-verteilung, Lüftungsanla operate where there are open, BACnet, combined with clear diverse BA system.
gen, Entrauchungsanlagen standardized communica engineering specifications. In
und Zonenregulierung. tions protocols and mandato large construction projects,
ry planning specifications. such as the new A-Plus ter
Anwendungsbeispiel minal building, it is not yet
Umbau „Trafostation Ost“
BACnet for all facilities economical to use BACnet Oliver Greune
Dass die Vorteile von BACnet Over the past 10 years, exclusively from field level Saia-Burgess Controls AG
für kleine Anlagen gleich BACnet has established it- to management control level. oliver.greune@
sam gelten, zeigt das folgen self on the market as the best Instead, it is more important saia-burgess.com
de Beispiel der Erweiterung protocol for building auto that an automation system www.saia-pcd.com
der „Trafostation Ost“ im mation systems. BACnet of should incorporate a multi
Gebäude 217 des Flughafen fers all the services required plicity of communications
betreibers Fraport AG. Die to build up a uniform struc protocols and conventional Franz Aulbach
ses Bauvorhaben umfasst ture from field to manage I / O modules. CMS electric GmbH
zwei lufttechnische Anlagen ment level. With clear plan aulbach@cms-electric.de
mit insgesamt zwölf Brand ning specifications and exact This characteristic of Saia www.cms-electric.de
schutzklappen und zwei Um compliance, it even allows PCD systems was another
Further projects
with Alerton
Mehmet Erkan of Tekfen is
delighted with the perfor
mance of Tekfen Tower’s
HVAC system. “It was the
first Class A building in Tur
key. Having met such high
standards, we decided to use
Alerton on two further pro
jects. The first was the first
LEED GOLD certified core
and shell office building in
Turkey, commissioned in
the first “Class A” construc stalling building automa comparatively complex, to 2011. Our latest project, al
tion in Turkey to be built to tion systems, and Alerton satisfy very high environ so LEED GOLD certified,
ISO 9001 / 2000-OHSAS which provides excellent mental standards set by Tek will be commissioned by mid
18001 standards. BMS products and techno fen. “For example, it has 2012.”
logy,” explained Mehmet over 650 fan powered VAV
It provides office accommo Erkan, Tekfen technical controls – a ’first’ in Turkey,”
dation for various compa manager for the project. said Hakan Ozbek of BTS.
nies including several Tek Tekfen appointed Ersa Engi “It is recognised as an ex
fen subsidiaries, as well as neering to design the HVAC cellent reference building by
a cafeteria, conference hall, system and Sönmez Metal most Turkish construction
fitness centre, supermarket, Co to construct the HVAC professionals.”
promenade terrace, cock plant.
tail bar and rentable storage The HVAC and BMS in Tek
spaces. In addition to monitoring fen Tower uses high perfor
and controlling the auto- mance strategies to improve
ACnet brings complex
B mated HVAC and plumbing energy savings, water effici
systems together systems, the Alerton BMS ency, CO2 emissions, indoor
It was vital to Tekfen that monitors the chillers, fire environmental quality, and
this benchmark “green” and smoke control system, stewardship of resources.
building included the best energy automation system
possible building manage and elevator automation sy
ment system (BMS) to stem, all using BACnet. “The Alerton BMS meets Christine Scheier
control its first-rate HVAC very high standards,” ex Alerton EMEA
plant. “We selected BTS High environmental plained Mehmet Erkan of christine.scheier@
(Bina Teknlojik Sistemleri) standards Tekfen. “These are ASH alerton.com
which has exceptional ex BTS explained that Tekfen RAE 90.1, ASHRAE 62.1 www.alerton.com
pertise in designing and in Tower’s HVAC system was and ASHRAE 55.” ASH
Reduzierte CO2-Emissionen
am Flughafen Manchester
Less CO2 Emissions
at Manchester Airport
Im Rahmen des Projekts fiel welche Signale an das Filter ner und HLK-Spezialisten pen und Pumpen im Betrieb.
die Wahl auf HLK-Frequen managementsystem zurück durchführte, brachte Ein „Nun haben wir grundsätz
zumrichter von ABB auf schicken können. Die beste sparungen von 50 % durch lich ABB-Frequenzumrich
grund ihrer benutzerfreund henden Umrichter konnten eine Reduzierung der Lüf ter im gesamten Flughafen
lichen Robustheit. Zudem diese Anforderungen nicht terdrehzahl um 20 Prozent, spezifiziert“, sagt Sheridan.
können diese über BACnet so kosteneffizient erfüllen.“ ohne dass die Luftqualität HLK Lieferant für den Flug
mit dem Gebäudemanage beeinträchtigt wird. Sheri hafen war Massey Cold
mentsystem (GMS) kommu Motoren-Umrüstung dan: „Wir haben uns zum beck Engineering unter Ge
nizieren und damit ein neu Alle Motoren der 220 Lüf Ziel gesetzt, den Flugha schäftsführer Paul Percy. Er
es, effizientes Filtersystem tungsaggregate wurden durch fen bis 2015 CO2-neutral zu und sein Team haben ABB-
überwachen. effiziente I E2-Motoren mit betreiben. Hinzu kommt, Frequenzumrichter und
hohem Wirkungsgrad und dass wir Kosten reduzie -motoren empfohlen und
Andy Sheridan, Service Fa Leistungen zwischen 3 kW ren wollen. Die Optimie diese für das Energiespar
cilities Manager am Flugha und 90 kW ersetzt. Ergän rung der Lüftungsaggrega projekt installiert.
fen Manchester: „Der ABB- zend zum ursprünglichen te war hierfür ein logischer
Umrichter kann via BACnet Design wurden 110 Nie Schritt.“ Emissionen gesenkt
mit unserem GMS kommu d e r s p a n nu n g s f r e q u e n z Die berechneten jährlichen
nizieren beziehungsweise in umrichter von ABB in den Auf dem Flughafen Man Einsparungen infolge der
tegrieren. Das war ein ent Terminals 1, 2 und 3 ins chester sind bereits zahl Installation der effizienten
scheidender Grund, diesen talliert. Die Umrüstung, die reiche ABB-Frequenzum Motoren und der Frequenz
zu nehmen. Wir wussten, ABB zusammen mit einem richter in unterschiedlichen umrichter betragen etwa
dass wir Filter verwenden, ABB Drive Alliance Part Applikationen wie Rolltrep 4.000 MWh.
Durch die Umrüstung der Lüftungsaggregate werden am Flughafen Manchester jährlich 4.000 MWh eingespart.
With upgrading the air handling units, Manchester Airport is saving 4,000 MWh a year.
Antriebstechnik. 50 Etagen kühlen
ohne die Erde aufzuheizen.
15. –20.4.2012
Bringing intelligent buildings to life. TM
www.deltacontrols.com
Besuchen Sie uns!
Halle 9.0 Stand E55
Anwendungen Solutions
Die Gebäudeautomation im onssystem fügt sich nahtlos Informationspunkte und in und Gebäudemanagement
Neubau des Universitätskli in das IT-Netzwerk ein und tegriert die gesamte Haus aufgaben im Einsatz.
nikums Sant Joan de Reus, verwaltet die Informationen technik in dem System. Sie
ca. 100 km südlich von aller Gewerke. Es umfasst ist auf einem Server im Re Daten-Zuordnung
B arcelona, wurde 2010 fer u. a. Kälte, Lüftung, Elek chenzentrum installiert und an Kostenstelle
tig gestellt. Das Klinikum trotechnik, Sanitär, medi kann von jedem beliebigen Das System verwaltet die
ist mit einer bebauten Flä zinische Gase, Photovolta Rechner mittels Webbrow Kälte- und Wärmeerzeu
che von 93.000 m² und ei ik, Brandmeldeanlage und ser über WLAN bzw. ei gung, die Verteilung sowie
nem Investitionsvolumen das Energiemanagement. ner VPN Verbindung ad eine Solaranlage zur Warm
von 120 Millionen Euro ei Bei der Konzeption des Ma ministriert werden. Drei wasserbereitung, die für die
nes der größten in Spanien. nagementsystems wurde be feste Bedienstationen sind Klimatisierung der OP-Be
Die gesamte Gebäudeauto sonderer Wert auf maxima für Wartung, Sicherheits- reiche von großer Bedeutung
mation basiert auf einem le Effizienz und optimale
offenen BACnet System. Bedienung der Anlagen ge
Das Klinikum verfügt über legt.
322 Zimmer, 12 OP-Berei
che und hat eine Hochschu Verwaltung
le mit 600 Studienplätzen der Haustechnik
angegliedert. Die offene Systemarchitek
tur besteht aus über 1.200
Verbesserung der Prozesse Controllern, verteilt auf
Die Anforderungen an Ge mehr als 70 Schaltschrän
bäudeautomationssysteme ke. Die BACnet Build
in Kliniken in Spanien neh ing Controller eBCON aus
men stetig zu. Integrale Ge der neuen enteliSYSTEM
bäude- und Raumautomati Produktfamilie von Del
on sowie Sicherheitstechnik ta Controls kommunizie
ermöglichen die umfassen ren über BACnet / IP im IT
de Kontrolle des Energie Netzwerk mit der SCADA
verbrauchs, erhöhen die Si und über BACnet / MSTP
cherheit, den Komfort und mit den Subnetzen. Ein
verbessern die internen Pro gesetzt werden auch die
zesse. Die Gebäudeautoma 7-Zoll BACnet Touchscreens
tion wurde von C ontrolli (B -OWS, B -OD, B-BC) als Die gesamte Haustechnik unter Kontrolle: Im Klinikum
Delta Spain mit einer lokale Bedienelemente. Die verwaltet die SCADA „Web Studio Controlli“ über 130.000
BACnet Lösung von Delta eingesetzte SCADA „Web Informationspunkte.
Controls realisiert. Das Ma Studio C ontrolli“ verwal All building services under control: In the hospital, the
nagement- und Automati tet insgesamt über 130.000 SCADA “Web Studio Controller” manages over 130,000 tags.
ist. Die Be- und Entlüftung Improving performance networks.The eBCON fic energy consumption to
der Räume und der Tief The requirements for build routes the BACnet infor be calculated. The data is
garage ist über CO2-Senso ing automation systems in mation via the BACnet / IP then sent directly to the ac-
ren und Zeitpläne optimal Spainish hospitals are in network to the IT infra counting department of the
an die Anforderungen und creasing. Integral building, structure and SCADA sy hospital. The energy con
Nutzungszeiten angepasst. room and security techno stem. Also, the 7-inch enteli sumption for electricity and
Im Rahmen des Energiema logy automation is enabling TOUCH BACnet touch air conditioning in tenant
nagements erfassen Netz a comprehensive ability to screen (B-OWS, B-OD, areas is recorded separately
analysegeräte den Strom control energy consumpti B -BC) is used for local ope and also sent directly to the
verbrauch sowie Kälte- und on, safety, comfort, and im ration . The SCADA “Web appropriate accounting de
Wärmemengenzähler den prove overall building per Studio Controller” manages partment.
spezifischen Energiever fomance. These new build over 130,000 tags and in
brauch. Die Daten werden ing automation opportuni tegrates all the buildi ng Through this new installa
direkt den Kostenstellen des ties have been realized by services into one network. tion, the hospital now has
Krankenhauses zugeordnet. Controlli Delta Spain using It is installed on a server a modern, open and effici
Für die Mietbereiche werden the Delta Controls’ products in the hospital’s data cen ent building management
die Energieverbräuche für as their BACnet solution. ter and can be managed system.
Strom und Kälte separat er The management and auto from any computer using a
fasst und ebenfalls den ent mation system fits seamless web browser over a Wi-Fi
sprechenden Kostenstellen ly into the IT network and or VPN connection. Three
zugewiesen. manages the information of operator workstations are
all systems including refri used for operation, mainte
Somit verfügt das Univer geration, ventilation, electri nance, security and buildi ng
sitätsklinikum über ein cal, plumbing, medical gases, management functions.
modernes, offenes und solar, fire alarm and energy
leistungsfähiges Gebäude management. The design of Data sent to
managementsystem. the management system will accounting department
be able to deliver special va The system manages the
lue for the customer through refrigeration and hea
In 2010, the building auto maximizing the efficiency ting plants’ distribution,
mation system was completed and optimal operation of as well as the solar hea
in the new building of the their equipment. ting water system, respon
Sant Joan de Reus Universi sible for the environmental
ty Hospital, located approxi Integrating requirements in the main
mately 100 km south of Bar building services operating rooms. The venti
celona. The University Hos The open system architec lation of the other rooms as
pital – one of the biggest in ture of the Sant Joan de Reus well as the garage is varied
Spain – has a developed area University Hospital consists based on CO2 sensors, as
of 93,000 square meters and of more than 1,200 control well as schedules adapted to
a total investment of 120 mil lers distributed across mo the space occupancy requi
lion Euros with 322 rooms, re than 70 locations. The rements and usage times. As
12 operating divisions as BACnet Buildi ng Control part of the energy manage
well as an affiliated college ler, an eBCON from the new ment system, network ana Francisco Garcia
with 600 students. The entire enteliBUS product family at lyzers capture the power Controlli Delta Spain,
building automation system Delta Controls, communi consumption and, together SA Barcelona
is based on an open BACnet cates via BACnet / MSTP with chilled and hot water fgarcia@controlli.es
system. to their associated sub- meters, enable the speci
Ein Bürogebäude zu gestal dem erweiterten Gebäudeau ne Disziplinen wie HLK, Be Building Technologies ei
ten, das ein Höchstmaß an tomationssystem Desigo ein leuchtung und Beschattung ne Lösung, die sich schnell
Energieeffizienz, Flexibili gesetzt, das auf BACnet / IP als Einheit integriert wurden. und einfach den künftigen
tät und Komfort bietet, dies (B-ASC Profil, BACnet Re Siemens Real Estate, die zu Anforderungen und Bedürf
war die Herausforderung für vison) basiert. Desigo Total künftige Betreiberin des Ge nissen des Gebäudebetrei
Siemens-Division Building Room Automation ist Teil bäudes, realisierte zusammen bers oder Mieters sowie dem
Technologies und Siemens der Gebäudeautomation, mit der Siemens-Division Grundriss des Gebäudes und
Real Estate. Gemeinsam ha welche die einzelnen Diszipli der Aufteilung der einzelnen
ben die beiden Einheiten in nen in de Räumen zu einem Räume anpassen lässt. Dafür
der niederländischen Stadt integrierten System zusam müssen keine Änderungen an
Hengelo ein Bürogebäude menfasst. Im Bürogebäude den Elektro- und HLK-Ins
mit übergreifender Integrati in Hengelo handelt es sich
XXXXXXXXXXXXXXX. tallationen vorgenom
on aller gebäudetechnischen um eine Gesamtlösung,
XXXXXXXXXXXXXXXXX. men werden.
Disziplinen realisiert. bei dem verschiede
Integriertes
Gesamtsystem
Beim Projekt wurde das
Raumautomationssorti
ment Total Room Au
tomation (TRA) mit
In dem Büroge-
bäude wurden
mit BACnet alle
gebäudetech-
nischen Disziplinen
integriert.
In the office
building, all of the
technical service
disciplines were
integrated with
BACnet.
Anwendungen Solutions
Integrierte Lösung
für den Krankenhausbetrieb
Integrated Solution for Hospital Management
Das ASB-Hochschulgelän und Larsen & Toubro, Indi Integration über BACnet IP Geräteprofil B-BC unterstüt
de verbindet ein umwelt en, verbindet eine langfristige Für die Automatisierung zen die BACnet-Varianten
freundliches Ambiente mit Partnerschaft im Bereich der des ASB-Hochschulgelän Ethernet, IP, MSTP und PTP.
modernen und innovativen Gebäudeautomation und des des wurden 15 frei pro Weitere Protokolle wie Mod
Lernwerkzeugen. ASB bie Gebäudemanagements. Der grammierbare Master Con bus, M-Bus, Wilo, Grund
tet eine breitgefächerte Aus Technologie Konzern Larsen troller der Controlesta Serie fos, ASCII, etc. werden eben
bildung, die von qualifi & Toubro mit einem Umsatz RCO7xx, sowie Netzwerk- falls unterstützt. Der Einsatz
zierten Akademikern und von 11,7 Milliarden USD bie Controller der Controlesta der feinmodularen Ein- / Aus
praktizierenden Fachleuten tet eine breite Palette von in Serie RCO5xx mit integrier gangs-Module bietet eine op
begleitet wird und eine ein novativen Lösungen, Dienst ten Ein- und Ausgängen ge timale Abdeckung der jeweils
zigartige Kombination aka leistungen und Produkten an. wählt. Die Master Controller geforderten Ein- und Aus
demischen und praktischen Larsen & Toubro vermarktet sind teilweise mit einem inte gangsanforderungen.
Lernens darstellt. Die Hoch die Produkte von Elesta unter grierten Grafik-Display zur
schule setzt sich zum Ziel, seinem Label ATMOS im in lokalen Bedienung ausgestat Daikin als HLK-Auftragneh
inspirierte und hoch moti dischen Markt. tet. Die Controller mit dem mer installierte ein VRV-Sys
vierte Fachleute auszubilden,
die mit einem hohen Maß an
Engagement Ihren Weg in
die Wirtschaft finden.
Der Energiebedarf von In sparende Technologie von Regler ergänzen die Rege grammierte Anlagenrege
for m at ionste ch nolog ien , CentraLine für die Regelung lungstechnik in den sechs lung über HAWK konzipiert
speziell für die Kühlung von der Brunnenwasserkühlung, Schaltschränken. LYNX ist wurde. Dank dieser web
IT-Systemen, wächst kon des Kühlwasserkreislaufs, ebenfalls ein frei program basierten Lösung kann das
tinuierlich. Um diesen stei der Klimaschränke in den mierbarer Regler, der über technische Personal des Re
genden Energieverbrauch Etagen, der Entrauchungs die Integrationsplattfor chenzentrums jederzeit vom
zu drosseln, sind intelli anlage und der Lüftungsan men HAWK in die verschie Büro aus mit Standardbrow
gente Energiekonzepte not lage im Erdgeschoss und den denen Systeme eingebunden sern auf die angeschlossenen
wendig. In neuen Rechen Büros. wird und für die Steuerung Subsysteme zugreifen. Die
zentren kommen daher der Lüftungsanlage zustän Leitzentrale von CentraLine
moderne Energietechniken Integrationsplattformen dig ist. Aufgrund der hohen ist einfach zu bedienen und
und eine intelligente HLK- HAWK Sicherheitsanforderungen in erleichtert somit die Kon
Regelung zum Einsatz. Vor Insgesamt acht webbasier einem Rechenzentrum sind trolle und Überwachung
bild für die Entwicklung te Integrationsplattformen alle Systeme redundant aus der Anlagenteile. Auch der
fortschrittlicher Energie HAWK ermöglichen die gelegt. Fällt eine Komponente CentraLine-Partner hat im
konzepte in Rechenzentren nahtlose Vernetzung der ver aus, kann eine andere über Bedarfsfall die Möglichkeit,
ist die PlusServer AG, die bei schiedenen Systeme. Über sie nehmen. via Fernzugriff auf die An
der Regelungstechnik auf die können die ablaufenden Pro lage zuzugreifen und Ände
Kompetenz und Technologie zesse optimal überwacht und Webbasierter Zugriff rungen vorzunehmen.
von CentraLine vertraut. optimiert werden. Außerdem Das technische Personal des
installierte der Regelungsex Rechenzentrums kann die Ein reibungsloser Betriebs
Neue Kapazitäten perte 113 Module des Reglers Regler entweder direkt über ablauf ist das A und O in ei
für Server LION. Das System besteht das im Schaltschrank in nem Rechenzentrum. Diesen
In Straßburg baute der IT- aus einem technisch ausge stallierte CentraLine Touch garantiert die hochmoder
Dienstleister mit Unterstüt reiften und frei programmier Panel oder via Fernzugriff ne Regelungstechnik von
zung von CentraLine das baren Regler und einer Palet bedienen. Der Fernzugriff CentraLine. Gerade die In
umweltfreundlichste Rechen te eigens dafür konzipierter erfolgt über die Leitzentra tegration der Leitzentrale
zentrum Europas, datadock, Ein- und Ausgangsmodule. le CentraLine ARENA AX, gewährt, dass der Betrieb ef
um die Kapazitäten für das Vier BACnet-fähige LYNX- die speziell für die frei pro fizient abläuft.
Hosting weiterer Server aus
zubauen. Heute verfügt das
datadock über eine Gesamt
anschlussleistung von acht
Megawatt (MW) und kann
auf einer Nutzfläche von
4.200 Quadratmetern rund
50.000 Server anbinden.
The energy demanded by IT system and other facilities stem. LYNX is also a free ner company, has the facility
systems increases continuo is ensured by an efficient ly programmable control to access the system remotely
usly, especially that used to control system. Control and ler: the units are connected and to make changes.
cool the equipment. Ingeni measurement specialists, to various systems through
ous energy concepts can re RGS GmbH of Bonn, places the HAWK integration plat Smooth operation is the most
duce this demand using a great confidence in the en forms and are responsible important characteristic of
combination of the latest po ergy-saving technology of for ventilation system con a control centre. This is en
wer engineering and intelli CentraLine control systems trol. To ensure high integri sured by the C entraLine
gent HVAC control. A leader to regulate well-water ty, all systems use redundant control system which uses
in the development of advan cooling, cooling water circu equipment. If any compo the latest technologies.
ced computer centre energy lation, climatic chambers, a nent fails, its duties are taken
concepts is PlusServer AG, smoke extraction system and over by another component.
whose control systems are ventilation systems on the
based on expertise and tech ground and in the offices. Remote access
nology of CentraLine. The computer centre’s tech
HAWK integration nical staff can operate the
New capacities platforms controllers directly using the
for servers Eight web-based CentraLine CentraLine touch panels in
With assistance from HAWK integration plat stalled in control cabinet, or
CentraLine, PlusServer has forms allow seamless net using remote access provided
installed Europe’s most en working of various systems by a CentraLine ARENA AX
vironmentally friendly com and are used to monitor and user interface: this was spe
puter centre, “datadock”, optimize processes; the sy cially designed for freely pro
in Strasbourg. It currently stem also includes 113 Cen grammable system control
has a total connected load traLine LION controller via the HAWKs. This web-
of eight megawatt (MW) modules, providing a sophi based solution allows techni
and can connect approxi sticated and freely program cal staff to access subsystems
mately 50,000 servers in mable controller and a ran through standard browsers
an effective area of 4,200 ge of individually designed at any time. The CentraLi Karlheinz Jäger
square meters. inlet and outlet modules. ne user interface makes it CentraLine by Honeywell
Four BACnet-compatible easy to control and monitor info-d@centraline.com
Safe and continuous CentraLine LYNX control the plant components. RGS www.centraline.com
operation of the cooling lers complete the control sy GmbH, a CentraLine part
S amsomatic entwickelte eine chen- und Sanitärbereiche. and two luxurious hospita of Coface Arena. The gene
technisch wie wirtschaftlich Der Cateringbereich und die lity suites treat guests to an rated heat is controlled by
zukunftsweisende Lösung, Mannschaftsräume erhalten extraordinary view into the a manifold and adapted to
basierend auf dem Samson- das Warmwasser aus fünf arena. Samsomatic pitched the consumption by electric
Produktprogramm. Wasserspeichern, die ver and won the contract for the control valves as needed.
brauchsgesteuert gefüllt wer building automation of the Energy-saving air-conditio
Maßgeschneiderte den. stadium. Decisive factors in ning in the grandstand is en
Leittechnik cluded security of investment, sured by 14 main ventilation
Herzstück der von Samsoma Brandschutzkonzept low energy consumption, co systems with heat recovery.
tic erstellten Leittechnik ist Dem Brandschutz wird mit st-effectiveness and the fact Additionally, five exhaust
das BACnet-fähige Automa einem ausgeklügelten Ent that the building automation fans on the roof properly
tionssystem Trovis 6600, das rauchungskonzept Rechnung was to be implemented with ventilate the kitchen and sa
die Informationen von 2.300 getragen. Die Steuerung ist BACnet. The task involved nitary facilities. Hot water
Datenpunkten aus den Ge für vier Brandabschnitte aus planning, programming and for the catering facilities as
werken Heizung, Lüftung, gelegt und sorgt im Ernstfall installing the systems as well well as the team and locker
Elektro und Sanitär entspre mit 400 Brandschutzklappen as starting them up on sche rooms is provided by five
chend verarbeitet. Dabei ste und zwei Dachablüftern für dule. The Samsomatic team water tanks that are filled as
hen zwölf CPU-Module und eine wirksame Entlüftung developed a technically and needed.
138 I / O-Module über Ether des Hauptgebäudes. Die Be economically viable solution
net und 70 Erweiterungsge leuchtung der Parkplätze, based on the Samson product Fire protection scheme
räte über Modbus in Verbin Zugangswege, Schriftzüge portfolio. A sophisticated smoke ex
dung. Die Daten werden von und Logos wird über Hellig traction scheme has also
den zertifizierten CPU-Mo keitssensoren, unterschiedli Custom building control been implemented to ensu
dulen auf eine Server-basier che Zeitprogramme oder in The BACnet-capable Trovis re fire safety. The control
te Leitstation übertragen, die Einzelfällen von Hand ge 6600 Automation System is system is designed for four
über RDP den Zugriff von al steuert. Die Rasenheizung at the heart of the control sy ventilation zones; when a
len Arbeitsplätzen gestattet. wird über zwölf in der Spiel stem drawn up by Samsoma fire occurs, 400 fire dampers
Die maßgeschneiderte Ge fläche verteilte Temperatur tic: it processes data of 2,300 and two exhaust fans on the
bäudeleittechnik ermöglicht sensoren geregelt und der data points from the heating, roof effectively ventilate the
mit animierten Anlagenbil Rasen im Wurzelbereich bei ventilation, electrical and sa grandstand facilities.
dern ein anwenderfreundli einer konstanten Temperatur nitary installations. Within
ches Bedienen und Überwa von elf Grad Celsius frostfrei the automation system, twel Illumination of the parking
chen der Anlagen. Zudem gehalten. So kann der Fußball ve CPU modules and 138 areas, access roads as well as
lassen sich relevante Anla auch im Winter rollen. I / O modules communicate the lighted signage and logos
genfunktionen in verschie via Ethernet, 70 expansion is controlled by brightness
denen Gebäudebereichen mit modules use Modbus com sensors, different schedules
drei Web-Terminals auf ei The opening ceremony of Co munication. Data are trans or, in isolated cases, by hand.
nem Touchpanel komforta face Arena was celebrated in mitted by the certified CPU The undersoil heating system
bel bedienen und beobach July 2011, which meant that modules to a server-based is controlled by twelve tempe
ten. Betriebssicherheit bietet the new football stadium at control station, which pro rature sensors spread across
ein umfassendes Alarmma Mainz was completed just vides RDP access from any the pitch so that the roots are
nagement, das die Störmel in time for the start of the workplace. Custom building protected against frost and
dungen von Fremdgewer new Bundesliga season. It is control with animated plant kept at a constant tempera
ken wie Netzersatzanlage, the new home of FSV Mainz schemes makes it easy for ture of 11 °C. This ensures
Einbruch- und Brandmel 05 and named after Coface, operators to run and moni that football can also be pla
deanlagen, Beschallungsan a financial services provider, tor the systems. In addition, yed throughout the winter.
lage, Sicherheitsbeleuchtung, with German headquarters relevant functions in diffe
Sprinkleranlagen, Drainage- in Mainz. Its pitch measures rent building sections can be
und Hebeanlagen zuverlässig 105 x 68; meters, its covered conveniently operated and
verarbeitet. stands provide standing and monitored using three web
seating room for 34,000 avid terminals with touch screen
Energiesparende supporters. input. Reliable operation
Klimatisierung is ensured by an extensive
Eine zuverlässige Wärme Multipurpose arena alarm management system,
versorgung ist Vorausset The prominent main grand which reliably processes er
zung für den Betrieb der stand building serves as the ror messages by other, non-
Arena. Die erzeugte Energie entrance to a 3,000 m² mul Samsomatic systems, such
wird über einen Verteiler ge ti-purpose center with spaci as the emergency power sy
regelt und mit elektrischen ous indoor and outdoor fa stem, the intrusion and fire
Stellventilen bedarfsge cilities, which can be used alarms systems, the sound
recht den Verbrauchern an for sporting events as well as and public address system,
gepasst. Die energiespa other events, meetings and emergency lighting, sprink
rende Klimatisierung des conferences. The five-story lers as well as drainage and
Hauptgebäudes überneh grandstand also contains the lifting installations.
men 14 Hauptlüftungsanla representative VIP entrance, Gerald Fiedler
gen mit Wärmerückgewin team and locker rooms, of Energy-saving SAMSOMATIC GMBH
nung. Zusätzlich sorgen fünf fices, business seats and the air-conditioning gfiedler@samsomatic.de
Dachablüfter für eine ausrei catering area. 27 individual A reliable heat supply is in www.samsomatic.de
chende Entlüftung der Kü ly designed executive boxes dispensable to the operation
Seit mehr als 100 Jahren Beratung und Qualitätspro Firma Spelsberg stellt sich die Managementebene für die
ist die Günther Spelsberg dukte für Partner und Kun Frage, wie man ein über die Gewerke Heizung, Lüftung,
GmbH & Co. KG mit Haupt den zu realisieren. Das ste Jahre entstandenes hetero Klima, Sanitär, Elektro, Käl
sitz in Schalksmühle eine fes tig wachsende Unternehmen genes Automationsnetzwerk te sowie die Einzelraumre
te Größe im Elektroinstal unterhält ein zweites Werk wirtschaftlich migriert und gelung. Man entschied sich
lations- und Gehäusesektor, in Buttstädt (Thüringen) und dieses in zukünftige Neu- für das IBS8 der INGA mbH
seit über 20 Jahren auch im Tochterunternehmen in Dä und Umbauten einbindet. aus Hameln, die mehr als 25
Bereich Photovoltaik. Als nemark, England, Frank Die optimale Lösung ist ei Jahre Erfahrung mit derarti
Experte im Bereich feucht reich, den Niederlanden, Po ne Leittechnik, die übergrei gen Projekten hat.
raumgeschützter Elektroins len, Spanien und Tschechien. fend und fabrikatsneutral al
tallation setzt das Unterneh le Gewerke sowie Gebäude Leittechnik IBS8
men seine Erfahrung und sein Migration des Netzwerks und Anlagen integriert. Da Beim Neubau des Verwal
Know-how ein, um individu Auch für ein zukunftsorien zu müssen zum einen prop tungsgebäudes in Schalks
elle Lösungen, professionelle tiertes Unternehmen wie die rietäre Systeme angekoppelt mühle hat man sich für Au
werden und zum anderen of tomationsstationen aus dem
fene Protokolle wie BACnet Hause CentraLine entschie
zur Verfügung stehen. Ziel den. Auf der Feldebene wer
setzung bei Spelsberg war den für die Einzelraumre
daher die Erneuerung der gelung LON-Komponenten
Für das Ministerium der Finanzen in Potsdam schrieb der Fachplaner für das Gewerk
Elektro KNX als Kommunikationsbus aus. Das Gewerk Heizung-Lüftung-Klima (HLK)
und die Leittechnik forderte jedoch BACnet. Um beide Systeme entsprechend ihrer
Stärken einsetzen zu können, bilden jetzt ein Ethernet-Netzwerk sowie das modulare
Wago-I / O-System den gemeinsamen Nenner in diesem Projekt.
For the Ministry of Finance in Potsdam, the professional planner for the electrical
system called for tenders for KNX as communication bus. However, the HVAC and
control technology systems called for BACnet. In order to be able to use both systems
according to their strengths, an Ethernet network and the modular Wago-I / O-System
now form the common denominator of this project.
In dem u-förmigen, massiven Controller anschließen, der Der KNXnet IP-Controller ACnet Controller
B
Gebäude des Ministeriums wiederum über Ethernet mit hat hier eine Doppelfunktion: vermittelt
der Finanzen entstanden anderen Systemen kommu Als KNXnet IP-Router über Da der KNX IP-Control
auf fünf Etagen 214 Räume, niziert. Die Funktionalität gibt er die Telegramme der ler sowohl das KNX IP-Pro
darunter 187 Büro- und dieses Controllers geht über KNX-Geräte an eine interne tokoll als auch das Mod
fünf Beratungsräume, mit einen einfachen KNXnet IP- Logik im KNXnet IP-Con bus-Protokoll unterstützt,
einer Gesamtnutzfläche von Router hinaus, da er nach troller. Ein dort hinterlegtes kann er direkt mit dem
4.450 m². IEC 61131-3 programmier SPS-Programm übernimmt BACnet-Controller kom
bar ist und um analoge und die weitere Verarbeitung der munizieren. Zur Kommu
Das Fachplanungsbüro Kügler digitale I / O-Busklemmen Informationen. Als K NXnet nikation und Vernetzung
Ingenieure aus Cottbus sah erweitert werden kann. Die IP-Controller veranlasst er der Gewerke Elektro und
für das Gewerk Elektro den digitalen Busklemmen wer die erforderlichen Schaltbe HLK wurden zusätzlich
Standard KNX-Bus als Zwei den als kostengünstige Bi fehle an die angereihten di BACnet / IP-Controller in
draht-Kommunikationsbus närein- und -ausgänge bei gitalen I / O-Klemmen. In stalliert. Sie erhalten von
vor. Die gewerkübergrei spielsweise zum Schalten der der anderen Richtung sen den KNX IP-Controllern in
fende Leittechnik forderte Beleuchtung in Büros, Flu det der Controller wiede den Elektro-Unterverteilun
als Kommunikationsbus für ren, Treppenhäusern und rum als KNXnet IP-Rou gen mittels Modbus-Proto
das Gewerk Heizung-Lüf Nebenräumen sowie zum ter KNX-Telegramme an koll alle benötigten Informa
tung-Klima (HLK) dagegen Steuern der Jalousien und die Busteilnehmer. Das Ge tionen und stellen sie über
BACnet / IP. Dadurch war Lüftungsanlagen verwendet. bäude automatisieren insge BACnet-Objekte der Gebäu
zwischen den unterschiedli samt 30 Wago-I / O-Knoten, deleittechnik bereit. Mit die
chen Kommunikationssys jeweils zwei pro Etage und sem Automatisierungskon
temen eine „KNX-BACnet- Elektroverteilung. Mit Hil zept konnten die Vorgaben
Schnittstelle“ erforderlich. fe des Managementtools ETS des Kunden an die Gebäu
Im Rahmen der Vergabege 3 lässt sich das KNX-Projekt deautomation, trotz unter
spräche kristallisierte sich über das Ethernet-Netzwerk schiedlicher Bussysteme, voll
folgendes Konzept heraus: in Betrieb nehmen. Auch ein erfüllt werden.
Als Kommunikationsmedi Fernzugriff für Servicefälle
um zwischen jeder der 30 und Wartungen kann einfach
KNX-Linien wird ein Ether eingerichtet werden. The Ministry of Finance’s
net-Netzwerk mit KNXnet u-shaped massive building
IP-Routern eingesetzt. includes 214 rooms on five
KNX-Geräte, wie Taster oder stories, including 187 offices
Modulares I / O-System Präsenzmelder, kommuni- and 5 conference rooms,
erfüllt Anforderungen zieren über die Standard with total usable space of
Als Automatisierungskom KNX-Busleitung mit dem 4,450 m.
ponente wählte Kügler das Automatisierungssystem.
© Kügler Ingenieure
modulare Wago-I / O-Sys KNX devices such as switches For the electrical system, the
tem. Mit diesem System las or motion detectors commu- professional planning office
sen sich die KNX-Linien nicate with the automation Kügler Ingenieure of Cott
über KNX / TP1-Busklem system via the standard KNX bus envisioned the standard
men direkt am KNXnet IP- bus line. KNX bus as a 2-wire com
munication bus. The system- ding discussions, the fol as KNXnet / IP router, it also installed. They receive
spanning control techno lowing plan crystallized: an transmits the telegrams from all the required information
logy, by contrast, required ETHERNET network with the KNX devices to an inter from the KNX IP controllers
BACnet / IP as the communi KNXnet / IP routers is used nal logic in the KNXnet / IP in the electrical subdistribu
cation bus for the HVAC sys as a means of communica controller. A PLC program tion systems via MODBUS
tems. Meanwhile, a “KNX- tion between all of the 30 stored there handles the fur protocol and they make it
BACnet interface” was re KNX lines. ther processing of the in available to the building con
quired between the vario formation. As KNXnet / IP trol system using BACnet ob
us communication systems. Modular I / O system controller, it triggers the re jects. With this automation
In the course of the awar fulfills requirements quired switch commands on concept, the customer’s spe
As automation components, the downstream digital I / O cifications for building au
Kügler selected the modular modules. In the other direc tomation could be fulfilled
WAGO-I / O-SYSTEM. With tion, as KNXnet / IP router, completely despite the diffe
this system the KNX lines can the controller sends KNX rent bus systems.
be connected via KNX / TP1 telegrams to the bus partici
bus modules directly to the pants. A total of 30 WAGO
KNXnet / IP controller, which I / O nodes automate the buil
in turn communicates with ding, two per floor electrical
other systems via ETHER distribution system. Using
NET. The functionality of this the ETS 3 management tool,
controller exceeds that of a the KNX project was started
simple KNXnet / IP router sin up via the ETHERNET net
ce it is programmable to IEC work. It is also possible to
© Kügler Ingenieure
Bernhard Isler1
Im Palmer House Hilton Hotel RAE 135.1-2009 für die Publi ge davon werden einem öffentli tet werden. Sie dienen als Hin
in Chicago fanden im Januar die kation verabschiedet. Obwohl chen Review nur der substanti weise und Empfehlungen in der
ses Jahres die Meetings des ASH auch das Addendum 135-2010ak ellen Änderungen (Independent Weiterentwicklung des Adden
RAE SSPC 135 BACnet Komi dafür bereit war, wurde dieses Substantive Changes, ISC) un dums. Ein APR ist nie der letz
tees statt. Während der A SHRAE Addendum zunächst übergan terzogen. Dies bedeutet, dass te Review vor einer Publikation.
Winter Konferenz und vor der gen und dann in einem späteren nur die Änderungen von Anfor Für die Publikation ist immer
AHR Expo 2012 nahmen vie Meeting des Ausschusses eben derungen seit dem letzten Re auch noch ein PPR notwendig,
le Personen an diesen Meetings falls noch verabschiedet. Damit view für Kommentare offen sind. der nicht mehr zu substantiellen
teil. Sowohl die Working Groups wurden die folgenden Addenda Die für einen PPR verabschiede Änderungen führt.
wie auch das Komitee erzielten für die Publikation freigegeben: ten Addenda waren:
bemerkenswerte Fortschritte mit Für das Addendum 135-2010aj,
verschiedenen Addenda und Än Addendum 135-2010ak Addendum 135-2010i IPv6 Support, wurde die Num
derungsvorschlägen. Fast alle Ad Verschiedene Änderungen PPR6 ISC mer 2 des APR vorläufig fest
denda, die im Review Prozess wa Addendum 135.1-2009l Lighting Output Objekttyp gelegt, weil dieses Addendum
ren, wurden vorangebracht für Verschiedene Änderungen Addendum 135-2010ai bereits im ersten Review zur Ver
eine Publikation oder einen wei Addendum 135.1-2009n PPR2 öffentlichung war (PPR1). Das
teren öffentlichen Review. Verschiedene Tests Network Port Objekttyp Komitee war sich bewusst, dass
Addendum 135-2010al dieses Addendum noch nicht
Davor fanden in der letzten Ok Zu dieser Liste müssen auch PPR2 komplett ist. Es beinhaltet die
toberwoche 2011 in Atlanta noch folgende Addenda hinzu Gateways, Routers und für IPv6 notwendigen Änderun
(Georgia) eine Reihe von Mee gefügt werden. Obwohl es Kom BBMDs gen am Network Port Objekt
tings des Komitees und der Wor mentare gab zu diesen Addenda Addendum 135-2010ao typ (im Addendum 135-2010ai)
king Groups statt. Dies war be im letzten öffentlichen Review PPR1 noch nicht. Das IPv6 Addendum
reits das sechste Interim Meeting zur Veröffentlichung (Publica Verschiedene Änderungen wurde trotzdem in den APR ver
im Herbst am Georgia Tech. tion Public Review, PPR), ent Addendum 135-2010aq abschiedet, da der Teil zum Da
schied das BACnet Komitee, PPR1 tenlink selbst bereits überarbei
In Atlanta lag der Schwerpunkt dass die notwendigen Änderun Lift Überwachung tet war nach dem PPR1. Indem
auf der Bearbeitung von Kom gen zur Beantwortung der Kom Addendum 135.1-2009k dies nun wieder der Öffentlich
mentaren und der Revision von mentare keine Anforderungen PPR3 ISC keit zur Sichtung bereitgestellt
Addenda, da die Meetings kurz und damit nur sprachliche Be Manuelle MS / TP Tests wurde, ist eine prototypische
nach dem Ende der öffentlichen arbeitungen sind. Dies erlaubte, Addendum 135.1-2009m Implementierung des Datenlinks
Reviews angesetzt waren. Eini auch diese Addenda an den Aus PPR3 ISC möglich, woraus fundierte Kom
ge dieser Arbeiten wurden ab schuss der Direktoren weiterzu Zusätzliche Tests mentare erwartet werden. Ohne
geschlossen, andere wurden als leiten für die Zustimmung zur einen APR wäre das Addendum
Heimarbeit mitgenommen und Publikation, ohne weiteren öf Ebenfalls verabschiedet, aber für aufgehalten worden, bis das Net
in zahlreichen Telefonkonferen fentlichen Review. einen öffentlichen Review zur work Port Objekt verabschiedet
zen der Working Groups dis Sammlung von Hinweisen und und veröffentlicht gewesen wäre,
kutiert und vorangebracht. Das Addendum 135-2010aa Empfehlungen (Advisory Public um damit in korrekter Weise Än
Ziel war, dass die Verarbeitung Channel Objekt Typ und Review, APR), wurden: derungen daran für IPv6 doku
aller Kommentare in Chica WriteGroup Service mentieren zu können.
go abgeschlossen werden kann. Addendum 135.1-2009j Addendum 135-2010aj
Dies beinhaltete die Erstellung Verschiedene Änderungen von APR2 Schnittstellen
von offiziellen Antworten zu den Tests IPv6 Support für Applikationen
Kommentaren sowie die entspre Addendum 135-2010ap Das neue Addendum 135-2010ap
chende Revision der Addenda so, Addenda verabschiedet für APR1 führt die Infrastruktur für ein
dass diese in Chicago dem Komi den öffentlichen Review Applikationsschnittstellen neues Konzept für die Struktu
tee für die Sichtung und Verab In Atlanta und in Chicago wur rierung von Anwendungsdaten
schiedung vorlagen. de vom Komitee eine Reihe von In einem APR werden ebenso in BACnet ein. Die sogenann
Addenda für ihren ersten oder Kommentare an ASHRAE ein ten Applikationsschnittstellen
Addenda in Publikation einen weiteren öffentlichen Re gereicht über die gewohnte Web- (Application Interfaces) werden
Während des Meetings in Chica view verabschiedet. Dies waren Oberfläche der Kommentar-Da verwendet, um die Schnittstel
go hat der Ausschuss der Direkto sowohl Addenda für den BACnet tenbank der ASHRAE. Diese le zu bestimmten Applikationen
ren der ASHRAE zwei Addenda Standard 135-2010 wie auch den Kommentare müssen aber nicht oder Gerätschaften zu repräsen
zum Test Standard ANSI / ASH Test Standard 135.1-2009. Eini offiziell vom Komitee beantwor tieren. Eine solche Schnittstelle
wird aus Properties von BACnet
Objekten im lokalen oder auch
einem fernen BACnet Gerät ge
bildet. In weiterer Arbeit wird
Bernhard Isler ist Sekretär des ASHRAE SSPC 135, Hersteller Voting Member dieses Komitees, und leitet die Objects
1
dieses Konzept dann verwendet
& Services Arbeitsgruppe. Er arbeitet für die Siemens Schweiz AG, Building Technologies Division, in Zug, Schweiz, für die Definition von standar
bernhard.isler@siemens.com disierten Schnittstellen, welche
Bernhard Isler is secretary of the ASHRAE SSPC 135, Producer Voting Member of the committee, and convenes the die Spezifikation und Integrati
Objects & Services working group. He is a member of Siemens Switzerland Ltd, Building Technologies Division, on von Applikationen in einem
located in Zug, Switzerland, bernhard.isler@siemens.com BACnet System erleichtern wird.
Damit wird auch eine neue Ebe ten maßgeschneiderte Zustands view period, the main focus of Public Review. The addenda
ne von semantischer Information informationen sowie Infor the SSPC was on comment re approved were:
zu BACnet hinzugefügt. mationen zur Struktur solcher sponses and addenda draft re
Anlagen. Für die Vervollständi visions. Some of this work was Addendum 135-2010i
Die BACnet Infrastruktur für gung mit Strukturinformationen completed in Atlanta, while oth PPR6 ISC
Application Interfaces besteht der Gebäude können dafür spä er work was taken home and Lighting Output Object
aus verschiedenen Elementen: ter auch standardisierte Appli discussed in numerous telecon Addendum 135-2010ai
cation Interfaces entwickelt wer ferences of the working groups. PPR2
Ein neues Kapitel 26 im Stand den. The goal was that all public re Network Port Object
ard 135-2010 beschreibt den view comment processing be Addendum 135-2010al
Mechanismus der Application Der neue Mechanismus „COV completed in Chicago. This in PPR2
Interfaces sowie ein Gerüst, Property Multiple“ erlaubt die cluded having the comments re Gateways, Routers and
um diese zu definieren und zu Subskription auf mehrere Pro solved and the next revisions BBMDs
dokumentieren. perties sowie die Notifikation ready to be reviewed and voted Addendum 135-2010ao
Ein neuer informeller Anhang, von Änderungen dieser Proper forward in the Chicago plenary PPR1
der ein maschinenlesbares For ties inklusive Zeitstempel in je sessions. Miscellaneous Changes
mat für die Beschreibung von weils einer einzigen Service-An Addendum 135-2010aq
Application Interfaces defi frage. Dieser neue Mechanismus Addenda to be published PPR1
niert. Dieses Format basiert wurde hinzugefügt, um den Be While at the Chicago meeting, the Elevator Monitoring
auf den XML Formaten aus darf an effizienter Benachrichti ASHRAE Board of Directors ap Addendum 135.1-2009k
dem Anhang Q des BACnet gung von Wertänderungen einer proved two addenda to the test PPR3 ISC
Standards. sehr großen Anzahl von Proper standard ANSI / ASHRAE 135.1- Manual MS / TP Tests
Erweiterungen des Structured ties zu berücksichtigen. Obwohl 2009. Also ready for approval was Addendum 135.1-2009m
View Objekttyps für die dieser Mechanismus nun zusam addendum 135-2010ak, but this PPR3 ISC
Repräsentation einer bestim men mit den Erweiterungen für addendum was somehow skipped Test Additions
mten Implementierung eines die Liftüberwachung eingeführt in Chicago but was approved in a
Application Interfaces in wird, ist er als generell verfügba subsequent meeting of the board. Also approved, but for an Advi
BACnet Geräten. rer Mechanismus entworfen. Er So the following addenda were sory Public Review (APR), were:
Ein neuer Dienst ReadProper kann deshalb auch in beliebigen approved for publication:
tyIndirect, welcher das erweit anderen Applikationen verwen Addendum 135-2010aj
erte Structured View Objekt det werden. Addendum 135-2010ak APR2
ergänzt. Dieser neue Dienst er Miscellaneous Changes IPv6 Support
laubt den direkten Zugriff auf Um aktuell zu bleiben über Pub Addendum 135.1-2009l Addendum 135-2010ap
Werte eines Application Inter lic Reviews, Publikationen von Miscellaneous Changes APR1
faces, sogar wenn dieses eine Standards sowie Komitee Mee Addendum 135.1-2009n Application Interfaces
mehrschichtige Struktur hat. ting Ankündigungen, kann man Miscellaneous Tests
das elektronische „ASHRAE In an APR, comments are submit
Es ist vorgesehen, dass spezi Standards Actions“ Mit Also to be added to this list ted through the regular ASHRAE
fische standardisierte Applica teilungsblatt abonnieren über die are the following addenda. Al online comment database web in
tion Interfaces, wie zum Beispiel A SHRAE Webseite www.ashrae. though these addenda received terface. But APR comments re
für einen Frequenzumrichter, im org / resources--publications / free- comments in their last Publica ceived are not required to be of
Anhang B des Standard 135 de resources / listserves. tion Public Review (PPR), the ficially responded to and resolved.
finiert und dokumentiert wer BACnet committee decided that They serve as guidance to the
den. Jede solche Definition muss the changes made to resolve the committee on moving forward
durch den Review Prozess bei The Palmer House Hilton hotel comments were non-substantive with the subject matter. An APR
ASHRAE gehen, wie jede andere in Chicago was the site of the and editorial only. This allowed cannot be the last review before
Änderung oder Erweiterung der January 2012 ASHRAE SSPC these addenda to be sent for publication. Publication still re
BACnet Standards auch. 135 BACnet Committee meet ward to publication approval by quires that a PPR be held and did
ings. As a part of the ASHRAE the ASHRAE Board of Directors not cause substantive changes.
Liftüberwachung winter conference and preced without further public review.
Das neue Addendum 135- ing the AHR Expo 2012, a larg For addendum 135-2010aj, IPv6
2010aq, welches in den PPR1 er group of participants attend Addendum 135-2010aa Support, the APR’s number was
verabschiedet wurde, schlägt ei ed these meetings. Remarkable Channel Object and Write chosen tentatively, since this ad
nen Satz von neuen Objektty progress was made on various Group Service dendum underwent PPR1 already.
pen und einen neuen Change- addenda and proposals, both Addendum 135.1-2009j The committee is aware that it is
Of-Value (COV) Mechanismus by the working groups and on Miscellaneous Test Changes not yet complete, since it lacks
für die Notifikation von Ände the plenary level. Almost all ad changes to the Network Port ob
rungen mehrerer Werte vor. Die denda that have been in the pub Addenda approved ject for IPv6. It was voted out for
se Sammlung von Erweiterungen lic review process were sent for for public review an APR since the data link part
wurde durch die Elevator Wor ward for publication or an addi In Atlanta and in Chicago, a was revised following PPR1. Mak
king Group erarbeitet, in enger tional review cycle. number of addenda were ap ing this available to the public en
Zusammenarbeit mit der Lift-In proved for initial or subsequent ables early implementations, from
dustrie. Der Zweck dieser Erwei Before Chicago, the BACnet public review. This includes ad which profound comments are ex
terungen ist, das Überwachen ei committee and its working denda to 135-2010 as well as ad pected. Otherwise, this addendum
ner großen Anzahl von Lifts, groups had a series of face-to- denda to the test standard 135.1- would be held off until the Net
Rolltreppen und anderer solcher face meetings during the last 2009. Some of these addenda work Port object is published and
Einrichtungen über BACnet zu week of October in Atlanta, GA. will undergo an Independent the changes to it for IPv6 can be
ermöglichen. This was the sixth fall interim Substantive Changes (ISC) re documented for public review.
meeting hosted by Georgia Tech. view. This means that only the
Die neuen Objekttypen sind Ele substantive changes from last Application interfaces
vator Group, Escalator und Lift. Getting together in Atlanta right review are open for review and Addendum 135-2010ap intro
Alle diese Objekttypen beinhal after the end of the fall public re commenting in the Publication duces the infrastructure for a new
concept of application data rep A new informative annex that Elevator monitoring The new mechanism “COV
resentation in BACnet. The so defines a machine-readable Addendum 135-2010aq, now Property Multiple” allows sub
called “Application Interfaces” format for describing applica going out for PPR1, proposes scriptions to, and notifications
are used to represent the inter tion interfaces based on the a set of new object types and of, time-stamped changes of
face to a particular application or XML data formats of 135- a new Change Of Value (COV) multiple properties in single
equipment, consisting of proper 2010 Annex Q. mechanism for reporting chang service requests. This was add
ty values from BACnet objects in E xtensions to the Structured es of multiple values. This col ed to address the need for mon
the local device, or even in remote View object type for the lection of extensions was elabo itoring large sets of values in a
devices. In further work, this in BACnet representation of a rated by the Elevator Working network-efficient way. Although
frastructure will be used for the particular implementation of Group in close cooperation with this new mechanism has been in
definition of standardized appli an application interface. the elevator industry. The pur troduced with the extensions for
cation interfaces, facilitating the A new ReadPropertyIndirect pose of these extensions is to en elevator monitoring, it has been
specification and integration of service that complements the able BACnet to monitor larger designed as a general purpose
applications and equipment in a extended Structured View ob numbers of elevators and esca mechanism, usable for any ap
BACnet system. This addendum ject type. This new service en lators. plication.
also enables the addition of a new ables accessing an interface
level of standardized semantic in value within a cascaded appli New object types are proposed To stay up-to-date on public re
formation. cation interface. for representing an Elevator views, standards publications,
Group, an Escalator and a Lift. as well as interim meeting an
The infrastructure for application Particular standardized applica All these new object types have nouncements, you can sub
interfaces in BACnet is proposed tion interfaces, such as for a vari tailored status information and scribe to the ASHRAE Stand
to consist of several elements: able frequency drive, are foreseen also provide structural infor ards Actions newsletter through
to be defined and documented in mation. In order to complete the ASHRAE website at http://
A new Clause 26 that describes Annex B of 135-2010. Every such this structural information with w w w.ash rae.org / resou rces --
the mechanism for application application interface definition building structures, standard ap publications / free-resources / list
interfaces and a template to de will have to pass through the reg plication interfaces may be de serves.
fine and document them. ular public review process. veloped in the future.
���.��������������.���
HMI/SCADA Solutions
BACnet insight
agencies, but this is only 5 % of picture 1). The VMAC is prob Bit Number 7 6 5 4 3 2 1 0
the total world population. Re- ably the most interesting part
assigning the IP address range is in these specifications. VMAC 0 0 High 6 Bits
practically impossible. makes it possible to represent the
much larger IPv6 addresses to the Middle Octet
A new version of the internet short packet structures used in
Low Octet
standard IPv6 has been developed BACnet.
since the 90s. Due to the limited
addresses in IPv4 (the last avail A BACnet IPv4 address consists Abbildung / Picture: 2
able pools have been assigned in of four octets for the address itself
February 2011) introduction of plus two octets for the UDP-Port.
IPv6 is expected very soon now. E.g. the IP address 192.168.0.10,
Port 47808 is encoded in hexa Further changes dia connected to a BACnet device.
What’s new in IPv6? decimal as follows: “C0A8000A Broadcast-messages, this means The network port object type
Beyond a few new features like BAC0”. messages sent to the entire net will be introduced in more detail
automatic address determination work, are discontinued in IPv6. in the next issue of the BACnet
by network nodes themselves and To encode an IPv6 address a total Those are replaced by so-called Europe Journal.
discontinued broadcast messages of 18 octets would be required but multicast-messages which are di
the extension of the address range this would also require extensions rected to a known group of net Note: The methods introduced in
makes the major difference. IPv6 in the BVLL (the BACnet Virtual work nodes and so do not stress this article are in public review at
addresses consist of 128 bit, this Link Layer) which would lead to the whole network. the moment but are expected to
means a total of 2128 nodes can incompatibilities. be finally approved soon.
be addressed. This is probably As in IPv4 there will be BBMD
enough to assign a unique IP ad And here the VMAC comes into (BACnet Broadcast Management Conclusion
dress to every sand grain on plan the game: In the BVLL the logical Devices) in IPv6 but with the Due to the continuous develop
et earth. devices address (the 22 bit device use of multicast-messages as said ment of this communication pro
instance number) will be encoded above. Those need to support a tocol the BACnet standard re
ACnet and IPv6
B into the 6 available octets as shown total length of 18 octets per entry. mains up-to-date even with the
At the moment specifications to in picture 2. The VMAC layer is introduction of new technologies.
use BACnet with IPv6 are devel then responsible to resolve the ac Furthermore a new object type, So BACnet is future-proof and so
oped and introduced. For this tual IPv6 address. This method the network port object, will be are the investments in using the
IPv6 was added to the ISO / OSI is already used to run BACnet on introduced. This object represents BACnet technology.
reference model for BACnet (see wireless ZIGBEE networks. the properties of the network me
Being everywhere.
Without having to be.
Web-based Building Management System by SE-Elektronic
at the l+b 2012 in Frankfurt
Cloud Computing
Energy-Monitoring
BACnet-Communication
Come and visit us at the world’s leading Besuchen Sie uns auf der light+building, der
trade fair for light and intelligent building weltgrößten Messe für Licht und intelligente
from 15 to 20 April 2012 in Frankfurt/Main. Gebäude. Vom 15. bis 20. April 2012 in
We look forward to seeing you there to Frankfurt am Main. Wir freuen uns, Ihnen
show you our BACnet-compliant solutions unsere BACnet-fähigen Lösungen und
and powerful building automation systems. unsere leistungsstarke Gebäudeautomation
persönlich vorzustellen.
Welcome to Hall 9.0, Stand B 60.
Willkommen in Halle 9.0, Stand B 60.
BACnet insight
Regelungen zum BTL Test Plan den Prüflaboren bei dessen Ver umfangreicheren Erweiterungen ge Updates erforderlich machen.
Nach Klärung von mehr als 100 öffentlichung eine Übergangs des BACnet-Standards behält sich Nicht das Geräteprofil sondern
fachlichen Fragen (Clarification phase (Transition Period) fest, in die BTL-WG vor, nur einen Teil die vom Gerät gebotenen Funk
Requests) zum BTL Test Plan 5 welcher der Hersteller die Wahl der in einer Protokoll-Revision tionen entscheiden über die Prüf
und den zugehörigen Testspezi zwischen Anwendung des al definierten Funktionen in das In barkeit und Zertifizierbarkeit ei
fikationen veröffentlichte die Ar ten und des neuen Testplans hat. terim Test Package Update einflie nes Produkts. Im Extremfall kann
beitsgruppe BTL-WG (BACnet Von dieser Möglichkeit kann der ßen zu lassen. Diese Maßnahme für ein Produkt, das ein niedri
Testing Laboratories Working Hersteller jedoch nur für den Fall erscheint notwendig, um unver geres Geräteprofil (z.B. B-AAC)
Group) zum Jahreswechsel Versi Gebrauch machen, dass im zu tretbare Wartezeiten für den Her und eine niedrigere Protokoll-Re
on 9 des BTL Test Package. Das prüfenden Gerät eine Protokoll- steller zu vermeiden. vision als andere, bereits geprüf
Testpaket definiert mit dem BTL Revision implementiert ist, die te und zertifizierte Produkte (z.B.
Test Plan, der BTL Checklist nach dem alten Testplan geprüft Wird ein Produkt auf Grundla B-BC) erfüllt, bis zur Veröffent
und weiteren Begleitdokumen werden darf. Anderenfalls muss ge einer nach einem Interim Test lichung eines entsprechenden In
ten die Abläufe und den Umfang stets der neue Testplan zur Prü Package Update durchgeführten terim Test Package Updates kei
der BACnet-Konformitätsprü fung herangezogen werden. Prüfung zertifiziert oder gelistet, ne Prüfung durchgeführt werden.
fung und ergänzt mit den BTL geht der Hersteller die Verpflich In Abhängigkeit von Umfang und
Specified Tests den Teststandard Für BTL Test Plan 9 endete die tung ein, bei Erscheinen eines Komplexität der implementier
ANSI / ASHRAE 135.1 um not Übergangsphase im März 2012. neuen Testplans das Produkt in ten, über den Test Plan hinaus
wendige Tests. Neben Korrektu nerhalb von drei Monaten beim gehenden Funktionen, kann die
ren und Verbesserungen beste Protocol_Revision Test Policy Prüflabor zum Nachtest einzu Entwicklung des jeweiligen Inte
hender Testdefinitionen lag der In Anbetracht der immer schnel reichen. Eine unveränderte Hard- rim Test Package Updates mehre
Fokus bei der Entwicklung von leren Entwicklung des BACnet- und Software beim Prüfling vo re Monate dauern.
Version 9 auf neuen Tests für die Standards, dessen aktueller Revi rausgesetzt, müssen vom Labor
Objekttypen Structured View, sionsstand bei 13 liegt, stellt sich lediglich die seit dem angewand Die BTL-WG ist um Vermeidung
Trend Log Multiple und Event zwangsläufig die Frage nach der ten Interim Test Package Up derartiger Szenarien bemüht,
Log sowie den dazugehörigen Prüfbarkeit von neueren Produk date zum Testplan hinzugefügten kann diese jedoch nicht aus
BIBBs. Anders als bei den bisheri ten mit einer Protokoll-Revision Tests ausgeführt werden. Deckt schließen. Um die Entwicklungs
gen Versionen entspricht die Ver größer als 9. Die BTL-WG hat die der neue Testplan die im Produkt dauer zu minimieren,, wird dem
sionsnummer des Testpakets nun Notwendigkeit erkannt und mit implementierte Protokoll-Revi Hersteller die Möglichkeit einge
der maximalen, damit prüfbaren der Schaffung einer entsprechen sion nicht ab, muss das Produkt räumt, Testspezifikationen für ein
BACnet-Protokoll-Revision. Mit den Regelung (Protocol_Revision mit dem Erscheinen der nächs von der BTL-WG definiertes In
dem vorliegenden Testpaket wer Test Policy) auf die Marktanfor ten Testplanausgabe erneut einer terim Test Package Update in Ei
den somit die Protokoll-Revisio derungen reagiert. Wird in einem Nachprüfung unterzogen werden. genleistung zu erarbeiten bzw.
nen 1 bis 9 erfasst. Prüflabor ein Antrag auf Prüfung ein Labor oder eine sonstige drit
eines Produkts mit einer Proto Mögliche Konsequenz der te Partei mit der Entwicklung zu
Im Rahmen der Bemühungen zur koll-Revision gestellt, die vom ge Verwendung von Interim beauftragen und die Testspezi
Harmonisierung der BACnet-Prü genwärtigen Testpaket nicht er Test Package Updates fikationen bei der BTL-WG zur
fungen in Europa und USA hat die fasst ist, konsultiert das Labor Durch die im BACnet-Stan Prüfung und Genehmigung ein
BTL-WG parallel zur Entwick die BTL-WG zur Bestimmung zu dard zahlreich definierten Op zureichen.
lung des neuen Testpakets Maß sätzlicher, über den Testplan hi tionen müssen Geräte, die d assel
nahmen zur besseren Regelung nausgehender Tests (Interim Test be BACnet-Geräteprofil erfüllen Gültigkeitsbereich von
der Prozesse getroffen und soge Package Update). Der Herstel und dieselbe Protokoll-Revision BIBB-Definitionen
nannte „Test Policies” verfasst. ler reicht bei der BTL-WG ei aufweisen, nicht unbedingt den Die BTL-WG befasst sich aktu
ne Dokumentation der in seinem gleichen Funktionsumfang bie ell mit einer weiteren entschei
Test Package Transition Policy Produkt umgesetzten BACnet- ten. Somit ist es möglich, dass denden Regelung, welche die
Eines dieser Dokumente ist die Funktionen zur Evaluierung des trotz identischem Geräteprofil Verwendung von BIBBs zum In
„Test Package Transition Poli gegebenenfalls zusätzlich entste und identischer Protokoll-Revi halt hat. Nach einer Vorgabe der
cy“, welche die Umstellung auf ei henden Testbedarfs ein. sion zweier Produkte eines nicht BTL sollen geänderte BIBB-Defi
ne neu veröffentlichte Version des Wird der vorliegende Testplan für geprüft und zertifiziert werden nitionen auch für niedrigere Pro
Testplans regeln soll. Um Her ein bestimmtes Produkt von der kann, während das andere bereits tokoll-Revisionen rückwirkend
stellern und Prüflaboren einen BTL-WG für unzureichend be zertifiziert ist. Die Implemen Gültigkeit haben. BIBBs sollen
fließenden Übergang beim Ein funden, obliegt es ihrer Verant tierung verschiedener Optionen somit stets eine eindeutige, Pro
satz eines neuen Testpakets zu er wortung, ergänzende Testspe kann für die beiden Produkte un tokoll-Revisionen übergreifende
möglichen, legt die BTL-WG mit zifikationen zu entwickeln. Bei terschiedliche Interim Test Packa Definition haben und von der in
einem Produkt realisierten Revi
sion des BACnet-Standards los
gelöst sein. Ziel ist die Förderung
der Interoperabilität zwischen
1
Thomas Kurowski ist Test Manager beim Prüflabor WSPLab, Voting Member der Arbeitsgruppe BTL-WG Produkten mit unterschiedlichen
und Mitglied der Arbeitsgruppe Technik der BIG-EU. thomas.kurowski@wsplab.de Protokoll-Revisionen. Aus die
Thomas Kurowski is Test Manager at the testing laboratory WSPLab, a voting member of the ser Regelung erwächst zugleich
BTL Working Group and a member of the Working Group Technique of the BIG-EU. thomas.kurowski@wsplab.de
die Forderung, dass Hersteller bei as the related BIBBs. In addition, tests. The BTL-WG may decide to test specifications. The manu
Veröffentlichung neuer Addenda corrections and improvements release an Interim Test Package facturer can contract a lab or
zum BACnet-Standard diese per have been made to the existing Update that covers only a subset another third party for this task.
manent hinsichtlich Definitions test definitions. Unlike previous of features documented in a The BTL-WG provides oversight
änderungen von BIBBs prüfen versions, the version number of protocol revision if the scope of the and ultimate approval of the test
und gegebenenfalls ihre Imple the test package now reflects the changes composing an addendum specifications.
mentierungen entsprechend aktu testable BACnet protocol revi to the BACnet standard is large.
alisieren. sions. The current test package This approach is meant to protect Scope of application
covers protocol revisions 1 - 9. the manufacturer from excessive of BIBB definitions
Mit der Prämisse, Definitionen waiting times. Another important policy that
bestehender BIBBs nur bei ent To harmonize testing efforts the BTL-WG is currently working
sprechender Notwendigkeit zu between Europe and the USA, the Where a product was certified on deals with the applicability of
ändern, ist das BACnet Standard BTLWG mandates test policies or listed based on a conform BIBBs. Following a BTL require
Komitee der ASHRAE (SSPC which regulate the testing process ance test using Interim Test ment, BIBB definition changes
135) bestrebt, derartige Modifi and usage of the test package. Package Updates, the manufac shall also be valid for lower
kationen auf eine überschaubare turer is obligated to re-submit protocol revisions. BIBBs shall
Anzahl von Ausnahmefällen zu Test Package Transition Policy his product for follow-up testing have an unambiguous definition,
beschränken. Dennoch lassen sie The Test Package Transition at the test lab within 3 months spanning protocol revisions and
sich nicht immer vermeiden, wie Policy mitigates the transition of publication of a new test be independent from the revi
die Auflistung auf Seite 47 aufzei to newly published test plans – plan. Provided the product did sion implemented in a product.
gen soll. a benefit to the manufacturers not undergo software or hard The goal is to promote interop
and testing laboratories. When a ware modifications, the lab erability between products with
Neben fachlichen Festlegungen, new test package is released, the would execute only the new tests different protocol revisions. As
die sich aus jener Regelung erge BTL-WG determines, in consul which were not covered by the a consequence, the manufac
ben werden, sind noch einige for tation with the testing laborato applied Interim Test Package turers would be required to track
melle Fragen offen. Beispielswei ries, a transition period where the Update. If the new test plan does BIBB definition changes each
se bleibt zu klären, welche Fristen manufacturer has the opportu not cover the protocol revision time an addendum to the BACnet
für Hersteller zur Anpassung ih nity to choose whether the old or implemented in the product, standard is published. The manu
rer BACnet-Implementierung the new test plan shall be applied the product would need to be facturer would update their
festgelegt werden sollten. to his product. The manufacturer re-submitted to the lab when the implementations where neces
can exercise his choice only if the subsequent test plan is published. sary to keep them in line with the
Nur mit einem großen Engage product to be examined claims latest BIBB definitions.
ment von zahlreichen BACnet- a protocol revision which may Potential consequences
Experten in der BTL-WG ist es be tested with the old test plan. resulting from the usage of It is the intention of the ASHRAE
möglich, bei den Konformitäts Otherwise the new test plan is to Interim Test Package Updates BACnet Committee (SSPC 135)
prüfungen mit der Entwicklung be applied. The numerous options defined to keep the number of BIBB defi
des BACnet-Standards Schritt in the BACnet standard allow nition changes as infrequent
halten zu können. Die Schaffung The transition period for BTL devices to comprise different as possible, but there are cases
fairer und marktgerechter Rege Test Plan 9 ended in March 2012. functional scope even if they where BIBB modifications seem
lungen ist eines der Ziele der BTL- support the same protocol revi appropriate. The list on page 47
WG. Die BTL-WG heißt Fachleu Protocol_Revision Test Policy sion and device profile. A product presents examples of BIBB redefi
te, die die Arbeitsgruppe in ihrer Considering that the BACnet may be testable and certifi nitions.
Bemühung zur Entwicklung des standard (currently at protocol able whereas another product
BTL Test Package unterstützen revision 13) will be at a higher supporting an identical protocol In addition to any technical issues
möchten, herzlich willkommen. revision than what is testable the revision and device profile is not. resulting from the requirement
question arises how to test prod The implementation of different of keeping products updated in
ucts claiming a revision higher options may require different accordance with current BIBB
BTL Test Plan Policy than 9. The BTL-WG created Interim Test Package Updates. It definitions, there are some proce
After resolving over 100 clar the Protocol Revision Test Policy is the device functionality and not dural questions to be addressed.
ification requests related to in response to this need and the device profile that determines One of these questions is: What
BTL Test Plan 5 and the corre market demand. When a test lab the testability and certifiably of time lines should be defined for
sponding test specifications, receives an application for testing a product. Therefore, a B-AAC adapting BACnet implementa
the BACnet Testing Laborato a product that claims a protocol with functionality missing from tions?
ries Working Group (BTL-WG) revision which is not covered by the current test package would
published version 9 of the BTL the current test plan, the test lab require the Interim Test Package It is the dedication of the
Test Package by the end of 2011. consults the BTL-WG to deter update whereas a B-BC with numerous BACnet experts that
The BTL Test Package consists mine appropriate test scope fully testable functionality could allows the conformance testing
of the BTL Test Plan, the BTL and the BTL-WG facilitates the be immediately tested and certi to keep pace with the develop
Checklist, the BTL Specified release of an Interim Test Package fied. It is important to note that ment of the BACnet standard.
Tests and other accompanying Update. To enact this policy the some missing functionality could Developing a fair policy is one
documents which are used to manufacturer submits documen take months to develop into a of the efforts of the BTL-WG.
supplement the BACnet Test tation of BACnet features imple releasable Interim Test Package The BTL-WG welcomes BACnet
Standard ANSI / ASHRAE 135.1 mented in his product to the Update. professionals willing to contribute
and define the scope and proce BTL-WG. to the working group’s efforts to
dures of BACnet conformance The BTL-WG endeavors to avoid develop the BTL Test Package.
testing The focus of the version If the BTL-WG considers the scenarios like these but cannot
9 Test Package was the creation current test plan insufficient for prevent them from happening.
of new tests for the Structured testing a specific product, the The manufacturer is encouraged
View, Trend Log Multiple and BTL-WG is responsible for devel to contribute by working with the
Event Log object types as well opment of the additional interim BTL-WG to develop the missing
• ANSI / ASHRAE Addendum l (Protocol Revision 9): • ANSI / ASHRAE Addendum ag (Protocol Revision 12):
» SCHED-I-B und SCHED-E-B » T-AMVR-A
Das Schedule-Objekt soll ein schreibbares Weekly_Schedule-Property Das Gerät muss die Verarbeitung des Dienstes
unterstützen. UnconfirmedEventNotification unterstützten.
Das List_Of_Object_Property_References-Property darf leer sein. The device shall support execution of the
The Schedule object shall support a writable Weekly_Schedule property. UnconfirmedEventNotification service.
The List_Of_Object_Property_References property may be empty.
BACnet Service Initiate Execute
» SCHED-E-B ConfirmedEventNotification x
Das List_Of_Object_Property_References-Property soll schreibbar sein. UnconfirmedEventNotification x
The List_Of_Object_Property_References property shall be writable. ReadRange x
ConfirmedEventNotification x ConfirmedEventNotification x
UnconfirmedEventNotification x UnconfirmedEventNotification x
ReadRange x ReadRange x
» T-ATR-B
Das Gerät muss die Generierung von
UnconfirmedEventNotification-Requests unterstützten.
The device shall support initiation of
UnconfirmedEventNotification requests.
• ANSI / ASHRAE Addendum af (Protocol Revision 13): Unterstützt ein Gerät AE-N-I-B, so muss es auch AE-INFO-B unterstützten.
» AE-N-I-B
Geräte, die weder Schreibzugriff auf Recipient_List-Properties erlauben Diese Forderung wurde von der BTL-WG schon vor dem Erscheinen von
noch Objekte vom Typ Notification Forwarder enthalten, müssen Addendum af als „BTL Requirement“ deklariert. Produkte, welche die
ConfirmedEventNotification-Requests nicht generieren können. Prüfung nach BTL Test Plan 5 oder BTL Test Plan 9 bestanden haben
Devices that contain only read-only Recipient_List properties and no bzw. bestehen, erfüllen dieses Kriterium bereits.
Notification Forwarder objects are not required to have the capability Devices supporting AE-N-I-B shall also support AE-INFO-B.
to initiate ConfirmedEventNotification requests.
Products that passed BTL testing with Test Plan 5 and 9, respectively,
BACnet Service Initiate Execute already fulfill this requirement.
ConfirmedEventNotification x (conditional)
UnconfirmedEventNotification x » AE-N-E-B
Bei Unterstützung von AE-N-E-B muss das Gerät entweder Schreibzu-
griff auf Recipient_List-Properties zulassen oder Objekte vom Typ Noti-
Im BTL Test Package 9 wird von der BTL die Schreibbarkeit von fication Forwarder unterstützen.
Recipient_List gefordert (BTL Requirement). Addendum af ist hierin Im BTL Test Package 9 wird von der BTL die Schreibbarkeit von
jedoch noch nicht berücksichtigt. Recipient_List indirekt durch die für AE-N-E-B vorausgesetzte
BTL Test Package 9 contains a BTL Requirement for writability of the Unterstützung von AE-N-I-B gefordert (s. oben). Addendum af ist
Recipient_List property. The test package does not consider Addendum hierin jedoch noch nicht berücksichtigt.
af yet. Devices claiming support for this BIBB shall either support Notification
Forwarder objects or support writable Recipient_List properties. BTL Test
Package 9 contains a BTL Requirement for writability of the Recipient_List
property. The test package does not consider Addendum af yet.
Die Virtuelle Leittechnik „VLTech“ von SE-Elektronic ist festigkeit und ist geeignet sophisticated firewall concept
eine innovative Portal-Lösung für ein leistungsstarkes für Hutschienenmontage im and access systems the high
Schaltschrank. Besonders est levels of security are gua
Energiemanagement-System.
macht das Gateway die Echt ranteed.
The virtual control system “VLTech” of SE-Elektronic is an zeituhr mit Pufferung über
innovative portal solution for a high-performance engergy integrierte Batterie und ei Benefits at a glance
management system. ne SD-Speicherkarte zur Si BACnet Communication
cherung der Konfigurations Cloud Computing
parameter. Weitere Features Energy Monitoring
sind die LED-Zustandsan Visualisation
Als zukunftsweisende Lö und Zugriffssysteme garan zeige der Kommunikation Data Security
sung bietet Cloud-Compu tieren höchsten Sicherheits und Systemzustände, sowie
ting die Möglichkeit der be standard. ein großer Spannungsbereich Integration via BACnet
darfsgerechten Nutzung von AC oder DC von 12-24V. Existing building services
IT-Ressourcen. „Gebäude Der Nutzen im Überblick technology can be easily con
leittechnik as a Service“ ist BACnet Kommunikation Mit der zukunftssicheren Ei nected to the virtual control
das Geschäftsmodell. Da Cloud-Computing genentwicklung des Betriebs system “VLTech” by using
durch entfällt beim Anwen Energie Monitoring systems bietet das Gateway BACnet gateway technolo
der die IT-Infrastruktur und Visualisierung einen hundertprozentigen gy. In the case of the GW-
der Zugriff auf die Daten Datensicherheit Schutz gegen Viren und Tro BC-SE connection is made
und Systeme erfolgt über das janer. Der integrierte WEB- via BACnet / IP, BACnet-PTP
Internet. Gebäudeleittechnik Integration durch BACnet Konfigurator sorgt für eine and / or BACnet MS / TP. All
wird als dynamisch nutz Mit dem BACnet Gateway optimale Einstellung der Sys relevant data are provisioned
barer Dienst (Rechenkapa ist eine einfache Anbindung temparameter. in the gateway so that they
zität, Datenspeicher, fertige der bisherigen Gebäudetech can be used immediately ir
Software und Applikation) nik an die virtuelle Leittech respective of whether there is
zur Verfügung gestellt. nik „VLTech“ möglich. Bei A leadingedge solution, cloud a higher level system or not.
dem GW-BC-SE erfolgt die computing allows the use of The data can be read and pro
Weltweit sind mit entspre Anbindung über BACnet / IP, IT resources whenever and cessed on a web GUI. Its ro
chender Zugangsberechti über BACnet-PTP und/oder however they are needed. bust design makes the gate
gung der Betrieb und die über BACnet MS / TP. Un “Virtual control technology way highly resistant against
Überwachung aller Anlagen abhängig vom konkreten for buildings as a Service” interferences or errors and
möglich. Die Kommunika Vorhandensein eines über is the business model under it can be easily mounted on
tion zwischen den Automa geordneten Systems wer lying it. Thanks to this ser DIN rails in the control cabi
tionsstationen und dem Re den alle relevanten Daten im vice, users no longer have to net. Special highlights of the
chenzentrum erfolgt über das Gateway bereits nutzungsfä establish their own IT infra gateway are a realtime clock
BACnet-Protokoll. Bestehen hig gespeichert. Die Daten structures. Data and systems and buffer thanks to an inte
de Systeme können über ein können über eine Webober are accessed through the in grated battery and an SD sto
BACnet-Gateway zusätzlich fläche gelesen und bearbei ternet. rage card to save configura
direkt aufgeschaltet werden. tet werden. Durch ein ro tion parameters. Additional
Ausgefeilte Firewallkonzepte bustes Industriedesign hat The building control techno features are an LED status
das Gateway eine hohe Stör logy is made available as a ser indicator for communication
vice which can be used dyna and system states and a wide
mically (computing po voltage range of 12 – 24 V AC
wer, data storage, rea or DC.
dy-to-run software and
application). Depending As the gateway runs on its
on assigned user rights own highly innovative pro
and authorizations, all prietary operating system it
systems can be operated is 100 % protected against
and monitored around bugs and Trojans. An inte
the globe. Communica grated WEB-configurator
tion between the diffe ensures optimal settings for
rent automation stations system parameters.
and computing center
is based on the BACnet
protocol. Additionally, SE-Elektronic GmbH
existing systems can be info@se-elektronic.de
Die virtuelle Leittechnik „VLTech“ von SE-Elektronic. connected via BACnet www.se-elektronic.de
The virtual control system “VLTech” of SE-Elektronic. gateways. Thanks to a
Trotz ihrer kleinen Abmes de Gerätetypen als BACnet gelstrategien beträchtliche requirements, even if they
sungen besitzen die Statio Version und als Version für Freiheiten. Die neuen Re change in the future. The
nen des Typs Trend IQ411 den Anschluss an ein Trend gelungsmodule, einschließ new controllers are ful
und IQ412 viele neue fort LAN verfügbar. Somit kön lich der Integratorfunktion ly compatible with earlier
schrittliche Funktionen. nen die unterschiedlichen und des virtuellen Energie generations of Trend con
Diese erleichtern die Instal Kundenwünsche und -an zählers, ermöglichen die trol and monitoring equip
lation, das Engineering und forderungen, auch wenn sich Überwachung des Ener ment and can be seamlessly
die Inbetriebnahme. Sie diese in Zukunft ändern soll gieverbrauchs. Der Ether integrated within existing
sind ideal für den Einsatz ten, erfüllt werden. Die neu net / TCP / IP Anschluss, die Trend BEMS.
in energieeffizienten, weit en Stationen sind vollständig Unterstützung der unter
verbreiteten Anwendungen, rückwärtskompatibel zu den schiedlichsten Browsermo Monitoring energy usage
wie Fußbodenheizungen, früheren Trend Leitstations- delle und die XML-Funk The IQ411 and 412 share
natürlichen Lüftungen und und Gerätegenerationen und tionen ermöglichen die the same flexible firmware
kleineren Lüftungsgeräten können somit nahtlos in ein Zusammenarbeit mit IT structure that Trend devel
geeignet. Trend GA-System integriert Systemen. oped for its last generation
werden. of controllers, which gives
Anpassung an considerable freedom to
Kundenwünsche Überwachung Though small in size, the the control strategy design
Standardmäßig sind die bei des Energieverbrauchs Trend IQ411 and IQ412 er. They also feature some
den Geräte IQ411 und 412 Die IQ411 und 412 nutzen both offer a combination new control modules, in
mit einem Ethernet An die gleiche flexible Firm of advanced capabilities. cluding an integrator func
schluss und einem integrier warestruktur wie die letz The versatile new units – tion and virtual heat meter,
ten Web-Server ausgestattet. te Trend Gerätegeneration which incorporate a range which together allow the
Zusätzlich sind bei und bieten dem Techniker of features that simplify in monitoring of energy us
beim Erstellen der Re stallation, engineering and age. The controllers’ Eth
commissioning - are ideal ernet / TCP / IP connectivity,
for energy efficient, multiple browser support
highly distribut and XML capability all fa
ed local control cilitate integration with IT
of services such as systems.
underfloor heating,
natural ventilation,
small air handlers
and air conditioning
terminal units.
Customization
Ethernet connectiv
ity comes as stand
ard on all variants of
the IQ411 and 412,
as does a web server.
In addition, there are
BACnet versions and Novar GmbH,
versions of the control Bereich Trend
lers that can be con harald.weber@
nected to a Trend LAN. trendcontrols.com
Trend BACnet Kompaktstation IQ41x This allows for different www.trendcontrols.com
Trend BACnet Unitary Controller IQ41x customer preferences and
ACnet-Netzwerke visualisieren,
B
integrieren und analysieren
Visualisation, Integration and Analysis
of BACnet Networks
Der FIS # BACnet Integrator von Hermos bietet Spezialisten B-OWS represented in the form of
wie auch unerfahrenen Anwendern einen einfachen und Für den Einsatz als generi a hierarchical tree and fil
sche B-OWS bietet der FIS # terable and sortable tables.
dennoch leistungsstarken Einstiegspunkt in die Welt der
BACnet Integrator zusätz Basically, all specified and
BACnet-Netzwerke. liche Merkmale, wie zum custom-defined object types
The FIS # BACnet Integrator of Hermos provides a simple Beispiel and properties can be dis
and yet powerful introduction into the world of BACnet Intuitive Bedienung played and edited.
Durchgängiges Alarm
networks for specialists as well as unexperienced user. handling Integration
Sichern & Wiederherstellen The FIS #BACnet Integrator
Komfortable Uhrzeit provides the opportunity
synchronisation to use a once imported net
Die Anwendungsmöglichkei Integration Kommunikationskontrolle work structure or an EDE-
ten des FIS#BACnet Integra Der FIS #BACnet Integrator Sicherheitsdienste file as a basis for the integra
tors reichen von der Verwen bietet die Möglichkeit, ei Dynamisches Erzeugen tion into the Building Man
dung als Browser, über die ne einmal eingelesene Netz und Löschen von Objekten agement System FIS # of Her
Integration von Neu- oder werkstruktur oder eine Anzeige historischer Daten mos or other workstations.
Bestandsanlagen, bis hin EDE-Datei als Basis für die aus Trendlog-, Trendlog Assigned object names can
zum Einsatz als generische Integration in das GLT-Sys multiple-, Eventlog- und be subject to an automatic
B-OWS. tem FIS # von Hermos oder File-Objekten. validation on the basis of a
andere Workstations zu nut freely defined specification.
Browser zen. Vergebene Objektna A review of objects accord
Mittels einer frei konfi men können auf Basis einer The applications of the FIS # ing to BACnet specifications
gurierbaren Suchfunkti frei definierbaren Vorgabe BACnet Integrator range in support of their proper
on können beliebige Netz einer automatischen Validie from the use as a browser, ties as well as their COV-P
werkstrukturen eingelesen rung unterzogen werden. Ei over the integration of new ability is also included. Fur
und visualisiert werden. ne Überprüfung der Objekte or existing installations, up thermore, a management of
Die Netzwerke, Geräte und gemäß BACnet Spezifikation to the use as generic B-OWS. existing BBMDs and FDs
Objekte werden sowohl in auf Unterstützung von Eigen within the network is also
Form eines hierarchischen schaften sowie deren COV-P Browser possible.
Baums, als auch in filter- Fähigkeit ist ebenfalls enthal Using a configurable search
und sortierbaren Tabellen ten. Darüber hinaus wird ein function, any network B-OWS
dargestellt. Grundsätzlich Management von im Netz structures can be imported The FIS #BACnet Integra
können sämtliche spezifi werk vorhandenen BBMDs and visualized. Networks, tor provides additional fea
zierten und benutzerdefi und FDs ermöglicht. devices and objects are both tures for the use of generic
nierten Objekttypen und – B-OWS, for example:
eigenschaften angezeigt und Intuitive operation
bearbeitet werden. Integrated alarmhandling
Backup & restore
Convenient time synchro
nization
Communication control
Life safety operations
Dynamic create and
delete object
Display of historical data
from Trendlog-, Trendlog
multiple-, eventlog- und
file-objects
HERMOS AG
info@hermos.com
Der FIS#BACnet Integrator. www.hermos.com
The FIS#BACnet Integrator.
Intelligente Fenstersteuerung
Intelligent Window Control
WindowMaster hat verschiedene MotorController entwickelt, die mit BACnet eine einfache
Einbindung elektromotorischer 24V-Fensterantriebe in die Gebäudeleittechnik ermöglichen.
WindowMaster has developed a range of MotorControllers that interface between
intelligent window actuators and the BMS systems through BACnet.
Verschiedene Funktionen
Die patentierte Systemlösung
MotorLinkTM von Window
Master ermöglicht u. a. das
digitale Motorenmanage
ment und die digitale Daten
kommunikation zwischen
der Gebäudeleittechnik, den Der BACnet MotorController von WindowMaster.
MotorControllern und den The BACnet MotorController from WindowMaster.
Fensterantrieben in einem
Gebäude. Die Technolo
gie beinhaltet alle Funktio BACnet MotorController The BACnet MotorController trapment when closing
nen, die den Anforderungen Die BACnet MotorController from WindowMaster (WBC reversing function to pro
an eine moderne und intel (WBC 16M) enthalten ein 16M 080B) for the control of tect weather seals
ligente Fassadenautomation 24V 16A Netzteil sowie ein up to 16 window actuators. fault indication
gerecht werden. Durch das oder zwei BACnet Modu online parameter set-up
breite Spektrum an Funktio le (WBA 11M). Jedes Modul Multiple functions
nalitäten bietet es viele Vor unterstützt BACnet IP sowie The unique technology ACnet MotorController
B
teile für den Systemintegra MS / TP und enthält mehr MotorLinkTM, developed The BACnet MotorControl
tor, den Bauherrn und den als 100 BACnet Datenobjek and patented by Window ler (WBC 16M) includes a
Nutzer. te, um eine flexible Integrati Master, ensures digital data 24V 16Amp power supply
on in die Gebäudeleittechnik communication to every sin unit and one or two BACnet
Die besonderen Funktionen zu ermöglichen. Versionsab gle window actuator in the MotorControl Modules
der MotorLinkTM-Technolo hängig kann die WBC 16M building. The large range (WBA 11M). Each mod
gie sind: bis zu 16 MotorLinkTM-Fens of functionality fulfills the ule supports BACnet IPand
exakte Positionskontrolle terantriebe ansteuern. Die requirements of modern fa MS / TP and contains more
und digitale Rückmel BACnet MotorCotroller cade design and lets the BMS than 100 BACnet data ob
dung jedes einzelnen kommen vor allem in beson supplier deliver a more ro jects to ensure a flexible inte
Fensterantriebs ders nachhaltigen und na bust, flexible, and intelligent gration in BMS systems. De
drei einstellbare, beliebi türlich belüfteten Gebäuden control solution to meet the pending on the type, WBC
ge Geschwindigkeiten zum Einsatz und sind auch individual project require 16M can control up to 16
Echtzeit-Synchronisation als Versionen für den Rauch- ments. MotorLinkTM window ac
zwischen bis zu vier An und Wärmeabzug erhältlich. tuators. BACnet MotorCo
trieben am selben Fenster The special features and trollers are typically used for
Reduzierung des functions in the Motor natural ventilation in sus
Einklemmrisikos Link™ technology are: tainable buildings. The Mo
beim Schließvorgang precise position control torController is also availa
des Fensters and actuator feedback ble for smoke ventilation.
Reversierungsfunktion three speed actuator oper
zum Schutz der Fenster ation
dichtungen genuine synchronisation WindowMaster A / S
digitale Fehlermeldung between multiple actua www.WindowMaster.com
Online-Einstellung von tors on the same window hcg.dk@windowmaster.com
Parametern reducing the risk of en
MBS bietet Lösungen und Rundum-Service für MBS offers you solutions and full services to satisfy
Sie und Ihre Kunden. Software- und Hardware- your customers. Software and hardware develop-
Entwicklung, OEM Produkte, Beratung, Schulung ment, OEM products, consulting, training and
und Betreuung. support.
Schnelle, einfache
BACnet-Projektabwicklung
Fast, Easy BACnet Project Processing
Trotz ihrer hohen Komplexi gesamte Systeme im Gebäu Mit den erweiterten Biblio its merits, right from the very
tät müssen Projekte der Ge demanagement unkompli theken können neuerdings beginning.
bäude- und Raumautomati ziert zu vernetzen und gezielt sogar ganze Anlagen und Sys
on rasch, leicht und günstig zu optimieren, setzt Sauter teme visualisiert und Anla Visualisation made easy
geplant wie umgesetzt wer seit dessen Anfängen darauf. genbilder der BACnet-Lösung For a fast response to BACnet
den. Mit Sauter CASE Suite einfach und in kurzer Zeit ge projects, Sauter CASE
Partner und dessen Lösungs Visualisierung neriert werden. Dies zum Bei Suite has both ready-made
bibliotheken stellt das Bas leicht gemacht spiel für das neue Sauter mo solutions and a solutions
ler Traditionsunterneh Für eine schnelle Lösung von duWeb Vision, den intuitiv library for room automation,
men seinen Kunden nicht BACnet-Projekten beinhal bedienbaren BACnet Web in order to address the trend
nur ein intelligentes Engi tet Sauter CASE Suite ne server. towards integrated building
neeringwerkzeug zur Verfü ben vorgefertigten Lösungen automation. At the same
gung, um diese Herausfor auch eine Lösungsbiblio Alle Bibliotheken basieren time, Sauter CASE Suite
derungen zu lösen, sondern thek für Raumautomation, auf den Sauter BACnet Pro also serves as a tool for the
auch seine 15-jährige Kom um dem Trend der integ jektierungs-Guidelines. Die commissioning and network
petenz und Erfahrung mit rierten Gebäudeautomation se Guidelines empfehlen, configuration of BACnet
dem BACnet / IP-Protokoll gerecht zu werden. Zudem wie der BACnet-Standard devices.
und erfolgreich realisierten dient die Sauter CASE Sui am besten in erfolgreiche
BACnet Projekten. te gleichzeitig als Werkzeug Projekte umgesetzt wird. With the expanded libraries,
für die Inbetriebnahme- und even entire installations
Weil der offene Kommunika Netzwerkkonfiguration von and systems can now be
tionsstandard es ermöglicht, BACnet-Geräten. Despite their high com visualised, and schematics
plexity, building and from the BACnet solution
room automation projects can also be generated easily
need to be planned and and quickly. This applies,
implemented quickly, easily for instance, to Suter’s
and cost effectively. With new moduWeb Vision, the
Sauter CASE Suite Partner BACnet web server that
and its solutions library, can be operated intuitively.
this established company, All libraries are based on
based in Basle, provides its Sauter BACnet engineering
customers with an intelligent guidelines. These guidelines
engineering tool to meet recommend how the
these challenges. This is also BACnet standard can best
supported by fifteen years be integrated into successful
of expertise and experience projects.
with the BACnet / IP protocol
and numerous successful
BACnet projects.
Multitalent mit B
ACnet
All-rounder with B
ACnet
Das Automationsgerät enteliTOUCH von Delta Controls Multiuser Kennwörter für and BACnet MS / TP for
unterstützt alle wichtigen BACnet Objekte und Dienste. restriktive Zugriffsteuerung room automation. BBMD
The automation device enteliTOUCH of Delta Controls einstellbare Zeitspanne für for up to 100 subnets and
Hintergrundbeleuchtung Web servers are of course al
supports all major BACnet objects and services.
unterstützt BACnet / IP, so on board.
BACnet MS / TP, BACnet
ZigBee With an available tempera
Firmware kann über das ture sensor, humidity sen
Das enteliTOUCH von Delta ACnet Broadcast Manage
B Netzwerk geladen werden sor and a motion sensor, it is
Controls ist ein BACnet Ge ment Devices (BBMD) für bis Schaltschrank- und Wand everything your heart desires
rät, das der „eierlegenden zu 100 Subnetze und Web montage, für Neubau- in the field of room automa
Wollmilchsau“ Konkurrenz server sind ebenso mit an und Sanierung tion. Even wireless sensors
macht. Als 7-Zoll-Touch Bord. Neben Temperatursen based on the ZigBee wireless
screen zur Visualisierung, sor, Feuchtesensor und Be protocols can be used.
als lokale Vorortbedienung wegungssensor finden auch The enteliTOUCH from
oder als Raumbediengerät, Wireless Sensoren aus Basis Delta Controls is a BACnet The user-friendly enteliTO
ist es ein multifunktionales ZigBee ihren Einsatz. device that competes with UCH can view the room oc
BACnet Automationsgerät. the so-called “Egg-laying cupancy, change the temper
Frei programmier- und visu Das enteliTOUCH kann be milk-producing woolen pig”, ature setpoint, visualize the
alisierbar unterstützt es al dienerfreundlich die Raum as they say in Germany. With floor plan, show CCTV vid
le wichtigen BACnet Objekte belegung anzeigen, den Tem its 7-inch touch screen, it can eo camera images and even
und Dienste für den täglichen peratursollwert verändern, be used to display building display the local weather
Bedarf: BACnet Alarme emp den Lageplan visualisieren, graphics for local operation forecast.
fangen und bestätigen, Trend die Videokamera aufschal or as a local room control
logs anzeigen und Zeitpläne ten und die Wettervorhersa panel. It is a multifunction Features
ändern, gleichzeitig aber auch ge anzeigen. al BACnet automation de B-OWS, B-OD, B-BC in
Anlagen in 3D wie auch in vice that is freely program one device
DIN Symbolgrafiken bedien Eigenschaften mable with fully customiz Attractive, modern design
bar machen, regeln, steuern, B-OWS und B-BC in Einem able graphics; it supports all to install in any location
überwachen und auch den attraktives, modernes Design major BACnet objects and Create custom 3D graph
Energieverbrauch anzeigen. kundenspezifische Grafiken services for everyday needs. ics using Delta Control’s
können direkt mit Deltas It has the ability to receive Illustrator drawing tool
Viele Funktionalitäten Illustrator erstellt werden and acknowledge BACnet Monitor and command
in einem Gerät überwachen und steuern alarms, show trend logs, BACnet objects such as In
Alles was BACnet Operator von BACnet Objekten change schedules and set puts, Outputs and Variables
Workstations und BACnet modifizieren von BACnet points, and at the same time Modify BACnet objects
Building Controller können Objekten wie Zeitpläne you can operate plants with such as schedules and cal
müssen, ist in einem Gerät und Kalender both 3D as well as DIN icon endars
vereint. Es nutzt BACnet / IP Alarme anzeigen und be graphics, while controlling, Display and acknowledge
zur Kommunikation zur MBE stätigen monitoring and also display alarms
und zu anderen DDC-Cont Trendlogs anzeigen ing energy consumption. A Show trendlogs and multi
rollern und BACnet MS / TP Sollwerte ändern, Ein- und true B ACnet “All-in-One”… trends
für die Raumautomation. Ausgänge überwachen Change system setpoints
Many features Multiple users and pass
in one device words for restricting access
Everything that BACnet Op Supports BACnet / IP,
erator Workstations and BACnet over Ethernet,
BACnet Building Control BACnet MS / TP commu
lers are supposed to do, the nication
enteliTOUCH does in one Designed for mounting in
device. It uses BACnet / IP Panel, wall, new and
to communicate to the Host retrofit locations
and other DDC controllers, Firmware can be flash
loaded over the network
Die Bauer Regelungssoftware zur gleichmäßigen Durch- big viele Bauer-Zonenregler DDC4200-L and DDC4400
mischung von Raumluft ist jetzt auf dem Automations- zugewiesen werden. So sind automation stations. It
auch für kleinere Projekte can be used after comple
system DDC4000 von Kieback&Peter verfügbar. Gesamtlösungen möglich. tion of a license agreement.
The Bauer control software for evenly mixing the air is Die Zonenregler kommuni Kieback&Peter’s weekly pro
now available for the automation system DDC4000 of zieren mit dem Hauptregler gram (BACnet scheduler) with
Kieback&Peter. auch dann, wenn sich diese its convenient graphical opera
in unterschiedlichen Teilnet tion was connected directly to
zen befinden. BAOPT®. All Kieback&Peter
software objects can be
used in conjunction with the
Der Vorteil der patentierten und DDC4400 ist BAOPT® The advantage of the patent BAOPT® software. This way,
Regelungssoftware BAOPT® als Softwareobjekt „Bauer- ed BAOPT® control software many flexible solutions are
liegt darin, dass sie die Raum Hauptregler und Bauer-Zo is that it mixes the air slowly possible. The BAOPT® system
luft langsam und gleichmä nenregler“ installiert. Es and evenly. Thus there are no can also serve as BACnet con
ßig durchmischt. Es gibt kei kann nach Abschluss einer more temperature stratifica figuration.
ne Temperaturschichtung Lizenzvereinbarung genutzt tions or temperature islands,
und Temperaturinseln mehr, werden. Das Kieback&Peter the air flow is reduced, the Flexible solutions
die Luftströmung wird ver Wochenprogramm (BACnet- comfort level is improved. The applied main controller
ringert und das Wohlbefin Scheduler) mit seiner komfor The energy consumption of Bauer software objects can
den verbessert. Zudem kann tablen grafischen Bedienung the ventilation system is re be assigned to many other
nicht nur der Energiever wurde direkt an BAOPT® duced as well. Thanks to the Bauer zone controller soft
brauch der Lüftungsanlage, angebunden. Zudem kön uniform temperature distri ware objects. In this way,
sondern dank der gleichmä nen alle Kieback&Peter Soft bution, the heating setpoint total solutions for smaller
ßigen Temperaturverteilung wareobjekte zusammen mit can also be reduced by 1 °C projects are possible. The
auch der Heiz-Sollwert um den BAOPT®-Objekten ver to 2 °C. Compared to con zone controllers communi
1 °C bis 2 °C gesenkt werden. wendet werden, wodurch sich ventional control technology, cate with the main control
Gegenüber konventionellen sehr flexible Lösungen erge BAOPT® saves 25 percent or ler, even if they are in differ
Regelungstechniken spart ben. Die Anlage kann auch more energy. ent subnets.
BAOPT® 25 Prozent oder als BACnet-Projektierung an
mehr an Energie. gelegt werden. Easy to use Kieback&Peter
BAOPT® is installed as soft GmbH & Co. KG
Einfache Bedienung Flexible Lösungen ware object “Bauer main con info@kieback-peter.de
Auf den Automationsstatio Den Softwareobjekten Bauer- troller and Bauer zone con www.kieback-peter.de
nen DDC4200, DDC4200-L Hauptregler können belie troller” on the DDC4200,
Umfassende Raumautomation
basierend auf BACnet / IP
Universal Room Automation
based on B
ACnet / IP
Siemens erweitert sein Gebäudeautomationssystem Desigo um
ein auf BACnet / IP basierendes Raumautomationssortiment.
Siemens extends its Desigo building automation and
control system within a room automation range based on
BACnet / IP.
Die neueste Aktualisierung die Empfehlung „BACnet dungsmanagement) verständ Raumordnung (BBR) auf
der rund 30 Empfehlun 2007“ und danach eine licher. „BACnet 2011“ erfasst Vorschlag des AMEV Ende
gen des Arbeitskreises Ma „1. Ergänzung 2009“ er alle von ASHRAE / ANSI 2009 eine Forschungsarbeit
schinen- und Elektrotechnik arbeitet. Nun hat AMEV freigegebenen Addenda (Er über anwendungsorientierte
staatlicher und kommunaler alle BACnet-Erfahrungen gänzungen) bis einschließlich Interoperabilitätstests beim
Verwaltungen (AMEV) be zusammengefasst und im BACnet-Revision 1.12 (Stand Aufbau herstellerneutraler
trifft das weltweit genorm Dezember 2011 als „BACnet Mai 2011). BACnet-Systeme in Auftrag
te BACnet-Protokoll. Hoch 2011“ veröffentlicht. gegeben. Der Schlussbericht
schulen, Kommunen und In der Praxis gelten die Ma des Forschungsprojektes liegt
andere Bauherren nutzen Deutliche Qualitäts nagement- und Bedien im Entwurf vor und soll auf
BACnet zunehmend, um de verbesserung einrichtungen (MBE) und der Homepage der BBR veröf
zentrale GA-Systeme liegen der BACnet 2011 die Automationsstationen fentlicht werden (siehe www.
schaftsübergreifend und her BACnet-Fachleute beschei (AS) als die wichtigsten bbsr.bund.de unter Zukunft
stellerneutral zu vernetzen nigen der vollständig über BACnet-Geräte. Hierfür de Bau: Suchwort BACnet ). Die
und damit z. B. ein zentra arbeiteten AMEV-Emp finiert die „BACnet 2011“ Ergebnisse wurden bereits
les Energiemanagement auf fehlung einen deutlichen jeweils zwei praxisorientier in der Empfehlung „BACnet
zubauen. Qualitätssprung gegenüber te Geräteprofile mit abge 2011“ berücksichtigt.
den früheren Empfehlun stuftem Leistungsumfang
Für das anspruchsvol gen. AMEV beschreibt alle (z.B. MBE-A und AS-B). Das Mit dem wissenschaft
le BACnet-Protokoll – die grundlegenden Aspekte des AMEV-Profil A umfasst al lich abgesicherten Test
DIN EN ISO 16484-5 vom BACnet-Protokolls auf 110 le Basis-Funktionen; das verfahren kann die Funk
März 2011 umfasst ca. Seiten in klarem Deutsch. AMEV-Profil B enthält nütz tionssicherheit bei der
700 Seiten englischen Text Beispiele machen komplexe liche Erweiterungen (z.B. Kopplung von BACnet-
– hatte der AMEV zunächst BACnet-Themen (z. B. Mel Trendfunktionen). Geräten unterschiedlicher
Hersteller künftig anwen
Wissenschaftlich dungsorientiert und mit ver
abgesicherter tretbarem Aufwand durch
Interoperabilitätstest unabhängige, GA-Fachleute
Das zentrale Ziel hersteller geprüft werden.
neutraler BACnet-Systeme ist
die Interoperabilität unter Kostenloser Download
schiedlicher BACnet-Geräte. Der AMEV hat Ende 2011
Bei der ersten Kopplung seinen Internetauftritt aktu
von BACnet-Geräten unter alisiert. Alle Empfehlungen
schiedlicher Hersteller wird des AMEV für BACnet / Ge
generell ein Interoperabili bäudeautomation, techni
tätstest empfohlen. Nur so sche Anlagen, Betriebsfüh
sind die Auswirkungen von rung etc. stehen unter www.
gerätespezifischen Interope amev-online.de kostenlos
rabilitätsproblemen frühzei zum Download bereit.
tig zu erkennen.
Einheitliche Anforderungen
an Planerqualifikation
Uniform Requirements for Planner Qualifications
Wie sieht das Anforderungs heitliches Mindestqualifi What are the requirements for minimum qualifications fra
profil für die Qualifikation kationsraster zur Zulassung the qualification of GA (Ge mework for admission of en
von GA-Planern aus, die in von Ingenieuren bei öffent bäude Automation / building gineers for public tenders, as
teroperable Gebäudeauto lichen Ausschreibungen, so automation) planners, who well as an evaluation catalog
mationssysteme unter dem wie einen Bewertungska are preparing interoperable for selecting planers. A mo
Einsatz neutraler Datenkom talog für die Auswahl von building automation systems del of the selection procedu
munikationsprotokolle vor Planern zu erstellen. Ein Mu with application-independent re is meant to facilitate the
bereiten? Um diese Frage zu sterauswahlverfahren soll data communication proto search for suitable consul
beantworten und in Zukunft die Suche nach geeigneten cols? To answer this questi tants. Also in planning, is to
eine einheitliche Projektver Ingenieurbüros erleichtern. on and to guarantee uniform provide a guide, which de
gabe zu garantieren, wurde Darüber hinaus ist geplant, procurement projects in the fines the minimum appropri
auf Initiative des Kompetenz allen Schulungsstellen einen future, a working group was ate requirements to all trai
kreises „BACnet im Deut Leitfaden an die Hand zu ge formed at the initiative of the ning venues. In this context,
schen Markt“ ein Arbeits ben, der die Mindestinhalte “BACnet on the German mar recommendations of existing
kreis gebildet. Die Vertreter entsprechender Qualifizie ket” circle of competence. The courses, which already meet
dieses Arbeitkreises, vor rungen definiert. In diesem representatives of this wor these requirements, should
rangig Vertreter öffentlicher Zusammenhang sollen auch king group, primarily repre be approached.
Bauherren und Ingenieurbü Empfehlungen bestehender senting public building ow
ros, aber auch Vertreter von Kurse, die diesen Anforde ners and engineers, but also The representative of the
Schulungseinrichtungen und rungen bereits entsprechen, representatives of training in “planner qualification” wor
ausführenden Firmen trafen ausgesprochen werden. stitutions and contractors met king group is Mario Betros
im Rahmen der BACnet An for the BACnet User Meeting (GAintegra – Engineering
wendertagung am 22. No Vertreter des Arbeitskreises on November 22, 2011 in company for building auto
vember 2011 in Frankfurt „Planerqualifizierung“ ist Frankfurt for the first time. mation and integration plan
zum ersten Mal zusammen. Mario Betros (GAintegra – ning), contact:
Ingenieurgesellschaft für Ge mario.betros@gaintegra.de
Leitfaden für bäudeautomation und Inte Guidelines for training
Schulungsstellen grationsplanung), Kontakt: venues
Der Arbeitskreis hat sich mario.betros@gaintegra.de The objective of the working
zum Ziel gesetzt, ein ein group is to create a uniform,
Abstimmungen zum bald erhältlichen Zertifizierungshandbuch, zur An- Consultations concerning the upcoming Certification Handbook,
meldung neuer BACnet Testlabore und zu einem weiteren Round Robin the registration of new BACnet test laboratories and a new Round
Test der Testlabore standen auf der Tagesordnung des Liaison Komitees, Robin Test of the test laboratories have been on the agenda of
dessen Mitglieder sich am 22. Januar 2012 in Chicago trafen. Weitere the Liaison committee. It’s members met on January 22nd, 2012 at
Themen waren die Koordinierung der amerikanischen und europä- Chicago. Further topics have been the coordination of the American
ischen Plugfests, der Austausch über anstehende Veranstaltungen und and the European Plugfests, information about upcoming events and
Ausstellungen und die gemeinsame Förderung von BACnet in China und exhibitions as well as the joint promotion of BACnet in China and
Asien. Die BIG-EU und BACnet International hatten das Komitee einge- Asia. BIG-EU and BACnet International had founded the committee
richtet, um die amerikanischen und europäischen BACnet Aktivitäten zu in order to harmonise the American and European BACnet activities
harmonisieren und globale Grundlagen für die Anwendung des BACnet and to develop a worldwide basis for the application of the BACnet
Standards zu entwickeln. Nach der Sitzung trafen sich die Repräsentan- standard (from left to right): Hans Symanczik, Carl Neilson, Andy
ten von BIG-EU und BACnet International zum Gruppenbild (v.l.n.r.): McMillan, Bruno Kloubert, Raymond Rae, Michael H. Newman,
Hans Symanczik, Carl Neilson, Andy McMillan, Bruno Kloubert, Raymond Frank Schubert, Natalie Nardonne, Brad Hill, Steven T. Bushby, Duffy
Rae, Michael H. Newman, Frank Schubert, Natalie Nardonne, Brad Hill, O’Craven, Klaus Wächter.
Steven T. Bushby, Duffy O’Craven, Klaus Wächter.
Willkommen in der BIG-EU We design open building- and so a lecturer for building au
process-automation (BACnet, tomation systems and build
Welcome to the BIG-EU LON, KNX and proprietary), ing information technology
security and video manage in the GEIT bachelor degree
ment-systems for industrial program at the HTW-Berlin,
integrationsplanerisch. Auf and real estate management, university of applied sciences
grund jahrzehntelanger Er hospitals, airports and data since 2005.
fahrung in diesen Bereichen centers. We basically work
bieten wir auch entsprechende as integration designer / engi
GAintegra Trainings an. Gemeinsam mit neers and combine the BMS,
Ingenieurgesellschaft für namhaften Unternehmens HVAC, security and video
Gebäudeautomation und beratern und Hochschuldo management-systems into
Integrationsplanung zenten schult GAintegra Teil one system with umbrella
mario.betros@gaintegra.de nehmer aus allen Bereichen functionality. We can offer OJ Electreonics A / S
www.gaintegra.com der Wirtschaft. trainings based on decades jba@oj.dk
of experience in these techni www.oj.dk
Der Inhaber Mario Betros ist cal areas. In partnership with
Wir planen offene Gebäude- BICSI zertifizierter Trainer leading consultants and aca
und Prozessautomatisierung für die Ausbildung von Da demics, GAintegra is teach OJ Electronics, gegründet
(BACnet, LON, KNX und ta Center Designer nach TIA ing participants from all sec 1964, hat seinen Hauptsitz in
proprietär) sowie Gefahren- 942. Er ist zudem seit 2005 tors of the economy. Sonderburg, Dänemark. Das
und Videomanagementsys Lehrbeauftragter für Auto Unternehmen entwickelt und
teme für Liegenschaften in matisierungstechnik sowie The owner of the company is fertigt Speziallösungen für
Industrie und Verwaltung, für Gebäudesystem- und Ge a BICSI certified trainer for HLK-Regler und -Leistungs
Krankenhäusern, Flughäfen bäudeinformationstechnik the training of data center de stufen. Eigene Forschung und
sowie Rechenzentren. Dabei im Studiengang GEIT an der signers according to, stand Entwicklung, kombiniert
arbeiten wir grundsätzlich HTW-Berlin. ard ANSI / TIA942. He is al mit modernster Technik,
Interoperabilität verbessern:
Plugfest in Dortmund BIG-EU
Plugfest
Improving Interoperability: 2012
Plugfest in Dortmund
Das Interesse der BACnet Because of the high interest of
Community am grenzenlosen the BACnet community in unli
Datenaustausch ist riesig. Des mited data exchange, the BIG-
halb wird die BIG-EU jetzt je EU decided to have an annually
des Jahr ein Plugfest in Europa Plugfest in Europe. This spring,
veranstalten. Diesen Frühling the developers and manufactu
treffen sich über 40 Entwick rers of BACnet products will
ler und Hersteller von BACnet meet from 02 until 04 May,
Produkten vom 2. bis 4. Mai 2012, at the Fachhochschule
2012 an der Fachhochschule (University of Applied Sciences
in Dortmund. Auf dem nun & Arts) in Dortmund, Germa
mehr 6. Europäischen BACnet ny. At the now 6th BACnet In
Interoperability Workshop ha teroperability Workshop, the
ben sie Gelegenheit, die Inte participants will have the op
roperabilität ihrer Produkte portunity to test the interope
mit Geräten anderer teilneh rability of their products with Vergangenes Jahr trafen sich die Entwickler und Hersteller
mender Hersteller zu testen – those from other attending von BACnet Geräten in Saarbrücken. Für dieses Jahr haben
auch innerhalb eines großen companies – also within a lar bereits 20 Herstellerfirmen ihre Teilnahme zugesagt.
BACnet Netzwerks. Die Tests ge BACnet network. The tests Last year, the developers and manufacturers of BACnet pro-
dienen der Verbesserung der may be used to improve the ducts met at Saarbrücken, Germany. For this year, already 20
BACnet-Implementierungen. BACnet implementations. manufacturer companies have confirmed participation.
BASview
BASrouter
Neu in unserem Sortiment:
● Der BASview: Ein Stand-Alone Gebäudecontroller für kleine bis
mittelgroße Automationsaufgaben. Steuert BACnet, Modbus und
LonWorks – ohne zusätzliche Lizenzgebühren!
● Das BASgateway: Ein Muss bei der Verwendung vieler verschiedener
Feldbusse. Integriert Modbus RTU & TCP Geräte in ein BACnet/IP
Netzwerk.
Das BACnet Forum Amsterdam am 9. Mai 2012 stellt die führende Rolle
der Niederländer in der offenen Gebäudeautomation unter Beweis.
Im Fokus steht die Zusammenarbeit mit öffentlichen Behörden.
The Dutch leading role in open building automation will be shown at the BACnet Forum
Amsterdam on May 9th, 2012. The Focus will be on cooperation with public authorities.
Immer mehr Behörden in Eu werden außerdem über den recommendation of AMEV “We will provide informati
ropa empfehlen BACnet als verbesserten BACnet Stan – the engineering group of on on the enhanced BACnet
Ausgangspunkt für offene dard und das weltweit har national, regional and local standard and the worldwide
Ausschreibungen. Folgen die monisierte Zertifizierungs authorities in Germany. harmonized certification sy
holländischen Behörden die verfahren informieren.“ Die stem.” The benefits of inte
sem Trend? Was müssen Vorteile der Interoperabilität “The exchange of the ne roperability will be presen
BACnet Nutzer über den glo werden anhand holländischer west capabilities of BACnet ted by means of reference
balen Kommunikationsstan Referenzprojekte verdeutli is a unique chance since our projects in the Netherlands.
dard der Gebäudeautomation cht. Die Teilnahme am Forum BACnet summit in Amster The participation in the fo
wissen? Die führende Rolle ist kostenfrei. Anmeldung dam in 2006” says Gijs rum is free. More informati
der Holländer in Sachen her und weitere Informationen de Koning, member of the on and application at www.
stellerunabhängige Gebäu unter www.bacnetforum.org. BIG-EU executive board. bacnetforum.org
demanagementsysteme zieht
BACnet Experten und Ent
wickler aus ganz Europa und
seit unserem letzten BACnet therlands. Jürgen Hardkop, Mechanical and Electrical
Engineering Working Party of
Forum in Amsterdam 2006“ Ministry of Economics in National, Regional and Local
Authorities in Germany
sagt Gijs de Koning, Mitglied North-Rhine Westphalia
des BIG-EU-Vorstands. „Wir will introduce the BACnet
for
Participationo costs
experts at n
Wednesday
October 17th
5. GebäudeEffizienz Hannover
Dialog 2012
Wednesday
October 24th
Cologne
Information. Application. Registration. www.gebaeudeeffizienz2012.de
The first thermal
energy calculator
with BACnet ®