NAME ROLE
Emmanuel Engineer
Rahamatullah Technician
Yaseen Technician
Personnel involved
Screw Driver, Rubber Hammer, Cotton Cloth,Heat tester, Flame TesterSmoke tester, Weigh Balance, Multi meter, Step Ladder, Pipe
Key Plant and Tools Required: Wrenches, Screw drivers, tapes, (all hand tools)
SCOPE OF WORK :- Inspection & Servicing of Fire Alarm & Fire Fighting Equipments.
1. Inspection & Servicing of Fire Extinguishers
a. Examined for obvious physical damage ,corrosion,leakage, clogged hose,handle damage,gauge
damage etc
b.Checking the weight using a weigh balance.
C. Shaking or Rolling DCP Fire Extinguisher to ensure the powder is not stuck inside.
d. Ensuring the safety seals and tampers indicators not broken or missing.
e. Update the date of next service due.
f. Operating mechanism to be free of damage.
g. Located in designated place.
h. No obstrucation to access or visibility
Corrective Action:-
When an inspection of any fire extinguisher reveals a deficiency in any of the condition listed in (h) & (g);
immediate corrective action shall be taken.
Rechargeable Fire Extinguishers:-
When an inspection of any rechargeable fire extinguisher reveals a deficiency in any of the condition listed
in (a),(b),(c),(d); it shall be subjected to applicable maintenance procedure with quotation.
2. Inspection & Servicing of the Fire alarm
The purpose of belwo mentioned method of statement is to explain the steps for the testing fire alarm
system. This procedure is to define the step by step method to implement the correct practices for the
testing of "fire alarm system"through the guidlines contained herein so as to ensure that the job execution
complies with the project requirments and serves the intended function to satisfactory level.
OPENNING
1. Keep the upstream side of the stop valve partially open. To avoid water flow to system side close the
system side stop valve. This valve is to be kept in open position after the
testing is completed.
2. Let any of the release devices to trip. This will result in sudden drop of water pressure in the deluge
valve top chamber which in turn will open the deluge valve. Close the upstream side stop valve
immediately.
RESETTING PROCEDURE
1. Close the upstream side stop valve provided below the deluge valve to cease the flow of water.
2. Open both the drain valves/ drain plugs and close when the flow of water has ceased.
3. Close the release device/replace the Sprinkler if release was through Sprinkler/ QB Detector.
4. Inspect and release if required, or close the section of the detection system subjected to “Fire
condition”.
5. In case of dry pilot detection system, open the air supply valve to build-up air pressure. Open the
priming valve fully. Open the upstream side of the stop valve provided below the Deluge valve. No water
should flow
into the system.
6. Where priming shut off valve (optional) is provided for
resetting, then the water need to be drained from upstream
side of valve
AFTER RESETTING
1. Drain valves must be kept closed
2. No leak or drip is detected from the drip valve
3. All the gauges except the system side water pressure gauge, should show the required pressure
4. There should be no leakage in the system
9. Safety/Eye Showers Inspection and testing
a. Check the conditions of the system ( leakage, damage ,etc)
b. Test the shower and ensure that the pressure is normal
c. Test the eye wash and check the pressure are okay
d. ensure the water is clean without any dirt or rust.
Temporary Supports and Props needed to To be assessed as work proceeds
facilitate the works:
Hazardous Substances:
1. Safety Helmet
Required Personnel Protective Equip: 2. Safety Glass
3. Safety Shoes
4. Hand Gloves
All work will be undertaken by qualified competent persons with experience of the type of work described above, and in all cases in full accordance with safety procedures
specified in the companies Health and Safety Policy.
METHOD OF STATEMENT