PERHIPARY WALLS
PREFUNCTION AREA
GREEN ROOMS
TOILET
VIP ROOMS WILL HAVE
HIGH PERFORMANCE CONCRETE
WHERE THE SLAB OF PRE FUNCTION
HALL IS LIKE A SHEAR WALL AND THE INTERIOR
AND EXTERIOR WALL IS ALSO SHEAR WALL
GROUND FLOOR
+2lvl
-0.30lvl
+1lvl
store room
+1lvl
-0.30lvl
+0.30lvl
A'
+0.30lvl
A
+0.30lvl
+0.30lvl +2lvl
+1lvl
vip lobby +0.30lvl
+0.30lvl
+0.30lvl
+0.30lvl
-0.30lvl
+1lvl
control room
+1lvl
-0.30lvl
+2lvl
+0.30lvl
MEZZANINE FLOOR
FROM THE STARTING OF THE MEZZANINE FLOOR
FIRST FLOOR
TO THE ROOF IS USED AS AN SPACE FRAMED
STRUCTURE.
IT IS FINISHED WITH THE ACOUSTIC PANELS
+8.5lvl
+4.20lvl
+4.20lvl
+8.5lvl
+4.20lvl
A' A
SERVICE AREA
+4.20lvl
+8.5lvl
+4.20lvl
+4.20lvl
YEAR - 4
SECTION - B
03
S
SHEET NO:
E w
DATE - 28 - 09 - 2020
N
SIGN AND
ARCHITECTURAL DESIGN
SCALE - 1 : 100 A0