TECHNICAL SITE SURVEY REPORT

Axiata (Bangladesh) Ltd [AKTEL]

Bangladesh

NSN PO: 01

SITE NAME: Abdul Barek Road

SITE ID: CTG0015

SITE ADDRESS: Hazi Nurul Alam, S/o: late Abdul Wadud, Nur Bhaban, Abdul Barek Road, P.S:
Pahartoli, Chittagong.

DATE OF SURVEY 25th March 2010

NMC CONTACT +88-01817181186

PARTICIPANT

NAME COMPANY CONTACT E-Mail Signature


Md. Nahidul Alam AXIATA 01819310065 nahidul@aktel.com

Md. Faruk NSN 01732268710 emohaza@live.com

Md. Ismail Hossain CEBL 01922278479 mamin_276@yahoo.com

Approved By Axiata: Approved By NSN:

Name: Name:

Signature: Signature:

Date: Date:

Customer: Axiata (Bangladesh) Ltd [AKTEL] SWAP BTS Technical Site Survey Report PAGE: 1
Site Name: Abdul Barek Road
Nokia Siemens Networks, All rights reserved. Version: 1.4
TABLE OF CONTENTS:

A. BTS swap summary report ……………………………………………………………………………………………………..3

B. Material requisition ………………………………………………………………………………………………………………..4

C. Standard Tools List For BTS Swap (Indoor) ……………………………………………………………………………..5

1.1. PURPOSE.....................................................................................................................................6

1.2. SCOPE .........................................................................................................................................6

1.3. SITE INFORMATION ....................................................................................................................6

1.4 Equipment Transportation and Handling……………………………………………………………………..…………6

1.5 BTS Room.....................................................................................................................................6

2. Network architecture from BTS to MSC with the location & transmission media ....................... 7

2.1 Type of transmission for existing BTS...........................................................................................7

3. Existing BTS Information...............................................................................................................8

3.1. Measurement for proposed BTS.........................................................................……………………...8

3.2. Antenna and Feeder cable Configuration....................................................................................9

3.3. Cable Tray....................................................................................................................................9

4. Power system details....................................................................................................................10

4.1. Details of existing DC power (Rectifier) supply system.............................................................10

4.2. Details of battery backup...........................................................................................................10

5. Space Requirements for NSN Equipment.....................................................................................11

5.1. Power requirements............................................................................................................11

5.2. Upcoming Power system (Rectifier) details...............................................................................11

6. Existing Deficiency: ................................................................................................................12

7. Indoor and outdoor Photograph................................................................................................13-16

8. Swap instruction...........................................................................................................................17

9. Observation & Recommendation................................................................................................17

Customer: Axiata (Bangladesh) Ltd [AKTEL] SWAP BTS Technical Site Survey Report PAGE: 2
Site Name: Abdul Barek Road
Nokia Siemens Networks, All rights reserved. Version: 1.4
A. BTS swap summary report:
BTS details: ERICSSON 900 MHz 1800 MHz
Existing site configuration (Base Rack 1) 4/4/4 N/A
Existing site configuration (Base Rack 2) N/A N/A
Existing site configuration (Base Rack 3) N/A N/A
Existing site configuration (Base Rack 4) N/A N/A
Planned site configuration (NSN) (Base Rack 1) 4/4/4 N/A
Planned site configuration (NSN) (Base Rack 2) N/A N/A
Planned site configuration (NSN) (Base Rack 3) N/A N/A
Planned site configuration (NSN) (Base Rack 4) N/A N/A

Action Point Summery Responsibility


Total no. of existing transmission link (Live link) 01 AXB
Hot swap is required No( Cold Swap) NSN
Difficulties in Equipment lifting NO NSN
House owner objection at night work NO Axiata
Indoor grounding issue NO Axiata
Outdoor grounding issue No Axiata
Maintenance time for swap BTS Based on agreed swap methodology Axiata
Traffic down time of power source change MW links Based on agreed swap methodology Axiata/NSN
Physical damage of any feeder cable NO Axiata
Confirmation of feeder marking OK Axiata
Lighting / Cooling isn’t proper NO Axiata
Immediate equipment transfer required after swap as NO NSN
no space is available at BTS room
Feeder Cable marking OK AXB/NSN

AXB ASSISTENCE:

1. PCM information data is required----AXB

2. Site access key is required----AXB

3. Physical/Logical parameter is required---- AXB

4. Emergency light is required —AXB.

Customer: Axiata (Bangladesh) Ltd [AKTEL] SWAP BTS Technical Site Survey Report PAGE: 3
Site Name: Abdul Barek Road
Nokia Siemens Networks, All rights reserved. Version: 1.4
B. Material requisition

SL No Item description Quantity Base Unit Responsibility


1 PCM & Alarm DDF(10M&10M) 1 Pc NSN
2 Battery Rack N/A Pcs NSN
3 AC Power Cable (MDB To Rectifier) 10 Mtr NSN
4 50 rm Blue DC Power Cable (Battery loop & Rectifier 17 Mtr NSN
Conn.)
5 50 rm Black DC Power Cable (Battery loop & Rectifier 17 Mtr NSN
Conn.)
6 Circuit Breaker in Rectifier with rating(63A) 2 Pcs NSN
7 Circuit Breaker in DCDB(6A) 3 Pcs NSN
8 Circuit Breaker in MDB(40A) 1 Pc NSN
9 Grounding Cable 44 Mtr NSN
10 Feeder Jumper Cable (3 m) N/A Pcs NSN
11 Feeder Jumper Cable (4m) N/A pcs NSN
12 Feeder Jumper Cable (6m) 6 Pcs NSN
13 PCM Cable (120 Ώ) 10m(4Pair) 1 Pc NSN
14 BTS Ext. Alarm Cable(10m) 1 Pc NSN
15 DCDB 1 Pc NSN
16 Ladder No Need Mtr AXB
17 Cable lux 25 rm 15 Pcs NSN
18 Cable lux 6 rm 15 pcs NSN
19 Cable lux 6 rm 10 pcs NSN
20 Cable Tie 4”, 6”, 10” 9 packets NSN
21 Cable Tie 12” 3 packets NSN
22 FCIA Cabinet(Capacity 24 TRX) 1 Pc NSN
23 Required TRX 12 Pcs NSN
24 Hit Sink Tube Black & Blue 12 Pcs NSN
25 White Channel 3” No Need Mtr NSN
26 25 rm Blue DC Power Cable (RBS & Rectifier Conn.) 12 Mtr NSN
27 25 rm Black DC Power Cable (RBS & Rectifier Conn.) 12 Mtr NSN

Customer: Axiata (Bangladesh) Ltd [AKTEL] SWAP BTS Technical Site Survey Report PAGE: 4
Site Name: Abdul Barek Road
Nokia Siemens Networks, All rights reserved. Version: 1.4
C. Standard Tools List For BTS Swap (Indoor)

TOOLS REQUIRED FOR BTS INSTALLATION Brand Importance Remarks


1 Site Master Standard Major
2 Digital Camera Standard Major
3 Digital Multi Meter Standard Major
4 Heat Gun Standard Major
5 Vacuum cleaner Standard Major
6 Krone puncher Standard Major
7 Water Level Meter Standard Major
8 Measuring Tape Standard Major
SPANNER:- 6-8,10-11,12-13,14-15,16-17,18-19,20-22,24-
9 26,32-36. Standard Major
10 TIE CUTTER Standard Major
11 CABLE CUTTER Standard Major
12 KNIFE Standard Major
13 SCREW DRIVER SET Standard Major
14 NOTCH PLUS Standard Major
15 CUTTING PLUS Standard Major
16 COMPUS Standard Major
17 SLIDING Wrench Standard Major
18 Allen KEYS(FULL SET) Standard Major
19 HAMMER Standard Major
20 Torque Wrench (FULL SET) Standard Major
21 FILE Standard Major
22 HACKSAW Standard Major
23 Drill Machine with Hammering & Iron Bit Standard Major
24 T10 Standard Major
25 T20 Standard Major
26 T25 Standard Major
27 Crimping tools set for cable lugs Standard Major
28 Soldering Iron Standard Major
29 Cable Stripper Standard Major
30 Earth Tester Standard Minor
31 Multi Plug with extension cable Standard Major
32 LAN RJ45 puncher Standard Major
33 Tester, Scissor, Marker Pen etc. Standard Major
34 Anti static-wrist strap Standard Major `
35 Feeder Connector Making tool Standard Major
36 Flashlight/ Necessary Lighting arrangement Standard Major
37 Socket Wrench Set Standard Major
38 Protective gloves Standard Major
39 Ladder Standard Major

Customer: Axiata (Bangladesh) Ltd [AKTEL] SWAP BTS Technical Site Survey Report PAGE: 5
Site Name: Abdul Barek Road
Nokia Siemens Networks, All rights reserved. Version: 1.4
1.1 Purpose: This document describes the present conditions on the site at the time of the survey date
and defines the needed changes.

1.2 Scope: This report covers only the Flexi BTS network equipments and power system.

1.3 Site information:

GPS Co-ordinates N: 22.35872 E: 091.78765


Site Location: Abdul Barek Road, P.S: Pahartoli, Chittagong.

Building type: 4 Stored


Existing type of site with tower GF: GFRT:
height (m): Rooftop Others:
Building + Tower height (m) 16+6=22m
Property Owner:  +88
Security guard available: Yes No Yes
Keys and permits from: Local Key is needed and Permission is taken  +88 01
from Regional Office (Aktel), Akteruzzaman
center, Chittagong
Other contact persons:  +88 01
Non - Working hour restrictions: Yes No
Remarks:

1.4 Equipment Transportation and Handling

Roads to the site suitable for transportation Yes No


Equipment easy access at site Yes No
Room available for equipments delivery/ storage Yes No
BTS Access Stairs Goods Lift
Others
Unpacking can be done inside Yes No
Remarks:

1.5 BTS room

Is there a raised floor? Yes No


Raised floor dimensions Length: cm Width: CM
Lighting requirements: Yes No
All the light working Yes No
properly
Emergency light available Yes No
Fire fighting system Yes No
available
Remarks: Emergency light is required for swap night.

Customer: Axiata (Bangladesh) Ltd [AKTEL] SWAP BTS Technical Site Survey Report PAGE: 6
Site Name: Abdul Barek Road
Nokia Siemens Networks, All rights reserved. Version: 1.4
2. Network architecture from BTS to MSC with the location & transmission media:

MSC ID: CM14 MSC ID:CM14 BSC ID: CB47 MW with MW with

Location: Location: Location: Monsurabad South Pahartoli


Akteruzzaman Akteruzzaman
center center

BTS With MW with MW with

Abdul Barek Saraipara Pahartoli


Road

2.1. Type of transmission for existing BTS.

Optical fiber multiplexer Microwave radio others……………………

Transmission for BTS Base Rack 1,900/1800 Base Rack 2, 900/1800 Base Rack 3, 900/1800 Base Rack 4, 900/1800
Manufacturer Alcatel-1
Capacity (Terminated 16E1
in DDF)
Capacity Available 15E1
Interface (120/75Ω) 120 Ohm
E1 with Site name for 1st E1: Abdul Barek Road- st
1 E1:
st
1 E1:
st
1 E1:
BTS PCM related Sarai para
DDF
2nd E1: nd
2 E1:
nd
2 E1:
nd
2 E1:

rd rd rd rd
3 E1: 3 E1: 3 E1: 3 E1:
th th th th
4 E1: 4 E1: 4 E1: 4 E1:
th th th th
5 E1: 5 E1: 5 E1: 5 E1:
th th th th
6 E1: 6 E1: 6 E1: 6 E1:
th th th th
7 E1: 7 E1: 7 E1: 7 E1:
th th th th
8 E1: 8 E1: 8 E1: 8 E1:
Remarks

Proper marking on Transmission equipments Yes No Others


Number Of Existing Transmission Links (Only Live links) 1
Traffic down time of power source change MW links Based on agreed swap methodology

Customer: Axiata (Bangladesh) Ltd [AKTEL] SWAP BTS Technical Site Survey Report PAGE: 7
Site Name: Abdul Barek Road
Nokia Siemens Networks, All rights reserved. Version: 1.4
3. Existing BTS Information

Manufacturer BTS type/ Model Serial Number Configuration BTS Dimension Power Comments
(H x D x W)mm Consump (mention the
tion Base rack)
Ericsson RBS 2216 /900 A535008173 4/4/4 950x520x600 +24V/250A Base rack-1

Ericsson/ Huawei/ ………..…….……900


Alcatel ………………….1800
Ericsson/ Huawei/ ………..…….……900
Alcatel ………………….1800
Ericsson/ Huawei/ ………..……….…900
Alcatel …………….……1800

3.1. Measurement for proposed BTS:


(All cable measurement must be through cable ladder)

BTS 900 BTS 900/ 1800 BTS 900/ 1800 BTS 900/ 1800
Ladder available above the proposed BTS cabinet: Yes No Yes No Yes No Yes No
Indoor feeder connector to Proposed BTS length : 6M
Length from GB to proposed BTS: 12M
Length from proposed BTS to Rectifier: 12M
Proposed DDF to BTS length: 10M
Length of GB to proposed DDF: 10M
Distance between transmission existing DDF to 10M
proposed DDF:
Distance between Alarm DDF to Proposed BTS: 10M
Remarks:

Customer: Axiata (Bangladesh) Ltd [AKTEL] SWAP BTS Technical Site Survey Report PAGE: 8
Site Name: Abdul Barek Road
Nokia Siemens Networks, All rights reserved. Version: 1.4
3.2. Antenna and Feeder cable Configuration:

Description Antenna Antenna Azimuth Tilt Feeder Indoor Indoor Cable Label
type height (Magnetic Cable Jumper Jumper damaged ing
(m) North) size cable size cable
length
Sector 1, 900 Single Band 23m 80º 6º 7/8” ¼” 5m NO OK
Single Band
Sector 2, 900 23m 180º 6º 7/8” ¼” 5m NO OK
Single Band
Sector 3, 900 23m 280º 6º 7/8” ¼” 5m NO OK

Sector 1, 900 N/A N/A N/A N/A N/A N/A N/A N/A N/A
extra
Sector 2, 900 N/A N/A N/A N/A N/A N/A N/A N/A N/A
extra
Sector 3, 900 N/A N/A N/A N/A N/A N/A N/A N/A N/A
extra
Sector 1, 1800 N/A N/A N/A N/A N/A N/A N/A N/A N/A
Sector 2, 1800 N/A N/A N/A N/A N/A N/A N/A N/A N/A
Sector 3, 1800 N/A N/A N/A N/A N/A N/A N/A N/A N/A
Sector 1,1800 N/A N/A N/A N/A N/A N/A N/A N/A N/A
extra
Sector 2,1800 N/A N/A N/A N/A N/A N/A N/A N/A N/A
extra
Sector 3,1800 N/A N/A N/A N/A N/A N/A N/A N/A N/A
extra
Remarks:
(Mention
required 6 Pcs 6m 1/2" jumper cable need for new Flexi BTS (900)
indoor jumper
cable length
for new BTS)

3.3. Cable Tray:

Re- use the existing cable tray Yes No


Remarks:

Customer: Axiata (Bangladesh) Ltd [AKTEL] SWAP BTS Technical Site Survey Report PAGE: 9
Site Name: Abdul Barek Road
Nokia Siemens Networks, All rights reserved. Version: 1.4
4. Power system details

Incoming AC mains Phases: 3Φ MCB rating: 63 A


Spare circuit breaker in MDB (3 Φ) No
Required circuit breaker in MDB 40 A-1 Pc
Main grounding Yes No
Generator Available: Yes No
Remarks
4.1. Details of existing DC power (Rectifier) supply system

Rectifier 1 Rectifier 2 Rectifier 3


Manufacturer Ericsson PBC-6500
DC output voltage (V) +24V,-48V
No. of installed Module 05
Option available for additional 11
module
Module rating 1200 W
Existing output current (A) [From No Display
display]
Load capacity (Including Batt. No Display
Charging)
% set for Batt. charging 10 A (10%),15.5A(10%)
Capacity available No Display
Spare circuit breaker/ Fuse with No
rating
Required circuit breaker in rectifier 63 A-2 Pcs
Required circuit breaker in DCDB CB-6 A(3Pcs)
Remarks

4.2. Details of battery backup

For Rectifier 1 For Rectifier 2 For Rectifier 3


Manufacturer Northstar, Compact
Power
Battery capacity (Ah) 9100
Ah,12V),(155Ah,6V)
No of Banks 3+3=6
Distance between GB to proposed 12M
rectifier through cable ladder
Distance between GB to proposed 10M
DCDB through cable ladder
Distance between battery to 15M
proposed rectifier
Distance between MDB to proposed 10M
rectifier
Remarks

Customer: Axiata (Bangladesh) Ltd [AKTEL] SWAP BTS Technical Site Survey Report PAGE: 10
Site Name: Abdul Barek Road
Nokia Siemens Networks, All rights reserved. Version: 1.4
5. MEASUREMENT OF NSN EQUIPMENT

Element Name Qty Dimension (H x D x W) Weight (KG) Comments


Flexi BTS Cabinet 1 1800 x 600 x 600 62 Only cabinet
Flexi BTS module 1 133 x 422 x 447 9.3 System Module
Flexi BTS 2/2/2 1 1800 x 600 x 600 138 Including FCIA Cabinet
Flexi BTS 4/4/4 1 1800 x 600 x 600 171 Including FCIA Cabinet
Flexi BTS 8/8/8 1 1800 x 600 x 600 247 Including FCIA Cabinet

Property Required Clearance


Front of the BTS cabinet 900 mm (35.4 in.)
Behind the BTS cabinet 50 mm (2.0 in.)
Behind the BTS cabinet (with maintenance space in the back) 500 mm (19.7 in.) with side access
Above the BTS cabinet 300 mm (11.8 in.)
Front of the Rectifier cabinet 500 mm (19.7 in.)
Behind the Rectifier cabinet (with maintenance space in the back) 50 mm (2.0 in.)

5.1. Power requirements

Element Name Configuration Power (W) Voltage (V) DC Comme


Consumption Breakers nts
(A)
Flexi BTS 900 2/2/2 1055 -48v 32A
4/4/4 2120 -48V 50A
Flexi BTS 1800 2/2/2 1160 -48v 32A
4/4/4 2360 -48v 63A

5.2. Upcoming Power system (Rectifier) details:

Manufacturer ELTEK
Model Flatpack2 HE
Rectifier Configuration -48V, 16KW (Max.)
Configuration per module 2000W, 41.7A, 48Vdc
Efficiency Up to 96.5%
Module offered 4 module
Total module capacity 8 modules.
MCBs/Fuses to connect battery bank 4 × 250A
Circuit Breaker in LLVD (Load low voltage disconnect) 5 × 100A SP FUSE/MCB 1 × 63A SP FUSE/MCB
Circuit Breaker in BLVD (Battery low voltage disconnect 2 x 63A SP Fuse/MCB 2 x 32A SP Fuse/ MCB
2 x 10A SP Fuse/ MCB

Customer: Axiata (Bangladesh) Ltd [AKTEL] SWAP BTS Technical Site Survey Report PAGE: 11
Site Name: Abdul Barek Road
Nokia Siemens Networks, All rights reserved. Version: 1.4
6. EXISTING DEFICIENCY:

Outdoor grounding cable available Yes No Comments:


Indoor grounding cable available Yes No Comments:
Tube light working properly Yes No Comments:
All modules in rectifier is working Yes No Comments:
AC is functioning Yes No Comments
Main power is available Yes No Comments:
Site Access at night Yes No Comments:

Customer: Axiata (Bangladesh) Ltd [AKTEL] SWAP BTS Technical Site Survey Report PAGE: 12
Site Name: Abdul Barek Road
Nokia Siemens Networks, All rights reserved. Version: 1.4
7.1. Photograph as seen facing side A- Side B corner

7.2. Photograph as seen facing side B – Side C corner

Customer: Axiata (Bangladesh) Ltd [AKTEL] SWAP BTS Technical Site Survey Report PAGE: 13
Site Name: Abdul Barek Road
Nokia Siemens Networks, All rights reserved. Version: 1.4
7.3. Photograph as seen facing side C – Side D corner

7.4. Photograph as facing side D (entrance) - Side A corner

Customer: Axiata (Bangladesh) Ltd [AKTEL] SWAP BTS Technical Site Survey Report PAGE: 14
Site Name: Abdul Barek Road
Nokia Siemens Networks, All rights reserved. Version: 1.4
7.5. Indoor Pictures:

MDB
Breakes

Proposed
Existing
Flexi BTS In
Ericsson
Place of
RBS2216
Ericsson RBS

Proposed
Rectifier

Proposed
DDF

Feeder with
Proposed
jumper
DCDB
connector

Customer: Axiata (Bangladesh) Ltd [AKTEL] SWAP BTS Technical Site Survey Report PAGE: 15
Site Name: Abdul Barek Road
Nokia Siemens Networks, All rights reserved. Version: 1.4
Battery
PBC 6500 Battery
Bank
Rectifier Modules Bank

7.6. Outdoor Pictures:

8. Swap instructions:

Customer: Axiata (Bangladesh) Ltd [AKTEL] SWAP BTS Technical Site Survey Report PAGE: 16
Site Name: Abdul Barek Road
Nokia Siemens Networks, All rights reserved. Version: 1.4
Step 1:
Before entering inside the BTS room, inform the NMC about entrance and write down the names of all the team members
with designations, ID, Mobile numbers, In time, signatures etc in the site register.

Step 2:
As this will be a Cold swap, first of all unpack & put the new NSN flexi BTS on the floor near the proposed place and install
DDF to the proposed locations. Here are two existing Ericsson BTS cabinets (900 & 1800) and the new NSN Flexi BTS will be
replaced with Ericsson 1800 cabinet. So, disconnect the jumpers from 1800 cabinet and take the values of VSWR and DTF.
Then we Connect jumper cable With new flexi BTS. After Install the BTS we should install new rectifier in the proposed
place, then battery connection will be made using the existing Battery. Every battery bank will contain 4 batteries in series
to make a 48 volt batteries bank. Then we install the DCDB in the proposed place & connect the power cable from Rectifier
to DCDB. After install the DCDB & Rectifier, we remove MW power from the Existing rectifier and this connection will be
install in DCDB.

Step 3:
Connect all the PCM and alarm cables (new BTS – new DDF and existing TX Rack - new DDF). Switch on the new BTS and
configure the new Flexi BTS will go to operational mode.

Step 4:
Now disconnect the jumpers cables from Ericsson 900 cabinet and take the values of VSWR and DTF. Do the necessary
configurations of NSN Flexi BTS for 900 part. Now the both parts of 900 & 1800 of new BTS are in operational mode.

Step 5:
Remove the existing Ericsson BTS 900 & 1800 carefully and place the new NSN Flexi BTS there. After completing the
installation work, pack the dismantled equipments and clean the BTS room properly.

Step 6:
Turn off the lights, turn on the AC if it was turned off during work, write down Out-time in the site register book, lock the BTS
room, inform the NMC and then leave the site.

9. Observation & Recommendation

1. Emergency Light is required at Swap Period.


2. Required Circuit Breaker in Rectifier –63 A(2Pcs)
3. Required Circuit Breaker in DCDB—6 A (3 Pcs)
4. Required Circuit Breaker in MDB—40A (1 Pc)

Customer: Axiata (Bangladesh) Ltd [AKTEL] SWAP BTS Technical Site Survey Report PAGE: 17
Site Name: Abdul Barek Road
Nokia Siemens Networks, All rights reserved. Version: 1.4

Das könnte Ihnen auch gefallen