Sie sind auf Seite 1von 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

NOTE:
DOOR WIDTH
1. DIMENSION ARE IN MILLIMETERS UNLESS OTHERWISE
25 25
125 840 125 INDICATED. DIMENSIONS INDICATED IN THE DRAWING ARE
A APPROXIMATE. ACTUAL SIZES COULD VARY AT THE SITE. IT IS A
CONTRACTOR'S RESPONSIBILITY TO CHECK THE ACTUAL

125
SIZES AND DO THE MINOR CHANGES ACCORDINGLY.FOR
DETAILS OF IRON MONGERY, REFER SCHEDULE OF DOOR
HARDWARE SETS AND MASTER SCHEDULE OF DOOR
ART WORK ON HARDWARE, FITTINGS AND ACCESSORIES.

25
TIMBER BACK PANEL
650

600
2. DOOR HEIGHT AND WIDTH TO BE VARIED AS PER THE DESIGN
(REFER DOOR SCHEDULE)
25

ENGINEERED TIMBER ARCHITRAVE


B B
125
Eq.

Eq.

1mm THICK DECORATIVE


STAINLESS STEEL PLATE DOOR SASH DETAIL
01. THICKNESS 40mm
3020

02. SIZE 692(W) x 2032(H)


LONG PULL HANDLE 03. STILE 32(T) x 50(W)mm HARDWOOD WITH MIN DENSITY 650kg/m³
C C
Eq.

04. TOP, BOTTOM &


32(T) x 50(W)mm HARDWOOD WITH MIN DENSITY 650kg/m³
INTERMEDIATE RAIL
DOOR HEIGHT

05. LOCK BLOCK 32(T) x 50(W)mm HARDWOOD WITH MIN DENSITY 650kg/m³
06. DOOR CORE 32mm PARTICLE BOARD WITH MIN DENSITY 600kg/m³
1000

07. FACE 3.6(T)mm MR PLYWOOD / ENGINEERED WOOD


5mm THICK & 3mm DEEP 5mm THICK & 3mm DEEP 08. LIPPING 10(T) x 40(W)mm TEAK LIPPING
Eq.

STAINLESS STEEL INSERTS STAINLESS STEEL INSERTS 09. FINISH 0.5mm TIMBER VENEER AS SPECIFIED
10. VISION PANEL N/A
11. GLASS BEADING N/A
D D
12. ART WORK BACK
18mm THICK ENGINEERED TIMBER
PANEL
Eq.

Eq.

BLOCK 5C

FFL. FFL. ZONE 4C ZONE 4D ZONE 6C ZONE 6D

CEILING LEVEL BLOCK 5B

OUTSIDE ELEVATION INSIDE ELEVATION 3000 - FROM FINISH FLOOR LEVEL DETAIL - C7 ZONE 4B ZONE 4A ZONE 6B ZONE 6A

BLOCK 5A

ML-02-80540
2 ELEVATIONS TIMBER ARCHITRAVE
ZONE 3C ZONE 3D
ZONE 9B
ZONE 7C ZONE 7D

E - Scale 1:25 E
ZONE 9A
ZONE 3B ZONE 3A ZONE 7B ZONE 7A

ZONE 1B ZONE 1C

ART WORK ON ZONE 2B ZONE 2A ZONE 8B ZONE 8A

9mm THICK PLYWOOD BACKING


ZONE 1A

DETAIL - C6
ML-02-80540 KEY PLAN

F TEAK VENEERED ENGINEERED F


A

ARCHITRAVE HEIGHT
Rev. Date Desd. Description Drwn. Chk'd App'd
-
HARDWOOD PANEL
This drawing was prepared by CECB based on Architectural design drawings prepared by M/s Muditha Jayakody Associates Pvt.
Ltd, who was the Main Consultant/Architectural Consultant for Defence Headquarters Complex Project, Akuregoda till 30.09.2016.

DETAIL - C8

FINISH OPENING HEIGHT 2100mm


5mm THICK & 3mm DEEP Client DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA
IN STAINLESS STEEL INSERTS MINISTRY OF DEFENCE

DOOR OPENING HEIGHT


ML-02-80540

DOOR FRAME HEIGHT


Project
940 DEFENCE HEADQUARTERS COMPLEX - AKUREGODA
45
80

Project Management & Procurement


200

PROJECT MANAGEMENT UNIT OF THE ARMED FORCES

Architectural Consultant (with effect from 01-10-2016)

OUT LONG PULL HANDLE CENTRAL ENGINEERING CONSULTANCY BUREAU


G (BACK TO BACK FIXING) G
A Engineering , Quantity Surveying & Construction Management

-
DOOR OPENING WIDTH CENTRAL ENGINEERING CONSULTANCY BUREAU
415, Bauddhaloka Mawatha, Colombo 07.
DETAIL - C2 TEL : 0112668800 FAX: 0112687369
DOOR FRAME WIDTH Construction by
ML-02-80537
CONSTRUCTION MANAGEMENT UNIT OF THE ARMED FORCES
FINISH MASONARY OPENING WIDTH 900mm Drawing Title
MAIN BUILDING
BLOCK 02
OUT SIDE IN SIDE
WOODEN DOORS FOR SPECIALIST AREAS
DOOR DETAIL - TYPE C
Designed Recommended
YGAD ...............................................
DETAIL - C3 Drawn WMN / KKD
CONSULTANT ARCHITECT / SENIOR ARCHITECT
H Approved H
........................................
ML-02-80537 Checked TOT DGM (Architectural)
Submitted Scale Date Status
TGRS 1:25 23.12.2020
1 PLAN 3 SECTION - A CAD File P:\02_Bldgs\01_MB\MB_AR\ARPrint\TI\DETAILS\TIMBER DOORS\Block 2 TEN
- Scale 1:25 - Scale 1:25 Sheet Size Drawing No. Rev. No.
This drawing is sole property of CECB. Data contained on this drawing shall not to be used, reproduced, duplicated in whole or part without the A3 DHQC-CECB-MB-TI-AR-DW-ML-02-80536 -
prior permission of CECB. CECB shall not be held responsible for the unauthorized use of this drawing on Projects other than for which it was used.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 23 December 2020

Das könnte Ihnen auch gefallen