Sie sind auf Seite 1von 5

IRIS/WS/FORMS/INS/CRANE-01

TYRE MOUNTED CRANE INSPECTION SHEET

Mobile Crane -50T

VEHICLE DETAIL: -Mobile Crane, NK-


23830
500EV
LOCATION: - Shimsima Project CAPACITY: - KATO 50T, MFG Year 2002

Last Maintenance Record Not Available


Engine Oil Pressure Ok
Engine Water Temperature Ok
Charging Voltage and battery. Ok
RPM & Kilometer, Hour Meter Ok
A/C, Door, Window Etc. Ok, A/c Not working
Windscreen wipers & Indicators. Ok
Lights & Warning Beacon OK
Fuel Gauge Ok
Side Mirrors & Reverse Alarm Ok
Air Service Indicator Ok
Exhaust Emissions. Ok
Engine Blowby Normal
Paint Condition Ok

Tyres & wheel Condition & Wheel Bolt Ok, RHS 3rd axle oil leakage observed from hub.
Clutch Operation. Ok
Gear Box operation. Ok
Propeller Shat, U-Joint & Center
Shaft was Dried
Bearing
Differential Ok
Chassis Condition Ok

Balance Rod Bush Ok


Brakes & Air system Ok
Road Springs & Suspension Ok
Front Leaf Spring Set of RHS & LHS Start Wearing out from rear side
Leaf Spring, Spring Bush & Center Bolt
which indicate bush play. Have to inspect and Replace if required.
Suspension Balloon Ok
Steering. & Mechanism, King Pin Ok
Wire Rope Condition Wire rope & Drive Pulley Dried, Proper lubrication required.
Boom Greasing Boom Is dry, Greasing required.
Hydraulic system is leaking from multiple places like, Outrigger
Hydraulics. System, Line, Hose Etc. distribution valve, main control valve, Wire rope winch drive hydraulic
motor and Swing drive hydraulic motor etc.
Crane Boom, Boom Pads, Inner
Boom telescopic cylinder seems leakage as excessive hyd. Oil leakage
Cylinder/rope, Swing Table and
from the boom end.
Outrigger Condition
Out Rigger Sliding Bush Sliding bush of Our Rigger are worn out, need to be replaced
Pulley & Hook condition & Safe Limit
Pulley is dry, Hooks is ok. SLI working nicely
Switch
Fault Codes in Dashboard NA
Comments.:- It has been observed that –
1- Boom greasing was not done since long time, resultant boom is dry condition and full Boom Greasing is
recommended with special high temperature grease.
2- Wire Rope and drive pulley greasing needs to be done.
3- Out Rigger Sliding Bush work out, need to be replaced.
4- Hydraulic system is leaking from multiple places like, Outrigger distribution valve, main control valve, Wire rope
winch drive hydraulic motor and Swing drive hydraulic motor etc.
5- Swing Motor & Boom Cylinder leakage should be rectified immediately.
6- Operator doesn’t have hard copy of TPI, but he presented soft copy. Make sure All required Document should
be available at Crane.

Inspector Name &


Driver's Name & Signature:
Signature:
ROHIT KUMAR TIWARI

Date. Transfer Location (If applicable).


23-Feb-21
23830 SIMAİSMA SAHIN AKYELOGLU MOBILE CRANE 50 TON FORCE HIRE