Sie sind auf Seite 1von 4

EDSD REV

REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
00

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
00 15-Jun-15 ISSUED FOR CONSTRUCTION FDB RCJ
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER

RCJ
JJLM

FDB
APPROVAL/CERTIFICATION REQUIREMENTS,

AGENCY
BY:

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
15-Jun-15

15-Jun-15
15-Jun-15

OPERATIONS
CONSTRUCTION
(DCC) NO. _____________________ DATE:

YANBU
Saudi Aramco 2616-ENG (03/99)

BGCS-5
MECHANICAL EQUIPMENT LIST
DOC

SAUDI ARABIA
SAPMT & SEPCO RESIDENTIAL CAMP AND PROJECT SUPPORT BUILDING
PREPARED BY:
June 15, 2015

A K53
DWG.TYPE PLANT NO. INDEX
SAUDI ARABIAN OIL COMPANY

JO / EWO: 10-01282-003
ISSUED FOR CONSTRUCTION
MECHANICAL EQUIPMENT LIST

DRAWING NO.
AND PROJ. SUPPORT BLDG (BGCS-5)
SAPMT & SEPCO RESIDENTIAL CAMP

SK-5-A-021
4
1
OF
SHT.NO.

00
EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EQUIPMENT LIST
ENGG CERT

RCJ

Item Doc. No.


FDB

Tag No. Qty Title Loc. Description


No. Reference
Capacity: 32,000 liters
Utility Raw
Site Diameter: 3.46 meters
01 K53-D-0002 1 Water SK-5-D-004
Office Height: 4.08 meters
Tank
Design Pressure: 1 atm
Driver: Electric Motor
DESCRIPTION

Capacity: 170 GPM


Utility Raw
ISSUED FOR CONSTRUCTION

K53-G-0002 Site Diff. Pressure: 110 psig


02 2 Water SK-5-G-004
A/B Office Diff. Head: 78.10 meters
Pumps
Rating: 14.54 HP
Operation: 1 operating, 1 standby
Capacity: 32,000 Liters (each tank)
K53-D-0004 Fire Water Site Diameter: 3.46 meters
03 3 SK-5-D-005
A/B/C Tanks Office Height: 4.08 meters
Design Pressure: 1 atm
JO/EWO

Driver: Diesel Engine


Fire Water Capacity: 725 GPM
K53-G-0004 Site
04 1 Diesel Diff. Pressure: 130 psig SK-5-G-011
15-Jun-15

A Office
DATE

Pump Diff. Head: 92.30 meters


Operation: 1 standby
NO.
REV

00

Driver: Electric Motor


DISCIPLINE
Capacity: 725 GPM
ENGINEER Fire Water
JJLM K53-G-0004 Site Diff. Pressure: 130 psig
05 2 Main SK-5-G-005
DATE:
15-Jun-15 B/C Office Diff. Head: 92.30 meters
Pumps
PROJECT Rating: 73.29 HP
ENGINEER
FDB
Operation: 1 operating, 1 standby
15-Jun-15
DATE: Driver: Electric Motor
CERTIFIED
Capacity: 300 GPM
RCJ Fire Water
K53-G-0004 Site Diff. Pressure: 125.5 psig
15-Jun-15 06 2 Jockey SK-5-G-010
DATE: D/E Office Diff. Head: 89.10 meters
Pumps
CONSTRUCTION
AGENCY
Rating: 29.28 HP
Operation: 1 operating, 1 standby
DATE:
Capacity: 32,000 Liters (each tank)
OPERATIONS Utility Raw
SAPMT Diameter: 3.46 meters
07 K53-D-0001 1 Water SK-5-D-001
Camp Height: 4.08 meters
Tank
DATE: Design Pressure: 1 atm
CONTROL NUMBER
VERIFICATION

Driver: Electric Motor


EDSD

Capacity: 262 GPM


Utility Raw
K53-G-0001 SAPMT Diff. Pressure: 125 psig
08 2 Water SK-5-G-001
DATE:

A/B Camp Diff. Head: 88.75 meters


BY:

Pumps
Rating: 25.47 HP
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

Operation: 1 operating, 1 standby


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________

MECHANICAL EQUIPMENT LIST DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

BGCS-5 DOC
K53 SK-5-A-021 2
SAPMT & SEPCO RESIDENTIAL CAMP AND PROJECT SUPPORT BUILDING A OF 00
YANBU SAUDI ARABIA JO / EWO: 10-01282-003 4
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Item Doc. No.
ENGG CERT

RCJ

Tag No. Qty Title Loc. Description


No. Reference
FDB

Capacity: 32,000 Liters (each tank)


K53-D-0003 Fire Water SAPMT Diameter: 3.46 meters
09 2 SK-5-D-002
A/B Tanks Camp Height: 4.08 meters
Design Pressure: 1 atm

Driver: Diesel Engine


Fire Water Capacity: 250 GPM
K53-G-0003 SAPMT
10 1 Diesel Diff. Pressure: 130 psig SK-5-G-012
A Camp
DESCRIPTION

Pump Diff. Head: 92.30 meters


ISSUED FOR CONSTRUCTION

Operation: 1 spare

Driver: Electric Motor


Capacity: 250 GPM
Fire Water
K53-G-0003 SAPMT Diff. Pressure: 130 psig
11 2 Main SK-5-G-002
B/C Camp Diff. Head: 92.30 meters
Pumps
Rating: 25.27 HP
Operation: 1 operating, 1 standby

Capacity: 32,000 Liters (each tank)


JO/EWO

Utility Raw SEPCO


K53-D-0005 Diameter: 3.46 meters
12 6 Water / Labor SK-5-D-007
A/B/C/D/E/F Height: 4.08 meters
Tank Camp
15-Jun-15

Design Pressure: 1 atm


DATE

Driver: Electric Motor


NO.
REV

00

Capacity: 525 GPM


Utility Raw SEPCO
DISCIPLINE K53-G-0005 Diff. Pressure: 100 psig
ENGINEER 13 3 Water / Labor SK-5-G-007
JJLM A/B/C Diff. Head: 71 meters
Pumps Camp
15-Jun-15 Rating: 40.83 HP
DATE:
PROJECT Operation: 2 operating, 1 standby
ENGINEER
FDB
Capacity: 32,000 Liters (each tank)
15-Jun-15 SEPCO
DATE: K53-D-0006 Fire Water Diameter: 3.46 meters
CERTIFIED 14 3 / Labor SK-5-D-008
A/B/C Tanks Height: 4.08 meters
RCJ Camp
15-Jun-15
Design Pressure: 1 atm
DATE:
CONSTRUCTION
AGENCY Driver: Diesel Engine
Fire Water SEPCO Capacity: 300 GPM
K53-G-0006
15 1 Diesel / Labor Diff. Pressure: 120.6 psig SK-5-G-009
DATE: A
OPERATIONS Pump Camp Diff. Head: 85.62 meters
Operation: 1 standby
DATE:
Driver: Electric Motor
CONTROL NUMBER

Capacity: 300 GPM


VERIFICATION

Fire Water SEPCO


K53-G-0006 Diff. Pressure: 120.6 psig
EDSD

16 2 Main / Labor SK-5-G-008


B/C Diff. Head: 85.62 meters
Pumps Camp
Rating: 28.14 HP
DATE:
BY:

Operation: 2 operating
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________

MECHANICAL EQUIPMENT LIST DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

BGCS-5 DOC
K53 SK-5-A-021 3
SAPMT & SEPCO RESIDENTIAL CAMP AND PROJECT SUPPORT BUILDING A OF 00
YANBU SAUDI ARABIA JO / EWO: 10-01282-003 4
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Item Doc. No.
ENGG CERT

RCJ

Tag No. Qty Title Loc. Description


No. Reference
FDB

Driver: Electric Motor


Capacity: 150 GPM
Fire Water SEPCO
K53-G-0006 Diff. Pressure: 119.4 psig
17 2 Jockey / Labor SK-5-G-006
D/E Diff. Head: 84.75 meters
Pumps Camp
Rating: 13.92 HP
Operation: 1 operating, 1 standby
DESCRIPTION

ISSUED FOR CONSTRUCTION


JO/EWO
15-Jun-15
NO. DATE
REV

00

DISCIPLINE
ENGINEER
JJLM
15-Jun-15
DATE:
PROJECT
ENGINEER
FDB
15-Jun-15
DATE:
CERTIFIED
RCJ

15-Jun-15
DATE:
CONSTRUCTION
AGENCY

DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________

MECHANICAL EQUIPMENT LIST DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

BGCS-5 DOC
K53 SK-5-A-021 4
SAPMT & SEPCO RESIDENTIAL CAMP AND PROJECT SUPPORT BUILDING A OF 00
YANBU SAUDI ARABIA JO / EWO: 10-01282-003 4
EDSD/2616-0399.doc

Das könnte Ihnen auch gefallen