Sie sind auf Seite 1von 6

SOHAIL AHMAD

Piping Design Engineer


+998909591006(Uzbekistan) +917406361226(India)
Sohail109gce@gmail.com

Personal Profile I am a hardworking, motivated and enthusiastic person with a proven track
record in piping and drafting. I always strive to achieve the highest standard
possible, at any given task and in any situation. I am accustomed in a challenging
and fast paced environment, particularly when dealing with multiple projects in
same time.

Career Objective Seeking a career with willingness to take up challenges and responsibilities. To
associate with a progressive organization that gives me scope to apply my
knowledge and skills along with my hard work and patience, and to be involved
as part of a team that works dynamically towards the growth of organization, and
where I can grow professionally and further enhance my skills, knowledge and
experience to face and overcome the challenges of today’s changing work
environment.

Experience 5 Years’ experience as Piping Layout Designer (SP3D/PDMS) in Oil and Gas, and
Summary Food and Beverages industries.

Key Skills  SP3D


 PDMS
 SPPID
 AUTOCAD 2D
 AUTOCAD 3D
 NAVIS WORK
 EXPOSURE IN ASME B31.3, B16.5, B 16.47, B 36.10, B16.9 AND ASTM, API
570,574,577 STANDARDS.
 sketch Up 2018.
Strength
 Good communication skills, Presentation skills & analytical reasoning skill.
 Ability to work in cross functional team with strong group dynamics.
 Good relationship building & strong interpersonal skills.
 Qualitative design experience of piping design for meeting customer
requirements in SP3D, PDMS and AutoCAD.
 Ability to plan, coordinate and execute critical projects in terms of time
Employer and and customer requirements.
Projects
I Company Name: UZLITI ENGINEERING, Tashkent, Uzbekistan
Duration : 2nd Nov 2017to Till Date
Projects
1. SULPHUR RECOVERY UNIT AT MUBARAK CPF
Client – ENTER ENGINEERING
Tool-SP3D and AutoCAD

Responsibilities-
 SP3D Modelling of Equipment’s as per Vendor Data.
 SP3D Modelling of symmetric piping for Claus process unit which meets
the process requirement and stress analysis.
 SP3D Modelling of steam jacketed piping from Sulphur tank to Sulphur pit.
 SP3D Modelling of pipe routing for Sulphur pit.
 SP3D Modelling of pipe routing of Condenser Tanks, Coolers, Pumps and
Heat exchanger.
 Adding logical support and physical supports for all pipes.
 Generating the isometric and back draft work.
 Checking Isometrics before issuing.
 Generating DGN file for Civil team.
 Generating the model in Navis work for review.
 Generating GA drawing for Claus Process.
 Generating MTO for Claus Process.
 Structural input for detailed modelling of Tech Structures and Racks by
structural department.

2. M25 VALANJIN-EARLY GAS TREATMENT UNIT


Client – ENTER ENGINEERING
Tool-SPPID and AutoCAD

Responsibilities-
 Preparation of Well Head P&ID for 10 wells.
 Preparation of Inlet Train Manifold System P&ID.
 Preparation of Test Separator and slug catcher P&ID.
 Preparation of Methanol Injection System P&ID.
 Preparation of Gas Heater System P&ID.
 Preparation of Drain Drum System P&ID.
 Preparation of Pig launcher and Pig Receiver P&ID.
 Preparation of Valve Station P&ID.
 Preparation of Gas flow meter P&ID.
 Involved in generating reports of valve list and line list numbers.

3. M25 VALANJIN-PIG LAUNCHER AND RECIEVER


Client – ENTER ENGINEERING
Tool-SP3D and AutoCAD

Responsibilities-
 SP3D Modeling of Pig launcher and Pig receiver equipment.
 SP3D Modeling of Piping for Pig launcher and Pig Receiver.
 SP3D Modeling of Piping for Valve Station.
 SP3D Modeling of Piping for Gas flow meter.
 Fixing the above Piping for Tie in connection point for pipeline.
 Preparation of Isometric for above all stations and back draft work.
 Preparation of GA drawings for above piping and equipment.
 Preparation of MTO for above piping.

4. LOW TEMPERATURE SEPRATION UNIT AT UKPG “ARSALAN”


Client – ENTER ENGINEERING
Tool-SP3D and AutoCAD

Responsibilities-
 SP3D Modelling of Pipe routing for Low Temperature Separator unit.
 SP3D Modelling of Pipe routing for Flare System Unit.
 SP3D Modelling of Pipe routing for Heat Exchangers, Column and Pumps.
 Data consistency and Clash checking for piping.
 Preparation of Nozzle Orientation drawings.
 Extracting pipe isometrics and checking of isometrics with latest P&ID,
line list, piping layout and piping material specification.
 Inter Department co-ordination with other departments.
 Modeling of primary and secondary supports.
 Modelling of equipment’s like pumps, filters, columns and exchangers and
positioning them as per equipment layout.
 Adding temporary structure such as platform and pipe rack at initial stage
for civil team.

5. DEVELOPMENT OF AKCHALAK GROUP OF FIELD WITH COMPLEX GAS


TREATMENT PLANT
Client – ENTER ENGINEERING
Tool-SP3D and AutoCAD

Responsibilities-
 Modelling of Equipment’s as per Vendor Data.
 Reviewing project documentation, work scope & preparation of weekly
progress reports.
 Modeling of equipment in SP3D like pumps, filters, exchangers and
arranging them as per equipment layout
 Checking of lines for data consistency and clashes in SP3D and preparation
of clash reports
 Extraction and preparation of general arrangement drawings using
Drawing manager.
 Checking of ISO’s and preparation of BOM.
 Participating of internal review & external review and updating the
comments.
 Coordinating with Interdisciplinary & Interdisciplinary coordinates for
project related queries.

6 UCHKIR GAS SWEETINING UNIT (Desulphurization Plant)


Client – ENTER ENGINEERING
Tool-SP3D and AutoCAD

Responsibilities-
 Modelling of Equipment’s as per Vendor Data.
 Reviewing project documentation, work scope & preparation of weekly
progress reports.
 Modeling of equipment in SP3D like pumps, filters, exchangers and
arranging them as per equipment layout
 Checking of lines for data consistency and clashes in SP3D and preparation
of clash reports
 Extraction and preparation of general arrangement drawings using
Drawing manager.
 Checking of ISO’s and preparation of BOM.
 Participating of internal review & external review and updating the
comments.
 Coordinating with Interdisciplinary & Interdisciplinary coordinates for
project related queries

II Company Name: AARVI ENCON PVT LTD, MUMBI, India


Duration : NOV. 2016 to OCT. 2017.

Projects
1. VCM PLANT Project
Client – RELIANCE INDUSTRIES LIMITED.
Tool-PDMS and AutoCAD

Responsibilities-
 PDMS Modeling of equipment as per the vendor data, vendor package
drawing & SKID drawings.
 Fixing the tie-in points for the area.
 Preparation of piping material specification
 Preparation of equipment layout of separator, water injection module
 Preparation of nozzle orientation for vertical columns
 Preparation of piping layout for utility service, process lines, firefighting
system.
 Checking of equipment layout as per the vendor information available.
 Checking of isometrics as per P&ID.
 Updating of site queries and generation of as-build drawings.
2. DHDT MANTANANCE UNIT Project
Client – IOCL BARUNI INDIA
Tool-PDMS and AutoCAD

Responsibilities-
 PDMS Modeling of equipment as per the vendor data, vendor package
drawing & SKID drawings
 Involved in preparation of Equipment modeling in PDMS as per
Equipment detail drawings and layouts and preparing nozzle orientations
of horizontal and vertical vessels.
 Modeling of Pipe routing in PDMS as per the P&ID, material specification
and Line List.
 Checking of lines for Data Consistency and Clashes in PDMS.
 Isometric Extraction and back draft work.
 Involved in preparation of Piping GA Drawing, Equipment Arrangement
drawing.
 Involved in internal and External Client review and updating of comments.
 Checking of Isometrics.
 Review PDMS models in Navisworks Review for Clash Checking
 Visiting the Site frequently to check the work has done according to PDMS
model.
III Company Name: RELIANCE INDUSTRIES INDIA JAMNAGAR
Duration : OCT 2015 to OCT 2016

Projects
1. JAMNAGAR J3 PROJECT.
Client – RIL
Tool-PDMS and AutoCAD

Responsibilities-
 PDMS Modeling of equipment as per the vendor data, vendor package
drawing & SKID drawings
 Fixing the tie-in points for the area and skid piping
 Preparation of piping material specification
 Preparation of equipment layout of separator, water injection module
 Preparation of nozzle orientation drawings for vertical columns
 Preparation of piping layout for utility service, process lines, firefighting
system.
 Checking of equipment layout as per the vendor information available
 Checking of isometrics as per P&ID
 Updating of site queries and generation of as-build drawings

IV Company Name : PETROCON ENGINEER AND CONSULTANT


Duration : FAB 2015 to MAY 2016.

Projects
1. CARDOLITE SPECIALTY CHEMICALS INDIA PVT. LTD, MSEZ,
MANGALORE
Client – CARDOLITE USA
Tool-PDMS and AutoCAD

Responsibilities-
 Preparation of Equipment & Piping modeling.
 Co-ordination with the other departments.
 Preparation of Nozzle orientation as per general arrangement drawings.
 Piping modeling with respect to P&ID and Plot Plan.
 Involved in modelling of Equipment’s and Piping in SP3D.
 Preparation of Intermediate & Final MTO.
 Knowledge of Piping Codes Like ASME.
 Designing of Platform and Ladder Assembly.
 Model Review with the Naviswork, SPR.
 Check the Isometrics as per the P&ID, Piping Specifications, Hookup.
 Modeling of pipe supports as per given standards.
 Extraction of isometric drawings in PDMS.
Projects:
2. OCP MEA EXPANSION, MOROCCO.
Client –TENOVA DELKOR, BANGALORE
Tool- PDMS and AutoCAD

Responsibilities-
 Arrangements of Equipment’s as per the process Requirements and Plot
Plan.
 13M Structural Walkway designed as per detailed drawing by client.
 Based on slurry flow, slope and 3D bends are provided as per norms.
 Preparing/updating Process Flow Diagrams and Piping & Instrumentation
Diagrams.
 Pipe routing done by specified PMS given by process team.
 Modeling of Supports as per Stress Requirement for critical and noncritical
lines.
 For better maintenance and efficiency, suggested different routing for
pumps to thickener.
 Modeling and positioning of Nozzles orientation for Thickener, Slurry feed
and Flocculent Tanks.
 Providing temporary Platforms for Valve access and maintenance of
Equipment’s

Education
 B.E IN MECHANICAL ENGINEERING from Vishveswaraiah Technological
University-Belgaum-2015
 PUC from R.K.S College-2011
 SSLC from N.A.V.M School-2008
Personal Details
Permanent address : AT+ P/O-SEKHWANIYA (KHAN TOLA ), KUSHINAGAR ,
UTTER PRADESH, INDIA 274402
Date of Birth : 07-10-1993
Marital status : Single
Nationality : Indian
Languages Known : English, Hindi, URDU,
Passport Number : N0434386
Place of issue : Bangalore
Declaration
I hereby declare that the particulars furnished above are correct and true to the
best of my knowledge.

Date: 11-12-2019 Yours Faithfully,


Place: Tashkent.
(SOHAIL AHMAD)