Installed
Pay Gross Cost in Hotel Peak
Weight Load Load Lakhs Load Diversity Hotel ID
Nos AC-I AC-II AC-III Sleeper Un-Res Total Staff (t) (t) (t) of Rs. (kW) Factor (kW)
Paass/Coach
ACCW 46 46 2 49.55 3.84 53.39 77.44 37.53 0.85 31.90
ACCN 64 64 2 48.55 5.28 53.83 78.61 37.53 0.85 31.90
FACCW 10 20 30 2 50.1 2.56 52.66 75.07 37.53 0.85 31.90
SLR 40 40 2 40.3 11.86 52.16 30.03 2.69 1 2.69
GS 90 90 36.7 7.2 43.9 29.68 2.69 1 2.69
GSCN 72 72 1 39.5 5.84 45.34 31.92 2.69 1 2.69
WCB 0 24 41.3 2.92 44.22 33.52 2.69 1 2.69
POWER CAR 0 60.4 4 64.4 101.67 1 0.00
PASSENGER/TRAINS
ACCW 3 138 0 0 0 138 6 148.65 11.52 160.2 232.32 112.59 95.70
ACCN 2 0 128 0 0 128 4 97.1 10.56 107.7 157.22 75.06 63.80
FACCW 1 10 20 0 0 0 30 2 50.1 2.56 52.66 75.07 37.53 31.90
SLR 2 0 0 0 80 80 4 80.6 23.72 104.3 60.06 5.38 5.38
GS 2 0 0 0 180 180 0 73.4 14.4 87.8 59.36 5.38 5.38
GSCN 13 0 0 936 0 936 13 513.5 75.92 589.4 414.96 34.97 34.97
WCB 1 0 0 0 0 0 24 41.3 2.92 44.22 33.52 2.69 2.69
POWER CAR 0 0 0 0 0 0 0 0 0 0 0 0 0.00
Total 24 10 158 128 936 260 1492 53 1005 142 1146 1033 274 240
No of Rakes 4
Bare Reqt 4130
Spare Coaches 22.50% 929
Total 5059
Hotel Load Provision on Trains - Alternati
Train - Tamilnadu Express- 24 Coaches ( 6AC Self Gen
Traction Diesel
Fuel Oil Cost per Litre 25
Elect Energy + TRD Cost per kWh(Rs.) 5.75
Haulage Energy Cons per 1000 GTKM 5.15 l
Weight of Train (t) 1146.25 t
Distance from NDLS - CEN 2190 km
Peak Hotel Load of the Train 239.82 kW
kVA with 0.8 power factor 299.78
Average Utilization factor 0.6
Average Hotel Load of the Train 143.9 kW
0.95
0.90
0.99
0.99
0.90
0.80
0.90
0.90
0.49
294.4 kW
394.68 hp
33.5 hr
56714.6533 Rs
41,401,697 Rs
Tamilnadu/ GT Express Hotel Load Requirement of End on Generation Coaches
Capacity, weight,Cost and Hotel Load.
Pay Gross
Weight Load Load
Nos AC-I AC-II AC-III Sleeper Un-Res Total Staff (t) (t) (t)
Paass/Coach
ACCW 46 46 2 44.80 3.84 48.64
ACCN 64 64 2 48.30 5.28 53.58
FACCW 10 20 30 2 43.80 2.56 46.36
SLR 40 40 2 40.30 11.86 52.16
GS 90 90 34.70 7.2 41.90
GSCN 72 72 1 37.50 5.84 43.34
WCB 0 24 39.30 2.92 42.22
POWER CAR 0 6 60.08 4.8 64.88
PASSENGER/TRAINS
ACCW 3 0 138 0 0 0 138 6 134.4 11.52 145.9
ACCN 2 0 128 0 0 128 4 96.6 10.56 107.2
FACCW 1 10 20 0 0 0 30 2 43.8 2.56 46.36
SLR 0 0 0 0 0 0 0 0 0 0
GS 2 0 0 0 180 180 0 69.4 14.4 83.8
GSCN 13 0 0 936 0 936 13 487.5 75.92 563.4
WCB 1 0 0 0 0 0 24 39.3 2.92 42.22
POWER CAR 2 0 0 0 0 0 12 120.16 9.6 129.8
Total for EOG 24 10 158 128 936 180 1412 61 991 127 1119
Total for SG 24 10 158 128 936 260 1492 53 1005 142 1146
Installed
Cost in Hotel Peak
Lakhs Load Diversity Hotel ID
of Rs. (kW) Factor (kW)
155.7 95.70
109.08 63.80
50.2 31.90
0 0.00
55.36 5.38
388.96 34.97
31.52 2.69
203.34 5.38
994.16 240
1033 240
-38.84 -0.177
3977
895
4871
188