Sie sind auf Seite 1von 3

1. Which of the following is not a standard?

a. BS7788

2. BS7799 is used for

a. All the above options

3. Risk analysis is done in the proposal stage.

a. True

4. Traceability is used to trace the action a button does on click?

a. False

5. Architecture of the applicaiton is done after the high level design

a. False

6. Acceptance testing does not involve

a. Developers ....

7. What testing done b4 an appl goes live?

a. Acceptance testing

8. Testers/Reviewers have write access to which area?

a. Test/Review area

9. Modifications cycle

a. Changerequest -> do impact analysis -> approve change -> update


requirements -> sign off SRS

10.Testing sequence

a. Unit -> system ->configuration -> Acceptance -> beta

11.Program was given and asked the errors in it?

a. Mixed data types used in computation

b. Void is the return type given but it has returned some values

c. Unused variables

12.Defects are logged using ...... in AVM ?

a. E- tracker
13.CMMI initial stage –

a. Chaotic

14.What s relation between post impl and appl maintanence

a. Post impl immediate afte impl and AM any time after impl

15.EMMA can instruement jar files

a. True

16.Large projects with fixed requirements

a. Waterfall model

17.Document requirements is finalized after mutual agreement between


customer and client. This is accompolished at which stage?

a. Elicitation (or)

b. validation

18.What is not a stage in maintainence?

a. Proactive

19.EVTX is the first step of each stage?

a. True

20.Test automation tools is used when?

a. After the development is complete

21.Rational project contains

a. All the options

22.If a project contains 8 members and 12 months duration then. What kind of
project

a. Large project

23.Characteristics of test case?

a. Improved coverage

24.Stages of s.w developement process?

a. None of tese
25.Which stage are iterated in increment model?

a. Design , construction and testing

26.What does project mgr least bothered about?

a. None

27.Project mgr takes care of

a. All

28.What is least bothered in the testing?

a. Name of the developer who caused the bug.

29.Business continuity plan is done at which stage?

a. Project start up or

b. contract management (not sure)

30.Defect are automatically closed once fixed?

a. False

31.Comments should explain all lines of code so that even non developers can
get to know the working without the language structure?

a. False

32.Load factor which metric?

a. Process

33.Scalability and maintaniability in whcih tool/

a. Web load

34.The proces of ensuring quality in an organization

a. Quality management

35.Test case point analyzed using

a. All the above

36.Six sigma means?

a. ??????

Das könnte Ihnen auch gefallen