Sie sind auf Seite 1von 4

SW-PR-02

AR 3251D
WRITE WHICH DIVISION ARE THE FOLLOWING SPECIFICATION TEXTS ARE
LOCATED USING THE 50 DIVISION MASTERFORMAT.
BUILDING TECHNOLOGY 4

DIVISION 01 1. TEMPORARY FACILITIES AND CONTROLS


QUIZ 01

DIVISION 44 2. ODOR CONTROL “50 DIVISIONS AND CONSTRUCTION


SPRECIFICATIONS”

DIVISION 44 3. SOLID WASTE CONTROL AND REUSE


DATE ISSUED: 8 FEBRUARY 2021
DIVISION 46 4. WATER AND WASTEWATER CLARIFICATION AND MIXING
DATE DUE: 10 FEBRUARY 2021

EQUIPMENT DATE SUBMITTED: 10 FEBRUARY 2021

DIVISION 45 5. MANUFACTURING EQUIPMENT

DIVISION 41 6. CONTAINER PROCESSING AND PACKAGING

DIVISION 41 7. MOBILE PLANT EQUIPMENT

DIVISION 40 8. PROCESS PIPING AND EQUIPMENT PROTECTION

DIVISION 35 9. COASTAL CONSTRUCTION

DIVISION 31 10. SPECIALFOUNDATIONS AND LOAD BEARING ELEMENTS

DIVISION 23 11. FACILITY FUEL SYSTEMS

DIVISION 27 12. STRUCTURED CABLING

DIVISION 34 13. TRACTION POWER

DIVISION 14 14. DUMBWAITERS


ARCH. NESTOR LAZAGA DUE, ARMENIA RUTH T.
DIVISION 32 15. BASES, BALLASTS, AND PAVING
INSTRUCTOR 2195695
QZ-PR-01
SHOW IN ILLUSTRATIONS USING THE FOLLOWING SPECIFICATIONS.

1. Masonry Units (CHB): 100 mm thick for all interior walls unless otherwise indicated.
Use 400 psi for non-load bearing blocks and 700 psi for load bearing blocks where
required.
2. Wood Louver Door: 50mm thick x 600mm wide Philippine mahogany wood frame
with 8mm thick glass, frame painted with quick dry enamel finish.

3. Vinyl Tiles: Supply and installation of 2.0mm thick x 300mm x 300mm homogeneous
vinyl tiles. Color: beige. Contractor shall submit samples for Procuring Entity’s
approval.

Das könnte Ihnen auch gefallen