1) The modules to be tested will be included in the Scope Inclusion.

True
2) Documentation testing does the verification of installation procedures and
deployment checklists.
3) Baseline is a measure of current level of performance.
4) TCP is Test Case Point
5) The following are the suspension criteria
a) Non availability of the application
b) Non availability of the test environment
c) Urgent defects are not fixed
d) Application fails sanity test
e) All of the above
6) Test Scenario is a powerful tool for test design.
7) Statement coverage is not a black box testing . (it’s a white box testing)
8) The objective of ranking test conditions is:
a) Determine which test conditions must be tested first
b) To determine the amount of resources allocated
c) Both
9) The correct processing results for each test situation must be determined. True
10) Finalization describes actions to be done after test case is performed.
11) The following are the test case components:
a) Test case name
b) Test case prerequisite
c) Test case execution order
d) Test procedures
e) Input values
f) Expected Results
g) Test Data sources

12) The following are the characteristics of a good test case:


a) High probability to find errors
b) Discover more information
c) Written for valid and expected results as well as invalid and unexpected
results
d) Should not be redundant
e) Test case will be complex if there are more than one expected result.
13) Test objective tells the tasks that the tester is required to accomplish.
14) The first stage of any recognized development project is data preparation.
15) Preparation of data can help to focus the business where requirements are vague.
True
16) Test data preparation techniques are:
a) Permutations
b) Partitions
17) RTM is the tool that is used right from the requirement study till the defect
analysis in the testing life cycle.
18) The main tasks of SCM activities are:
a) Identifying and organizing the software configurable items
b) Maintaining change requests
c) Tracking the status of configurable items
d) Review and Audit of SCM activities

19) There can be only One SCM coordinator.


20) If softcopies of the work product is lost, then you should contact the NSS team.
21) Prerequisite of Test Execution Phase:
a) All test cases signed of by the client
b) Test Bed setup complete
22) When a risk/issue be escalated?
a) When a risk/issue foreseen will have an impact on testing
23) Incident Report is a document reporting on any event that occurs during testing
which requires investigation.
24) A Defect Report is a case against a product.
25) The following are the Defect analysis tools:
a) Pareto Charts
b) Fishbone diagram/ Ishikawa diagram
c) Defect Containment Matrix
26) Deferred defect will be an enhancement.
27) Defect Resolution ensures that all defects are reviewed and resolved efficiently.
28) Test Results can be stored in Test Runs. True
29) Quality Center can also be used as a defect tracking tool. True
30) The following are test coverage analysis tools;
a) McCabe
b) Battle Map
31) Test Coverage is ensured through test scenarios. True
32) The system is treated as a “Black Box” in use case modeling. True
33) Checklist is very important in verification phase.
34) The Driver function will call the Stub.
35) Test Data is also important to non functional testing. True
36) Setup data tells the system about the business rules.
37) Partitioning of data helps in:
a) Allows controlled and reliable data
b) Can reduce the need for exclusive access to environment.
38) SCM coordinator and Project leader has delete access to the files.
39) Usable Version of SCI item will always reside in Baseline library.
40) If document needs to be changed, it must be checked out from VSS. True