Sie sind auf Seite 1von 4

PRICELIST DISKON RUMAH

CLUSTER JASMINE

SEBELUM DISKON BUKIT JASMINE 01-Sep-20


Harga Harga DP KPR Asumsi Angsuran KPR / bln (bunga 7.00%)
Tipe BLOK LB LT Harga Tunai Harga KPR
Angsuran 12 Bln Angsuran 24 Bln 5% 5 Thn 10 Thn 15 Thn 20 Thn
JASMINE 1E BD.08 & BD.15 45 160 716,980,225 792,315,649 849,714,067 777,966,044 38,898,302 14,634,280 8,581,203 6,642,950 5,729,984
JASMINE 3A BD.08 & BD.15 70 200 993,146,500 1,097,479,383 1,176,971,103 1,077,606,453 53,880,323 20,270,801 11,886,328 9,201,540 7,936,938
JASMINE 1E HOEK BD.08/01 45 223 883,415,436 976,226,557 1,046,939,792 958,548,248 47,927,412 18,031,203 10,573,080 8,184,918 7,060,034
JASMINE 1E HOEK BD.15/19 45 223 883,415,436 976,226,557 1,046,939,792 958,548,248 47,927,412 18,031,203 10,573,080 8,184,918 7,060,034
JASMINE 3A HOEK BD.08/02 & 18 70 283 1,201,005,786 1,327,163,894 1,423,284,357 1,303,133,778 65,156,689 24,513,184 14,373,964 11,127,288 9,598,023
JASMINE 3B HOEK BD.08/02 & 18 52 283 1,074,290,736 1,187,143,764 1,273,127,022 1,165,647,949 58,282,397 21,926,945 12,857,453 9,953,315 8,585,393
JASMINE 1 BD.01 45 136 635,601,235 702,391,865 753,279,963 689,669,840 34,483,492 12,973,345 7,607,269 5,889,000 5,079,653
JASMINE 2 BD.02 60 170 825,356,763 912,071,723 978,140,264 895,554,587 44,777,729 16,846,233 9,878,241 7,647,023 6,596,064
JASMINE 2 HOEK BD.02/19 60 230 956,039,238 1,056,475,857 1,132,998,996 1,037,345,073 51,867,254 19,513,446 11,442,233 8,857,753 7,640,399
JASMINE 1C HOEK BD.18/01 52 272 997,262,920 1,102,028,027 1,181,849,060 1,082,072,768 54,103,638 20,354,817 11,935,593 9,239,677 7,969,834
JASMINE 3 BD.15/16 66 200 964,987,600 1,066,363,798 1,143,602,806 1,047,054,046 52,352,702 19,696,081 11,549,326 8,940,657 7,711,909

SETELAH DISKON 25-Feb-21


Harga Harga DP KPR Asumsi Angsuran KPR / bln (bunga 7.00%)
Tipe BLOK LB LT Harga Tunai Harga KPR
Angsuran 12 Bln Angsuran 24 Bln 5% 5 Thn 10 Thn 15 Thn 20 Thn
JASMINE 1E BD.08 & BD.15 45 160 696,945,595 736,914,682 767,367,319 729,301,522 36,465,076 13,718,854 8,044,419 6,227,410 5,371,554
JASMINE 3A BD.08 & BD.15 70 200 968,103,213 1,018,064,571 1,056,130,368 1,008,548,122 50,427,406 18,971,748 11,124,594 8,611,860 7,428,300
JASMINE 1E HOEK BD.08/01 45 223 858,379,671 915,299,335 958,666,699 904,457,495 45,222,875 17,013,705 9,976,443 7,723,044 6,661,637
JASMINE 1E HOEK BD.15/19 45 223 858,379,671 915,299,335 958,666,699 904,457,495 45,222,875 17,013,705 9,976,443 7,723,044 6,661,637
JASMINE 3A HOEK BD.08/02 & 18 70 283 1,177,119,534 1,249,027,607 1,303,814,710 1,235,330,831 61,766,542 23,237,746 13,626,076 10,548,328 9,098,631
JASMINE 3B HOEK BD.08/02 & 18 52 283 1,050,404,484 1,122,312,557 1,177,099,660 1,108,615,781 55,430,789 20,854,116 12,228,371 9,466,324 8,165,332
JASMINE 1 BD.01 45 136 611,146,305 642,652,203 666,656,698 636,651,080 31,832,554 11,976,012 7,022,456 5,436,280 4,689,152
JASMINE 2 BD.02 60 170 796,953,724 836,336,098 866,341,716 828,834,693 41,441,735 15,591,168 9,142,300 7,077,311 6,104,649
JASMINE 2 HOEK BD.02/19 60 230 940,881,451 995,376,235 1,036,896,071 984,996,276 49,249,814 18,528,716 10,864,810 8,410,754 7,254,832
JASMINE 1C HOEK BD.18/01 52 272 977,228,059 1,041,452,607 1,090,385,595 1,029,219,360 51,460,968 19,360,594 11,352,604 8,788,369 7,580,550
JASMINE 3 BD.15/16 66 200 939,944,313 989,905,671 1,027,971,468 980,389,222 49,019,461 18,442,053 10,813,993 8,371,415 7,220,900

Asumsi bunga 7.00%


Cara Pembayaran Tunai : Catatan :
- Tanda Jadi : Rp 5.000.000,- Hari ke-1 - Harga sudah termasuk: PPN, IMB, Listrik 1300 watt, Air PDAM, Akta Jual Beli,
- Uang Muka : 20% dikurangi Tanda Jadi Hari ke-15 BBN Sertifikat HGB, Biaya Perolehan Hak Atas Tanah dan Bangunan (BPHTB)
- Sisa : 80% Hari ke-31 untuk pembelian ke-1. Pembelian ke-2 dan seterusnya atas nama yang sama,
dikenakan tambahan biaya BPHTB sebesar @ Rp 3.000.000.
Cara Pembayaran Angsuran 12 / 24 Bulan :
- Harga belum termasuk: Biaya proses KPR (bagi pembeli KPR), IPL (Iuran
- Tanda Jadi : Rp 5.000.000,- Hari ke-1 Perawatan Lingkungan).
- Uang Muka : 30% dikurangi Tanda Jadi Hari ke-15 - Pembelian dianggap batal apabila tidak ada pembayaran uang muka paling
- Sisa : 70% diangsur selama 12 / 24 bulan lambat sesuai tanggal jatuh tempo
Angsuran ke-1 mulai Hari ke-31 - Untuk pembelian KPR, berkas permohonan KPR diserahkan paling lambat 2
Cara Pembayaran KPR : minggu setelah pembayaran Tanda Jadi. apabila tidak menyerahkan maka
- Tanda Jadi : Rp 5.000.000,- Hari ke-1 pembelian dianggap BATAL.
- Uang Muka : 5% (KPR ke-1) / - Ilustrasi perhitungan angsuran KPR di atas merupakan perkiraan, nilai
15% (KPR ke-2) / perhitungan sebenarnya akan dikeluarkan oleh pihak bank pemberi KPR.
20% (KPR ke-3) dikurangi Tanda Jadi Hari ke-15 - Besaran bunga KPR dapat berubah sewaktu-waktu, besaran bunga yang
berlaku adalah besar bunga pada saat penandatanganan akad kredit.
- Sisa : 95% / 85% / 80% KPR
- Untuk pembelian Angsuran 12 / 24 bulan, harga sudah termasuk asuransi
jiwa Ciputra Life.
*Harga dan ketentuan di atas dapat berubah sewaktu-waktu - Konsumen diwajibkan melampirkan NPWP Pribadi.
tanpa pemberitahuan terlebih dahulu.

No. Rekening a/n PT Ciputra Indah:


711-555-55-37 (BCA)
167-00-555-55-220 (Mandiri)

Kantor Pemasaran : Jalan Raya Cileungsi-Jonggol KM 23,2 Kab. Bogor 16830 | Telp : 021-8993 0808, | Fax : (021) 8993 2023 / 8993 2862
www.citraindah.com CitraIndahCityOfficial CitraIndahCity.Official KotaNuansaAlam CitraIndahCityOffcial
PRICELIST DISKON KAVLING
CLUSTER JASMINE
SEBELUM DISKON BUKIT JASMINE 01-Sep-20
Harga Harga DP KPR Asumsi Angsuran KPR / bln (bunga 7.00%)
Tipe BLOK LT Harga Tunai Harga KPR
Angsuran 12 Bln Angsuran 24 Bln 20% 5 Thn 6 Thn 7 Thn 8 Thn
KAV JASMINE 1 BD.01 136 346,933,471 383,413,985 411,208,663 376,465,316 75,293,063 5,963,512 5,134,688 4,545,496 4,106,097
KAV JASMINE 2 BD.01 170 433,791,839 479,392,482 514,135,829 470,706,645 94,141,329 7,456,370 6,420,065 5,683,380 5,133,985
KAV JASMINE 1E BD.08/ganjil 160 448,924,360 496,113,918 532,067,867 487,125,431 97,425,086 7,716,457 6,644,004 5,881,623 5,313,064
KAV JASMINE 3A BD.08/genap 200 559,114,825 617,874,382 662,643,568 606,682,085 121,336,417 9,610,330 8,274,661 7,325,167 6,617,066
KAV JASMINE 1E BD.15/ganjil 160 440,261,860 486,541,855 521,802,804 477,726,618 95,545,324 7,567,572 6,515,811 5,768,140 5,210,552
KAV JASMINE 3B BD.15/ganjil 200 550,452,325 608,302,319 652,378,505 597,283,273 119,456,655 9,461,445 8,146,469 7,211,684 6,514,553
KAV JASMINE 2 BD.02/01 hoek 281 726,021,363 802,306,106 860,427,815 787,775,679 157,555,136 12,478,997 10,744,634 9,511,717 8,592,249
KAV JASMINE 1E BD.08/01 hoek 223 622,474,342 687,886,648 737,724,596 675,427,161 135,085,432 10,699,307 9,212,290 8,155,205 7,366,866
KAV JASMINE 1E BD.15/19 hoek 223 613,811,842 678,314,586 727,459,533 666,028,349 133,205,670 10,550,422 9,084,097 8,041,722 7,264,354

SETELAH DISKON 11-Feb-21


Harga Harga DP KPR Asumsi Angsuran KPR / bln (bunga 7.00%)
Tipe BLOK LT Harga Tunai Harga KPR
Angsuran 12 Bln Angsuran 24 Bln 20% 5 Thn 6 Thn 7 Thn 8 Thn
KAV JASMINE 1 BD.01 136 322,773,408 355,929,616 381,191,488 349,614,148 69,922,830 5,538,168 4,768,459 4,221,292 3,813,232
KAV JASMINE 2 BD.01 170 403,216,760 444,662,020 476,239,361 436,767,685 87,353,537 6,918,750 5,957,164 5,273,596 4,763,814
KAV JASMINE 1E BD.08/ganjil 160 407,597,197 449,659,903 481,707,678 441,647,959 88,329,592 6,996,057 6,023,727 5,332,521 4,817,043
KAV JASMINE 3A BD.08/genap 200 510,246,496 562,824,878 602,884,598 552,809,948 110,561,990 8,756,952 7,539,888 6,674,707 6,029,484
KAV JASMINE 1E BD.15/ganjil 160 407,597,197 449,659,903 481,707,678 441,647,959 88,329,592 6,996,057 6,023,727 5,332,521 4,817,043
KAV JASMINE 3B BD.15/ganjil 200 508,446,496 561,024,878 601,084,598 551,009,948 110,201,990 8,728,438 7,515,338 6,652,973 6,009,851
KAV JASMINE 2 BD.02/01 hoek 281 660,943,586 729,450,162 781,645,649 716,401,290 143,280,258 11,348,370 9,771,144 8,649,932 7,813,770
KAV JASMINE 1E BD.08/01 hoek 223 565,332,343 623,957,239 668,623,827 612,790,593 122,558,119 9,707,093 8,357,977 7,398,922 6,683,691
KAV JASMINE 1E BD.15/19 hoek 223 565,332,343 623,957,239 668,623,827 612,790,593 122,558,119 9,707,093 8,357,977 7,398,922 6,683,691

Asumsi bunga 7.00%

Cara Pembayaran Tunai : Catatan :


- Tanda Jadi : Rp 5.000.000,- Hari ke-1 - Harga sudah termasuk PPN, jaringan listrik, jaringan air bersih
- Uang Muka : 20% dikurangi Tanda Jadi Hari ke-15 - Harga sudah termasuk asuransi jiwa Ciputra Life (khusus untuk pembelian
- Sisa : 80% Hari ke-31 angsuran 12 / 24 bulan)
Cara Pembayaran Angsuran 12 / 24 Bulan : - Harga belum termasuk biaya penyambungan PLN dan PDAM, Biaya Perolehan
- Tanda Jadi : Rp 5.000.000,- Hari ke-1 Hak Atas Tanah dan Bangunan (BPHTB), Biaya proses KPT (bagi pembeli KPT),
dan biaya Iuran Perawatan Lingkungan (IPL)
- Uang Muka : 30% dikurangi Tanda Jadi Hari ke-15
- Pembelian dianggap batal apabila tidak ada pembayaran uang muka
- Sisa : 70% diangsur selama 12 / 24 bulan paling lambat sesuai tanggal jatuh tempo
Angsuran ke-1 mulai Hari ke-31 - Untuk pembelian KPT, berkas permohonan KPT diserahkan paling
Cara Pembayaran KPR : lambat 2 minggu setelah pembayaran Tanda Jadi. apabila tidak menyerahkan
- Tanda Jadi : Rp 5.000.000,- Hari ke-1 maka pembelian dianggap BATAL.
- Uang Muka : 20% (KPR ke-1) / - Ilustrasi perhitungan angsuran KPR di atas merupakan perkiraan, nilai
25% (KPR ke-2) / perhitungan sebenarnya akan dikeluarkan oleh pihak bank pemberi
30% (KPR ke-3) dikurangi Tanda Jadi Hari ke-15 KPT.
- Sisa : 80% / 75% / 70% KPR - Besaran bunga KPT dapat berubah sewaktu-waktu, besaran bunga
yang berlaku adalah besar bunga pada saat penandatanganan akad
kredit.
*Harga dan ketentuan di atas dapat berubah sewaktu-waktu - Konsumen diwajibkan melampirkan NPWP pribadi.
tanpa pemberitahuan terlebih dahulu.

No. Rekening a/n PT Ciputra Indah:


711-555-55-37 (BCA)
167-00-555-55-220 (Mandiri)

Kantor Pemasaran : Jalan Raya Cileungsi-Jonggol KM 23,2 Kab. Bogor 16830 | Telp : 021-8993 0808, | Fax : (021) 8993 2023 / 8993 2862
www.citraindah.com CitraIndahCityOfficial CitraIndahCity.Official KotaNuansaAlam CitraIndahCityOffcial

Das könnte Ihnen auch gefallen