1.0 ALL ELECTRICAL INSTALLATION HEREIN AND OTHER RELATED WORKS TO BE DONE ON THIS BUILDING SHALL
CONFORM IN ACCORDANCE WITH THE PROVISIONS AND CODE STANDARD OF THE
FOLLOWING:
2.0 ELECTRICAL INSTALLATION HEREIN SHALL BE DONE UNDER THE DIRECT SUPERVISION OF A DULY REGISTERED
ELECTRICAL PANEL S TWO-GANG
BOX SWITCH
ELECTRICAL ENGINEER. THE ELECTRICAL ENGINEER SHALL BE RESPONSIBLE I N THE INTERPRETATION OF THE DESIGN 2
INTENT, PLANS AND SPECIFICATIONS AND THE REQUIRED STANDARD OF THE ELECTRICAL
CODE. DUPLEX CONVENIENCE
CIRCUIT RUN AND
NUMBER OUTLET
3.0 SERVICE ENTRANCE TO THE BUILDING SHALL BE THREE PHASE (3∅), 3-WIRE + 1-GROUND WIRE, 60HZ, 230V,
THROUGH 750KVA TRANSFORMER BANK.
4.0 MATERIALS AND EQUIPMENT TO BE USED (BALLAST, FLUORESCENT TUBE, WIRING DEVICES, CIRCUIT BREAKERS,
SWITCH EMERGENCY LIGHTS
CONDUIT AND PIPES, ENCLOSURES, WIRES AND CABLES, ETC...) SHALL HAVE IMPORTED COMMODITY CLEARANCE (ICC) RUN CONVENIENCE
LABEL FOR FOREIGN MADE PRODUCTS AND P.S. MARK FOR LOCAL IN NATURE OF THE BUREAU OF PRODUCT STANDARDS E
L OUTLET
(BPS).
CIRCUIT KILOWATT-HOUR
5.0 PROVIDE GROUNDING AND NEUTRAL WIRE TO ALL OUTLETS AND LIGHTING CIRCUITS. ALL NON-CURRENT CARRYING BREAKER M METER
METAL PARTS SHALL BE GROUNDED AND BONDED
6.0 ALL PANEL BOARDS, MAIN DISTRIBUTIONS PANEL, ETC SHALL HAVE GROUNDING BUS FOR BRANCH CIRCUITS AND
TRANSFORM G13 LED T8 Tubelight
SUB-FEEDER GROUNDING SYSTEM, MAIN GROUNDING SYSTEM SHALL BE BONDED TO THE NEAREST METAL WATER PIPE
IN SERVICE. ER 1200mm 18w LED
1600Lm
7.0 MOUNTING HEIGHTS FOR ALL WIRING DEVICES AND PANEL BOARDS SHALL BE AS FOLLOWS:
7.1 LIGHTING SWITCHES: 1.20 M ABOVE FLOOR FINISH FUSE
7.2 CONVENIENCE OUTLET: 0.30 M ABOVE FLOOR FINISH DISCONNECT EMERGENCY
7.3 TELEPHONE OUTLET: 0.30 M ABOVE FLOOR FINISH LIGHTS
7.4 PANEL BOARDS AND CABINETS: 1.8m ON TOP ABOVE FLOOR FINISH
7.5 MOTOR CONTROL AND ECB: 1.8m ON TOP ABOVE FLOOR FINISH GROUN
7.6 MANUAL TRANSFER SWITCH: 1.8m ON TOP ABOVE FLOOR FINISH D
7.7 EMERGENCY LIGHT FIXTURE: 0.8m BELOW CEILING LINE
9.0 LIGHTING FIXTURES WITH FLUORESCENT TUBE SHALL HAVE THERMAL PROTECTOR HIGH-POWER FACTOR BALLAST
(PRE-HEAT)
10.0 ALL CABLE SPLICED AND TERMINATIONS AT BUS BARS AND CIRCUIT BREAKERS SHALL BE CRIMP-TYPE TERMINAL
LUGS.
11.0 MECHANICAL EQUIPMENT WITH HIGH VIBRATION MOVEMENTS SHALL HAVE FLEXIBLE CONDUIT CONNECTION FROM
MOTOR TERMINAL BOX TO OVER CURRENT DEVICE ENCLOSURE
(ECB).
12.0 PRIOR TO ITS MOUNTING AND TERMINATION OF LIGHTING FIXTURES, WIRING DEVICES, EQUIPMENT, ETC.
CONTRACTOR SHALL ENGAGE WITH THE CONSULTANT OR OWNER'S REPRESENTATIVE FOLLOWING FIELD ACCEPTANCE
TEST AND MATERIAL
INSPECTION:
13.0 NO CHANGE AND MODIFICATION SHALL BE MADE WITHOUT THE CONSULTANT / DESIGNER'S WRITTEN CONSENT.
PROJECT NO PROJECT TITLE ISSUE DATE & TIME OWNER SHEET NAME SHEET NUMBER
EXHAUST FAN
EL
CKT2 a a
LPP b
bEF
LPP
a a
EXHAUST FAN
EF
SWITCHBOARD
CKT1
LPP
aEF
PROJECT NO PROJECT TITLE ISSUE DATE & TIME OWNER SHEET NAME SHEET NUMBER
50 AT, 230V, 2P
15 AT , 2P 20 AT , 2P
CKT. 1 CKT. 2
PROJECT NO PROJECT TITLE ISSUE DATE & TIME OWNER SHEET NAME SHEET NUMBER
225A, 225A, 150A, 150A, 200A, 200A, 100A, 100A, 100A, 100A, 100A, 100A, 150A, 150A, 200A, 200A, 225A, 225A,
2P 2P 2P 2P 2P 2P 2P 2P 2P 2P 2P 2P 2P 2P 2P 2P 2P 2P
M M M M M M M M M
M.I.
150A, 150A, 125A, 125A, 600A, 600A, 300A, 300A, 400A, 400A, 200A, 200A, 100A, 100A, 100A, 100A, 100A, 100A,
2P 2P 2P 2P 3P 3P 3P 3P 3P 3P 2P 2P 3P 3P 3P 3P 3P 3P
M M M M M M M M M
LIBRARY CARP/ALUM NEW KA NEW GALERYA NEW C.HUB NEW CAC SPARE SPARE SPARE
PROJECT NO PROJECT TITLE ISSUE DATE & TIME OWNER SHEET NAME SHEET NUMBER
V A 2P 2P 2P 2P 2P 2P
Sv Sa 225A 225A 150A 150A 200A 200A 100A 100A 100A 100A 100A M.I. 100A
L1 L2 L3 2P 2P 2P 2P 2P 3P
GROUND FAULT 150A 150A 200A 200A 225A 225A 150A 150A 125A 125A 600A 600A
INDICATOR 80
M
ADMIN-A HKP CSS-B&NEW CSS LIBRARY CARP/ALUM NEW KA
3P,600V
M.I. 1200A
1200A E.I. 3P 3P 2P 3P 3P 3P
300A 300A 400A 400A200A 200A 100A 100A 100A M.I. 100A 100A 100A
NP GP
INCOMING FEEDER
BOTTOM ENTRY NEW GALERYA NEW C.HUB NEW CAC SPARE SPARE SPARE
GROUND BUS,1200 A
LEGEND :
PROJECT NO PROJECT TITLE ISSUE DATE & TIME OWNER SHEET NAME SHEET NUMBER
250
300
Sand Backfill
Warning Tape
Red Concrete Tile
600
Sand Backfill
500 2P 2P 2P 2P 2P 2P 2P 2P 2P
M M M M M M M M M
DETAIL A-A 2P 2P 3P 3P 3P 2P 3P 3P 3P
FEEDER
F1
LOAD DECRIPTION
NEW KA
SIZE OF FEEDER
2 Sets,3-250mm2
ESTIMATED LEGHTH
200 mtrs
LOCATION
UP SITE PLAN
M M M M M M M M M
F2 NEW GALERYA 3 - 250 mm2 300 mtrs UP SITE PLAN
F3 CULTURAL HUB 3 - 250 mm2 150 mtrs UP SITE PLAN
FFL
PROJECT NO PROJECT TITLE ISSUE DATE & TIME OWNER SHEET NAME SHEET NUMBER
250
SALUN
300
NEW
Sand Backfill ALUMNI IDR KA
Warning Tape
ISKOLAR NG
Red Concrete Tile BAYAN
GALERYA
MUSEUM
CSS
BUILDING
TO REHABILITATE
500 LIBRARY
POWER HOUSE
EXISTING
TRANSFORMER
CAC
BUILDING
DETAIL A-A
PROJECT NO PROJECT TITLE ISSUE DATE & TIME OWNER SHEET NAME SHEET NUMBER