1 A network engineer working for a contracting company is informed of a


pre-bid meeting with a potential client. What purpose does the network engineer have for
attending the pre-bid meeting?
to submit request for proposal responses
to discuss proposed installation and monitoring plans
to perform system-level acceptance tests on the current network
to clarify project scope and timelines not included in the original request for
proposal
to create a business case outlining reasons for financial investment in a network
upgrade

2 A corporation (client) wants a network upgrade and is putting out a


request for services to various network consulting companies (contractors). A RFQ is
required. Which statement is true concerning the RFQ?
sent from the contractors to the client in response to a RFP
sent from the client to the contractors along with the RFP to provide more specific
technical details
sent from the client to the contractors in place of a RFP when the technical
specifications of a project are known
sent from the contractors to the client outlining reasons for financial investments
for the network upgrade

3 What provides the initial data for the Optimize Phase?


performance monitoring
business goals
technical goals
RFP

4 A major corporation has decided to hire someone to upgrade their network


infrastructure. A network consulting company wants the job. What document must the
network consulting company obtain to learn about the business goals, the project scope,
the requirements for the new network and the expected deliverables?
Business Case
Project Plan
Request for Proposal
Request for Comments
5 In a network management architecture, which statement best describes a
management agent?
communication protocol used between a management station and managed device
standardized database that a device keeps about itself concerning network
performance parameters
host with the management application loaded that is used by the administrator to
monitor and configure network devices
software running on a managed device to collect network information and allow
that device to be managed by a management station

6 During an analysis of a customer network, several possible opportunities


for network improvement are identified. At which stage of the Cisco Lifecycle Services
does this process occur?
Prepare Phase
Plan Phase
Design Phase
Implement Phase
Optimize Phase
Operate Phase

7 Which two statements best describe the responsibilities of an account


manager? (Choose two.)
acts as the primary point of contact between the company and the client
directs the sales teams and support personnel
provides technical support to critical clients
selects the equipment and technologies to be used for the client solution
acts as the network design lead

8 A network engineer is analyzing the network of a potential client company


to identify problems and determine whether a network upgrade or addition is needed.
Which role in the sales team is this engineer assuming?
post-sales field engineer
pre-sales engineer
account manager
network designer
9 What is the purpose of SNMP?
to facilitate the exchange of information between devices and the NMS
to monitor and control managed network devices
to report user logins to a monitoring station
to verify traffic throughout the network and keep a log of all activity

10 What is the purpose of preparing a business case?


to justify the financial investment in implementing the technology change
to provide an example of a previous job done in the RFP
to define the technical requirements of the network
to define timelines and critical milestones

11 During an evaluation of the currently installed network, the IT staff


performs a gap analysis to determine whether the existing network infrastructure can
support the desired new features. At which stage of the Cisco Lifecycle Services
approach does this activity occur?
Prepare Phase
Plan Phase
Design Phase
Implement Phase
Operate Phase
Optimize Phase

12 A network engineer working for ABC company is writing a response to an


RFP for a network upgrade and must create an executive summary. Which statement
describes the basic components of an executive summary?
quick overview of the problem, the recommended solution, and the justification
for ABC company doing the job
detailed description of the solution, including but not limited to, timelines, turn-
over schedule, warranty information, and emergency recovery information
detailed description of costs including, the cost of software and hardware
components, licensing requirements, labor cost, and other applicable fees
multiple page document containing additional information such as detailed lists of
equipment required, diagrams, company background information, and insurance coverage

13 What is the purpose of system-level acceptance testing?


to develop an installation plan for the newly designed network
to train end users and support personnel on the newly installed network
to check that the newly installed network meets the business goals and design
requirements
to justify the financial investment required to implement the technology change

14 Why is it important to prioritize business goals when developing network


design?
to ensure that the least expensive technologies are implemented first
to simplify the configuration, administration, and monitoring of the newly
installed network
to anticipate the effects of changes and growth of the business
to adhere to the best opportunities to contribute to the success of the business

15 Which two statements are true regarding the response to an RFQ? (Choose
two.)
The response should be brief.
It should strictly conform to the formatting requirements specified by the RFQ.
Only the items that the contracting company will be addressing should be
answered.
The response helps the customer compare pricing with other potential contractors.
The response is more complicated than a response to a RFP.

16 What is the purpose of creating a prioritized list of technical requirements?


defines the project scope
determines the business profitability
creates a feasibility report for analysis
identifies existing and new user groups

17 What is a business constraint that may impact the WAN design of a


company?
company policy regarding specific operating systems on LAN devices
current monitoring protocols implemented on end-user devices
non-availability of end users during implementation
company policy requiring the use of specific vendor networking equipment due to
partnerships
18 What are two disadvantages of using a bottom-up approach instead of a
top-down approach to network design? (Choose two.)
It can result in an inappropriate network design.
A new design cannot be implemented right away.
It does not take into account the business goals of the company.
This approach is not commonly practiced and is therefore not as well known.
It requires tedious and time-consuming meetings with the customer to develop an
understanding of the organization.

19 Which stage of the Cisco Lifecycle Services strategy is usually completed


before an organization issues a Request For Proposal (RFP) or Request For Quotation
(RFQ)?
Prepare Phase
Plan Phase
Design Phase
Implement Phase
Operate Phase