Sie sind auf Seite 1von 1

INVITATION FOR PRE-QUALIFICATION OF CONTRACTORS OFFSHORE DRILLING

& COMPLETION SUPPORT SERVICES DRILLING CAMPAIGN ON JV BLOCKS 2009 - 2011


1. Introduction - Frac Pack services for 7 in, 9-5/8 in and 10-3/4 in casing, including wireline related completion
Total E&P Nigeria Limited invites interested and reputable companies with suitable equipment and services and tools etc. High Pressure sand control pumping operations with the use of some
relevant experience to apply for pre-qualification for consideration to tender on the under mentioned skid Mounted equipment, associated personnel and consumables (gels, proppant, etc).
Drilling and Completion support services. It is planned that the services will be carried out as from Q2, 2009 - Matrix acidizing and stimulation services (sandstone Acids, HCL, etc…), equipment (skid Mounted
for a drilling campaign of up to two (2) years with a possible extension. and /or Stimulation vessel), - associated personnel and consumables.
2. Description of Services N) Perforation Services
A) Directional Drilling and FEWD Services Contractor shall supply equipment, engineering, hardware and personnel for Services to perform
Contractor shall be able to provide following services for drilling deviated and/or horizontal wells: Perforations Operations. This will include tubing conveyed perforations and wireline conveyed
- complete set of equipment for Bottom Hole Assembly to perform directional drilling (mud motors, Perforations.
Rotary Steerable Systems, stabilisers, etc.) to drill to requested inclination and azimuth O) DST Services
- qualified directional drillers. Contractor shall supply DST equipment, engineering, hardware and personnel for DST Services. This will
- software and hardware for survey data management, well planning, anti-collision scanning, BHA include full down hole tools to perform DST operations.
behaviour prediction, torque and drag calculations and hydraulics calculations. P) Down Hole Gauges Services
Contractor shall also be able to provide following services for drilling deviated and/or horizontal wells: Contractor shall supply engineering, hardware, equipment and personnel for down hole gauges services
- down-hole while drilling directional drilling measurement monitoring (inclination, azimuth, tool during testing operations.
face). Q) Sand Control Completion Services
- down-hole while drilling resistivity, gamma ray real-time measurements. Contractor shall supply engineering, hardware, equipment and personnel for sand control completion
- down-hole while drilling density-neutron real-time measurements. including service tools and services for sand control lower completions.
- qualified LWD Engineers. R) Completion Services
Contractor shall supply engineering, hardware, sub assemblies preparation and equipment and
B) Downhole Tools and Fishing Services
personnel for running and hole and setting of Upper Completions including Service Tools and Services.
Contractor shall be able to provide following services for deviated and/or horizontal wells:
- complete set of downhole fishing equipment for drilling and completion operations (jars, overshots, S) Slick line Services
etc.). Contractor shall supply Equipment and services for slick line operations related to completions and DST's
- qualified fishing personnel. including engineering, equipment and personnel for completion assistance and slick line fishing services.
C) Gyro Services 3. Pre-qualification documents
Contractor shall be able to provide following services for deviated wells: To qualify for consideration, contractors are required to supply the undermentioned documentation (in the
- complete set of North seeking gyro equipment. event pre-qualification is requested for more than one service, then separate sets of documentation shall
- qualified gyro surveyors. be provided clearly indicating each service for which pre-qualification is being applied. For each service for
D) Casing/Tubing Running which prequalification is requested, two (2) sets of the following documentation, with the specific chapters,
Contractor shall be able to supply equipment and services to handle, clean, drift and perform controlled separated by dividers, in the same order as set out here below (a) to (o), in addition two (2) electronic
make up of casing and tubing connections for tubing and casing pipes ranging from 2” to 30”. Special copies CD ROM of the prequalification documents shall be furnished:
tubing like Chrome Tubing would be involved. A) A separate section summarizing the contents chapter by chapter of the pre-qualification document.
E) Filtration Services B) Evidence of contractor's registration in Nigeria (Certificate of Incorporation), Nigerian company's legal
Contractor shall provide surface filtration equipment, consumables and services (experienced and qualified status, copies of Corporate Affairs Commission's forms C02 and C07 showing Contractor's
personel, logistic Base and workshop facilities in Port Harcourt). shareholding profile.
C) Contractor's general structure and organisation, including the branch dedicated to such activities.
F) Cementing And Pumping Services D)In case of joint venture with, attach copy of the joint venture agreement, and details of the interest of
Contractor should be able to provide Cementing and pumping services in an offshore rig environment with each of the joint venture partners and the role of each party shall be clearly indicated.
related services including: E) Details of Contractor's Health, Safety and Environmental Policy and Programme together with HSE
- Cementing, pumping, squeeze and acidification services Management System. HSE considerations on site and throughout the requirement are part of
- Engineering, cement design and lab testing services Contractor's responsibility and Contractor must have proven methods for eliminating risks associated
- Experienced and qualified personnel with its own scope of services and all interfaces with others. These methods must be clearly indicated.
- Cement and pumping equipment, accessories and products F) Safety records with summarised description of accidents, equipment damage, near-misses, LTI as well
- Provision of cementing programs and recommendations LTIF TRIR per million manhours over the past three (3) years.
- Warehousing and Logistics G)Details of Contractor's Community Affairs Policy & Programme and records for the past three (3) years.
- Base and workshop facilities in Port Harcourt H) Quality Assurance System certified ISO 9000 or equivalent.
G) Offshore Bulk Cuttings Recovery And Transfer Services I) Copy of relevant Department of Petroleum Resources (DPR) Certificate of Registration for year 2008.
Contractor should be able to provide equipment and services for Offshore Bulk Cutting Recovery and J) Details of relevant verifiable experience of similar services that Contractor has undertaken as main
Transfer in an offshore Jack Up rig environment with related services including: Contractor in the last five (5) years, inside or outside Nigeria. This is mandatory.
- Recovery and transfer of non-aqueous base mud cuttings from the rig drilling solids control K) Reference of three (3) major customers that can be contacted for information/reference.
equipment to skips on a dedicated vessel, via pneumatic means L) Description and specifications of equipment currently owned by Contractor together with proof of
- Provision of bulk cuttings storage tanks on the rig ownership and safety standards that will be utilised in the execution of the work. Proof of available
- Experienced and qualified personnel office, resources, warehouse, equipment, facilities, spares, base camp, trucks etc. to support your
- Logistics support operations.
- Base and workshop facilities in Port Harcourt M)Resume of key personnel to be involved in the services.
H) Electrical Logging N) Qualifier's audited accounts and tax clearance certificate for the past three (3) years.
Contractor shall provide latest-generation technology and high calibre personnel (engineers and O)All relevant information concerning contacts, telephone, fax, e-mail address of the representatives.
operators) able to run any types of log requested ; most particularly (a) Magnetic Resonance Imaging, (b)
Formation Tester with multi-sampler, fluid analyser and pump-out modules, (c) High Resolution Imaging 4. Nigerian content
tools applicable to water-based, and oil-based mud systems. Tools maintenance record must be given. Total E&P Nigeria Limited and its Joint Venture Partner are committed to maximise the Nigerian Content of
Contractor should be able to process some of the acquired data as may be requested, within 48 hours. this project. Companies are to note that evidence of a Nigerian Content strategy/plan is a compulsory
HSE considerations on site, and throughout the campaign are part of Contractor's responsibility. prerequisite. In line with this, companies are required to ensure that information on the following is
I) Mud Logging included in their submission, to show their level of compliance with Federal Government Directives on
Contractor should provide Computerised-Advanced Data Unit Mud Logging and Geological Services, Nigerian Content Development.
including the personnel, the necessary consumables and the surface equipment required for measuring ? Interested foreign companies must partner with Nigerian companies to undertake this project.
while drilling or/and tripping the drilling and geological parameters, to be able to conduct in a safe manner ? Provide training plans for the Nigerian workforce on this project.
drilling operations and to be able to determine lithology and hydrocarbon potential zones. ? Provide details of the percentage of your key management positions held by Nigerians and what
J) BIT SUPPLY SERVICES percentage of total workforce is Nigerian.
Contractor shall provide both rock bit and monoblock bits for application in the drilling of loosely ? Proposed utilization of Nigerian resources (manpower services through subcontracting where
consolidated shale and sand stone intervals in both water based and non-aqueous based drilling fluid. applicable, equipment and materials, etc.) in order to achieve the Federal Government target of
Drilling bit performance benchmarking and end of section reports shall be issued by contractor. Contractor 70% by 2010 in terms of the value of the relevant contract.
must be able to provide bits suitable for rotary steerable application and must be able to provide bit ? Provide evidence of significant growth capacity building (human/infrastructure) in Nigeria existing
engineering softwares for optimization of bit operating parameters. Supply shall be on a consignment over the next three (3) years.
basis. ? Location and address of Project Management Team and Procurement centre in Nigeria
K) Surface Well testing and Surface Sampling ? In case of a joint venture, attach a copy of the joint venture agreement, and details of the interest of
Contractor shall provide equipment, personnel and services for surface well testing operations, including each of the joint venture partners. The role of each party should be clearly indicated.
Note non-compliance with Nigerian Content Directives is “fatal flaw” and which shall result in
burner booms, surface production monitoring, surface fluid sampling and PVT analysis and surface data
disqualification from bidding on this project
Acquisition for gas and oil wells.
L) Coiled Tubing and Nitrogen Services Failure to provide any of the listed documents will affect or reduce the score relevant to that item.
Contractor shall supply equipment, personnel and services to perform coiled tubing operations in live gas Notwithstanding, the submission of this documentation, Total E&P Nigeria Limited is neither committed
and oil well (including Nitrogen pumping operations). nor obliged to include any contractor on the tender list or award any form of contract to any contractor
M) Sand Control Hardware and Sand Control Pumping Services and/or associated companies, subcontractor or agent. Please note that this is not an invitation to tender.
Contractor shall supply equipment, engineering, personnel and services to perform sand control Full tendering procedure will be provided only to Contractors that have been successfully pre-qualified
operations. This will include the delivery of hardware and engineering, pumping equipment, etc. in order to through this advertisement and this may consist of safety / technical audit of facilities/equipment to
complete : determine those suitable to provide the relevant services. Please visit the NipeX Portal at
- High Rate Water Pack services for 7”, 9-5/8”, 10-3/4” casing including service tools, wireline related www.nipexng.com for this Advertisement and other information. Suppliers are expected to be pre-
completion services and tools etc. qualified in the NipeX JQS database. This is a condition to participate in this exercise. Application
forms are available at www.nipexng.com

5. Submission of pre-qualification documents


A separate document shall be submitted for each service for which prequalification is requested. The pre-qualification documents should be sealed and marked
“Pre-qualification for Offshore Drilling and Completion Support Services Drilling Campaign JV Offshore 2009 - 2011”
[mention the name of the service]
Delivery shall either by hand or by courier service to reach
the address given below not later than Friday, 23rd January, 2009.
Contracts Manager (Room 0/11 B.7)
TOTAL E&P NIGERIA LIMITED
Plot 25, Trans-Amadi Industrial Layout
Port Harcourt (Nigeria)

Das könnte Ihnen auch gefallen