Date: 24.04.2010
3. Category of equipment : A
4. Problem reported :1. None, As per EMCCR plan for Unit#2 all three End
Shield Pump and Motor are to be overhauled.
Head: 34m
Motor Details :
12. Performance test : Performance of all five pumps checked, and it is within
acceptable limit. For details refer annexure A.II
S. Assembly Replace P1 P2
No measurement. d if,
.
1. Casing D1 199.99 199.99
wearing
ring ID,
mm
2. Impeller D’1 199.7964 199.64
hub OD,
mm
3. Clearance C1 >0.40mm 0.20 0.35
between ID
of casing
wearing
ring and
OD of
impeller
hub, mm
(C=D-D’)
4. Pressure D”1 199.97 199.94
cover
wearing
ring
5. Impeller d1 199.77 199.61
hub OD
6. Clearance c1 >0.40 0.20 0.33
between mm
rear
Pressure
cover
wearing
ring and
impeller
hub OD,
mm (c=D”-
d)
Annexure A.II
Performance of individual pump running
SI NO Calandria Calandria
Vault Cooling Vault Cooling
Pump#1 Pump#2
H V A H V A
1 Pump 1.4 0.8 1.2 2.9 1.6 2.2
DE
Bearing
2 Pump 1.1 1.1 1.0 2.0 1.7 1.7
NDE
3 Motor 1.1 2.4 1.1 1.1 2.3 2.1
DE
Bearing
4 Motor 1.2 2.4 1.0 1.1 2.3 1.3
NDE
Bearing
5 Motor 0.7 0.9 1.0 1.0 0.8 0.9
Base
6 Dischrge 0.5 1.2 0.7 2.0 2.4 2.3
Pipe line
7 Suction 0.8KG/Cm2 0.8Kg/Cm2
Pr.
8 Discharge 3Kg/Cm2 3Kg/Cm2
Pr.
9 Full Load 45amp 45amp
Current