Beruflich Dokumente
Kultur Dokumente
ELECTRICAL MATERIALS 41 6 26 0 0 0 0 0 0 0 0 0 26 16 6
MECHANICAL MATERIAL 19 6 8 1 0 1 0 0 0 0 0 0 21 13 2
LEGEND:
1 Very Urgent to close/Rejected ITR
2 Moderate to close/NOWC w/Major Comments
3 Not Urgent to Close due to Spec./NOWC-Subject to Docs.
4 Will be closed after DCD Inspection/NOWC Minor Comments
5 Easy /Ready to close- NOWC ( Subject To DCD comments)
SUBMITTED TO
TOTAL ITR TOTAL OPEN
TOTAL ITR JV & NOT YET
CLOSED ITR
COSED
258 56 202 81
67 22 45 32
41 19 22 11
14 126894 Station Installation inspection for Conduits for ECS System Installation Defers from the Atkins Approved Shop DWG NOWC 1 M. Jabar 1
1.) Installed Panel for ECS-04 A&B not the right one. Changes
in Conduit & Trunking Possible When the Appropriate Panel is 1 1
Inspection Installation of ECS Trunking & Conduits installed for Re-Inspection
33 158090 R05, R15, R83 at R05,R15,R83, Lifts and R84 As Per Attached NOWC V. Cenas
Highlighted Drawing
2.) Add Support for 50mm Trunking, Lift 1 - Near Vertical bend,
Lift 2- Near Horizontal Bend
1 1
13-Mar-11
Ready JT 10-Feb
Ready JT 10-Feb
Ready JT 10-Feb
Ready JT 10-Feb
Ready JT 10-Feb
ETASET 31-Jan
JT 10-Feb
Installation Inspection of earth bar in Rm. 80, 81.2 Installed earth bar at Rms. 80 & 81.2 did not match the shop
9 151488 Room 80, 81.2, & 82
and 82 drawing, 14 way instead of 12 way bar.
NOWC 1 V. Cenas 1
Installation inspection of cable tray and trunking in 2. Provide fishplate for all bonding; apply galvanized paint in all
10 151502 Room 01 & 02
R01 and R02. cuttings, and complete earth bonding connector at R02.
NOWC 1 V. Cenas 1
16 159129 Station Inspection Installation of Primary Cabinet # 2 2.) Rectify All Physical Damages incurred on the Panel NOWC 1 V. Cenas 1
35 162061 Room 53 Inspection Installation of SMDB-NORMAL @ R53 2.) Remove Rough Edges on Channel Support then Paint and NOWC V. Cenas
Put on Rubber End Caps.
1 1
Inspection Installation & Insulation Test of ATS 1.) CL/CT Installation not Done 1 1
45 162797 Station NOWC V. Cenas
Cable from PC1 to PC2 (1X4CX70mm) # 77 2.) Torque test not Included on this ITR 5 1
1.) No Panel Tag 1 1
2.) Removed Rough Edges on Channel Support, Paint and Put
46 162065 Station Inspection Installation of DB-01 @ 70.1 Rubber End Caps CLOSED
1
V. Cenas
1
Inspection Installation & Insulation test of UPS & 1.) Pill up Completely the Test Result Form 5 1
57 162802 Station NOWC V. Cenas
BYPASS Switch (Cable only) 2.) CT/CL ITR not done 1 1
1.)Exposed supply cable to conceal on conduit 1 1
58 167089 Room 01 Installation Inspection of LCP Panel in Rm.01 NOWC V. Cenas
2.)Wire entry to box, provide rubber 1 1
1.) Cable from spur outlet to be fastened to the wall NOWC 1 V. Cenas 1
Inspection Installtion of FM200 Panel at R85.1 &
65 164425 Room 85.1 & 85.2
R85.2
2.) Battery not yet installed 1 V. Cenas 1
1.)Arrange cable properly. Make it look neat NOWC 1 V. Cenas 1
66 164426 Room 54 Inspection Installtion of FM200 Panel at R54 & R82
2.)Battery not yet installed 1 V. Cenas 1
71 170395 Room 54 Installation Inspection of UPS and Battery in rm 54 Rack no connection to earth-provide earth connection CLOSED 1 V. Cenas 1
72 167102 Room 70.2 Installation Inspection of conduit for lighting @ 70.2 Align light fixture. Make it parallel along station gridline NOWC 1 V. Cenas 1
Bus Waiting Area Ent. Installation Inspection of GI Conduit Installation for 1.) Provide Cover ( Metal Cap) on not used JB Port. 1 1
84 155304 NOWC V. Cenas
Pod A. Lighting in Bus Waiting Area Ent. Pod A.
2.) Attach Engineer Letter of Approval for MS. 5 1
Bus Waiting Area Ent. Installation Inspection of GI Conduit Installation for 1.) Provide Cover ( Metal Cap) on not used JB Port. 1 1
85 154251 NOWC V. Cenas
Pod B. Lighting in Bus Waiting Area Ent. Pod B.
2.) Attach Engineer Letter of Approval for MS. 5 1
1.) Add Trunking Support as Discussed during the inspection 1 1
Installation inspection of Trunking and Conduit for
Landing Level Ent. Pod.
86 149943 ECS in Landing Level Ent. Pod. A, 1-100mm 2.) Minor Deviation Actual Route- to be Reflected on the As- NOWC V. Cenas
A
Trunking / Conduits to (4) FCU's built DWG.
1 1
3.) Attach Approved MS 5 1
Installation inspection of Trunking and Conduit for 1.) Subject for Re- Inspection when Approved Shop DWG. Is
Landing Level Ent. Pod. 1
87 149944 ECS in Landing Level Ent. Pod. B, 1-100mm Available CLOSED V. Cenas 1
A
Trunking / Conduits to (4) FCU's 2.) Attach Approved MS 5
1.) Put Label on Trunking 1 1
Landing Level Ent. Pod installation Inspection of Trunking for Lighting ,
88 154252 NOWC V. Cenas
A Power and Fire Alarm at Landing Level Ent. Pod A
2.) Shop DWG. Subject for Approval by the Engineer. 5 1
98 156450
Narrow footbridge (FB A Installation Inspection of Ceiling Rose for Ancillary 2.) Replace Ceiling rose Cables with FR Cable
NOWC
1
V. Cenas
1
and B ) and Signage in Narrow footbridge (FB A and B ) 3.) VDB Connection to be shown on the Revised SD 3
Signage in Architectural DWG is only one in electrical Shop 5 1
Dwg.
1.) Bends/Dents on panel noted to rectify 1 1
99 160359 Station Installation inspection of MCC ESS ENT B LV Panel NOWC V. Cenas
2.) Inspection for panel (Enclosure) installation only 5 1
1.) Damages Door Lock. Replace 1 1
2.) Tighten Fixing Bolts 1 1
Installation Inspection of ECS Panel 3 in EPOD A 3.) Enclosure Installation Details Provided 5 1
100 160354 EPOD A Basement NOWC V. Cenas
Basement
4.) After Work Completed Panel Should be Clean Accumulated
Dust a Foreign Object Removed Dirts, Stains and Scratches 1 1
Eliminated.
108 164676 Entrance Pod B Installation Inspection of SMBD normal EPOD B 2.)Enclosure installation only based on shop layout drawing no CLOSED V. Cenas
installation details provided on shopping. Other works covered 5 1
on separate ITR
Installation Inspection of DB9B in electrical room Apply paint panel pedestal inspected enclosure installation
118 164707 Entrance Pod B
ground floor epod B only based on approved layout
CLOSED 1 V. Cenas 1
13-Mar-11
JT 10-Feb
ETASET 31-Jan
Ready JT 10-Feb
Ready JT 10-Feb
to rectify by sub-con ETASET 31-Jan
to rectify by sub-con ETASET 31-Jan
to rectify by sub-con ETASET 31-Jan
to rectify by sub-con ETASET 31-Jan
ETASET 31-Jan
JT 10-Feb
ETASET 31-Jan
JT 10-Feb
ETASET 31-Jan
JT 10-Feb
ETASET 31-Jan
JT 10-Feb
ETASET 31-Jan
JT 10-Feb
ETASET 31-Jan
JT 10-Feb
ETASET 31-Jan
JT 10-Feb
ETASET 31-Jan
JT 10-Feb
ready JT 10-Feb
To confirm with the construction ETASET 31-Jan
To confirm with the construction ETASET 31-Jan
ready JT 10-Feb
To confirm with the construction ETASET 31-Jan
ready JT 10-Feb
ready JT 10-Feb
ready JT 10-Feb
ready JT 10-Feb
ETASET 31-Jan
JT 10-Feb
Put label on trunking (be done by
ETASET 31-Jan
Subcon)
attach approved shop drawing JT 10-Feb
provide cover on trunking (be done
ETASET 31-Jan
by subcon)
Put label on trunking (be done by
ETASET 31-Jan
Subcon)
attach approved shop drawing JT 10-Feb
Put label on trunking (be done by
ETASET 31-Jan
Subcon)
To provide cover (to be done by
ETASET 31-Jan
subcon)
attach approved shop drawing JT 10-Feb
ETASET 31-Jan
JT 10-Feb
Ready JT 10-Feb
Ready JT 10-Feb
Ready JT 10-Feb
Ready JT 10-Feb
Ready JT 10-Feb
Installation Inspection of Voice evacuation speaker 1. Installation subject for inspection by the architectural. 2 1
7 167096 Entrance Pod A in landing level entrance pod canopy and bus NOWC V. Cenas
waiting area ent Pod A 2. VES installation subject for final approval of DCD 4 1
Installation Inspection of Voice evacuation speaker 1. Installation subject for inspection by the architectural. 2 1
Ent Pod B and Bus
9 167097 in landing level entrance pod canopy and bus NOWC V. Cenas
waiting area
waiting area ent Pod B and Bus waiting area 2. VES installation subject for final approval of DCD 4 1
Landing Level Entrance Installation Inspection of lighting fixture @ Landing
10 170398
B Level Entrance B
Installation approval by the architect NOWC 2 V. Cenas 1
Landing Level Entrance Installation Inspection of lighting fixture @ Landing
11 170399
A Level Entrance A
Installation approval by the architect NOWC 2 V. Cenas 1
12 170246 Footbridge B Inspection Installation of light fittings at footbridge B Installation subject for approval by the architect NOWC 2 V. Cenas 1
13 170245 Footbridge A Inspection Installation of light fittings at footbridge A Installation subject for approval by the architect NOWC 2 V. Cenas 1
Installation Inspection of light fixture in ent. Pod A
14 171452 Entrance Pod A Canopy
canopy
1.) Installation subject for approval by the architect NOWC 2 V. Cenas 1
Installation Inspection of light fixture in ent. Pod B
15 171453 Entrance Pod B Canopy
canopy
1.) Installation subject for approval by the architect NOWC 2 V. Cenas 1
17 ← Total ITR
13-Mar-11
Ready JT 10-Feb
Installation Inspection of under screed Conduits 1.) Contractor to raised FCR, additional 2 Trunking 50x38mm
7 152514 Entrance Pod B FB level
and Trunking at Entrance Pod B Footbridge Level was installed.
NOWC 3 V. Cenas 1
13-Mar-11
0 3 13 29 0 0
30 ← Total ITR
Total 30 TOTAL 45
13-Mar-11
Ready JT 10-Feb
ready JT 10-Feb
8 137438 Station Installation Inspection of Under creed Conduits Reflect Changes on the As-Built DWG. NOWC 5 M. Jabar 1
Subject to Final Installation 5 1
Inspection of Electrical Rigid Steel Conduit under
9 139232 Room 02
screed installation (Ticket Office Machine Room 02) Junction Box was Shifted as per attached Signed Drawing due
CLOSED M. Jabar
to site condition.
5 1
Inspection Installation of Wiring for Small Power at 1.) Conduit Inspection for R12 not Covered on ITR#
R05, R12, R55.3, R19.4,
16 156414
R70.2
R05,R12,R55.3,R19.4 and R70.2 @ Concourse IR/CW/156404 to raised another IR for Conduit inspection and NOWC 5 V. Cenas 1
Level for Wiring inspection (Separate ITR)
Inspection installation of wiring for Lighting at (R31) Orange Color Wire for Vital ckt. To be Reflected on the revise
17 156401 Room 31
Female Public Toilet Concourse Level SD Submittal
NOWC 5 V. Cenas 1
Installation Inspection of LV Cable Ladder for Only cable Ladder for LV Cables for Primary cabinet (Incoming
20 162152 Room 53
Primary Cabinet 1 & 2 @ R53 ) were inspected
NOWC 5 V. Cenas 1
Installation Inspection of FM200 devices installation Manual Release sign to be installed; submit ITR for wiring
43 167869 Room 80, 81, 82
in RM 80, 81, and 82 installation
NOWC 5 V. Cenas 1
Landing Level Ent. Pod Installation Inspection of GI Conduit Installation for 1.) Inspection only on Landing Area only Telecom Room not
58 156591
A Small Power in Landing Level Ent. Pod A included (Retail Area)
NOWC 5 V. Cenas 1
63 162661 Station MCC-CHWP Torque Test Cable subject for Installation Inspection NOWC 5 V. Cenas 1
MCC ESS ENT A Incoming Cable and BusBar
64 146042 Entrance A
Torque Test
Cable Subject for Inspection of Installation NOWC 5 V. Cenas
GL 2 - 4.2 Concourse Inspection of installation of exit signs at concourse 1.)To be reflect in as built drawings changes made in actual
71 170236
Level level GL 2 to 4.2 installation
NOWC 5 V. Cenas 1
Telecom Room Entrance Installation Inspection of isolator Installation in 1.)Changes in actual installation (to suit actual Field condition)
72 171066
B telecom Room Entrance B shall be reflected in as built drawing
NOWC 5 V. Cenas 1
Installation inspection of lighting fixtures and socket 1.)Changes in actual installation (to suit actual Field condition)
73 171089 Telecom Room
outlet in telecom room shall be reflected in as built drawing
NOWC 5 V. Cenas 1
Telecom Room Entrance Installation Inspection of LV cable tray at telecom 1.)Changes in actual installation (to suit actual field condition)
74 171458
B room epod B shall be reflected as-built drawing
NOWC 5 V. Cenas 1
1 13 84 14 1 0
75 ← Total ITR
13-Mar-11
JT 10-Feb
Ready JT 10-Feb
Ready JT 10-Feb
Ready JT 10-Feb
Ready JT 10-Feb
Ready JT 10-Feb
Ready JT 10-Feb
Ready JT 10-Feb
ready JT 10-Feb
Installation & Insulation inspection for general ventilation 2.Make sure all grill/diffusers installed at proper location
4 145150 Room 01, 02 & 04 as per approved drawing. NOWC 1 1
system (R01, R02 & R04)
3.Subject for final inspection & T&C. 2 1
4.All threaded rod excess should be cut. 1 1
5.All damage insulation, rectify. 1 1
1.Submit as built approved drawing for R01. 5 1
Installation & Insulation inspection for smoke duct system
5 145151 Room 01, 02 & 04 2.All damage insulation/threaded rod should be NOWC
(R01, R02 & R04)
rectified.
1 1
3.subject for final inspection & T&C. 2 1
1.Rectify CHW pipe touching FM200 at R01. 1 1
2.Rectify CHW pipe touching concrete wall for proper
insulation of pipe.
1 1
Installation Inspection of chilled water pipe at R01, R02 &
6 145152 Room 01, 02 & 04 NOWC
R04 3.Pressure test not yet offered 5 1
4. Subject for final inspection & T&C inspection. 2 1
5.Subject for pull out test (Supports) 5 1
1.Rectify flexible duct connection to FCU. 1 1
7 145154 Room 01, 02 & 04 Installation Inspection of FCU1, 2, 4 & 7 (R01, R02 & R04) NOWC
2.Verify ceiling plan, coordinate with trades. 1 1
3.subject for final inspection & T&C 2 1
1. Rectify pendent/upright at R04 & R02. 1 1
Installation Inspection of Pipe Works for Fire Fighting 1.)As per attached photos and comment above; 5 1
19 153304 Station
Services
NOWC J. Andoyo
2.)subject to DCD approval 4 1
1.) Pressure testing Passed during inspection 5 1
R13, R15, R31, R32.1 , R30, Installation Inspection of UPVC Drainage at R13, R15, R31,
22 154337
R32.2 Concourse Level R32.1 , R30, R32.2 Concourse Level
Subject to Leak & Flow Testing CLOSED 5 J. Andoyo 1
Pressure testing for Cold Water Services at R30 Public Subject Final Pressure testing ( System) and DCD
23 155272 Room 30 Male Public Toilet
Toilet Male Approval , No Leak
CLOSED 4 1
Pressure testing for Cold Water Services at Female Public Subject for final pressure test (System) DCD Approval,
24 155273 Female Public toilet
Toilet , Concourse Level No Leak
CLOSED 4 1
73 162155 Room 70.2 Installation Inspection for SEF-03 @ Rm 70.2 CLOSED J. Andoyo
2.) Provide Checklist for Extract Fan Installation 5 1
3.) Avoid Clashing w/ other Services 1 1
ENT POD B Landing Area Installation Inspection of FCU-02B-07 @ ENT POD B 2.) Installed U- Trap was 25mmφ Pipe 2.) Diaelectric
77 160903 Union not installed NOWC 1 J. Andoyo 1
Footbridge Level Landing Area Footbridge Level
3.) Ensure unit is Clean from Debris 5 1
4.) Ensure Duct Connected to FCU must be Supported
to Avoid Sagging
1 1
ENT POD B Landing Area Inswtallation Inspection of FCU-02B-08 @ ENT POD B 2.) Installed U- Trap was 25mmφ Pipe 2.) Diaelectric
78 160904 Union not installed NOWC 1 J. Andoyo 1
Footbridge Level Landing Area Footbridge Level
3.) Ensure unit is Clean from Debris 5 1
4.) Provide Support for Sagging Duct Connected to
FCU
1 1
ENT POD B Landing Area Installation Inspection of Valve Package FCU-02B-08 @ Rectify location of TP & AV Aser Approved Shop
80 160908
Footbridge Level ENT POD B Landing Area Footbridge Level Drawing
CLOSED 1 J. Andoyo 1
E POD B Ground Level MHI Inspection Installation of Chilled Water Pipe @ E POD B 1.) Provide Permanent Supports 1 1
92 163735
Room Ground Level MHI Room
CLOSED J. Andoyo
2.) Checklist Unfilled Up 5 1
1.) Subject to DCD Approval 4 1
93 163736 Room 82 Installation Inspection for Gas Suppression Pipe @ Room 82 NOWC J. Andoyo
2.) Noozle not yet installed 1 1
94 163741 Footbride A & B Inspection for Fresh Air Duct Joint @ Footbride A & B Subject to Final Inspection CLOSED 2 J. Andoyo 1
116 158178 Room 16 & 40.2 Insulation Inspection of fire rated duct in R16 & R40.2 Rectify Loose insulation CLOSED 1 J. Andoyo 1
Unpaid Area Concourse Installation inspection of VAC Ducts in paid & unpaid area
118 158395
Level concourse level (pls see attached drawing)
as per comment above and attached photos CLOSED 5 J. Andoyo 1
119 158391 GL 6.4-8 concourse level Installation inspection of vent pipes GL 6.4-8 concourse level Rectify the insulation according to approved drawing NOWC 1 J. Andoyo 1
Gridline 6.2-8 Concourse Installation inspection of PPR Pipes Concourse level,
120 158398
Level gridline 6.2-8
Ensure pipe is supported and rubber provided NOWC 1 J. Andoyo 1
121 162153 Room 70.1 Installation inspection for SEF-01 @ Rm. 70.1 2.)provide checklist for extraction installation NOWC 5 J. Andoyo 1
122 163732 Station Installation inspection for valve package (AHU Provide anti-corrosive paint for welded joints at support NOWC 1 J. Andoyo 1
G/L 6.3-7.4 Corridor & BOH Installation Inspection of fire fighting pipes in G/L 6.3-7.4 Welded joints must be pointed; Subject to DCD
123 160675
Areas concourse level Corridor & BOH Areas concourse level approval
NOWC 4 J. Andoyo 1
Entrance pod A Footbridge & Installation Inspection of hydrant pipes in entrance pod A Provide U-Bolt for Support & Subject to DCD
124 158397
landing area footbridge & landing area approval
NOWC 4 J. Andoyo 1
140 166760 Roof B Installation Inspection of EF-G02B-03 Roof B 2.)Provide approved detailed installation DWG. NOWC 5 J. Andoyo 1
3.)Slab opening is smaller than diameter 1 1
4.)Subject to final inspection 2 1
141 166756 PSD Room Installation inspection of EF-11 @ R85.2 PSD room 1. Provide saddle support & double nut CLOSED 1 J. Andoyo 1
163 164773 E.Pod B Footbridge Pre commissioning Test for EF-02BF-02@ E.Pod B Footbridge 2.)Ensure duct work is cleaned internally CLOSED 1 J. Andoyo 1
3.)As per comment attached 5 1
4.)Subject to T & C 2 1
1.)Witnessed pre-commissioning only 5
164 166734 Entracne pod B Pre commissioning check for FCU-02BF-02 2.)As per comments attached CLOSED 5 J. Andoyo 1
3.)Subject to T & C 2
1.)Witnessed pre-commissioning only 5
165 166731 Entracne pod B Pre commissioning check for FCU-02B-09 2.)As per comments attached CLOSED 5 J. Andoyo 1
3.)Subject to T & C 2
1.)Witnessed pre-commissioning only 5
166 166733 Entracne pod B Pre-commissioning Check for FCU-02BF-01 2.)As per comments attached CLOSED 5 J. Andoyo 1
3.)Subject to T & C 2
1.)Witnessed pre-commissioning only 5 1
167 166727 Entracne pod B Pre-Commissioning check for FCU-02B-03 2.)As per comments attached CLOSED 5 J. Andoyo 1
3.)Subject to T & C 2 1
180 166688 Footbridge Landing B Pre commissioning of G02B-FCU-07 (Footbridge Landing B) 2.)Ensure duct work is clean internally. CLOSED 1 J. Andoyo 1
3.)As per comment attached 5 1
4.)Subject to T & C 2 1
1.)Witnessed pre commissioning only 5 1
181 166723 Station Pre commissioning check for EF-10 2.)As per comment attached CLOSED 5 J. Andoyo 1
AL QUSAIS 1 (G-02) - ITR Register (Mech'l-Install Test) Page 79 of 251
STATUS
Site Closing Inspected
SN. IR No. Location Activity Description Comments Status
181 166723 Station Pre commissioning check for EF-10 CLOSED Rated By
J. Andoyo Close Ready Doc. Subject to Rectify Others
3.)Subject to T & C 2 1
188 164774 E.Pod B Basement Level 2.)Ensure ductwork is cleaned internally CLOSED 1 J. Andoyo 1
3.)As per comment attached 5 1
4.)Subject to T & C 2 1
1.)Ensure duct works is cleaned internally 1 1
189 164769 E.Pod B Mezz. Level Pre commissioning Test for EF-02B-02 @ E.Pod B Mezz. Level CLOSED J. Andoyo
2.)As per comment attached 5 1
3.)Subject to T & C 2 1
1.)Clean the fan chamber/AHU unit 1 1
2.)Drive Guard not Filted 1 1
190 164956 Station Pre commissioning for AHU-07 @ R70.2 3.)Vee belt not filted CLOSED 1 J. Andoyo 1
4.)MSD was checked manually 5 1
5.)Rectify conduit 1 1
1.)Clean the fan chamber/AHU unit 1 1
2.)Drive Guard not Filted 1 1
3.)Vee belt not filted 1 1
191 164955 Station Pre commissioning for AHU-06 @ R70.2 CLOSED J. Andoyo
4.)MSD was checked manually 5 1
5.)Rectify conduit 1 1
6.)Provide access to AHU Door 1 1
1.)Clean the fan chamber/AHU unit 1 1
2.)Drive Guard not Filted 1 1
192 164954 Station Pre commissioning for AHU-05 @ R70.1 3.)Vee belt not filted CLOSED 1 J. Andoyo 1
4.)MSD was checked manually 5 1
5.)Rectify conduit 1 1
1.)Ensure fan chamber/AHU unit is clean 1 1
2.)Drive guard & Vee belt not yet fixed 1 1
193 166579 Station Pre commissioning for AHU-04 CLOSED J. Andoyo
3.)MSD Manual checking only 5 1
4.)Subject to T & C 2 1
1.)Clean the fan chamber/AHU unit 1 1
2.)Drive Guard not Filted 1 1
194 164953 Room 70.2 Pre commissioning for AHU-03 @ R70.2 3.)Vee belt not filted CLOSED 1 J. Andoyo 1
4.)MSD was checked manually 5 1
5.)Rectify conduit 1 1
1.)Clean the fan chamber/AHU unit 1 1
2.)Drive Guard not Filted 1 1
195 164952 Room 70.2 Pre commissioning for AHU-02 @ R70.2 3.)Vee belt not filted CLOSED 1 J. Andoyo 1
4.)MSD was checked manually 5 1
5.)Rectify conduit 1 1
Pressure Testing Inspection of FM200 Pipes at concourse 1.)Submit approved shop drawing. 5 1
211 167236 Room 54
Level Room 54
NOWC J. Andoyo
2.)Subject to DCD Approval 4 1
Installation and Leak Testing of Inspection for the Drainage 1.)Attached FCR is not yet approved. 2 1
235 146403 Station
System
NOWC J. Andoyo
2.)Survey ITR must be attached 5 1
Installation Inspection of Fire Fighting Pipes at Footbridge A 1.)Provide additional supports on pipes. 1 1
237 150709 Footbridge A & B
&B
NOWC J. Andoyo
2.)Subject to DCD approval 4 1
1.)Subject for final inspection of sprinkler pipe for the
Installation inspection of pipe works for Fire Fighting whole system of F.F. & as per approved DCD.
4 1
238 152399 Station
Services
NOWC J. Andoyo
2.)Pressure testing not yet offered. 5 1
1.) Main Pipe inspection only, Sprinkler Head not
included provide identification labels
5 1
Installation inspection of pipe works for Fire Fighting
239 154328 Station
Services
NOWC J. Andoyo
2.) Subject for Final inspection & DCD Approval. 4 1
240 153320 Station Leak & Flow Test of UPVC Drainage NOWC J. Andoyo
2.) No Leak found during the time of inspection , 5 1
Ent. Pod B Ground Level Bus 1.) Provide Double Nuts on All Drop rod Supports 1 1
installation inspection of VAC Ducts in Ent. Pod B Ground
256 158180 Waiting & Landing Area
Level Bus Waiting & Landing Area Footbridge Level
NOWC J. Andoyo
Footbridge Level 2.) provide Additional Support to Avoid Sagging of Duct
@ Ent. Pod landing
1 1
Ent. Pod A Footbridge & installation inspection of UPVC Pipe in Ent. Pod A 1.) Raise FCR 2 1
257 158181
Mezzanine Level Footbridge & Mezzanine Level
NOWC J. Andoyo
2.) Subject to Leak & Flow Tests 5 1
Pressure Test of Fire Fighting Pipes in Concourse Level 1.) As Per Attached Document 5 1
258 158190 Concourse Level Public Area
Public Area
NOWC J. Andoyo
2.) Subject for DCD Approval 4 1
Ent. Pod A Footbridge Installation Inspection of PPR Pipes Ent. Pod A Footbridge 1.) Provide FCR 2 1
259 158399
Narrow Narrow
NOWC J. Andoyo
2.) Provide Rubber Inserts. 1 1
1.) As Per Attached Document 5 1
Concourse Level Gridline
260 158400
6.2-8
Pressure Test of PPR Pipes Concourse Level Gridline 6.2-8 2.) Calibration Certificate not Attached NOWC 5 J. Andoyo 1
3.) Subject to Pressure Testing for the Whole System 5 1
Installation Inspection of FCU-02B-05 @ ENT. Pod B 2.) Ensure Debris remved and cleanliness 1 1
267 160901 Ent. Pod B Footbridge level Footbridge Level (As Per attached Highlighted Shop NOWC J. Andoyo
drawing)
3.) Ensure Drain U-Trap Pipe is 32mm 1 1
4.) Rectify Loose Locknut @ Drop Rod Support 1 1
5.) Subject to Final Inspection 2 1
1.) Rectify Isolator Clashing with Drain U-Trap 1 1
Installation Inspection of FCU-02B-06 @ ENT. Pod B 2.) Ensure Debris remved and cleanliness 1 1
268 160902 Ent. Pod B Footbridge level Footbridge Level (As Per attached Highlighted Shop NOWC J. Andoyo
drawing)
3.) Ensure Drain U-Trap Pipe is 32mm 1 1
4.) Rectify Loose Locknut @ Drop Rod Support 1 1
5.) Subject to Final Inspection 2 1
Installation Inspection of Valve Packages for FCU-02B-05 @ 1.) Provide Additional Supports for Piping 1 1
269 160905 Ent. Pod B Footbridge level Ent. Pod B Footbridge level (As per attached Shop Drawing NOWC J. Andoyo
)
2.) Pressre Testing Not yet Done 5 1
3.) Subject to Final Inspection 2 1
Installation Inspection of Valve Packages for FCU-02B-06 @ 1.) Rectify AV to TP 1 1
270 160906 Ent. Pod B Footbridge level Ent. Pod B Footbridge level (As per attached Shop Drawing 2.) Pressure Testing Not Yet Done NOWC 5 J. Andoyo 1
) 3.) Sbject to Final inspection 2 1
1.) Ensure Drain U-Trap to be 32mm Pipe Dia 1 1
2.) Ensure actuator accessibility 1 1
Installation inspection for FCU-BF-01 @ E.POD B
271 162028 Entrance Pod B
Footbridge
NOWC J. Andoyo
3.) Rectify Loose Lock Nut for Drop ROD Support 1 1
4.) Dialectric Union not Installed 5.) Ensure unit is clean
from debris
1 1
Entrance Pod B Ground Installation inspection for valve package of FCU-02B-02 @ 1.) Provide supports. 1 1
279 162032
Level E.Pod B. Gr. Level
NOWC J. Andoyo
2.)Pressure testing not yet done 5 1
Entrance Pod B Ground Installation inspection for valve package of FCU-02B-01 @ 1.) Provide supports. 1 1
280 162031
Level E. Pod B. Gr. Level
NOWC J. Andoyo
2.)Pressure testing not yet done 5 1
1.) Drain Utrap not yet connected, ensure pipe dia
1 1
Entrance Pod B Ground Installation inspection for FCU-02B-04 @ E.Pod B. Ground 15.32mm, electric unim not installaed
281 162027
Level level
NOWC J. Andoyo
2.) ensure unit is clean from debris. 1 1
3.) ensure rubber washer is installaed 1 1
1.) Drain Utrap not yet connected, ensure pipe dia
15.32mm, electric unim not installaed
1 1
Entrance Pod B Ground Installation inspection for FCU-02B-03@ E.Pod B ground
282 162026
Level level
NOWC J. Andoyo
2.) ensure unit is clean from debris. 1 1
3.) ensure rubber washer is installaed 1 1
1.)Rectify damage filter. 1 1
Entrance Pod B Ground 2.)rectify drain utrap & ensure 22mm pipe 1 1
283 162025
Level
Installation for FCU-02B-02 @ E. Pod B ground level NOWC J. Andoyo
3.) electric union not installed. 1 1
4.) ensure unit is clean from debris. 1 1
5.) ensure washer installed 1 1
1. Replace damage filter (Rectify) 1 1
Installation Inspection for Fire Fighting Pipes @ Ent. Pod B 1.) Provide Sleeves 1 1
292 162170 Ent. Pod B Trench Area
Trench Area
NOWC J. Andoyo
2.) Subject to DCD Approval 4 1
Pressure Testing of pipe works for fire fighting services at 1.)Subject to final pressure testing of the whole system. 5 1
301 155277 Ent. Pod Bus Waiting
entrance Pod B waiting & escalators
NOWC J. Andoyo
2.)Subject to DCD aproval 4 1
Entrance Pod B Footbridge Pressure Testing for CHW Piping @ Entrance Pod B
302 154339
Level Footbridge level B
1.)Subject to pressure testing of the whole system NOWC 5 J. Andoyo 1
325 164932 Station Inspection of steps Installation for escalator #2 1.) Items 3, 5, & 6 must be check during T & C CLOSED 2 J. Andoyo 1
326 164933 Station Inspection of Steps Installation for escalator # 3 1.)Items 3, 5 & 6 must be check during T & C CLOSED 2 J. Andoyo 1
327 164934 Station Inspection of steps Installation for escalator #4 1.)Items 3, 5 & 6 must be check during T & C CLOSED 2 J. Andoyo 1
Inspection of steps Installation for escalator #7 (Emtrance
328 164935 Entrance Pod B
Pod B
1.)Items 3, 5 & 6 must be check during T & C CLOSED 2 J. Andoyo 1
329 164931 Station Inspection of steps installation for escalator # 1 1.)Items 3, 5 & 6 must be check during T & C CLOSED 2 J. Andoyo 1
Inspection of steps installation for escalator #8 (Entrance
330 164936 Entrance Pod B
Pod B)
1.)Items 3, 5 & 6 must be check during T & C CLOSED 2 J. Andoyo 1
Installation Inspection of fire fighting piping at entrance pod 2.)Spools not provided 3.Installation must be as 1 1
332 167223 Entrance pod B Pump Room
B Pump Room
NOWC J. Andoyo
3.)Attach checklist for ITP #2. 5 1
4.) per approved shop drawing 5 1
5.)Subject to "DCD" approval 4 1
1.)Initial inspection on subject to final inspection 2 1
Entrance Pod B Basement Installation Inspection of Fire Piping at Entrance Pod B 2.)Installation not yet completed 1 1
333 167224
Level Basement Level
NOWC J. Andoyo
3.)Attach other checklist ITP 2.4 5 1
4.)Subject to DCD Approval 4 1
1.)Rectify clashing pipe w/ other services; provide
Installation Inspection of fire fighting piping at concourse support for sagging pipe;
1 1
334 167221 Room 70.2 Concourse Level
level Rm. 70.2
NOWC J. Andoyo
2.)subject to DCD approval 4 1
Installation Inspection of fire fighting piping at concourse
335 167222 Room 70.1 Concourse Level
level Rm. 70.1
As per comment above subject to DCD approval NOWC 4 J. Andoyo 1
2.)Subject to T & C 2 1
2.)Subject to T & C 2 1
2.)Subject to T & C 2 1
2.)Subject to T & C 2 1
Epod A Basement Level and Installation Inspection of drainage Layout (HDPE) @ Epod A 1. Piping must be clamped w/ rubber inserts @ rigid
343 167226
Ground Level Basement Level and Ground Level supports
NOWC 1 J. Andoyo 1
E.Pod A Basement Level & Installation Inspection of drainage layout (HDPE) @ E.Pod A 1. Provide rubber inserts whenever necessary &
344 167228
Ground Level Basement Level & Ground Level Submit as built Drawing
NOWC 5 J. Andoyo 1
2.Subject to T & C 2 1
2.Subject to T & C 2 1
Inspection of UT & DPT for chilled water pipe @ Ent. Pod A
348 162168 Ent. Pod A FB, Landing Area
FB, Landing Area
As Per comment above and attached test reports NOWC 5 J. Andoyo 1
1.)Submit approved shop drawing, Nozzle not yet
installed,
5 1
Installation Inspection of FM200 Pipes at Entrance Pod B
349 167242 Entrance Pod B Telecom Rm NOWC J. Andoyo
Telecom Rm 2.)Raised FCR 2 1
3.)Subject to DCD approval 4 1
1.)Submit approved shop drawing, 5 1
Installation Inspection of FM200 Pipes at ENT Pod B 2.)Nozzle not yet installed, 1 1
350 167234 ENT Pod B Electrical Room
Electrical Room
NOWC J. Andoyo
3.)Raised FCR 2 1
4.)Subject to DCD approval 4 1
1.)Submit approved shop drawing, 5 1
Installation Inspection of FM200 Pipes at ENT Pod A 2.)Nozzle not yet installed, 1 1
351 167235 ENT Pod A Electrical
Electrical
NOWC J. Andoyo
3.)Raised FCR 2 1
4.)Subject to DCD approval 4 1
Pressure Testing Inspection of FM200 Pipes at Epod B 1.)Submit approved shop drawing. 5 1
352 167238 Epod B Electrical Room
Electrical Room
NOWC J. Andoyo
2.)Subject to DCD Approval 4 1
Pressure Testing Inspection of FM200 Pipes at Epod B 1.)Submit approved shop drawing. 5 1
353 167237 Epod B Telecom Room
Telecom Room
NOWC J. Andoyo
2.)Subject to DCD Approval 4 1
Pressure Testing Inspection of FM200 Pipes at Epod A 1.)Submit approved shop drawing. 5 1
354 167239 Epod A Electrical
Electrical
NOWC J. Andoyo
2.)Subject to DCD Approval 4 1
Inspection for UT & DPT of chilled Water Pipes in E.Pod A
355 164780 E.Pod A Mezz. Level
Mezz. Level
As per attached reports 1781 & 1829 CLOSED 5 J. Andoyo 1
Pre commissioning Inspection of fire pump and jockey pump 1.)witnessed pre commissioning conducted by eta; 5 1
365 170281 Entrance pod B basement
at entrance pod B basement
NOWC J. Andoyo
2.)subject to T & C & DCD approval 4 1
366 166699 Mezzanine A Pressure Testing of AHU @ Mezzanine A Valve Package as per attached documents/ report ; as per ITR 177636 CLOSED 5 J. Andoyo 1
UT & DPT Test for Chilled Water Pipe @ Mezzanine E Pod
367 163740 Mezzanine E Pod B
B
As per attached test reports & Photos CLOSED 5 J. Andoyo 1
1.)Witnessed only 5 1
378 170686 Entrance Pod A Clearance check for elevator #3 (Entrance Pod A) NOWC J. Andoyo
2.)As per attached documents 5 1
3.)Submit approved as built drawing 5 1
1.)Witnessed only 5 1
379 170687 Entrance Pod A Clearance check for elevator #4 (Entrance Pod A) NOWC J. Andoyo
2.)As per attached documents 5 1
3.)Submit approved as built drawing 5 1
1.)Witnessed only; 5 1
Smoke test inspection for smoke extract fans at concourse,
380 171086 Platform Level Footbridge B
platform level & footbridge B
NOWC J. Andoyo
2.)Subject to DCD approval 4
3.)As per Attached documents 5 1
1.)Witnessed only. 5 1
Pre commissioning inspection for Heat Exchanger #1&2 at
381 171085 Entrance Pod A
pump Room Ent Pod A
NOWC J. Andoyo
2.)Ensure thermometers are installed and strainers are
cleaned.
1 1
3.)Units must be cleaned and insulated 1 1
30 132 313 80 386 77
13-Mar-11
Irrelevant comment JT
10-Feb
To rectify by sub con ETASET 31-Jan
To rectify by sub con ETASET
31-Jan
Attach as built drawing JT 10-Feb
Attach as built drawing JT 10-Feb
To rectify by sub con ETASET
31-Jan
To rectify by sub con ETASET 31-Jan
JT
10-Feb
JT 5-Feb
Attach T&C ITR JT
5-Feb
To rectify by sub con ETASET
31-Jan
Attach approved shop drawing JT
10-Feb
Irrelevant comment JT
10-Feb
DCD required JT TBA
Ready JT
10-Feb
Attach ITR JT
10-Feb
Attach Final Inspection ITR ETASET
31-Jan
DCD required JT TBA
Irrelevant comment JT
10-Feb
ETASET
31-Jan
JT
5-Feb
Irrelevant comment JT
10-Feb
Attach T&C ITR JT 5-Feb
To confirm with the construction team ETASET
31-Jan
Irrelevant comment JT
10-Feb
Attach T&C ITR JT 5-Feb
To confirm with the construction team ETASET
31-Jan
Irrelevant comment JT
10-Feb
To rectify by sub con ETASET
31-Jan
Attach T&C ITR JT 5-Feb
Provide FCR JT
10-Feb
Irrelevant comment JT
10-Feb
Provide FCR JT
10-Feb
To rectify by sub con ETASET 31-Jan
To rectify by sub con ETASET 31-Jan
Provide FCR JT
10-Feb
To rectify by sub con ETASET 31-Jan
To rectify by sub con ETASET 31-Jan
Provide FCR JT 10-Feb
To rectify by sub con ETASET 31-Jan
To rectify by sub con ETASET
31-Jan
To rectify by sub con ETASET 31-Jan
Provide FCR JT 10-Feb
Provide FCR JT
10-Feb
To rectify by sub con ETASET
31-Jan
To rectify by sub con ETASET 31-Jan
Provide FCR JT
10-Feb
To rectify by sub con ETASET 31-Jan
To rectify by sub con ETASET 31-Jan
DCD required JT
TBA
attach pressure test report JT
10-Feb
To rectify by sub con ETASET
31-Jan
DCD Required JT TBA
attach pressure test report JT
10-Feb
Irrelevant comment JT
10-Feb
To rectify by sub con ETASET 31-Jan
check in the final inspection ETASET
31-Jan
Irrelevant comment JT
10-Feb
check in the final inspection ETASET
31-Jan
To rectify by sub con ETASET
31-Jan
To rectify by sub con ETASET
31-Jan
To rectify by sub con ETASET 31-Jan
attach T&C ITR JT 5-Feb
Irrelevant Comment JT
10-Feb
attach pressure test report JT 10-Feb
To rectify by sub con ETASET
31-Jan
To confirm with the construction ETASET 31-Jan
Attach checklist JT
10-Feb
To rectify by sub con ETASET
31-Jan
Attach checklist JT
10-Feb
To confirm with the construction ETASET 31-Jan
Irrelevant comment JT
10-Feb
irrelevant comment JT
10-Feb
attach flow test report JT
10-Feb
DCD required JT TBA
irrelevant comment JT
10-Feb
attach flow test report JT
10-Feb
DCD required JT TBA
JT
10-Feb
DCD Required JT
TBA
DCD Required JT
TBA
To rectify by sub con ETASET
31-Jan
To rectify by sub con ETASET 31-Jan
To confirm with the construction ETASET
31-Jan
provide additional support by sub con ETASET
31-Jan
Provide FCR JT 10-Feb
To be rectify by sub-con ETASET
31-Jan
Re check at site ETASET 31-Jan
Provide FCR JT
10-Feb
Provide FCR JT
10-Feb
irrelevant comment JT
10-Feb
Attach checklist JT 10-Feb
attach approve shop drawing JT 10-Feb
To be clean by sub con ETASET 31-Jan
To rectify by sub con ETASET 31-Jan
Provide FCR JT 10-Feb
attach close T&C ITR JT 5-Feb
Irrelevant comment JT
10-Feb
attach approve shop drawing JT 10-Feb
Provide FCR JT 10-Feb
attach close T&C ITR JT 5-Feb
Attach material ITR JT
10-Feb
To confirm with the construction ETASET 31-Jan
Attach checklist JT 10-Feb
attach approve shop drawing JT 10-Feb
Provide FCR JT 10-Feb
Irrelevant comment JT
10-Feb
attach needed drawing JT
10-Feb
To rectify by sub con ETASET 31-Jan
attach close T&C ITR JT 5-Feb
To be rectify by sub-con ETASET
31-Jan
To rectify by sub con ETASET
31-Jan
To be rectify by sub-con ETASET 31-Jan
irrelevant comment JT
10-Feb
To be rectify by sub-con ETASET
31-Jan
To be rectify by sub-con ETASET 31-Jan
attach close T&C ITR JT 5-Feb
attach approve shop drawing JT
10-Feb
Irrelevant Comment JT
10-Feb
attach installation checklist JT 10-Feb
Irrelevant comment JT 10-Feb
Irrelevant comment JT 10-Feb
attach close T&C ITR JT 5-Feb
JT 10-Feb
JT 10-Feb
JT 5-Feb
JT 10-Feb
JT 5-Feb
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
Irrelevant comment JT 10-Feb
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
Irrelevant comment JT 10-Feb
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
Irrelevant comment JT 10-Feb
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
JT 10-Feb
JT 10-Feb
JT 5-Feb
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
To rectify by sub con ETASET 31-Jan
attach close T&C ITR JT 5-Feb
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
Irrelevant comment JT 10-Feb
attach close T&C ITR JT 5-Feb
To be rectify by sub-con ETASET 31-Jan
To be rectify by sub-con ETASET 31-Jan
To be rectify by sub-con ETASET 31-Jan
To be rectify by sub-con ETASET 31-Jan
Attach T&C ITR JT 5-Feb
To be rectify by sub-con ETASET 31-Jan
To be rectify by sub-con ETASET 31-Jan
To be rectify by sub-con ETASET 31-Jan
To confirm with the construction if its
ETASET
clean 31-Jan
To be rectify by sub-con ETASET 31-Jan
Attach T&C ITR JT 5-Feb
To confirm with the construction if its
ETASET
clean 31-Jan
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
Irrelevant comment JT 10-Feb
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
To confirm with the construction if its
ETASET
clean 31-Jan
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
To confirm with the construction if its
ETASET
clean 31-Jan
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
To rectify by sub con ETASET 31-Jan
To confirm with the construction if its
ETASET
clean 31-Jan
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
JT 10-Feb
JT 10-Feb
JT 5-Feb
JT 10-Feb
JT 10-Feb
JT 5-Feb
JT 10-Feb
JT 10-Feb
JT 5-Feb
Irrelevant comment JT 10-Feb
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
JT 10-Feb
ETASET 31-Jan
JT 10-Feb
JT 5-Feb
Irrelevant comment JT 10-Feb
To be clean by sub con ETASET 31-Jan
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
Irrelevant comment JT 10-Feb
To be clean by sub con ETASET 31-Jan
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
Irrelevant comment JT 10-Feb
To be clean by sub con ETASET 31-Jan
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
Irrelevant comment JT 10-Feb
To be clean by sub con ETASET 31-Jan
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
To rectify by sub con ETASET 31-Jan
Irrelevant comment JT 10-Feb
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
Irrelevant comment JT 10-Feb
Irrelevant comment JT 10-Feb
To confirm with the construction if its
ETASET
clean 31-Jan
Attach T&C ITR JT 5-Feb
Irrelevant comment JT 10-Feb
To confirm with the construction if its
ETASET
clean 31-Jan
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
Irrelevant comment JT 10-Feb
To confirm with the construction if its
ETASET
clean 31-Jan
To be clean by sub con ETASET 31-Jan
To rectify by sub con ETASET 31-Jan
Irrelevant comment JT 10-Feb
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
JT 10-Feb
ETASET 31-Jan
JT 10-Feb
JT 5-Feb
attach test reports JT 10-Feb
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
Irrelevant comment JT 10-Feb
To confirm with the construction if its
ETASET
clean 31-Jan
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
Irrelevant comment JT 10-Feb
Irrelevant comment JT 10-Feb
5-Feb
5-Feb
DCD Required JT
TBA
Provide FCR JT
10-Feb
DCD required JT
TBA
DCD Required JT
TBA
To rectify by sub con ETASET
31-Jan
DCD Required JT
TBA
To rectify by sub con ETASET
31-Jan
DCD Required JT
TBA
attach pressure test report JT 10-Feb
Irrelevant comment JT
10-Feb
To rectify by sub con ETASET 31-Jan
Provide FCR JT 10-Feb
attach close T&C ITR JT 5-Feb
Ready JT
10-Feb
DCD Required JT TBA
To rectify by sub con ETASET
31-Jan
To rectify by sub con ETASET
31-Jan
To rectify by sub con ETASET
31-Jan
To rectify by sub con ETASET 31-Jan
To rectify by sub con ETASET 31-Jan
To rectify by sub con ETASET
31-Jan
Provide FCR JT
10-Feb
attach flow test report JT 10-Feb
Irrelevant Comment JT
10-Feb
DCD Required JT TBA
Provide FCR JT
10-Feb
To rectify by sub con ETASET 31-Jan
Irrelevant Comment JT
10-Feb
attach calibration certificate JT 10-Feb
attach pressure test report JT
10-Feb
DCD required JT
TBA
provide docs JT
10-Feb
attach pressure test report JT
10-Feb
attach pressure test report JT
10-Feb
31-Jan
DCD required JT
TBA
attach pressure test report JT
10-Feb
Irrelevant comment JT
10-Feb
To rectify by sub con ETASET 31-Jan
attach close T&C ITR JT
5-Feb
Irrelevant comment JT
10-Feb
Irrelevant comment JT
10-Feb
To rectify by sub con ETASET
31-Jan
attach close T&C ITR JT 5-Feb
Irrelevant comment JT
10-Feb
To rectify by sub con ETASET
31-Jan
attach close T&C ITR JT 5-Feb
Irrelevant comment JT
10-Feb
To rectify by sub con ETASET
31-Jan
attach close T&C ITR JT 5-Feb
JT
5-Feb
JT
5-Feb
JT
5-Feb
JT
5-Feb
JT
5-Feb
JT
5-Feb
To rectify by sub con ETASET
31-Jan
To rectify by sub con ETASET 31-Jan
To rectify by sub con ETASET 31-Jan
To rectify by sub con ETASET
31-Jan
To rectify by sub con ETASET
31-Jan
To rectify by sub con ETASET
31-Jan
attach checklist JT 10-Feb
attach approve shop drawing JT 10-Feb
DCD required JT TBA
attach close T&C ITR JT
5-Feb
Installation to be completed by the
ETASET
sub con 31-Jan
attach checklist JT 10-Feb
DCD required JT TBA
31-Jan
attach T&C ITR JT 5-Feb
31-Jan
attach T&C ITR JT 5-Feb
31-Jan
attach T&C ITR JT 5-Feb
31-Jan
attach T&C ITR JT 5-Feb
31-Jan
attach T&C ITR JT 5-Feb
31-Jan
attach T&C ITR JT 5-Feb
31-Jan
Attach T&C ITR JT 5-Feb
31-Jan
Attach T&C ITR JT 5-Feb
Irrelevant comment JT
10-Feb
attach approve shop drawing JT
10-Feb
Provide FCR JT 10-Feb
DCD required JT TBA
attach approve shop drawing JT
10-Feb
To install by the sub con ETASET 31-Jan
Provide FCR JT 10-Feb
DCD required JT TBA
attach approve shop drawing JT
10-Feb
To install by the sub con ETASET 31-Jan
Provide FCR JT 10-Feb
DCD required JT TBA
attach approve shop drawing JT
10-Feb
DCD required JT TBA
attach approve shop drawing JT
10-Feb
DCD required JT TBA
Provide FCR JT
10-Feb
To rectify by sub con ETASET 31-Jan
DCD required JT TBA
Irrelevant comment JT
10-Feb
DCD required JT TBA
attach docs JT
10-Feb
JT
10-Feb
ok JT
10-Feb
ok JT
10-Feb
ok JT
10-Feb
ok JT 10-Feb
To rectify by subcon ETASET
31-Jan
Provide additional support by subcon ETASET
31-Jan
Provide additional support by subcon ETASET
31-Jan
ok JT
10-Feb
ok JT
10-Feb
ok JT
10-Feb
JT 10-Feb
attach as built drawing JT 10-Feb
ok JT
10-Feb
ok JT 10-Feb
attach as built drawing JT 10-Feb
ok JT
10-Feb
DCD Required JT TBA
ok JT 10-Feb
ok JT
10-Feb
Verify with the subcon ETASET
31-Jan
Verify with the subcon ETASET 31-Jan
Installation & Insulation inspection for general ventilation 2.Make sure all grill/diffusers installed at proper location
3 145150 Room 01, 02 & 04 as per approved drawing. NOWC 1 1
system (R01, R02 & R04)
3.Subject for final inspection & T&C. 2 1
4.All threaded rod excess should be cut. 1 1
5.All damage insulation, rectify. 1 1
1.Submit as built approved drawing for R01. 5 1
Installation & Insulation inspection for smoke duct system
4 145151 Room 01, 02 & 04 2.All damage insulation/threaded rod should be NOWC
(R01, R02 & R04)
rectified.
1 1
3.subject for final inspection & T&C. 2 1
1.Rectify CHW pipe touching FM200 at R01. 1 1
2.Rectify CHW pipe touching concrete wall for proper
insulation of pipe.
1 1
Installation Inspection of chilled water pipe at R01, R02 &
5 145152 Room 01, 02 & 04 NOWC
R04 3.Pressure test not yet offered 5 1
4. Subject for final inspection & T&C inspection. 2 1
5.Subject for pull out test (Supports) 5 1
1.Rectify flexible duct connection to FCU. 1 1
6 145154 Room 01, 02 & 04 Installation Inspection of FCU1, 2, 4 & 7 (R01, R02 & R04) NOWC
2.Verify ceiling plan, coordinate with trades. 1 1
3.subject for final inspection & T&C 2 1
1. Rectify pendent/upright at R04 & R02. 1 1
ENT POD B Landing Area Installation Inspection of FCU-02B-07 @ ENT POD B 2.) Installed U- Trap was 25mmφ Pipe 2.) Diaelectric
48 160903 Union not installed NOWC 1 J. Andoyo 1
Footbridge Level Landing Area Footbridge Level
3.) Ensure unit is Clean from Debris 5 1
4.) Ensure Duct Connected to FCU must be Supported
to Avoid Sagging
1 1
ENT POD B Landing Area Inswtallation Inspection of FCU-02B-08 @ ENT POD B 2.) Installed U- Trap was 25mmφ Pipe 2.) Diaelectric
49 160904 Union not installed NOWC 1 J. Andoyo 1
Footbridge Level Landing Area Footbridge Level
3.) Ensure unit is Clean from Debris 5 1
4.) Provide Support for Sagging Duct Connected to
FCU
1 1
ENT POD B Landing Area Installation Inspection of Valve Package FCU-02B-08 @ Rectify location of TP & AV Aser Approved Shop
50 160908
Footbridge Level ENT POD B Landing Area Footbridge Level Drawing
CLOSED 1 J. Andoyo 1
E POD B Ground Level MHI Inspection Installation of Chilled Water Pipe @ E POD B 1.) Provide Permanent Supports 1 1
51 163735
Room Ground Level MHI Room
CLOSED J. Andoyo
2.) Checklist Unfilled Up 5 1
1.) Subject to DCD Approval 4 1
52 163736 Room 82 Installation Inspection for Gas Suppression Pipe @ Room 82 NOWC J. Andoyo
2.) Noozle not yet installed 1 1
1.) Rectify Alilignment of supports / Saddle ,double Nut 1 1
2.) Remove Other Services from Support 1 1
53 163742 Footbride A & B Inspection for Fresh Ar Duct Installation @ Footbridge A & B NOWC J. Andoyo
3.) Rectify Incomplete insulation 1 1
4.) Provide Additionl supports of Duct Connected to
FCU / Louver
1 1
Inspection Installation of Valve Package for FCU-02B-04 @
54 163745 E POD B Ground Level
E POD B Ground Level
Install Additional Support @ Return Line CLOSED 1 J. Andoyo 1
71 158391 GL 6.4-8 concourse level Installation inspection of vent pipes GL 6.4-8 concourse level Rectify the insulation according to approved drawing NOWC 1 J. Andoyo 1
Gridline 6.2-8 Concourse Installation inspection of PPR Pipes Concourse level,
72 158398
Level gridline 6.2-8
Ensure pipe is supported and rubber provided NOWC 1 J. Andoyo 1
73 162153 Room 70.1 Installation inspection for SEF-01 @ Rm. 70.1 2.)provide checklist for extraction installation NOWC 5 J. Andoyo 1
74 163732 Station Installation inspection for valve package (AHU Provide anti-corrosive paint for welded joints at support NOWC 1 J. Andoyo 1
86 166760 Roof B Installation Inspection of EF-G02B-03 Roof B 2.)Provide approved detailed installation DWG. NOWC 5 J. Andoyo 1
3.)Slab opening is smaller than diameter 1 1
4.)Subject to final inspection 2 1
87 166756 PSD Room Installation inspection of EF-11 @ R85.2 PSD room 1. Provide saddle support & double nut CLOSED 1 J. Andoyo 1
96 164773
AL QUSAIS E.Pod B Footbridge
1 (G-02) - ITR Pre commissioning Test for EF-02BF-02@ E.Pod B Footbridge
Register (Mech'l-Install Test) Page 145 of 251 CLOSED J. Andoyo
STATUS
Site Closing Inspected
SN. IR No. Location Activity Description Comments Status
Rated By Close Ready Doc. Subject to Rectify Others
96 164773 E.Pod B Footbridge Pre commissioning Test for EF-02BF-02@ E.Pod B Footbridge 2.)Ensure duct work is cleaned internally CLOSED 1 J. Andoyo 1
3.)As per comment attached 5 1
4.)Subject to T & C 2 1
107 166688 Footbridge Landing B Pre commissioning of G02B-FCU-07 (Footbridge Landing B) 2.)Ensure duct work is clean internally. CLOSED 1 J. Andoyo 1
3.)As per comment attached 5 1
4.)Subject to T & C 2 1
1.Ensure duct work is cleaned internally 1 1
108 166725 Entrance Pod B Pre commissioning check for FCU-02B-01 CLOSED J. Andoyo
2.)As per comment attached 5 1
3.)Subject to T & C 2 1
1.)Rectify isolator arrangement & Flexible content. 1 1
109 166729 Entrance Pod B Pre commissioning check for FCU-02B-05 2.)As per comment attached CLOSED 5 J. Andoyo
1
3.)Subject to T & C 2 1
1.)Rectify isolator arrangement 1 1
110 166730 Entrance Pod B Pre commissioning check for FCU-02B-06 CLOSED J. Andoyo
AL QUSAIS 1 (G-02) - ITR Register (Mech'l-Install Test) Page 147 of 251
STATUS
Site Closing Inspected
SN. IR No. Location Activity Description Comments Status
Rated By Close Ready Doc. Subject to Rectify Others
110 166730 Entrance Pod B Pre commissioning check for FCU-02B-06 2.)As per comment attached CLOSED 5 J. Andoyo 1
3.)Subject to T & C 2 1
1.)Ensure ductwork cleaned internally 1
111 166722 Station Pre-commissioning check for SEF-04 2.)As per comment attached CLOSED 5 J. Andoyo 1
3.)Subject to T & C 2
113 164774 E.Pod B Basement Level 2.)Ensure ductwork is cleaned internally CLOSED 1 J. Andoyo 1
3.)As per comment attached 5 1
4.)Subject to T & C 2 1
1.)Ensure duct works is cleaned internally 1 1
114 164769 E.Pod B Mezz. Level Pre commissioning Test for EF-02B-02 @ E.Pod B Mezz. Level CLOSED J. Andoyo
2.)As per comment attached 5 1
3.)Subject to T & C 2 1
1.)Clean the fan chamber/AHU unit 1 1
2.)Drive Guard not Filted 1 1
115 164956 Station Pre commissioning for AHU-07 @ R70.2 3.)Vee belt not filted CLOSED 1 J. Andoyo 1
4.)MSD was checked manually 5 1
5.)Rectify conduit 1 1
1.)Clean the fan chamber/AHU unit 1 1
2.)Drive Guard not Filted 1 1
3.)Vee belt not filted 1 1
116 164955 Station Pre commissioning for AHU-06 @ R70.2 CLOSED J. Andoyo
4.)MSD was checked manually 5 1
5.)Rectify conduit 1 1
6.)Provide access to AHU Door 1 1
1.)Clean the fan chamber/AHU unit 1 1
2.)Drive Guard not Filted 1 1
117 164954 Station Pre commissioning for AHU-05 @ R70.1 3.)Vee belt not filted CLOSED 1 J. Andoyo 1
4.)MSD was checked manually 5 1
5.)Rectify conduit 1 1
1.)Ensure fan chamber/AHU unit is clean 1 1
2.)Drive guard & Vee belt not yet fixed 1 1
118 166579 Station Pre commissioning for AHU-04 CLOSED J. Andoyo
3.)MSD Manual checking only 5 1
4.)Subject to T & C 2 1
1.)Clean the fan chamber/AHU unit 1 1
2.)Drive Guard not Filted 1 1
119 164953 Room 70.2 Pre commissioning for AHU-03 @ R70.2 3.)Vee belt not filted CLOSED 1 J. Andoyo 1
4.)MSD was checked manually 5 1
5.)Rectify conduit 1 1
1.)Clean the fan chamber/AHU unit 1 1
2.)Drive Guard not Filted 1 1
120 164952 Room 70.2 Pre commissioning for AHU-02 @ R70.2 3.)Vee belt not filted CLOSED 1 J. Andoyo 1
4.)MSD was checked manually 5 1
5.)Rectify conduit 1 1
Ent. Pod B Ground Level Bus 1.) Provide Double Nuts on All Drop rod Supports 1 1
installation inspection of VAC Ducts in Ent. Pod B Ground
150 158180 Waiting & Landing Area
Level Bus Waiting & Landing Area Footbridge Level
NOWC J. Andoyo
Footbridge Level 2.) provide Additional Support to Avoid Sagging of Duct
@ Ent. Pod landing
1 1
Ent. Pod A Footbridge Installation Inspection of PPR Pipes Ent. Pod A Footbridge 1.) Provide FCR 2 1
151 158399
Narrow Narrow
NOWC J. Andoyo
2.) Provide Rubber Inserts. 1 1
Installation inspection of UPVC Pipe for Drainage Services
at Ent. Pod A Riser, Roof Level, Landing Area, AC Plant
152 160898 Ent. Pod A
Room, & Ground Level (As Per Attached highlighted Shop
Provide Additional Support & Rubber inserts NOWC 1 J. Andoyo 1
Drawing)
Installation Inspection of FCU-02B-05 @ ENT. Pod B 2.) Ensure Debris remved and cleanliness 1 1
154 160901 Ent. Pod B Footbridge level Footbridge Level (As Per attached Highlighted Shop NOWC J. Andoyo
drawing)
3.) Ensure Drain U-Trap Pipe is 32mm 1 1
4.) Rectify Loose Locknut @ Drop Rod Support 1 1
5.) Subject to Final Inspection 2 1
1.) Rectify Isolator Clashing with Drain U-Trap 1 1
Installation Inspection of FCU-02B-06 @ ENT. Pod B 2.) Ensure Debris remved and cleanliness 1 1
155 160902 Ent. Pod B Footbridge level Footbridge Level (As Per attached Highlighted Shop NOWC J. Andoyo
drawing)
3.) Ensure Drain U-Trap Pipe is 32mm 1 1
4.) Rectify Loose Locknut @ Drop Rod Support 1 1
5.) Subject to Final Inspection 2 1
Installation Inspection of Valve Packages for FCU-02B-05 @ 1.) Provide Additional Supports for Piping 1 1
156 160905 Ent. Pod B Footbridge level Ent. Pod B Footbridge level (As per attached Shop Drawing NOWC J. Andoyo
)
2.) Pressre Testing Not yet Done 5 1
3.) Subject to Final Inspection 2 1
Installation Inspection of Valve Packages for FCU-02B-06 @ 1.) Rectify AV to TP 1 1
157 160906 Ent. Pod B Footbridge level Ent. Pod B Footbridge level (As per attached Shop Drawing 2.) Pressure Testing Not Yet Done NOWC 5 J. Andoyo 1
) 3.) Sbject to Final inspection 2 1
1.) Ensure Drain U-Trap to be 32mm Pipe Dia 1 1
2.) Ensure actuator accessibility 1 1
Installation inspection for FCU-BF-01 @ E.POD B
158 162028 Entrance Pod B
Footbridge
NOWC J. Andoyo
3.) Rectify Loose Lock Nut for Drop ROD Support 1 1
4.) Dialectric Union not Installed 5.) Ensure unit is clean
from debris
1 1
Entrance Pod B Ground Installation inspection for valve package of FCU-02B-01 @ 1.) Provide supports. 1 1
165 162031
Level E. Pod B. Gr. Level
NOWC J. Andoyo
2.)Pressure testing not yet done 5 1
1.) Drain Utrap not yet connected, ensure pipe dia
1 1
Entrance Pod B Ground Installation inspection for FCU-02B-04 @ E.Pod B. Ground 15.32mm, electric unim not installaed
166 162027
Level level
NOWC J. Andoyo
2.) ensure unit is clean from debris. 1 1
3.) ensure rubber washer is installaed 1 1
1.) Drain Utrap not yet connected, ensure pipe dia
15.32mm, electric unim not installaed
1 1
Entrance Pod B Ground Installation inspection for FCU-02B-03@ E.Pod B ground
167 162026
Level level
NOWC J. Andoyo
2.) ensure unit is clean from debris. 1 1
3.) ensure rubber washer is installaed 1 1
1.)Rectify damage filter. 1 1
Entrance Pod B Ground 2.)rectify drain utrap & ensure 22mm pipe 1 1
168 162025
Level
Installation for FCU-02B-02 @ E. Pod B ground level NOWC J. Andoyo
3.) electric union not installed. 1 1
4.) ensure unit is clean from debris. 1 1
5.) ensure washer installed 1 1
1. Replace damage filter (Rectify) 1 1
Installation Inspection for Fire Fighting Pipes @ Ent. Pod B 1.) Provide Sleeves 1 1
174 162170 Ent. Pod B Trench Area
Trench Area
NOWC J. Andoyo
2.) Subject to DCD Approval 4 1
Installation Inspection of fire fighting piping at entrance pod 2.)Spools not provided 3.Installation must be as 1 1
205 167223 Entrance pod B Pump Room
B Pump Room
NOWC J. Andoyo
3.)Attach checklist for ITP #2. 5 1
4.) per approved shop drawing 5 1
5.)Subject to "DCD" approval 4 1
1.)Initial inspection on subject to final inspection 2 1
Entrance Pod B Basement Installation Inspection of Fire Piping at Entrance Pod B 2.)Installation not yet completed 1 1
206 167224
Level Basement Level
NOWC J. Andoyo
3.)Attach other checklist ITP 2.4 5 1
4.)Subject to DCD Approval 4 1
1.)Rectify clashing pipe w/ other services; provide
Installation Inspection of fire fighting piping at concourse support for sagging pipe;
1 1
207 167221 Room 70.2 Concourse Level
level Rm. 70.2
NOWC J. Andoyo
2.)subject to DCD approval 4 1
2.)Subject to T & C 2 1
2.)Subject to T & C 2 1
2.)Subject to T & C 2 1
2.)Subject to T & C 2 1
Epod A Basement Level and Installation Inspection of drainage Layout (HDPE) @ Epod A 1. Piping must be clamped w/ rubber inserts @ rigid
214 167226
Ground Level Basement Level and Ground Level supports
NOWC 1 J. Andoyo 1
2.Subject to T & C 2 1
2.Subject to T & C 2 1
1.)Submit approved shop drawing, 5 1
Installation Inspection of FM200 Pipes at ENT Pod B 2.)Nozzle not yet installed, 1 1
218 167234 ENT Pod B Electrical Room
Electrical Room
NOWC J. Andoyo
3.)Raised FCR 2 1
4.)Subject to DCD approval 4 1
1.)Submit approved shop drawing, 5 1
Installation Inspection of FM200 Pipes at ENT Pod A 2.)Nozzle not yet installed, 1 1
219 167235 ENT Pod A Electrical
Electrical
NOWC J. Andoyo
3.)Raised FCR 2 1
4.)Subject to DCD approval 4 1
1.)provide additional supports; 1 1
Entrance Pod B Basement Installation Inspection for Exhaust Air Duct at Entrance Pod 2.)rectify alignment of duct level; 1 1
220 167250
level B Basement level
NOWC J. Andoyo
3.)rectify U profile arrangement; 1 1
4.)ducts fully insulated 1 1
1.)Provide Shop drawing 5 1
2.)Rectify alignment of duct level; 1 1
Entrance Pod B Basement Installation Inspection for fresh Air duct at entrance Pod B 3.)rectify U-profile arrangement; 1 1
221 167249
Level Basement Level
NOWC J. Andoyo
4.)provide additional support; 1 1
5.)raise "NCR" if comments not rectified; 5 1
6.)ducts fully insulated 1 1
Installation Inspection for Exhaust air duct at entrance Pod A 1.)rectify alignment of supports; 1 1
222 167246 Entrance Pod A Mezz. Level
Mezz. Level
CLOSED J. Andoyo
2.)ducts are fully insulated 1 1
1.)Witnessed only. 5 1
Pre commissioning inspection for Heat Exchanger #1&2 at
237 171085 Entrance Pod A
pump Room Ent Pod A
NOWC J. Andoyo
2.)Ensure thermometers are installed and strainers are
cleaned.
1 1
3.)Units must be cleaned and insulated 1 1
7 72 185 30 386 77
13-Mar-11
Irrelevant comment JT
10-Feb
To rectify by sub con ETASET 31-Jan
To rectify by sub con ETASET
31-Jan
Attach as built drawing JT 10-Feb
Attach as built drawing JT 10-Feb
To rectify by sub con ETASET
31-Jan
To rectify by sub con ETASET 31-Jan
To rectify by sub con ETASET
31-Jan
attach as built drawing JT
10-Feb
Attach ITR JT
10-Feb
Attach Final Inspection ITR ETASET
31-Jan
DCD required JT TBA
To confirm with the construction team ETASET
31-Jan
Attach T&C ITR JT
5-Feb
ETASET
31-Jan
JT
5-Feb
Irrelevant comment JT
10-Feb
Attach T&C ITR JT 5-Feb
To confirm with the construction team ETASET
31-Jan
Irrelevant comment JT
10-Feb
Attach T&C ITR JT 5-Feb
To confirm with the construction team ETASET
31-Jan
Irrelevant comment JT
10-Feb
To rectify by sub con ETASET
31-Jan
Attach T&C ITR JT 5-Feb
To rectify by sub con ETASET
31-Jan
To rectify by sub con ETASET 31-Jan
To rectify by sub con ETASET 31-Jan
To rectify by sub con ETASET
31-Jan
To rectify by sub con ETASET 31-Jan
Provide FCR JT
10-Feb
To rectify by sub con ETASET 31-Jan
To rectify by sub con ETASET 31-Jan
Provide FCR JT
10-Feb
To rectify by sub con ETASET 31-Jan
To rectify by sub con ETASET 31-Jan
Provide FCR JT 10-Feb
To rectify by sub con ETASET 31-Jan
To rectify by sub con ETASET
31-Jan
To rectify by sub con ETASET 31-Jan
Provide FCR JT 10-Feb
Provide FCR JT
10-Feb
To rectify by sub con ETASET
31-Jan
To rectify by sub con ETASET 31-Jan
Provide FCR JT
10-Feb
To rectify by sub con ETASET 31-Jan
To rectify by sub con ETASET 31-Jan
Irrelevant comment JT
10-Feb
To rectify by sub con ETASET 31-Jan
check in the final inspection ETASET
31-Jan
Irrelevant comment JT
10-Feb
check in the final inspection ETASET
31-Jan
To rectify by sub con ETASET
31-Jan
To rectify by sub con ETASET
31-Jan
To rectify by sub con ETASET 31-Jan
attach T&C ITR JT 5-Feb
To rectify by sub con ETASET
31-Jan
To confirm with the construction ETASET 31-Jan
Attach checklist JT
10-Feb
To rectify by sub con ETASET
31-Jan
Attach checklist JT
10-Feb
To confirm with the construction ETASET 31-Jan
Irrelevant comment JT
10-Feb
irrelevant comment JT
10-Feb
Attach checklist JT 10-Feb
attach approve shop drawing JT 10-Feb
To be clean by sub con ETASET 31-Jan
To rectify by sub con ETASET 31-Jan
Provide FCR JT 10-Feb
attach close T&C ITR JT 5-Feb
Attach material ITR JT
10-Feb
To confirm with the construction ETASET 31-Jan
Attach checklist JT 10-Feb
attach approve shop drawing JT 10-Feb
Provide FCR JT 10-Feb
Irrelevant comment JT
10-Feb
attach needed drawing JT
10-Feb
To rectify by sub con ETASET 31-Jan
attach close T&C ITR JT 5-Feb
To be rectify by sub-con ETASET
31-Jan
To rectify by sub con ETASET
31-Jan
To be rectify by sub-con ETASET 31-Jan
irrelevant comment JT
10-Feb
To be rectify by sub-con ETASET
31-Jan
To be rectify by sub-con ETASET 31-Jan
attach close T&C ITR JT 5-Feb
attach approve shop drawing JT
10-Feb
To rectify by sub con ETASET 31-Jan
attach close T&C ITR JT 5-Feb
To be rectify by sub-con ETASET 31-Jan
To be rectify by sub-con ETASET 31-Jan
To be rectify by sub-con ETASET 31-Jan
To be rectify by sub-con ETASET 31-Jan
Attach T&C ITR JT 5-Feb
To be rectify by sub-con ETASET 31-Jan
To be rectify by sub-con ETASET 31-Jan
To be rectify by sub-con ETASET 31-Jan
To confirm with the construction if its
ETASET
clean 31-Jan
To be rectify by sub-con ETASET 31-Jan
Attach T&C ITR JT 5-Feb
To confirm with the construction if its
ETASET
clean 31-Jan
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
To confirm with the construction if its
ETASET
clean 31-Jan
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
To confirm with the construction if its
ETASET
clean 31-Jan
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
To rectify by sub con ETASET 31-Jan
JT 10-Feb
ETASET 31-Jan
JT 10-Feb
JT 5-Feb
Irrelevant comment JT 10-Feb
To be clean by sub con ETASET 31-Jan
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
Irrelevant comment JT 10-Feb
To be clean by sub con ETASET 31-Jan
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
Irrelevant comment JT 10-Feb
To be clean by sub con ETASET 31-Jan
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
Irrelevant comment JT 10-Feb
To be clean by sub con ETASET 31-Jan
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
To rectify by sub con ETASET 31-Jan
Irrelevant comment JT 10-Feb
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
Irrelevant comment JT 10-Feb
Irrelevant comment JT 10-Feb
To confirm with the construction if its
ETASET
clean 31-Jan
Attach T&C ITR JT 5-Feb
Irrelevant comment JT 10-Feb
To confirm with the construction if its
ETASET
clean 31-Jan
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
Irrelevant comment JT 10-Feb
To confirm with the construction if its
ETASET
clean 31-Jan
To be clean by sub con ETASET 31-Jan
To rectify by sub con ETASET 31-Jan
JT 10-Feb
ETASET 31-Jan
JT 10-Feb
JT 5-Feb
Irrelevant comment JT 10-Feb
To confirm with the construction if its
ETASET
clean 31-Jan
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
To confirm with the construction if its
ETASET
clean 31-Jan
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
To rectify by sub con ETASET 31-Jan
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
To rectify by sub con ETASET 31-Jan
DCD Required JT
TBA
To rectify by sub con ETASET
31-Jan
DCD Required JT
TBA
To rectify by sub con ETASET
31-Jan
Irrelevant comment JT
10-Feb
To rectify by sub con ETASET 31-Jan
Provide FCR JT 10-Feb
attach close T&C ITR JT 5-Feb
To rectify by sub con ETASET
31-Jan
To rectify by sub con ETASET
31-Jan
To rectify by sub con ETASET
31-Jan
To rectify by sub con ETASET 31-Jan
To rectify by sub con ETASET 31-Jan
To rectify by sub con ETASET
31-Jan
31-Jan
Irrelevant comment JT
10-Feb
To rectify by sub con ETASET 31-Jan
attach close T&C ITR JT
5-Feb
To rectify by sub con ETASET
31-Jan
DCD Required JT TBA
Irrelevant comment JT
10-Feb
To rectify by sub con ETASET
31-Jan
attach close T&C ITR JT 5-Feb
Irrelevant comment JT
10-Feb
To rectify by sub con ETASET
31-Jan
attach close T&C ITR JT 5-Feb
Irrelevant comment JT
10-Feb
To rectify by sub con ETASET
31-Jan
attach close T&C ITR JT 5-Feb
Installation to be completed by the
ETASET
sub con 31-Jan
attach close T&C ITR JT 5-Feb
Installation to be completed by the
ETASET
sub con 31-Jan
attach close T&C ITR JT 5-Feb
Installation to be completed by the
ETASET
sub con 31-Jan
attach close T&C ITR JT 5-Feb
Installation to be completed by the
ETASET
sub con 31-Jan
attach close T&C ITR JT 5-Feb
attach pressure test report JT
10-Feb
To confirm with the construction ETASET 31-Jan
To rectify by sub con ETASET
31-Jan
To confirm with the construction ETASET 31-Jan
To clean by sub con ETASET 31-Jan
Installation to be completed by the
ETASET
sub con 31-Jan
31-Jan
attach T&C ITR JT 5-Feb
31-Jan
attach T&C ITR JT 5-Feb
31-Jan
attach T&C ITR JT 5-Feb
31-Jan
attach T&C ITR JT 5-Feb
31-Jan
attach T&C ITR JT 5-Feb
31-Jan
attach T&C ITR JT 5-Feb
31-Jan
Attach T&C ITR JT 5-Feb
31-Jan
Attach T&C ITR JT 5-Feb
attach approve shop drawing JT
10-Feb
To install by the sub con ETASET 31-Jan
Provide FCR JT 10-Feb
DCD required JT TBA
attach approve shop drawing JT
10-Feb
To install by the sub con ETASET 31-Jan
Provide FCR JT 10-Feb
DCD required JT TBA
To rectify by sub con ETASET
31-Jan
To rectify by sub con ETASET 31-Jan
To rectify by sub con ETASET 31-Jan
To rectify by sub con ETASET 31-Jan
attach approve shop drawing JT
10-Feb
To rectify by sub con ETASET 31-Jan
To rectify by sub con ETASET 31-Jan
To rectify by sub con ETASET 31-Jan
Provide NCR if comments are not
JT
rectified 10-Feb
To rectify by sub con ETASET 31-Jan
To rectify by sub con ETASET 31-Jan
To rectify by sub con ETASET 31-Jan
Provide FCR JT
10-Feb
To rectify by sub con ETASET 31-Jan
DCD required JT TBA
ok JT
10-Feb
ok JT
10-Feb
ok JT
10-Feb
ok JT 10-Feb
To rectify by subcon ETASET
31-Jan
Provide additional support by subcon ETASET
31-Jan
Provide additional support by subcon ETASET
31-Jan
ok JT
10-Feb
ok JT
10-Feb
ok JT
10-Feb
Verify with the subcon ETASET
31-Jan
Verify with the subcon ETASET 31-Jan
Grid Line 6.5-8.2 Room 40.1 , Installation Inspection of Chilled Water Pipe in Grid Line 6.5-
8 156758 R05 , R13 ,R19.4, R70.2 & 8.2 Room 40.1 , R05 , R13 ,R19.4, R70.2 & R12 Concourse As per comment above raise FCR & flushing is done NOWC 2 1
R12 Concourse Level Level
15 163741 Footbride A & B Inspection for Fresh Air Duct Joint @ Footbride A & B Subject to Final Inspection CLOSED 2 J. Andoyo 1
Ent. Pod A FB Landing Area Installation inspection of chilled water pipe @ Ent. Pod A FB
18 162166
Riser & pump room Landing Area Riser & pump room
As per comment above raise FCR & flushing is done NOWC 2 J. Andoyo 1
Installation and Leak Testing of Inspection for the Drainage 1.)Attached FCR is not yet approved. 2 1
50 146403 Station
System
NOWC J. Andoyo
2.)Survey ITR must be attached 5 1
1.) Attached ITR for Installation of UPVC Drainage @
Ground High Level GL 5-9 ( EPOD A Side)
5 1
51 153320 Station Leak & Flow Test of UPVC Drainage NOWC J. Andoyo
2.) No Leak found during the time of inspection , 5 1
Pressure Testing for CHW PIPES at Ent. Pod B, FB Level , 1.)As per Attach Report & Other Document 5 1
52 155288 Ent. Pod B, FB Level
Footbridge B.
NOWC J. Andoyo
2.)Subject for Testing & Commissioning 2 1
Ent. Pod A Footbridge & installation inspection of UPVC Pipe in Ent. Pod A 1.) Raise FCR 2 1
53 158181
Mezzanine Level Footbridge & Mezzanine Level
NOWC J. Andoyo
2.) Subject to Leak & Flow Tests 5 1
55 164932 Station Inspection of steps Installation for escalator #2 1.) Items 3, 5, & 6 must be check during T & C CLOSED 2 J. Andoyo 1
56 164933 Station Inspection of Steps Installation for escalator # 3 1.)Items 3, 5 & 6 must be check during T & C CLOSED 2 J. Andoyo 1
57 164934 Station Inspection of steps Installation for escalator #4 1.)Items 3, 5 & 6 must be check during T & C CLOSED 2 J. Andoyo 1
Inspection of steps Installation for escalator #7 (Emtrance
58 164935 Entrance Pod B
Pod B
1.)Items 3, 5 & 6 must be check during T & C CLOSED 2 J. Andoyo 1
59 164931 Station Inspection of steps installation for escalator # 1 1.)Items 3, 5 & 6 must be check during T & C CLOSED 2 J. Andoyo 1
Inspection of steps installation for escalator #8 (Entrance
60 164936 Entrance Pod B
Pod B)
1.)Items 3, 5 & 6 must be check during T & C CLOSED 2 J. Andoyo 1
61 ← Total ITR
Ready 32
LEGEND (For Site Closing Rated) Documents 59
Rectify 0
Subject to T&C 6
2 Moderate to Close Others (Rejected) 0
Already Closed as SONO 15 17
Total 61
Submitted 14 TOTAL 112
13-Mar-11
JT
10-Feb
JT 5-Feb
Provide FCR JT
10-Feb
Attach T&C ITR JT
5-Feb
DCD required JT TBA
Provide FCR JT
10-Feb
Provide FCR JT
10-Feb
attach approved installation JT
10-Feb
Attach T&C ITR JT
5-Feb
Provide FCR JT
10-Feb
Provide FCR JT
10-Feb
Provide FCR JT
10-Feb
Provide FCR JT
10-Feb
Provide FCR JT
10-Feb
attach T&C ITR JT
5-Feb
Irrelevant comment JT
10-Feb
attach T&C ITR JT 5-Feb
attach flow test report JT 10-Feb
Provide FCR JT
10-Feb
attach approve letter by the engineer JT
10-Feb
Provide FCR JT
10-Feb
Provide FCR JT
10-Feb
Provide FCR JT
10-Feb
Irrelevant comment JT
10-Feb
attach approve shop drawing JT 10-Feb
Provide FCR JT 10-Feb
attach close T&C ITR JT 5-Feb
Irrelevant comment JT 10-Feb
Irrelevant comment JT 10-Feb
attach close T&C ITR JT 5-Feb
JT 10-Feb
JT 10-Feb
JT 5-Feb
JT 10-Feb
JT 5-Feb
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
Irrelevant comment JT 10-Feb
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
Irrelevant comment JT 10-Feb
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
Irrelevant comment JT 10-Feb
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
JT 10-Feb
JT 10-Feb
JT 5-Feb
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
Irrelevant comment JT 10-Feb
attach close T&C ITR JT 5-Feb
Irrelevant comment JT 10-Feb
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
JT 10-Feb
JT 10-Feb
JT 5-Feb
JT 10-Feb
JT 10-Feb
JT 5-Feb
JT 10-Feb
JT 10-Feb
JT 5-Feb
Irrelevant comment JT 10-Feb
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
Irrelevant comment JT 10-Feb
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
attach test reports JT 10-Feb
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
Irrelevant comment JT 10-Feb
Irrelevant comment JT 10-Feb
Attach T&C ITR JT 5-Feb
5-Feb
5-Feb
Provide FCR JT
10-Feb
Subject to approval of FCR. Attach
JT
Survey ITR 10-Feb
attach survey ITR JT 10-Feb
attach ITR of installation of UPVC
JT
drainage
10-Feb
Ready JT
10-Feb
attach close T&C ITR JT
5-Feb
Irrelevant comment JT
10-Feb
attach close T&C ITR JT 5-Feb
Provide FCR JT
10-Feb
attach flow test report JT 10-Feb
Irrelevant comment JT
10-Feb
JT
5-Feb
JT
5-Feb
JT
5-Feb
JT
5-Feb
attach pressure test report JT
10-Feb
Attach T&C ITR JT 5-Feb
attach balancing sheet JT 10-Feb
0 ← Total ITR
Ready #REF!
LEGEND (For Site Closing Rated) Documents #REF!
Rectify #REF!
Subject to T&C #REF!
Others (Rejected) #REF!
3 Not Urgent to Close (Due to Design or Specifi cation issue) Already Closed as SONO #REF! 17
13-Mar-11
Installation Inspection of Pipe Works for Fire Fighting 1.)As per attached photos and comment above; 5 1
1 153304 Station
Services
NOWC J. Andoyo
2.)subject to DCD approval 4 1
Pressure testing for Cold Water Services at R30 Public Subject Final Pressure testing ( System) and DCD
2 155272 Room 30 Male Public Toilet
Toilet Male Approval , No Leak
CLOSED 4 1
Pressure testing for Cold Water Services at Female Public Subject for final pressure test (System) DCD Approval,
3 155273 Female Public toilet
Toilet , Concourse Level No Leak
CLOSED 4 1
1.)Subject to Final Pressure Testing of the Whole
Room 31, Female Public Pressure Test for Fire Fighting Pipe @ Female Public Toilet System 5 1
4 160667
Toilet, Concourse Level ( See Attached Highlighted Shop Drawing )
NOWC J. Andoyo
2.) Subject to DCD Approval 4 1
1.) Subject to Final Pressure Testing of the Whole
Pressure Test for Fire Fighting Pipe @ Male Public Toilet System
5 1
5 160668 Room 30 Male Public Toilet
( See Attached Highlighted Shop Drawing )
NOWC J. Andoyo
2.) Subject to DCD Approval 4 1
1.) Subject to DCD Aproval 4 1
E POD A Ground Level Bus Installation Inspection for Sprinkler @ E POD A Ground
6 162157
Waiting Area Level Bus Waiting Area
NOWC J. Andoyo
2.) Subject to Pressure Testing of the Whole System 5 1
Entrance pod A Footbridge & Installation Inspection of hydrant pipes in entrance pod A Provide U-Bolt for Support & Subject to DCD
21 158397
landing area footbridge & landing area approval
NOWC 4 J. Andoyo 1
Pressure Testing Inspection of FM200 Pipes at concourse 1.)Submit approved shop drawing. 5 1
22 167236 Room 54
Level Room 54
NOWC J. Andoyo
2.)Subject to DCD Approval 4 1
Installation Inspection of Fire Hose Cabinet at Platform level
23 170296 Platform Level A & B
A&B
Arrange all accessories; Subject to DCD approval NOWC 4 J. Andoyo 1
Installation Inspection of fire Extinguisher at concourse level
24 170301 Concourse level GL 6.3-8.1
GL 6.3-8.1
Subject to DCD approval NOWC 4 J. Andoyo 1
Pressure Testing of pipe works for fire fighting services at 1.)Subject to final pressure testing of the whole system. 5 1
34 155277 Ent. Pod Bus Waiting
entrance Pod B waiting & escalators
NOWC J. Andoyo
2.)Subject to DCD aproval 4 1
Installation Inspection of fire fighting piping at concourse
35 167222 Room 70.1 Concourse Level
level Rm. 70.1
As per comment above subject to DCD approval NOWC 4 J. Andoyo 1
1.)Submit approved shop drawing, Nozzle not yet
installed,
5 1
Installation Inspection of FM200 Pipes at Entrance Pod B
36 167242 Entrance Pod B Telecom Rm NOWC J. Andoyo
Telecom Rm 2.)Raised FCR 2 1
3.)Subject to DCD approval 4 1
Pressure Testing Inspection of FM200 Pipes at Epod B 1.)Submit approved shop drawing. 5 1
37 167238 Epod B Electrical Room
Electrical Room
NOWC J. Andoyo
2.)Subject to DCD Approval 4 1
Pressure Testing Inspection of FM200 Pipes at Epod B 1.)Submit approved shop drawing. 5 1
38 167237 Epod B Telecom Room
Telecom Room
NOWC J. Andoyo
2.)Subject to DCD Approval 4 1
Pressure Testing Inspection of FM200 Pipes at Epod A 1.)Submit approved shop drawing. 5 1
39 167239 Epod A Electrical
Electrical
NOWC J. Andoyo
2.)Subject to DCD Approval 4 1
Pre commissioning Inspection of fire pump and jockey pump 1.)witnessed pre commissioning conducted by eta; 5 1
40 170281 Entrance pod B basement
at entrance pod B basement
NOWC J. Andoyo
2.)subject to T & C & DCD approval 4 1
1.)landing valves must be tilted; attach detail drawing of
Entrance Pod A & B Including Installation Inspection of Fire Hose Cabinet at entrance Pod FHC; 5 1
41 170295
Footbridge Level A & B Including footbridge level
NOWC J. Andoyo
2.)subject to DCD approval 4 1
42 170298 Entrance Pod A Installation Inspection of Fire Extinguisher at Entrance Pod A 1.)subject to dcd approval NOWC 4 J. Andoyo 1
1.)Witnessed only; 5 1
Smoke test inspection for smoke extract fans at concourse,
43 171086 Platform Level Footbridge B
platform level & footbridge B
NOWC J. Andoyo
2.)Subject to DCD approval 4
3.)As per Attached documents 5 1
0 15 36 42 0 0
43 ← Total ITR
Ready 15
LEGEND (For Site Closing Rated) Documents 36
Rectify 0
Subject to T&C 42
Others (Rejected) 0
Already Closed as SONO 0 17
4 Will be Closed after DCD Inspection or Asbuilt Drawing or T&C
TOTAL 93
13-Mar-11
Irrelevant comment JT
10-Feb
DCD required JT TBA
DCD required JT
TBA
DCD required JT
TBA
attach pressure test report JT
10-Feb
DCD Required JT TBA
attach pressure test report JT
10-Feb
DCD Required JT TBA
DCD required JT
TBA
attach pressure test report JT
10-Feb
DCD required JT
TBA
attach pressure test report JT
10-Feb
irrelevant comment JT
10-Feb
attach flow test report JT
10-Feb
DCD required JT TBA
irrelevant comment JT
10-Feb
attach flow test report JT
10-Feb
DCD required JT TBA
irrelevant comment JT
10-Feb
attach flow test report JT
10-Feb
DCD required JT TBA
irrelevant comment JT
10-Feb
attach flow test report JT
10-Feb
DCD required JT TBA
irrelevant comment JT
10-Feb
attach flow test report JT
10-Feb
DCD required JT TBA
irrelevant comment JT
10-Feb
attach flow test report JT
10-Feb
DCD required JT TBA
irrelevant comment JT
10-Feb
attach flow test report JT
10-Feb
DCD required JT TBA
irrelevant comment JT
10-Feb
attach flow test report JT
10-Feb
DCD required JT TBA
DCD Required JT
TBA
DCD Required JT
TBA
DCD Required JT
TBA
attach pressure test report JT 10-Feb
DCD required JT
TBA
DCD required JT
TBA
attach pressure test report JT
10-Feb
DCD required JT
TBA
attach pressure test report JT
10-Feb
Irrelevant comment JT
10-Feb
DCD required JT TBA
ok JT
10-Feb
DCD Required JT TBA
ok JT 10-Feb
1 152401 Station Pressure testing of pipe works for Fire Fighting services. Subject for final pressure testing for the whole system. NOWC 5 J. Andoyo 1
Attach ITR for installation as per approved Shop
2 152598 Ground Level Leak test for drainage pipe at ground level
drawing
CLOSED 5 J. Andoyo 1
GL 4.1-6.3/ A Concourse Inspection of Joints for Smoke Duct system at GL 4.1-6.3/ A
3 153318
Level Concourse Level
As per comment above and attached photos CLOSED 5 J. Andoyo 1
R13, R15, R31, R32.1 , R30, Installation Inspection of UPVC Drainage at R13, R15, R31,
4 154337
R32.2 Concourse Level R32.1 , R30, R32.2 Concourse Level
Subject to Leak & Flow Testing CLOSED 5 J. Andoyo 1
Unpaid Area Concourse Installation inspection of VAC Ducts in paid & unpaid area
12 158395
Level concourse level (pls see attached drawing)
as per comment above and attached photos CLOSED 5 J. Andoyo 1
E.Pod A Basement Level & Installation Inspection of drainage layout (HDPE) @ E.Pod A 1. Provide rubber inserts whenever necessary &
34 167228
Ground Level Basement Level & Ground Level Submit as built Drawing
NOWC 5 J. Andoyo 1
37 166699 Mezzanine A Pressure Testing of AHU @ Mezzanine A Valve Package as per attached documents/ report ; as per ITR 177636 CLOSED 5 J. Andoyo 1
UT & DPT Test for Chilled Water Pipe @ Mezzanine E Pod
38 163740 Mezzanine E Pod B
B
As per attached test reports & Photos CLOSED 5 J. Andoyo 1
1.)Witnessed only 5 1
39 170686 Entrance Pod A Clearance check for elevator #3 (Entrance Pod A) NOWC J. Andoyo
2.)As per attached documents 5 1
3.)Submit approved as built drawing 5 1
1.)Witnessed only 5 1
40 170687 Entrance Pod A Clearance check for elevator #4 (Entrance Pod A) NOWC J. Andoyo
2.)As per attached documents 5 1
3.)Submit approved as built drawing 5 1
8 13 33 2 0 0
40 ← Total ITR
Ready 13
LEGEND (For Site Closing Rated) Documents 33
Rectify 0
Subject to T&C 2
Others (Rejected) 0
Already Closed as SONO 8 17
13-Mar-11
Irrelevant comment JT
10-Feb
JT
10-Feb
Irrelevant Comment JT
10-Feb
attach installation checklist JT 10-Feb
attach approved shop drawing JT
10-Feb
attach approved shop drawing JT
10-Feb
Attach closed ITR 166736 JT
10-Feb
Attach closed ITR 166736 JT
10-Feb
Attach closed ITR 166736 JT
10-Feb
JT
10-Feb
JT
10-Feb
JT
10-Feb
Irrelevant comment JT 10-Feb
Irrelevant comment JT 10-Feb
JT
10-Feb
Irrelevant Comment JT
10-Feb
provide docs JT
10-Feb
attach pressure test report JT
10-Feb
attach pressure test report JT
10-Feb
Material Inspection -ECS Cable (Quad Shielded LSZH Pls. Refer to Engineer's Letter-061277, Durl to Secure Approval from
6 156594 Station & SCP
5060H) the Engineer that this material is acceptable for use in Green Line
NOWC 5 V. Cenas 1
Material Inspection ECS Cable 2cx18AWG LSZH, AK Pls. Refer to Engineer's Letter-061277 DURL to Seek Approval from
7 156595 Station & SCP
4625 AGC the Engineer that this material is Acceptable for use in Green Line
CLOSED 5 V. Cenas 1
26 158590 Station & SCP ECS Panel # 3 Material Inspection There are (9) MCB in the Panel (8) only are in the list CLOSED 1 V. Cenas 1
1.) Component Labels Do Not match on the dwg. 1 1
3.) There are (10) MCB in the Panel , only (9) are on the List 1 1
1.) There are (9) MCB'S in the Panel , only (8) are in the list 1 1
28 158592 Station & SCP ECS Panel # 7 Material Inspection CLOSED V. Cenas
2.) Only (1) 20A MCB Found , (2) in the list 1 1
29 158593 Station & SCP ECS Panel # 8 Material Inspection There are (9) MCB in the Panel (8) only are in the list CLOSED 1 V. Cenas 1
Total 0 5 65 1 3 41
67 ← Total ITR
Ready 5
LEGEND (For Site Closing Rated) Documents 65
Rectify 3
1 Very Urgent to Close Subject to T&C 1
2 Moderate to Close Others (Rejected) 41
3 Not Urgent to Close (Due to Design or Specifi cation issue) Already Closed as SONO 0 17
4 Will be Closed after DCD Inspection or Asbuilt Drawing or T&C
5 Easy/Ready to Close TOTAL 115
13-Mar-11
3.) Pls Refer to Engineer that this Material is Acceptable for use in
Green Line
5 1
1.) Component Labels Does not Match on the Listing in BOM, Some
Component Cannot be Identified or Missing inside the Panel As noted 1 1
in the attached BOM
5 158095 Station Material Inspection for MCC-2 NOWC V. Cenas
2.) Pls Refer to Engineer's letter-061277, DURL to Secure Approval
from the Engineer that this Material is Acceptable for use in Green 5 1
Line
19 158590 Station & SCP ECS Panel # 3 Material Inspection There are (9) MCB in the Panel (8) only are in the list CLOSED 1 V. Cenas 1
1.) Component Labels Do Not match on the dwg. 1 1
3.) There are (10) MCB in the Panel , only (9) are on the List 1 1
1.) There are (9) MCB'S in the Panel , only (8) are in the list 1 1
21 158592 Station & SCP ECS Panel # 7 Material Inspection CLOSED V. Cenas
2.) Only (1) 20A MCB Found , (2) in the list 1 1
22 158593 Station & SCP ECS Panel # 8 Material Inspection There are (9) MCB in the Panel (8) only are in the list CLOSED 1 V. Cenas 1
1.) Component Rating does not match on the Listing on the BOM 1 1
25 159123 Station Material inspection for DIM-02 2.) Pls. refer to engineer's Letter -061277, DURL to Secure Approval NOWC V. Cenas
from the engineer that this Material is Acceptable for use in Green 5 1
Line
31 AL QUSAIS
161047 1 (G-02)- ITR Register
Station (Elect'l-Material)
Material inspection for VDB-24 EM 1 (41) NOWC V. Cenas Page 221
STATUS
Site Closing
SN. IR No. Location Activity Description Comments Status Inspected By
Rated Close Ready Doc. Subject to Rectify Others
41 164717 Station Material Inspection-Lighting fixture S301 (Thorn) Per L-068759 Said Material is Still NOWC NOWC 5 V. Cenas 1
Total 0 0 43 0 3 41
41 ← Total ITR
Ready 0
LEGEND (For Site Closing Rated) Documents 43
Rectify 3
1 Very Urgent to Close Subject to T&C 0
Total 41 Others (Rejected) 41
Submitted 26 Already Closed as SONO 0 17
Closed 6
Balance 8 TOTAL 87
13-Mar-11
Discripancy JT 31-Jan
Discripancy JT 31-Jan
Material Inspection for MiMic Panel & Vigilon 4 Loop 2.) Subject to Compliance of engineer comment on MA-003791 to
3 155217 Station & SCP Attach copy of Said Comments NOWC 5 V. Cenas
Panel.
3.) To Fill-up ITP # / item #. 5 1
4.) Attach engineer Letter of Approval of the MS 5
5.) Subject for Final Approval by DCD 5 1
6.) Attach MR-0663. 5
Please refer to Engineer's Letter- 061277 DURL to Secure Approval
Material Inspection for LSF Cable (Ducab) Cable no.
4 156416 Station & SCP
75 and 76 Ducab FR 4CX70mm.
from the Engineer that this Material is acceptable for use in Green CLOSED 5 V. Cenas 1
Line.
Material Inspection -ECS Cable (Quad Shielded LSZH Pls. Refer to Engineer's Letter-061277, Durl to Secure Approval from
5 156594 Station & SCP
5060H) the Engineer that this material is acceptable for use in Green Line
NOWC 5 V. Cenas 1
Material Inspection ECS Cable 2cx18AWG LSZH, AK Pls. Refer to Engineer's Letter-061277 DURL to Seek Approval from
6 156595 Station & SCP
4625 AGC the Engineer that this material is Acceptable for use in Green Line
CLOSED 5 V. Cenas 1
1.) Pls Refer to Engineer Letter -061277 durl to Secure Approval from
16 162668 Station Material Inspection DB 9A
the Engineer that this Material is Acceptable for use in Green Line
NOWC 5 V. Cenas 1
21 164417 Station Material Inspection of Pressure Switch FM-200 equipments to be approved by DCD NOWC 5 V. Cenas 1
22 164420 Station Material Inspection for exit lights Signage for inspection also by the architect CLOSED 5 V. Cenas 1
23 164421 Station Material Inspection for UPS Battery System (50KVA) Material approval for greenline CLOSED 5 V. Cenas 1
Secure approval from the engineer that this material is acceptable use
25 167092 Station Material Inspection of ECS Devices (DPS)
in greenline
CLOSED 5 V. Cenas 1
26 167871 Station Material Inspection - Lighting ficture W103 (Thorn) Material to be inspected also by the architect CLOSED 5 V. Cenas 1
Total 0 5 22 1 0 0
26 ← Total ITR
Ready 5
LEGEND (For Site Closing Rated) Documents 22
Rectify 0
Subject to T&C 1
Others (Rejected) 0
Already Closed as SONO 0 17
13-Mar-11
ok JT 10-Feb
attach approved MS JT 10-Feb
Irrelevant comment JT 10-Feb
Attach MR-0663 JT 10-Feb
Material Inspection for ERW Pipes for Chilled Delivered Material is not from approved supplier 5 1
6 140713 Station & SCP NOWC J. Andoyo
Water System
2.) 8"(7 nos) and 10"(2 nos) only 5 1
1.)As per attached ITR# 145154 5
7 141760 Station & SCP Material Inspection for Fan Coil Units (Trane) CLOSED J. Andoyo 1
2.)Subject to T&C 5
Material Inspection of MFSD (Ruskin) (MFSD 1.) As Per MA # 004953 & DN # 26071 1 1
8 143553 Station & SCP 800X500mm FSD36) & (MFSD 1200X1800mm- NOWC J. Andoyo
FSD36)
2.) Subject to Final Installation 5 1
1.)100 and 125 mm Metering Station has no test
Material Inspection for Butterfly Valves, MET 1
9 148209 Station & SCP point CLOSED J. Andoyo 1
Station, Y Strainer and DRV
2.)Take signature of site Engineer checklist 5
1.)Remove rust before panting and installing 5
Material Inspection for Seamless Buttweld
10 148216 Station & SCP
Fittings
CLOSED J. Andoyo 1
2.)Subject to proper storage after removing rust 5
1.) As Per L-053217 DN#21180 & Other
Document
5 1
Material Inspection for fire pumps and 2.) Ensure coupling Guard Replace w/ original
11 149977 Station & SCP parts NOWC 1 J. Andoyo 1
accessories.
3.) Subject to Final Installation 5 1
4.) Subject to DCD Approval. 5 1
1.)Attach Shipping documents, Test report and
Packing List.
1 1
Material inspection for Jockey pumps and
12 149980 Station & SCP
accessories.
2.)Write ETASET D.A on checklist NOWC 5 J. Andoyo 1
3.)Electric parts to be checked and approved by
electrical Engineer
5 1
Material Inspection for Rectangular Normal Taper Eccentric reducer with angle greater than
13 149986 Station & SCP
Ducts 22.5 degree is not acceptable
NOWC 1 J. Andoyo 1
17 150702 Station & SCP Material Inspection for Malleable Iron Fittings All material should have proper storage NOWC 1 J. Andoyo 1
Material inspection for Floor Drain & Floor Clean 1.) As Per Attached L-050710 & DN-30541 5 1
21 155287 Station & SCP NOWC J. Andoyo
Outs
2.) Test Certificate Must be in English 1 1
1.) As Per MA- 000721/ Letter-059922 & DN-
22 156496 Station & SCP Material Inspection for VCD's
30793
CLOSED 5 J. Andoyo 1
1.) As per MA#003617 & DN# 30589 5
23 156497 Station & SCP Material Inspection for Slot Diffusers CLOSED J. Andoyo 1
2.)Subject to Final Installation 5
Material Inspection for ERW Chilled Water Pipes 1.)Attach Approved MA for ERW Chilled Water
24 156756 Station & SCP
21/2X6mtr, 2x6mtr & 11/4x6mtr Pipes
NOWC 1 J. Andoyo 1
Material inspection Steel Expansion Bellows / 1.)As Per MA-002364 & DN-31415, 5
27 156766 Station & SCP
Joints
CLOSED J. Andoyo 1
2.) Subject to Final Installation 5
1.)As Per MA-004353 & DN-31419, 5
28 156767 Station & SCP Material Inspection of Fire Smoke Dampers CLOSED J. Andoyo 1
2.)Subject to Final Installation 5
1.)As Per Attached MA-001564 & DN-31299, 5
29 156768 Station & SCP Material Inspection of Carbon Steel Flanges CLOSED J. Andoyo 1
2.)Subject to Final installation 5
Material Inspection of Pipe Support Clamps for As Per Attached Document DN-31270/ 31351, 5
30 156770 Station & SCP
CHW Pipes
CLOSED J. Andoyo 1
2.)Subject to Final Installation 5
Material Inspection of Roof Drain for Type 2 1.) AsPer MA-057249 & DN-32390 5
33 160909 Station & SCP
Station
CLOSED J. Andoyo 1
2.) No Photo Attachment 1
Material Inspection for fire hose cabinet and 1.)As per MA-000371 & DN-244588; 5 1
34 160912 Station & SCP NOWC J. Andoyo
breeching Inlet Cabinet (MS & SS)
2.)Subject to DCD Approval 5 1
Material inspection of round duct (Supplier-
35 162021 Station & SCP
emirates ducts)
1.) As per MA-000649/L-068145 CLOSED 5 J. Andoyo 1
1.) As Per MA-003245/ L-057116 5
2.) Provide FAT Certificate 1
36 162167 Station & SCP Material Inspection for AHU-2 3.) Damage Copper Tube / Pipe @ Return was CLOSED J. Andoyo 1
1
Rectified @ Site
4.) Delivery Note not attach 1
19 25 9 2 7 0
41 ← Total ITR
Ready 25
LEGEND (For Site Closing Rated) Documents 9
Rectify 7
1 Very Urgent to Close Subject to T&C 2
2 Moderate to Close Others (Rejected) 0
3 Not Urgent to Close (Due to Design or Specifi cation issue) Already Closed as SONO 19 17
4 Will be Closed after DCD Inspection or Asbuilt Drawing or T&C
5 Easy/Ready to Close TOTAL 62
JT 10-Feb
JT 10-Feb
JT 10-Feb
ok JT 10-Feb
ok JT 10-Feb
JT 10-Feb
JT 10-Feb
JT/ETA 31-Jan
JT 10-Feb
JT 10-Feb
JT 10-Feb
ok JT 10-Feb
JT 10-Feb
JT 10-Feb
JT 10-Feb
JT 10-Feb
JT 10-Feb
JT 10-Feb
JT 10-Feb
JT/ETA 31-Jan
JT 10-Feb
JT 10-Feb
JT 10-Feb
JT 10-Feb
JT 10-Feb
JT/ETA 31-Jan
JT 10-Feb
JT 10-Feb
JT/ETA 31-Jan
JT 10-Feb
JT 10-Feb
JT 10-Feb
JT 10-Feb
JT 10-Feb
JT 10-Feb
JT 10-Feb
JT 10-Feb
JT 10-Feb
ok JT 10-Feb
JT 10-Feb
JT/ETA 31-Jan
JT 10-Feb
JT 10-Feb
JT/ETA 31-Jan
JT/ETA 31-Jan
JT/ETA 31-Jan
ok JT 10-Feb
Material Inspection for ERW Pipes for Chilled Attached DN are not from approved Supplier. 3
2 140659 Station & SCP
Water System numbers of 10 in. pipes are rejected due to rust
NOWC 1 J. Andoyo 1
Material Inspection of MFSD (Ruskin) (MFSD 1.) As Per MA # 004953 & DN # 26071 1 1
3 143553 Station & SCP 800X500mm FSD36) & (MFSD 1200X1800mm- NOWC J. Andoyo
FSD36)
2.) Subject to Final Installation 5 1
1.)100 and 125 mm Metering Station has no test
Material Inspection for Butterfly Valves, MET 1
4 148209 Station & SCP point CLOSED J. Andoyo 1
Station, Y Strainer and DRV
2.)Take signature of site Engineer checklist 5
1.) As Per L-053217 DN#21180 & Other
Document
5 1
Material Inspection for fire pumps and 2.) Ensure coupling Guard Replace w/ original
5 149977 Station & SCP parts NOWC 1 J. Andoyo 1
accessories.
3.) Subject to Final Installation 5 1
4.) Subject to DCD Approval. 5 1
1.)Attach Shipping documents, Test report and
Packing List.
1 1
Material inspection for Jockey pumps and
6 149980 Station & SCP
accessories.
2.)Write ETASET D.A on checklist NOWC 5 J. Andoyo 1
3.)Electric parts to be checked and approved by
electrical Engineer
5 1
Material Inspection for Rectangular Normal Taper Eccentric reducer with angle greater than
7 149986 Station & SCP
Ducts 22.5 degree is not acceptable
NOWC 1 J. Andoyo 1
8 150702 Station & SCP Material Inspection for Malleable Iron Fittings All material should have proper storage NOWC 1 J. Andoyo 1
Material inspection for Floor Drain & Floor Clean 1.) As Per Attached L-050710 & DN-30541 5 1
12 155287 Station & SCP NOWC J. Andoyo
Outs
2.) Test Certificate Must be in English 1 1
Material Inspection for ERW Chilled Water Pipes 1.)Attach Approved MA for ERW Chilled Water
13 156756 Station & SCP
21/2X6mtr, 2x6mtr & 11/4x6mtr Pipes
NOWC 1 J. Andoyo 1
Material Inspection of Roof Drain for Type 2 1.) AsPer MA-057249 & DN-32390 5
18 160909 Station & SCP
Station
CLOSED J. Andoyo 1
2.) No Photo Attachment 1
1.) As Per MA-003245/ L-057116 5
2.) Provide FAT Certificate 1
19 162167 Station & SCP Material Inspection for AHU-2 3.) Damage Copper Tube / Pipe @ Return was CLOSED J. Andoyo 1
1
Rectified @ Site
4.) Delivery Note not attach 1
6 11 9 0 6 0
19 ← Total ITR
Ready 11
LEGEND (For Site Closing Rated) Documents 9
Rectify 6
1 Very Urgent to Close Subject to T&C 0
Others (Rejected) 0
Total 19 Already Closed as SONO 6 17
Submitted 8
Closed 6 TOTAL 32
JT/ETA 31-Jan
JT 10-Feb
ok JT 10-Feb
JT/ETA 31-Jan
JT 10-Feb
JT 10-Feb
JT/ETA 31-Jan
JT 10-Feb
JT 10-Feb
JT/ETA 31-Jan
JT 10-Feb
ok JT 10-Feb
JT 10-Feb
JT/ETA 31-Jan
JT 10-Feb
JT/ETA 31-Jan
JT/ETA 31-Jan
JT/ETA 31-Jan
0 4 0 0 0 0
1 ← Total ITR
Ready 4
LEGEND (For Site Closing Rated) Documents 0
Rectify 0
Subject to T&C 0
2 Moderate to Close Others (Rejected) 0
Already Closed as SONO 0 17
Total 1
Submitted 1 TOTAL 4
ok JT 10-Feb
ok JT 10-Feb
Material Inspection for ERW Pipes for Chilled Delivered Material is not from approved supplier 5 1
3 140713 Station & SCP NOWC J. Andoyo
Water System
2.) 8"(7 nos) and 10"(2 nos) only 5 1
1.)As per attached ITR# 145154 5
4 141760 Station & SCP Material Inspection for Fan Coil Units (Trane) CLOSED J. Andoyo 1
2.)Subject to T&C 5
1.)Remove rust before panting and installing 5
Material Inspection for Seamless Buttweld
5 148216 Station & SCP
Fittings
CLOSED J. Andoyo 1
2.)Subject to proper storage after removing rust 5
Material inspection Steel Expansion Bellows / 1.)As Per MA-002364 & DN-31415, 5
11 156766 Station & SCP
Joints
CLOSED J. Andoyo 1
2.) Subject to Final Installation 5
1.)As Per MA-004353 & DN-31419, 5
12 156767 Station & SCP Material Inspection of Fire Smoke Dampers CLOSED J. Andoyo 1
2.)Subject to Final Installation 5
1.)As Per Attached MA-001564 & DN-31299, 5
13 156768 Station & SCP Material Inspection of Carbon Steel Flanges CLOSED J. Andoyo 1
2.)Subject to Final installation 5
Material Inspection of Pipe Support Clamps for As Per Attached Document DN-31270/ 31351, 5
14 156770 Station & SCP
CHW Pipes
CLOSED J. Andoyo 1
2.)Subject to Final Installation 5
Material Inspection for fire hose cabinet and 1.)As per MA-000371 & DN-244588; 5 1
15 160912 Station & SCP NOWC J. Andoyo
breeching Inlet Cabinet (MS & SS)
2.)Subject to DCD Approval 5 1
Material inspection of round duct (Supplier-
16 162021 Station & SCP
emirates ducts)
1.) As per MA-000649/L-068145 CLOSED 5 J. Andoyo 1
13 10 0 2 1 0
21 ← Total ITR
Ready 10
LEGEND (For Site Closing Rated) Documents 0
Rectify 1
Subject to T&C 2
Others (Rejected) 0
Already Closed as SONO 13 17
JT 10-Feb
JT 10-Feb
JT 10-Feb
JT 10-Feb
JT 10-Feb
JT 10-Feb
JT 10-Feb
JT 10-Feb
JT 10-Feb
JT 10-Feb
JT 10-Feb
JT 10-Feb
JT 10-Feb
JT 10-Feb
JT 10-Feb
JT 10-Feb
JT 10-Feb
JT 10-Feb
JT 10-Feb
JT 10-Feb
JT 10-Feb
JT 10-Feb
JT 10-Feb
JT 10-Feb
JT 10-Feb
JT 10-Feb
ok JT 10-Feb
MECHANICAL
1 124868 Station Material Inspection for Curtain Type Fire Dampers 1.)The Blades are outside the air stream (Type B Model) CLOSED 1 1 Verify with the subcon ETASET 31-Jan
2 133988 Station Installation and Leak Testing for Drainage System 1.)As built data is not matching with attached drawing REJ 7 1 Submit correct drawing ETASET 5-Feb
Installation Inspection of condensate drain pipe for
3 170285 Room 70.2
AHU 03 at R70.2.
- CLOSED J. Andoyo 1 JT 31-Jan
Installation Inspection of condensate drain pipe for
4 170288 Room 70.2
AHU 07 at R70.2.
- CLOSED J. Andoyo 1 JT 31-Jan
Installation Inspection of condensate drain pipe for
5 170287 Room 70.2
AHU 06 at R70.2.
- CLOSED J. Andoyo 1 JT 31-Jan
ELECTRICAL
Material Inspection of Smoke Alarm, Horn Strobe, 1.)Materials Specifications not matching with approved Technical
6 122728 Station
Alarm Bell Data
CLOSED 1 M. Jabar 1 provide approved MA JT 31-Jan
1.) Delivered Cable ( As Per Marking on the Cable Does not Match verify the used cable from the
Material Inspection for Type L102 light Fixture and with the Description on the Supplier's Delivery Note
1 1 subcon
ETASET 31-Jan
7 156409 Station REJ V. Cenas
Accessories
2.) No Engineer Approval for the Cable 1 provide approved MA 31-Jan
8 167870 Station Material Inspection - Lighting ficture F213 (Thorn) 1.)Rejected MA REJ 1 V. Cenas 1 provide approved MA 31-Jan
1.)Cables length are not enough to reach the earth mesh. NCR JT &
10 139211 Station Installation Inspection of Earthing Cable
should be raised for this problem with the proposed solution.
CLOSED 1 M. Jabar 1 Reinspect the replaced cable
ETASET
31-Jan
JT &
1.)One (1) missing detector as per drawing attached. 1 1 Check the missing detector
ETASET
31-Jan
11 140746 Station Installation Inspection for Fire Rated Cables (FM 200). CLOSED M. Jabar
2.)Attached drawing is not approved. 5 1 Attach approved shop Drawing JT 10-Feb
1.)Provide pcs plate at all cable tray bends. 1 1 To rectify the comment by subcon ETASET 31-Jan
2.)Slotted channel support was not properly fixed to cable tray, with
gap, fix properly.
1 1 To rectify the comment by subcon ETASET 31-Jan
Installation Inspection of cable tray and trunking in
12 151487 Room 80 & 82 REJ E. Sebastian
Rms. 80 & 82.
3.)Remove unused threaded and allotted support. 1 1 To rectify the comment by subcon ETASET 31-Jan
4.)Provide cable tray and stickers for cable tray at room 80. 1 1 To rectify the comment by subcon ETASET 31-Jan
1.) Conduit is shaking. Tightened all clamp termination. 1 1 Rectify by subcon ETASET 31-Jan
2.) Apply zinc rich galvanized paint to all cutting and excess conduit
Installation inspection of conduits for roof cleaning threaded rod(slotted channel support, angle support
1 1 Apply paint ETASET 31-Jan
13 152649 Roof Level
sockets at roof level
CLOSED V. Cenas
3.) Subject for re inspection. 1 1 Re inspection JT/ETA 31-Jan
4) .Provide DAS for DB schedule and FCR for re routing of
conduit/32mm sq.
3 1 provide DAS JT 31-Jan
1.) Conducted inspection of Cable Tray (450mm) on GL5 to 6.2 A
only.
5 1 ok JT 10-Feb
2.) Cut Excess Treaded Support to a required length only and
Apply Galvanized Paint
1 1 Rectify by subcon ETASET 31-Jan
3.) Some Plotted Support has no end Cap Cover , Complete end
cap cover.
1 1 Provide end cap rubber ETASET 31-Jan
5.) Faceplate not properly installed? 10 Observed proper Spacing 1 Rectify by subcon ETASET 31-Jan
6.) Shop Drawing subject for approval 5 attach approved drawing JT 10-Feb
7.)Inspected at highlights only (Cloud Portion),See attached
drawing with Signature.
5 1 ok 10-Feb
1.) Ducting and Cable Tray support are common in Public area,
Provide separate support for cable tray
1 1 Rectify by subcon ETASET 31-Jan
2.) Cable Tray for E&M and MHI are common in corridor/ Public
area support for E&M must be independent
1 1 Rectify by subcon ETASET 31-Jan
3.) All jointing of cable tray must be provided w/ Fishplate 1 1 Rectify by subcon ETASET 31-Jan
4.) Inspected w/ highlighted only (Cloud Portion) See attached
5 1 ok 10-Feb
Inspection Installation of Cable Tray at Concourse drawing w/ my signature
15 153566 Concourse Level REJ V. Cenas
Level Public Area as per attached Highlighted Drawing. 5.) Some jointing has no earth bonding connection complete
bonding connection
1 1 Rectify by subcon ETASET 31-Jan
7.) Provide cable tray label / Identification 1 1 Rectify by subcon ETASET 31-Jan
8.) Provide end cap cover for slotted support channel 1 1 Rectify by subcon ETASET 31-Jan
9.) Cable tray installation at GL-3.3/ axis B in incomplete the said
installation.
1 1 complete tha installation ETASET 31-Jan
1.) Separate this ITR Possibly on Per Room Basis so that we can
close out those Rooms where Installation is Completed.
5 1 ok JT 10-Feb
4.) R53 : All Conduiting not done, DB Panels not yet installed. 1 1 complete tha installation ETASET 31-Jan
1.) Rectify installation as Instructed during inspection 1 1 Rectify by subcon ETASET 31-Jan
Room 14, 16, 19.3, 40.1 & Inspection Installation of Conduit for Small Power at
17 156403
40.2 Concourse Level R14,R16,R19.3,R40.1 and R40.2 @ Concourse Level
2.) Connection from RTU to Security Shutter not installed CLOSED 1 V. Cenas 1 complete tha installation ETASET 31-Jan
3.) Please Mark up DWG. Showing Actual installation some were
modified
5 1 ok JT 10-Feb
Inspection insulation test of SMBD-Emergency
18 162793 Station
Incoming & Outgoing cables
- CLOSED V. Cenas 1 ETASET 31-Jan
Inspection LV cable termination and torque test of
19 164414 Station
SMDB-Retail
- CLOSED V. Cenas 1 ETASET 31-Jan
Inspection of LV Cable termination torque test of
20 164413 Station
SMBD-Emergency
- CLOSED V. Cenas 1 ETASET 31-Jan
1. Contractor not ready for the inspection 1 1 complete tha installation ETASET 31-Jan
Inspection installation of LV cables at R05, R19.3 and
21 161032 Room 05, 19.3, 19.4
R19.4 as per attached highlighted drawing
REJ V. Cenas
2.Provide all necessary documents for the inspection 5 1 ok JT 10-Feb
1. Ceiling rose behind large pipe to a more accessories location
Inspection Installation of conduits for lighting at R14, R15
5 1 ok JT 10-Feb
22 155223 Room 14, 15, 16, 19.3
R15, R16 and R19.3 at concourse level
CLOSED V. Cenas
2.) One JB not yet installaed at R19.3 1 1 complete tha installation ETASET 31-Jan
Inspection installation of wiring for power at R14, 1.) Wiring form RTU to security shutter not installed 1 1 complete tha installation ETASET 31-Jan
23 156413 Room 14, 19.3, 40.1, 40.2
R19.3, R40.1 and R40.2
CLOSED V. Cenas
2.)Conduit installation still to be rectified 1 1 Rectify by subcon ETASET 31-Jan
Inspection installation of small power wiring at
24 158086 Concourse Level concourse level public area as per attached highlighted 1. No access ceiling already installed CLOSED 1 V. Cenas 1 recheck JT/ETA 31-Jan
drawing
Installation inspection of cable ladder and try for LV 1.) Horizontal run should be straight (Constant Elevation) not tilting. 1 1 Rectify by subcon ETASET 31-Jan
31 160362 Entrance Pod A
cable in basement level Epod A
CLOSED V. Cenas
2.)Provide proper bending of CT. 1 1 Rectify by subcon ETASET 31-Jan
6 10 9 0 34 8
31 ← Total ITR
Ready 10
LEGEND (For Site Closing Rated) Documents 9
Rectify 34
1 Very Urgent to Close Subject to T&C 0
2 Moderate to Close Others (Rejected) 8
3 Not Urgent to Close (Due to Design or Specifi cation issue) Already Closed as SONO 6 17
4 Will be Closed after DCD Inspection or Asbuilt Drawing or T&C
5 Easy/Ready to Close TOTAL 67
Closed
Raised till yesterday
Raised today
Closed today
JTMJV Scope