Beruflich Dokumente
Kultur Dokumente
S.RAMAKRISHNA REDDY
Email:srkreddy244@gmail.com
OBJECTIVE:
Intend to build a career in the field of wireless communication and obtain a position, where I can
acquire skill and experience, working in a team environment thereby continuously growing and
contributing to the main objective of the organization. To take my organization and myself to greater
heights through my commitment, sincerity, adaptability and versatility.
EXPERIENCE SUMMARY:
3.8 years of working experience in Electrical Engineer and I&C of BTS ,O&M Engineer.
PROFESSIONAL EXPERIENCE
Worked for Reliance Infocomm Ltd (UPL-agency) as “Electrical Engineer” from JULY 2007
to June 2010. (TSP Project O&M Projects)
Job Profile 1:
Site preliminary survey along with site acquisition team of the Customer
Site Lay-out & Preparation
Soil Testing & Investigation
Layout design & Drawings of equipment etc.
Preparation of Bill of Quantities & Bill of Services.
Quality check on all items used in the project at site and at the Suppliers' Factory (at request
by Operators).
Planning, Scheduling, Execution, Monitoring & Controlling and Analyzing & Reporting (MIS-
Management Information System)
State Electricity Boards for obtaining required Power connection.
Obtain No Objection Certificate (NOC) from local statutory bodies for setting up of Cell Site(s).
Site Security / Safeguard Provision.
Finalization of equipment specifications, works in consultation with technical and commercial
teams of the Customer
Preparation of schedules and co-ordination with all suppliers & sub-contractors
Co-ordination with all Liaisoning & other agencies
Planning & Scheduling of Materials Management
Supervision of Civil, Electrical, Structural (Tower) and installations of other equipment
Quality inspections and audit
Co-ordination with all suppliers and Subcontractors for liquidation of punch points
Site Acceptance Test (AT) and documentation
Accomplish Site Ready For Installation (RFI)
Site inspection report
Final inspection & Handover of site
Bills verification and certification
Project Documentation.
Job Profile 2:
Ensuring preventive and breakdown maintenance of BTS network within the specified
time frame and implementation of corrective actions.
SITE OBJERVATIONS:
Outdoor
Indoor
The installation of antenna mounting pipes associated with mechanical arrangement will be
examined and where necessary corrected to ensure the following: -
• Desired Orientation
• Desired Height
• Grounding
• Lighting Protection
Antenna Installation Process
The antenna installation & testing will be carried out using the following resources: -
• Trained team
• Expert supervision
• Site Master
• Earthing System :
The earthing system is designed to achieve the uniform earth resistance of less than 1
ohm at the site. The grounding system consists of the following Sub Systems:
• Earthing pits - 6 nos., one for lightning protection of Tower and Equipment Shelter, one
for the Electronic Equipment inside the Shelter, one for the DG Neutral DG & Body earth
earth , one for AC earth, one for RF earth and one for Electrical Equipments Earthing.
• Earth conductor runs from the lightning protection system, Principal ground bar
maintained as reference in the shelter for electronic equipment, DG neutral and DG body
to the respective earth pits.
VSWR Testing : By using VSWR we can find out the value of vswr for RF readings and
find out the Return loss and Distance to Fault .
EXPERIENCE SUMMARY
40 Site Surveys, Site Selection in various phases since inception
Monitoring and controlling the project as per the project schedule & cost
Work profile :
Experience in (MEPT)
1. Worked in ASTER TELESERVICES Pvt LTD as a “ Project Engineer” from August 2006 to May
2007.
Performing the test for VSWR, Return Loss and DTF of the feeder cables using Site Master,
Power Calibration of CDMA Modcell
Taking care of network & project related activities of BTS.
Ensuring preventive and breakdown maintenance of BTS network within the specified time frame
and implementation of corrective actions.
Rectification of network and BTS related problems, and equipment alarms simulation check and
fault rectification.
Carrying out transmission network routings for new sites and induction of new sites & repeaters
installation from projects, and supervision of the installation sites.
Maintenance of adequate spares stock for Switch, BTS, Transmission, and tools, test equipments
for respective zone (s) and for controlled documents.
Acquisition of new sites and identification of new sites for network implementation and
certification of Civil, Electrical and BTS.
Maintenance of all electrical equipments for the BTS sites which includes DG, AMF, and AC, and
inspection of all electrical installation works.
Certification of vendor related work’s ie, BTS Installations, Electrical, Tower and Civil.
Setting up of E1 Links for BTS cell sites and follow up with the Reliance delegates for site
readiness.
RF & Microwave survey for various sites for implementing the network.
Scheduling & supervising the work of survey teams. Analyzing the survey reports.
MW network planning Discussion of hop plans with stake holders after site surveys
for approval and installation and commissioning of equipment at site.
Co-ordination site readiness status with various functions inside the company for
equipment installation and commissioning. Microwave, Network I&C for equipment
installation, commissioning, configuration and integration with MSC.
Project Management
Preparation of Project schedule & project monitoring to the project leaders.
Planning of resources for timely completion of the project.
Monitoring and controlling of the project as per the project schedule & cost
ACADEMIC PROFILE:
COMPUTER LITERACY:
PERSONAL INFORMATION:
DECLARATION: -
I hereby declare that all the above information furnished by me is true to the best of my knowledge
and given an opportunity, I shall definitely prove my worth
Place: KHAMMAM.
Date:
(S.RAMAKRISHNA REDDY)