SAP Production Planning Tips and Tricks contains a huge collections of smart answers to

get the work done faster. Here is the list of tips this manual provides.

Download the SAP PP Tips and Tricks Manual.

Contains Tips and Tricks on the below topics.

1. Table of the Order Production Operation


2. Why used Planning tools like APO or I2?
3. Difference between MRP vs MPS
4. SAP Factory Calendar
5. GR processing time in PP and MM
6. Production Planning – Extract data from MRP Table
7. Calculation to determine the delivery date and release date
8. Purchasing processing Time – OPPQ
9. Define Safety Stock Availability
10. Questions on MRP Group and MRP Controller
11. What if nothing happens when you run MRP?
12. Guide To Mass Replace Work Center
13. Planning separately via Storage Location or Vendor with MRP Area
14. The Common used Planning Strategy
15. Why Planning file entry still Exists?
16. Planning Strategy Selection
17. When do we use planning without final assembly strategy?
18. MRP Monthly lot size
19. Reservation Not Created During MRP Run
20. How to Configure Range Of Coverage Profile
21. Lose of link between sales order and production order
22. Batch Characteristics while Running MRP
23. What is Firming Type in the MRP Types
24. Functions of Production Version
25. What is Discrete Manufacturing, REM and Demand Management?
26. Rescheduling date does not take into account the GR Processing Time
27. Schedule Margin Key in Production Scheduling
28. What’s the function for Plan order convert to production order?
29. Work Scheduling View in Material Master
30. Scheduling Background Jobs for MRP
31. What is Finite and Infinite Scheduling
32. What Is Mean By Schedule Lines
33. Production Setup Time
34. Material Stock in Production Order
35. Automatic Conversion to Production Orders
36. Regarding Production Order Confirmation
37. How Costing takes place in Production Orders
38. SAP flow for REWORK activity
39. Serial Number For Component
40. How To Delete Old Production Orders
41. Checking Costs and Revenues from the Sales Order
42. PP – Define the default components reservation movement type
43. Goods Receipt (101) for Process Order
44. Goods receipt and goods issue through a PI sheet
45. Steps for Subcontracting
46. Stock in Transit – liquidation or remove the stock which is in transit
47. Restricting Good Receipt Unless Production Order Confirmed
48. How to link BOM component to storage location?
49. When is a Material BOM Not Exploded?
50. Creating a simple BOM
51. Explode BOM
52. Where used list for BOM
53. PP – Controlling data for your Bill of Materials
54. Allocating BOM to Other Plant
55. Mass Change Bill of Materials
56. Multi-level configuration with variants
57. What exactly is a Phantom item or Assembly means?
58. Attachment Of Drawings in BOMs
59. Split In Routing / Difference Between Alternative And Parallel Seq
60. A basic SAP Engineering Change Management Setup
61. Capacity Leveling Profile Setup
62. Production Control System Messages
63. Production Order System Status
64. Explain System and User Status In Production Order
65. PP Year End To Do List
66. SAP Production Planning and Control Frequently Asked Question
67. The Overall Flow For SAP PP