Beruflich Dokumente
Kultur Dokumente
1 Manufacturing Formula:
FORMULATION
Manufacturing Specifications:
Hardness : 3 t0 4 Kg/ cm
Granulation
4. Pass the wet mass through no.8 mesh and collect sieved
material.
Lubrication
Compression
Film Coating
Process:
A] Preparation of suspension:
B] Suspension Coating:
Packaging
During packing, check leak test as per SOP every 30 min. and/or
at the time of changing Alu Foil. Remove and keep aside control
samples. After completion of packing intimate QA to draw
samples of finished goods for analysis.
All information provided in above manufacturing process section
follows ICH guidelines.