Sie sind auf Seite 1von 2

Unit ID HM Total Jam Fuel Ratio Total Fuel Harga Satuan Total

Rp / H / ls Rp
Excavator PC 200 RA 02 10 18 20 360 225,000 4,050,000
8
Dum truck RA 01 8 15.3 15 229.5 2,500,000 2,500,000
7.3
RA 02 7.1 7.1 15 106.5 2,500,000 2,500,000

Compactor SBI 02 6.5 6.5 16 104 250,000 1,625,000

Excavator PC 200 PT. BIS 10 18 20 360 260,000 4,680,000


8
Dum truck PT.BIS 1 8 8 15 120 2,500,000 2,500,000
PT. BIS 2 8 8 15 120 2,500,000 2,500,000

Sub Total 20,355,000


TOTAL 33,655,00
Price Fuel Tanggal
Rp.9500/L
3,420,000 3/19/2020
3/26/2020
2,180,250 3/19/2020
3/26/2020
1,011,750 3/26/2020
55,000,000 1,833,333.33
988,000 3/26/2020

3,420,000 3/19/2020
3/26/2020
1,140,000 3/19/2020
1,140,000 3/19/2020

13,300,000
33,655,000