Beruflich Dokumente
Kultur Dokumente
1 2 3 4 5 6
Su M Tu W Th F Sa 7 8 9 10 11 12 13
Su M Tu W Th F Sa 14 15 16 17 18 19 20
1 2 3 4 5 6 21 22 23 24 25 26 27
1 2 7 8 9 10 11 12 13 28 29 30
3 4 5 6 7 8 9 14 15 16 17 18 19 20
Mon, Nov 8 - Sun, Nov 14 10 11 12 13 14 15 16 21 22 23 24 25 26 27 dic iembre 2010
Su M Tu W Th F Sa
28 29 30 1 2 3 4
17 18 19 20 21 22 23
W45-1 to W45-7 5 6 7 8 9
12 13 14 15 16 17 18
10 11
24 25 26 27 28 29 30 19 20 21 22 23 24 25
26 27 28 29 30 31
31 diciembre 2010
8 8 x
9 9 x
10 10 x
11 11 x
12 12
1 1
2 2 x
3 3 x
4 4 x
5 5
6 6
TOTAL = 7 HORAS
8 8
9 9
10 10
11 11
12 12
1 1
2 2
3 3
4 4
5 5
6 6
Additional Notes:
-- Column A is named "arr_event" and is the text displayed on
the planner.
-- Column F is named "arr_eventdate" and is used by both the
mini calendars and the planner to determine what events should
be listed or highlighted.
-- Columns D (week) and E (WeekDay) are for calculating
floating holidays. For example, Thanksgiving is on the 4th
Thursday of November.
-- Columns B (month) and C (Day) are for calculating the
date using DATE(year,month,day).
October 2010
Wk Su M Tu W Th F Sa These dates and those in the Events sheet must be formatted the same way
39 1 2
40 3 4 5 6 7 8 9 10/3/2010 10/4/2010 10/5/2010 10/6/2010 10/7/2010
41 10 11 12 13 14 15 16 10/10/2010 10/11/2010 10/12/2010 10/13/2010 10/14/2010
42 17 18 19 20 21 22 23 10/17/2010 10/18/2010 10/19/2010 10/20/2010 10/21/2010
43 24 25 26 27 28 29 30 10/24/2010 10/25/2010 10/26/2010 10/27/2010 10/28/2010
43 31 10/31/2010
November 2010
Wk Su M Tu W Th F Sa
44 1 2 3 4 5 6 11/1/2010 11/2/2010 11/3/2010 11/4/2010
45 7 8 9 10 11 12 13 11/7/2010 11/8/2010 11/9/2010 11/10/2010 11/11/2010
46 14 15 16 17 18 19 20 11/14/2010 11/15/2010 11/16/2010 11/17/2010 11/18/2010
47 21 22 23 24 25 26 27 11/21/2010 11/22/2010 11/23/2010 11/24/2010 11/25/2010
48 28 29 30 11/28/2010 11/29/2010 11/30/2010
December 2010
Wk Su M Tu W Th F Sa
48 1 2 3 4 12/1/2010 12/2/2010
49 5 6 7 8 9 10 11 12/5/2010 12/6/2010 12/7/2010 12/8/2010 12/9/2010
50 12 13 14 15 16 17 18 12/12/2010 12/13/2010 12/14/2010 12/15/2010 12/16/2010
51 19 20 21 22 23 24 25 12/19/2010 12/20/2010 12/21/2010 12/22/2010 12/23/2010
52 26 27 28 29 30 31 12/26/2010 12/27/2010 12/28/2010 12/29/2010 12/30/2010
ISO
US :: Use Start Day=1 (Sunday). Week 1 contains January 1
ISO :: Must use Start Day=2 (Monday). Week 1 contains the first Thursday
Note: When using the US week number, you must have the Analysis ToolPak add-in installed
11/5/2010 11/6/2010
11/12/2010 11/13/2010
11/19/2010 11/20/2010
11/26/2010 11/27/2010
12/3/2010 12/4/2010
12/10/2010 12/11/2010
12/17/2010 12/18/2010
12/24/2010 12/25/2010
12/31/2010