Sie sind auf Seite 1von 21

Action plan for the lakes under BBMP, BDA, Lake Development Authority and Karanataka Forest

Department

Most of the work is slated to be completed by 2014, while a few by 2013.


The rows marked in red are the lakes whose BBMP zones have not been identified

Action plan for lakes to be restored

Lakes under BBMP

Name of lake

Abbigere kere

Agrahara lake

Bellahalli

Chikka Banawara

Chokkanahalli lake
Handrahalli
Kammagondanahalli

Kattiganahalli kere
Kattiganahalli kere

Kogilu lake

Lakshmipura lake
Lingadiranahalli
Mallasandra Gudde lake
Medi Agrahara

Nagarabhavi

Shivanahalli

Singapura kere

Srigandadakaval

Srinivasapura kere
Thirumenahalli

Vaderahalli

Veerasagara lake

Vishwa nidam lake

Ramagondanahalli

Gunjur mouji kere

Panathur kere

Parappara Agrahara

Gangasetty kere

Kudlu doddakere

Nalluralli tank

Kudlu chikere

Siddapura kere

Panathur kere

Bhoganalli kere

Devara bisenalli kere

Gunjur palya kere

Gunjur kere (Carmelarm)

KR Puram (BEML)

Vibhuthipura kere

Horamavu kere
Vijanapura kere

Junnsandra kere

Konnappana agrahara

Chikka Bellandur kere

Doddakanenahalli kere

Haraluru kere

Munnekolalu kere

Horamavu Agara

Sadaramangala kere

Garudachar palya kere (Gosala)

Hoodi kere

Hoodi kere (Giddana kere)

Garudachar palya (Achanakere)

Devsandra kere

Chikkabasavanapura kere

Sowl kere

Bhattralli kere

Sigehalli

Jimkenalli kere

Sitaram palya

Pattandur Agrahara
Kasavanalli
Shilavantana kere
Nagareshwara-Nagenahalli lake

Kalkere Rampura kere

Chennasandra

Pattandur Agrahara
Mahadevpura

Dubasipalya lake

H Gollahalli lake

Gattigere palya lake

Byappana palya kunte

Chikkegowdana palya lake

Halagevaderahalli lake

Byrasandra kere

Gowdana Palya lake

Haralakunte lake (Somasandrakere)

Mangammana Palya lake

Anjanapura lake/Alahalli

Basapura lake -1

Basapura lake -2

Basavanapura lake

Begur lake

Chikkammanahalli lake

Chik Begur lake


Devarakere lake

Nyanappanahalli lake

Gottigere lake

Kalena Agrahara lake

Subbarayanakere

Subedeharanakere

Subramanyapura lake

Swarnakunte gudda kere

Yellenhalli lake

Chowdeshwari layout lake

Kammanahalli lake (Meenakshi lake)


Annappahalli/Yelachenahalli lake

Singasandra lake

Kalyani/kunte next to Sai Baba temple

Total funds required

Lakes under BDA

Name

Nalagadaranahalli

Amruthalli

Chikkabasthi
Manganahalli

Kenchanapura

Garvebhavi Palya

Chunchanaghatta

Kaggadasanapura

Singasandra

B Narayanapura

Doddanakundi

Narasappanahalli

Bheemanakuppe

Hosakere

Chikkabettahalli

Sulekere

Kannenahalli

B Channasara lake

Bellandur

Varthur

Lingadheeranahalli

Gubbalala

Konankunte

Hosakerehalli

Doddakallasandra

Avalahalli

Byrasandra

Arekere
Hulimavu

Kembathalli

Vasanthapura

Lakes under LDA

Name

Jaraganahalli

Agaram lake

Lakes under KFD

Name of lake

Puttenahalli

JB Kaval tank

Mylsandra
BBMP zone Extent Status
Sketch certified by Tahsildar; fencing is almost complete
except in encroached areas and letter has been sent to DC
Dasarahalli 47-13 (Urban) to take action to evict encroachments
Sketch certified by Tahsildar; fencing is almost complete
except in encroached areas and letter has been sent to DC
Byatarayanapura 15-33 (Urban) to take action to evict encroachments

Byatarayanapura 18-32 Survey completed

104.4 To be surveyed
Sketch certified by Tahsildar; fencing is almost complete
except in encroached areas and letter has been sent to DC
Byatarayanapura 8-2 (Urban) to take action to evict encroachments
Dasarahalli 16-6 Fencing in progress
Dasarahalli 22.29 Certified, fencing yet to start

Byatarayanapura 25 Sketch certified by Tahsildar, fencing to be started


Byatarayanapura 20-10 Sketch certified by Tahsildar, fencing is nearing completion
Sketch submitted to Tahsildar for certification, fencing in
Byatarayanapura 73-28 progress
Sketch certified by Tahsildar; fencing is almost complete
except in encroached areas and letter has been sent to DC
East 10-20 (Urban) to take action to evict encroachments
Dasarahalli 11-32 Fencing in progress
Dasarahalli 17-11 Fencing in progress
13-15 Survey in progress
Rajarajeshwari
Nagar 17-39 Survey in progress

Lake land is acquired for NH-7, other roads and railway


Byatarayanapura 18-12 embankment. To be handed over to BDA
Sketch certified by Tahsildar; fencing is almost complete
except in encroached areas and letter has been sent to DC
66-18 (Urban) to take action to evict encroachments

6-33 Fencing in progress

Byatarayanapura 3-4 To be surveyed


Fencing not started as acquisition data on the lake area is not
Byatarayanapura 23-8 available

Byatarayanapura 9-34 Sketch certified by Tahsildar, fencing in progress


Sketch certified by Tahsildar. Fencing is almost complete
except for an encroachment, letter has been sent to DC
Byatarayanapura 21-14 (Urban) to evict encroachment

Dasarahalli 4-30 Certified. In progress

Mahadevpura 36-26 To be surveyed


Sketch made by BBMP surveyors. Fencing is complete except
for a temple area, about which case is pending in SC. DC had
given 2.20 acres to an individual through an order in 1953.
Mahadevpura 63-39 Afforestation works are in progress
Sketch certified by tahsildar. Fencing is complete,
encroachments have been evicted and afforestation is in
Mahadevpura 27-17 progress

16-11 Fenced by KFD, afforestation works are in progress


Sketch signed by BBMP surveyors. Encroachments by slum
dwellers wil be shifted from the tank. Afforestation work is in
Mahadevpura 21-27 progress
Sketch certified by Tahsildar. Some encroachments are
evicted and tank is partly fenced. Afforestation works are
43-39 progressing
Sketch submitted to Tahsildar, yet to be certified. Some land
was granted to individuals, DC has to verify that. Partly fenced
Mahadevpura 47-39 and afforestation works are in progress
Sketch certified by Tahsildar. Tank is completed, all
encroachments evicted and afforestation works are in
13-15 progress
Sketch submitted to tahsildar. Encroachment of 2.18 acres
already evicted; rest encroachment by BEML Housing Society,
case pending in HC. Tank is partly fenced and afforestation
South 27-35 works are in progress
Sketch certified by Tahsildar. Encroachments evicted, fencing
Mahadevpura 6-31 complete and afforestation works in progress
Sketch certified by Tahsildar. Some encroachments are to be
removed. Tank is fully fenced and afforestation work is in
Bommanahalli 12-24 progress
Sketch certified by Tahsildar. All encroachments except that of
road are evicted. Fencing is complete and afforestation is
Bommanahalli 13-31 progressing
Sketch certified by Tahsildar. Encroachments evicted, fencing
Mahadevpura 36-27 complete and afforestation works in progress
Sketch certified by Tahsildar. Encroachments evicted except
Christian missionary area, fencing complete and afforestation
Mahadevpura 9-17 works in progress

Sketch certified by Tahsildar. Partly fenced, Encroachment of


East 45-39 30 guntas should be evicted; afforestation progressing
Sketch certified by Tahsildar. Fencing work progressing. DC
has been asked to remove the permanent structures that have
Mahadevpura 45-18 encroached the lake
Sketch submitted to Tahsildar. Fencing work progressing.
Encroached by permanent constructions/houses, some cases
Byatarayanapura 37-14 pending in HC
Sketch submitted to Tahsildar. A govt school building and
other constructions have encroached the lake and sewage is
Mahadevpura 11-28 entering the lake
Sketch certified by Tahsildar. Entire lake is encroached, used
Bommanahalli 24-33 for eucalyptus plantation. Case is pending in court
Sketch certified by Tahsildar, fencing and afforestation in
Bommanahalli 5-17 progress
Sketch submitted to Tahsildar; fencing and afforestation in
Mahadevpura 67-14 progress. Encroachment by way of agriculture/garden
Sketch certified by Tahsildar. Afforestation progressing and
fencing work will be completed after removing encroachments
Bommanahalli 18-14 on north east side
Sketch submitted to Tahsildar. Fencing and afforestation
progressing; encroachment near waist weir by way of
Bommanahalli 34-7 compound wall to be evicted.

Sketch certified and afforestation in progress. Fencing is


complete except on south side where apartments have
Mahadevpura 15-38 extended compound wall into the lake area; this will be evicted

Sketch submitted to tahsildar; fencing and afforestation


Byatarayanapura 51-34 progressing
Afforestation in progress. Part of the lake in Sadaramangala
village has been certified by Tahsildar, there are protests
about ownership. Sketch of the other part of the lake, which
Mahadevpura 62-11 comes in Kodagehalli village, is yet to be certified.
Sketch submitted for counter signature to Tahsildar,
Mahadevpura 5-36 Bangalore East. Afforestation progressing

Mahadevpura 15-10 Fencing done by KFD and BBMP. Afforestation progressing


Survey map submitted to East Tahsildar. Fencing partly
Mahadevpura 28-31 completed, afforestation progressing

Sketch submitted to East Tahsildar; fencing and afforestation


Mahadevpura 5-14 progressing

Sketch certified by East Tahasildar. Encroaching building to


Mahadevpura 16-8 be evicted; fencing and afforestation progressing

Mahadevpura 14-7 submitted


Sketch certified bytoEast
EastTahsildar
Tahsildar; fencing
except theunder progress
lake area in
Doddakanahalli sy no.68; fencing and afforestation
Bommanahalli 61-37 progressing
Sketch submitted to East Tahsildar. Encroachment is by way
18-10 of slum. Fencing and afforestation progressing
Sketch certified by East Tahsildar; fencing and afforestation in
progress. Letter addressed to DC to evict buildings that
Mahadevpura 31-13 encroach
Sketch certified by East Tahsildar; fencing and afforestation in
progress. Letter addressed to DC to evict buildings that
Mahadevpura 8-24 encroach
Rajarajeshwari Sketch submitted to East Tahsildar; encroachment exists;
Nagar 23-37 fencing and afforestation progressing

Sketch submitted to East Tahsildar; Encroachment is partly


16-35 removed and fencing and afforestation work is going on
Bommanahalli 55-8 Fenced by KFD
Mahadevpura 19-32 Sketch countersigned by East Tahsildar; Fencing done by ZP
Byatarayanapura 11-8 Yet to be surveyed and fenced
Sketch submitted for certification. Part of the area was granted
to private people, now sketch has to be corrected accordingly.
Byatarayanapura 187-31 Fencing and afforestation progressing

Fenced by KFD, part of lake is encroached by Fire station and


East 47-38 buildings

12-37 Major part of lake is encroached


Mahadevpura 13-11 Major part of lake is encroached

23-35 Survey sketch certified; encroachment being evicted


Rajarajeshwari
Nagar 21-18 Fencing and afforestation completed
Rajarajeshwari
Nagar 1 ac 30 g Checked
Rajarajeshwari
Nagar 2 ac 31 g Certified, encroachment to be removed
Rajarajeshwari
Nagar 1 ac 10 g Checked
Rajarajeshwari
Nagar 17-10 Fencing existing

15-11 Survey in progress

South 9-30 Checked, encroachment to be removed

16-29 Certified

Bommanahalli 7-29 Sketch submitted for certification

Bommanahalli 21-25 Certified

9-34 Fencing and afforestation progressing

10-29 Fencing and afforestation progressing

Mahadevpura 7-34 Fencing and afforestation progressing

Bommanahalli 137-24 Fencing and afforestation progressing

East 5-19 Fencing and afforestation progressing

Bommanahalli 41-16 Certified. Yet to start


South 7-15 Certified

Bommanahalli 6-07 Fencing and afforestation progressing

Bommanahalli 37-13 Fencing and afforestation progressing

7-30 Work in progress

Bommanahalli 5-10 Fencing and afforestation progressing

Bommanahalli 6-05 Fencing and afforestation progressing


Rajarajeshwari
Nagar 18-6 Sketch submitted for certification

9-05 Fencing and afforestation progressing

4-39 Fencing and afforestation progressing

Byatarayanapura 11-18 Fencing and afforestation progressing

East 18-37 Fencing and afforestation progressing


South 6-32 Fencing progressing

Bommanahalli 11-09 Fencing progressing

Bommanahalli 1-08 Development and afforestation progressing

BBMP zone Extent Status

20 lake is weed infested and sewage ridden


lake is sewage-ridden and covered with weeds to the extent
Byatarayanapura 25 that water surface is not visible

6 Highly weed-infested. Is a source for fishing


6 Weed infested and sewage ridden
Located close to NICE road, surrounded by villages and
20 agricultural farms
Impounding capacity to be increased and water quality to be
Bommanahalli improved
Water is dark and opaque, and foaming is observed. Needs to
Bommanahalli 14-14 be de-weeded

East 35-19 Needs to be de-weeded and free of sewage

Bommanahalli 7-20 Water is opaque. Boundary to be demarcated.

Mahadevpura 3-8 Needs to be de-weeded and free of sewage

Mahadevpura 111-37 Very little water impounded


Should be de-weeded, and made free of industrial waste and
11-24 sewage

Water is clean. Dredging needed to increase capacity


Water quality should be improved. De-weeding required and
38-16 sewage entry to be controlled
Boundary not defined. Impounding capacity should be
Byatarayanapura increased and de-weeding should be done

15-7 Very small quantity of water impounded. Boundary to be fixed

117-16 Very small quantity of water impounded. Boundary to be fixed


Covered with weeds. Sewage entry should be stopped and
3-8 storage capacity should be increased
Covered with weeds, there is heavy foaming. Sewage entry
Bommanahalli 797-21 should be controlled
High levels of organic pollution. Desilting and controlling
Mahadevpura 411-21 sewage entry is needed

Dasarahalli 5-22 Dry


Rajarajeshwari
nagar 8-10 Polluted

Bommanahalli 19-18 Polluted, weed growth, solid waste dumped and encroached
Rajarajeshwari
nagar 59-26 Dry, silted, weed growth, weir breached, encroached

Bommanahalli 21-16 polluted, encroached

South 21-25 polluted, weed growth

South 14-30 Dry, silted, weed growth, weir breached, encroached

Bommanahalli 37-21 Polluted, weed growth, solid waste dumped and encroached
Bommanahalli 130-17 Polluted, weed growth, solid waste dumped and encroached

5-16 Encroached

Bommanahalli 7-10 Polluted, weed growth, solid waste dumped and encroached

Was developed under National Lake Conservation


BBMP zone Extent Status
Programme (NCLP). There is sewage entry. De-weeding
needed and STP has to be set up if inflow of rainwater is
South inadequate.
Developer under NCLP on 15 years lease basis by M/s Biota
Natural Systems (India) Pvt Ltd, Hyderabad from 10-4-2007 to
Bommanahalli 97-76 9-4-2022 at the cost of Rs 1363.16 lakh

Cost
Lake full of sewage, but rich in avian bio-diversity. Recently
estimate in
sewage diverted to Yelahanka tertiary treatment plant (STP),
BBMP Zone lakhs Status
but treated water is not discharged back to the lake.
Restoration should be in phased manner to protect existing
Byatarayanapura 100 habitat of birds

Byatarayanapura 20 Lake situated in forest area


Rajarajeshwari
nagar 85 Plating indigenous species, fencing
Restoration plan Time in years Estimated Cost Remarks
After encroachment is
removed, development work
Comprehensive Development 3 340 can be started
After encroachment is
removed, development work
Comprehensive Development 3 110 can be started
After encroachment is
removed, development work
Comprehensive Development 3 135 can be started
After encroachment is
removed, development work
Comprehensive Development 3 820 can be started

Comprehensive Development 3 65
Comprehensive Development 2 120
Comprehensive Development 3 305
After encroachment is
removed, development work
Comprehensive Development 3 180 can be started
Comprehensive Development 3 145

Comprehensive Development 3 540


After encroachment is
removed, development work
Comprehensive Development 3 75 can be started
Comprehensive Development 2 70
Improvements 2 240
Comprehensive Development 3 300

215
After encroachment is
removed, development work
Comprehensive Development 3 400 can be started
After encroachment is
removed, development work
Comprehensive Development 3 470 can be started
After encroachment is
removed, development work
Comprehensive Development 3 55 can be started
After encroachment is
removed, development work
Comprehensive Development 3 25 can be started
After encroachment is
removed, development work
Comprehensive Development 3 170 can be started

Comprehensive Development 3 70

Comprehensive Development 3 145

Improvements 2 60
After encroachment is
removed, development work
Comprehensive Development 3 270 can be started

Comprehensive Development 3 435

Comprehensive Development 3 199

Comprehensive Development 3 232


After encroachment is
removed, development work
Comprehensive Development 3 290 can be started

Comprehensive Development 3 612


After encroachment is
removed, development work
Comprehensive Development 3 668 can be started

Comprehensive Development 2 187

After encroachment is
removed, development work
Comprehensive Development 3 385 can be started

Comprehensive Development 3 54
After encroachment is
removed, development work
Comprehensive Development 3 89 can be started

Comprehensive Development 3 189

Comprehensive Development 3 514


After encroachment is
removed, development work
Comprehensive Development 2 68 can be started
After encroachment is
removed, development work
Comprehensive Development 2 87 can be started
After encroachment is
removed, development work
Comprehensive Development 3 395 can be started
After encroachment is
removed, development work
Comprehensive Development 3 528 can be started
After encroachment is
removed, development work
Comprehensive Development 2 91 can be started
After encroachment is
removed, development work
Comprehensive Development 3 118 can be started

Comprehensive Development 2 73

Comprehensive Development 3 479


After encroachment is
removed, development work
Comprehensive Development 3 257 can be started
After encroachment is
removed, development work
Comprehensive Development 3 483 can be started

After encroachment is
removed, development work
Comprehensive Development 3 234 can be started
After encroachment is
removed, development work
Comprehensive Development 3 367 can be started

After encroachment is
removed, development work
Comprehensive Development 3 374 can be started

Comprehensive Development 2 89

Comprehensive Development 2 110

Comprehensive Development 2 399


After encroachment is
removed, development work
Comprehensive Development 3 75 can be started
After encroachment is
removed, development work
Comprehensive Development 3 230 can be started
After encroachment is
removed, development work
Comprehensive Development 3 103 can be started

Comprehensive Development 3 850


After encroachment is
removed, development work
Comprehensive Development 3 258 can be started
After encroachment is
removed, development work
Comprehensive Development 3 441 can be started
After encroachment is
removed, development work
Comprehensive Development 3 61 can be started
After encroachment is
removed, development work
Comprehensive Development 3 174 can be started
After encroachment is
removed, development work
Comprehensive Development 3 117 can be started
Comprehensive Development 3 766
Comprehensive Development 2 290
Fencing 1 87
After encroachment is
removed, development work
Comprehensive Development 3 2624 can be started
After encroachment is
removed, development work
Comprehensive Development 3 344 can be started
After encroachment is
removed, development work
Comprehensive Development 2 104 can be started
111
After encroachment is
removed, development work
Comprehensive Development 2 500 can be started

Comprehensive Development 3 400

17

102

14

Comprehensive Development 2 200

200
After encroachment is
removed, development work
Comprehensive Development 2 200 can be started
After encroachment is
removed, development work
200 can be started
After encroachment is
removed, development work
Comprehensive Development 3 200 can be started

350
After encroachment is
removed, development work
Comprehensive Development 3 150 can be started
After encroachment is
removed, development work
Comprehensive Development 3 170 can be started
After encroachment is
removed, development work
Comprehensive Development 3 145 can be started
After encroachment is
removed, development work
Comprehensive Development 3 600 can be started
After encroachment is
removed, development work
Comprehensive Development 3 150 can be started
After encroachment is
removed, development work
Comprehensive Development 3 350 can be started
After encroachment is
removed, development work
Comprehensive Development 3 80 can be started
After encroachment is
removed, development work
Comprehensive Development 3 80 can be started
After encroachment is
removed, development work
Comprehensive Development 3 520 can be started
After encroachment is
removed, development work
Comprehensive Development 3 180 can be started
After encroachment is
removed, development work
Comprehensive Development 3 130 can be started
After encroachment is
removed, development work
Comprehensive Development 3 160 can be started

260
After encroachment is
removed, development work
Comprehensive Development 3 160 can be started
After encroachment is
removed, development work
Comprehensive Development 3 130 can be started
After encroachment is
removed, development work
Comprehensive Development 3 185 can be started
After encroachment is
removed, development work
Comprehensive Development 3 260 can be started
150
After encroachment is
removed, development work
Comprehensive Development 3 150 can be started
After encroachment is
removed, development work
Comprehensive Development 3 60 can be started

262 cr

Chain link fencing, de-weeding,


Time required
desilting/dredging, network
Restoration plan in years
improvement, electrical works,
Chain link fencing, de-weeding,
landscaping, STP, Jogging track,
desilting/dredging, network
boat jetties 3
improvement, electrical works,
Chain link fencing, de-weeding,
landscaping, STP, Jogging track,
desilting/dredging, network
boat jetties 3
improvement, electrical works,
landscaping, STP, Jogging track,
boat jetties 3
Chain link fencing, de-weeding,
desilting/dredging, network
improvement, electrical works,
landscaping, STP, Jogging track,
Chain link fencing, de-weeding,
boat jetties 3
desilting/dredging, network
improvement, electrical works,
landscaping, STP, Jogging track 3

DPR under preparation 3

DPR under preparation 3

DPR under preparation 3

DPR under preparation 3

DPR under preparation 3

DPR under preparation 3

DPR under preparation 3

DPR under preparation 3

DPR under preparation 3

DPR under preparation 3

DPR under preparation 3

DPR under preparation 3

DPR under preparation 3

DPR under preparation 3

DPR under preparation 3

DPR under preparation 3

DPR under preparation 3

DPR under preparation 3

DPR under preparation 3

DPR under preparation 3

DPR under preparation 3

DPR under preparation 3

DPR under preparation 3


DPR under preparation 3

DPR under preparation 3

DPR under preparation 3

Action plan
Lease is terminated and lessee got
stay from High Court. After case is
Action plan is not yet decided
decided, LDA will maintain the lake.
As inflow is reduced STP needs to
be installed to let in treated water

Proposed Restoration
Bund strengthening, clearing inlet
and outlet, diversion channel,
desilting etc
Bund strengthning, pitching round
the wasteweir, creation of island,
desilting, catchment area treatment
bund strengthning, desilting,
planting, fencing