Project : BAGUIO TECHNOHUB CAMPUS, BPO-A

Location : Camp John Hay, Baguio City


Subject : CPM Network

EVENT ACTIVITY

1-2 Mobilization
2-3 Application for Excavation Permit
2-5 Preparation of Permit Plans & Application for Bldg. Permit
3-4 Temfacil / staking-out
4-6 Excavation & Trimming for Footing & Foundation
5-6 Dummy
6-7 Fabrication & Installation, Rebars for Foundation
& Columns (fisrt lift)
7-8 Concreting of foundation
8-9 Formworks, Foundation to Ground Level Columns
9 - 10 Concreting of Columns, Foundation to Ground level
6 - 11 Fabrication of Forms for Beams & Slabs
8 - 12 Rebars; Columns splicing & ties, shear wall & stairs from
ground to second level
10 - 13 Backfill and Compaction
11 - 13 Dummy
13 - 14 Rebars for slab on fill
13 - 14a Roughing-ins for MEPF at ground level
14 - 15 Concreting of slab on fill
14a - 14 Dummy
15 - 16 Formworks for Columns; Shear wall & stairs from
ground to second floor
15 - 19a CHB installation; ground to second level
16 - 17 Concreting of Columns, Shear Walls & Stairs
ground to second level
17 - 18 Rebars; Beams and slabs for second floor
17 - 19 Formworks; Beams and slabs for second floor
17 - 17a Roughing-ins for MEPF at second floor
17a - 19 Dummy
19 - 20 Concreting; Beams and slabs for second floor
20 -21 Rebars; Columns splicing & ties, shear wall & stairs from
second to third level
21 - 22 Formworks for Columns; Shear wall & stairs from
second to third floor
22 - 23 Concreting of Columns, Shear Walls & Stairs
second to third level
23 - 25 Formworks; Beams and slabs for third floor
23 - 24 Rebars; Beams and slabs for third floor
23 - 25a Roughing-ins for MEPF at third floor
20 - 25b CHB installation; second to third level
25a - 25 Dummy
25 - 26 Concreting; Beams and slabs for third floor
26 - 27 Rebars; Columns splicing & ties, shear wall & stairs from
EVENT ACTIVITY

third to fourth level


25b - 28 Dummy
27 - 28 Formworks for Columns; Shear wall & stairs from
third to fourth floor
28 - 29 Concreting of Columns, Shear Walls & Stairs
third to fourth level
29 -30 Formworks; Beams and slabs for fourth floor
29 - 31 Rebars; Beams and slabs for fourth floor
30 - 31 Dummy
31a - 32 Roughing-ins for MEPF at fourth floor
31 - 32 Concreting; Beams and slabs for fourth floor
32 - 33 Rebars; Columns, shear wall & stairs from
fourth level to roofdeck
28 - 33a CHB installation; third to fourth level
33 - 34 Formworks for Columns; Shear wall & stairs from
fourth floor to roofdeck
33a - 34 Dummy
34 - 35 Concreting of Columns, Shear Walls & Stairs
fourth level to roofdeck
35 - 36 Formworks; Beams and slabs at roofdeck
35 - 37 Rebars; Beams and slabs at roofdeck
35 - 37a Roughing-ins for MEPF at roofdeck
37 - 38 Concreting; Beams and slabs at roofdeck
37a - 37 Dummy
38 - 39 Installation of Structural Roof framings at roofdeck
39 - 40 Roofing works
38 - 41 CHB installation; fourth level to roofdeck
37 - 41 Ceiling and Partitions, ground to fourth floor
40 - 43 Wall finishes at roofdeck
41 - 42 Wall finishes, ground to fourth floor
41 - 42b Tile Works
20 - 34a Duct works and refrigerant piping
40 - 42a Fire Protection Works
40 - 44 Electrical & Auxiliary Works
44 - 45 Elevator Works
43 - 46 Fabrication, Delivery for Interior Fit-out
43 - 45a Pumps and accessories
46 - 47 Testing & Commissioning
47 - 48 Turn-over
48 - 49 Occupancy Permit
49 - 50 Dummy
47 - 50 Demobilization

Prepared by:
EVENT ACTIVITY

EXCELL CONTRACTORS AND DEVELOPERS, INC.


ACTIVITY DURATION

10
9
44
11
30
0
7

3
2
1
30
11

15
0
2
2
1
0
2

10
1

6
7
3
0
1
2

5
4
3
10
0
1
2
ACTIVITY DURATION

0
2

5
4
0
3
1
2

10
2

0
1

5
4
3
1
0
2
3
10
30
20
31
30
34
30
40
5
65
9
5
3
7
0
5
ACTIVITY DURATION
NO
1 2 3 4 5 6 7 8 9 10 11 12
230
230
48

47

227 227
NOVEMBER '10
13 14 15 16 17 18 19 20 21 22 23 24
237 237
49

50

237
237
25 26 27 28 29 30