Warehouse Management
CookBook
On
ECC 5.0
1
IBM India Private Limited WM CookBook ECC 5.0
Revision History
Revision history page contains a log of changes done to the document. For the integrity of the document it
is requested that no pages of the document be removed.
WM Warehouse Management
WMS Warehouse Management System
ECC ERP Central Component
ERP Enterprise Resource Planning
SU Storage Unit
HU Handling Units
i
IBM India Private Limited WM CookBook ECC 5.0
1
IBM India Private Limited WM CookBook ECC 5.0
2
IBM India Private Limited WM CookBook ECC 5.0
3
IBM India Private Limited WM CookBook ECC 5.0
1 Introduction
The purpose of this document is to describe the general configuration steps required to manually set up
the configuration within the system landscape that has already been installed using the corresponding
installation or configuration guides for installation.
The Configuration Guide describes step by step procedure to set up the configuration of WM manually
1.1 Prerequisites
The prerequisites to work with the manual configuration of Warehouse management are as follows
• SAP R/3 with
o Organization Structure
o Complete MM, SD and FI configuration to ensure all Inventory Management Operations are
possible.
4
IBM India Private Limited WM CookBook ECC 5.0
2.1.1 Definition
In this activity, a warehouse number is defined for the physical warehouse in which all the warehouse
operations are supposed to take place.
2.1.2 Assignment
In this activity the warehouse number is assigned to a combination of plant and storage location. This is
the highest level of integration between Inventory Management and Warehouse Number. This assignment
ensures that System recognize the storage locations in Materials Management controlled by the
Warehouse Management system
In this activity various control parameters for warehouse in Warehouse Management System are defined.
5
IBM India Private Limited WM CookBook ECC 5.0
• Region Code:
Region code is assigned to the warehouse for Hazardous Materials Management Functions. This code is
assigned in the configuration for Hazardous Materials Management.
• Weights/Units of Measure
• Other details:
Method for Blocking Logic is defined as one of the control parameters here. This blocking logic will control
the simultaneous operations in the warehouse.
• Storage Unit Management is activated at Warehouse Level in the control parameters only.
• Capacity Check Method: If the capacity check is switched on in a storage type, you can use this
indicator to control whether a warning message, an error message, or no message at all is to be issued
by the system whenever there is not enough weight available in the material master (capacity check for
weight) or insufficient quantity (capacity check for quantity).
6
IBM India Private Limited WM CookBook ECC 5.0
• Weight/Volume Unit: The weights/volume of all the materials managed in the warehouse is managed in
the unit of weight/volume that is specified in Weight/volume Unit field while defining warehouse. All
weights are managed in the warehouse in the unit of weight that is specified in the Weight Unit field in
this section . In the case of movements, the material weight is converted to this unit of weight and
updated in the storage bins. The capacity check by weight is also made in this unit. Here, the maximum
accuracy is 1/1000 of this unit of weight.
• Note: It is not advisable to change this unit of weight in a productive environment. In case it is
unavoidable, data must be corrected by running report RLS10200 afterwards.
• Default UoM: The system selects this unit of measure first for use in the warehouse if no default unit of
measure was defined in the material master
o Use: If no UoM is available in the material master, the system tries to assign one of the defaults from
the warehouse number record. If these defaults have not been maintained, the system uses the
base Unit of Measure
o 1st Proposal UoM : The Unit of Measure defined in this field is taken as a default for a transaction of
a material if system do not find any unit of measure from the material master record for that material.
o 2nd Proposal UoM : The Unit of Measure defined in this field is taken as a default for a transaction
of a material if system do not find any unit of measure from the material master record for that
material.
• Time unit/Performance Data: The time unit maintained here is used while processing performance
data. The Planned TO time and the Time Limits of Critical Objects in Warehouse Activity Monitor is
maintained in this Unit.
• Blocking Method: The setting maintained in this field controls the degree to which multiple users are
allowed to remove materials from the storage bins of the warehouse.
• Partial Picking: This field controls the type of partial picking allowed in this warehouse. It controls the
partial picking for material for TR and Delivery processing.
• Capacity Check: This indicator controls the issue of messages in the case of incorrect data for
capacity check function. If the capacity check function is activated in a Storage Type, we can control by
using this indicator whether a warning message or an error message is issued in the case of missing
weight in the Material Master Record.
• Batch Missing during TR Creation: This setting controls whether a warning or an error message or
no message at all, need to be displayed if batch is missing for a material which is handled in batches,
at the time of TR Creation for this material
• SU Management: If the warehouse is using Storage Units Management Function, then this indicator
need to be activated. At the same time this indicator will also be activated for storage types in this
warehouse.
• Performance Data: To control whether an error or warning or no message to be displayed if some
parameter is missing while processing planned TO data.
A warehouse Complex is divided into several different areas to store materials in different manner, for
example High Rack Storage Area, Bulk Storage Area, GR Area, GI Area etc.
7
IBM India Private Limited WM CookBook ECC 5.0
8
IBM India Private Limited WM CookBook ECC 5.0
o Full stock need to be removed from the storage bin of this storage type or not.
o Remaining stock need to be returned to the same bin or not.
o In case the remaining stock , required to be moved to some other storage type, then Return Storage
type is Maintained for this storage type.
o Pick point for this storage type, if any.
o To activate Zero Stock check type of Physical inventory method, the indicator, Execute Zero Stock
Check is activated
o Rounding off for picking quantities activated or not. If this indicator is set over here, then the
rounding quantities need to be maintained in the material master record for that material.
Note: The interim storage types (900-999) are required for various postings (for example, GR and GI
postings, and differences) in WM. When you define your warehouse numbers, copy the interim storage
types from warehouse number 001.
Storage Sections are used to group together storage bins with similar features. These bins are used for
stock placement purposes.
Note: If storage sections are not required in a storage type, at least one storage section (for example,
001) per storage type is to be defined in this IMG Activity (Mandatory). The storage section in this case is
identical to the storage type.
In SAP WM, picking area is an object within a storage type that groups together storage bins for stock
removal. This is not a mandatory activity (unlike Storage Section)
Picking Area defined here , is used only for stock removal activities. For TO Printing purposes, a printer
can be assigned to a printing area.
9
IBM India Private Limited WM CookBook ECC 5.0
A door is a location where the goods either arrive in the warehouse or leave it. A picked-items zone can
be assigned to a dock door as a default value. This value is assigned to the dock door in the delivery
document, provided the "Door and picked-items-zone determination" do not have a different assignment.
A staging area is an interim storage area for goods that have been received from goods receipt and
afterwards need to be transferred into the warehouse.
It is also an interim storage area for goods that were picked in a warehouse and are to be loaded for
goods issue through loading ramps or doors
Storage bins can be divided into groups (for example, large storage bins, small storage bins, and so on).
By defining storage bin types, you can divide up your storage bins into groups according to their physical
features (for example, big bins, small bins, and so on). In combination with the storage unit type (for
example, pallets, wire boxes, and so on), the system proposes a suitable storage bin during the putaway.
10
IBM India Private Limited WM CookBook ECC 5.0
11
IBM India Private Limited WM CookBook ECC 5.0
o Structure: Specifies how the increment for automatic generation of storage bins is to be
interpreted. Different letters mean that the digits are increased by the increment independently of
one another. Same letters mean that the increment is a multi-digit one
Note: Sequence number has no WM relevance except for technical reasons, as for one warehouse and a
storage type , there can be various storage bin structures.
12
IBM India Private Limited WM CookBook ECC 5.0
This indicator is assigned in the Warehouse Management 1 view of the material master record. And then
while defining search strategy for putaway and stock removal, a separate table entry is created in the
storage type search table for this indicator to differentiate the stock removal and placement of materials
having this indicator, from other materials.
13
IBM India Private Limited WM CookBook ECC 5.0
14
IBM India Private Limited WM CookBook ECC 5.0
15
IBM India Private Limited WM CookBook ECC 5.0
o Firstly, the SAP System has to know the storage types in which materials are to be put away or
picked from. This information is provided by the "Storage Type Search" table. If you have activated
the storage unit check, it will also affect the storage type search. In this case, the storage unit type is
from the transfer order is also checked against the permissible storage units for each storage type.
The system takes this information from the "Allowed storage unit types / storage type" table, which
you also configure here.
o Secondly, you can also influence the storage type search by setting additional indicators.
o Operation indicator (e.g. putaway or picking operation)
o Storage type indicator from the material master
o Stock category indicator
o Special stock indicator
o Storage class
o Water pollution class (WPC)
The Warehouse Management system will only use the "storage class" and "water pollution class"
indicators if you have activated the hazardous material management facility
o Thirdly, as already mentioned, various indicators affect the storage type search procedure. To
reduce the number of entries in the storage type search table, you can define an access strategy.
The system then uses this strategy as follows to locate the corresponding entries in the storage type
search table:
First, the SAP System attempts to read a fully qualified entry, i.e. an entry with all of the relevant indicators
from the material and (if present) hazardous material master.
If the system does not find an entry in the storage type search table, it attempts to read the table again –
this time using the access strategy
In this IMG Activity, search sequence for Storage Type search is determined. Following are the activities
carried out in this step.
16
IBM India Private Limited WM CookBook ECC 5.0
17
IBM India Private Limited WM CookBook ECC 5.0
If you want the system to search through the entire warehouse number for a stock pick, enter "***" (stands
for stringent FIFO) as the storage type. The system will then search the entire warehouse for the oldest
stock of the material. The entry "+++" means that the system branches to the user exit to the stringent
FIFO process (MWMTO013).
To use 2-step picking procedure, make sure that the destination storage type of the pick step is used as
the source storage type for distributing the accumulated quantities. For the storage type search with the 2-
step picking process, define activity type "2" (Column " Activity"). Activity types ‘A’ and ‘E’ are used for
picking and putaway respectively
18
IBM India Private Limited WM CookBook ECC 5.0
This IMG Activity is used to set up the system so that for each WM movement type certain storage types
are proposed. These reference movement types are assigned and are into account in the table "Storage
type search”.
The reference storage type entered against a WM Movement type entered here is assigned to a particular
storage type search sequence in “Storage Type Search Table”.
19
IBM India Private Limited WM CookBook ECC 5.0
system then uses the entry found for the storage type search. In this case, the system uses the third
line in the storage type search table
IMG Path IMG Logistics Execution Warehouse Management Strategies
Activate Storage Type Search Access Optimization – Storage Type
Search
Transaction Code SPRO/SM30
Table / View T334U / V_T334U
This section involves the activation of storage section search in putaway activities in a warehouse. The
storage section is searched by WMS in the following sequence:
o First of all , the system searches for a suitable storage type for putaway activity.
o Then the system finds a suitable putaway strategy for this storage type.
o After that system searches for a suitable storage section using the storage section search strategy
defined here.
NOTE: Storage Section search is not applicable for Fixed Bin Putaway Strategy.
20
IBM India Private Limited WM CookBook ECC 5.0
21
IBM India Private Limited WM CookBook ECC 5.0
3.3 Cross Line Stock Putaway – to Define Sort Sequence for Putaway
The cross-line putaway method can be used with the following putaway strategies:
o Empty storage bin
o Addition to existing stock
o Pallets
o Bulk Storage
If SAP system is allowed to carry out the search for a suitable storage bin according to the numerically
ascending sequence of storage bins, there is a danger of one-sided loading into the warehouse. This can
be influenced the sequence of storage bin allocation using this cross-line putaway method. With cross-line
putaway, the danger of one-sided loading into the warehouse can be prevented and, at the same time,
have the putaways carried out efficiently.
22
IBM India Private Limited WM CookBook ECC 5.0
Note: To use the "Cross-line putaway" strategy, activate the strategy before adding the storage bins. If
you activate this strategy after bins have been created, the control fields and indicators for existing
storage bins will not be filled properly.
If you must change the cross-line putaway method for storage types in which storage bins have already
been created, you must change the affected storage bins using the "multiple processing" function.
Example:
23
IBM India Private Limited WM CookBook ECC 5.0
This field plays a great role during picking. The sequence value defines the sequence in which the picker
is to remove goods from the storage bins. This sequence is defined on the lines for sequence definition for
cross line stock putaway in step 3.3.
Example:
R = Row, S = Stack, L = Level
For the coordinate structure R R - S S - L L for example, enter 1 2 3 4 5 for the storage bin positions 4, 5,
6, 7 and 8 of the coordinate structure (that is, for S S - L L) in the sort fields. The first column in each
storage type will be printed first, then the second and so on. For this example, the entries are as follows in
the definition table:
In this IMG Activity, different putaway strategies are defined for every storage type in their storage type
Master records. For more information, refer to section 2.3.
In this IMG Activity, different stock removal strategies are defined for every storage type in their storage
type Master records. For more information, refer to section 2.3.
24
IBM India Private Limited WM CookBook ECC 5.0
Goods transfers and stock quantities in the Warehouse Management system contain a reference to their
origin. The requirement type refers to the origin type, for example, goods receipt for purchase order or
goods issue to cost centers. The requirement number is the originating document itself, for example, the
purchase order number or the cost center
Example
Let us take line 2 of the table shown above, For requirement type B, the field name in case of Material
Document for dynamic bin is Purchase Order number and in case of Delivery Document it is Delivery
document Number.
The transfer type is a suitable tool for reports (for example, all stock placements into a storage type, all
stock removals from a storage type, and so on).The transfer type is not used in system control functions. It
is advisable to keep standard settings for your warehouse.
25
IBM India Private Limited WM CookBook ECC 5.0
In this IMG Activity, the configuration data for print control is set. Using the print control function, for
example, we can define which documents (that is, for transfer orders) are to be printed for goods
movements.
• How these documents are to be printed (that is, which forms are to be used, how many copies are to be
printed).
• On which printer a document is to be printed automatically.
Using the print control functions, WMS provide flexible control of the printing activities in your warehouse.
But it is advisable to have a look at the print control functionality documentation before setting up those
flexible controls.
This section involves Print Control for Standard Functionality. If Storage Unit Management is used in the
warehouse then the standard functionality as well as print control for Storage Unit Management need to
be defined.
26
IBM India Private Limited WM CookBook ECC 5.0
27
IBM India Private Limited WM CookBook ECC 5.0
28
IBM India Private Limited WM CookBook ECC 5.0
29
IBM India Private Limited WM CookBook ECC 5.0
30
IBM India Private Limited WM CookBook ECC 5.0
31
IBM India Private Limited WM CookBook ECC 5.0
Like Inventory Management Movement Types, WM has also some movement types which controls
process flow in the warehouse. In fact, WM movement type decides which Interim storage area need to be
used for a particular material movement.
At the same time WM Movement type has various other control functions like Manual /Automatic TO, Print
code, GR Data to be updated in quant or not, information regarding TO confirmation, Return storage type
search for material returns and control indicators for Storage type search
32
IBM India Private Limited WM CookBook ECC 5.0
33
IBM India Private Limited WM CookBook ECC 5.0
34
IBM India Private Limited WM CookBook ECC 5.0
Posting Change: Using a posting change , you can change the material identification of stocks. A posting
change affects at least material number, plant, stock category or special stock.
Stock Transfer: Using a stock transfer, a quant is moved physically from one place to another in the
warehouse.
For stock transfers and posting changes, the movement types in the series "3nn" are used. For internal
warehouse replenishment, use the WM movement type "319" .
Then the replenishment control is defined for the warehouse and storage type combination as shown
below:
35
IBM India Private Limited WM CookBook ECC 5.0
In the WM System, you can generate (TO) in the background, directly following the creation of a transfer
requirement (TR)
OR
Creating transfer orders is not started in the transaction that creates the transfer requirement or the
posting change notice, but by a report that runs in the background.
36
IBM India Private Limited WM CookBook ECC 5.0
37
IBM India Private Limited WM CookBook ECC 5.0
Using the 2-step picking procedure, it is possible to divide the entire picking process into removal of a
cumulative quantity and its allocation to individual requirements (reference documents). With the removal
of cumulative quantities, the stock removal process can be optimized to a greater degree.
At the same time, after activating 2 step picking for the warehouse. It is mandatory to define the two step
picking indicator in WM1 view of the material master.
38
IBM India Private Limited WM CookBook ECC 5.0
39
IBM India Private Limited WM CookBook ECC 5.0
In this IMG Activity , the settings for handling differences and TO confirmation are done.
Here difference Bin and Indicators, TO and Srce Bin controls whether the difference storage bin should be
a distinct bin or it will be same as TO number or Source Bin Number
40
IBM India Private Limited WM CookBook ECC 5.0
41
IBM India Private Limited WM CookBook ECC 5.0
42
IBM India Private Limited WM CookBook ECC 5.0
43
IBM India Private Limited WM CookBook ECC 5.0
o No Material: Select this indicator to display the material numbers for the entry of the counted
inventory results, mark this field. If it is required to enter the material numbers yourself, leave this
field blank.
o Entry: This indicator defines how the inventory count results are to be entered in the system (using
a beginning value as a basis):
o per page of the warehouse inventory list
o per storage bin or inventory item
o in sequential order beginning with the start value
o Double Line: Means that you can enter the inventory count results in two lines. This setting only
affects transactions LI11, LI12, and LI13. New transactions are not affected by this setting.
o Difference: When you enter the counted results, the system will issue a warning message if the
value entered here is exceeded. If you start any recounts, the bins/quants will be proposed for
recounting on the basis of this value.
o Next page: This indicator controls the input of counted results on Next page. If the counted results
for one bin cover several pages because mixed storage is allowed in the storage type concerned
and you are printing out the warehouse inventory list without the material number, it often happens
that a count result is not on the same page stored in the system. So that this problem does not
occur later on when you are entering the counted results in the system, it should be possible to enter
quants on subsequent pages.
44
IBM India Private Limited WM CookBook ECC 5.0
In this IMG Activity, Movement types are defined for posting and clearing inventory differences in a
warehouse for each stock category.
45
IBM India Private Limited WM CookBook ECC 5.0
As a rule, clearing differences is technically possible in almost all storage types. However, it is appropriate
to accumulate differences in one storage type (999) and to initiate the clearing process there. This setting
is executed in this step.
46
IBM India Private Limited WM CookBook ECC 5.0
In this IMG Activity, transaction parameters for various WM transaction are defined.
47
IBM India Private Limited WM CookBook ECC 5.0
In this IMG Activity, Number ranges for TR , TO, Quant, PCN and Groups are defined for a warehouse
Number.
IMG Path IMG Logistics Execution Warehouse Management Master Data
Maintain Number Ranges
Transaction Code SPRO/SM30
Table / View INRDP
48
IBM India Private Limited WM CookBook ECC 5.0
To guarantee correct data flow between the components Inventory Management (MM-IM) and Warehouse
Management (MM-WM), alignment of the movement types between Inventory Management and the
Warehouse Management system is mandatory activity, which is executed in this IMG Activity.
• Control of Assignment “Plant/Stor. Loc. – Warehouse Number: In this IMG Activity, Controls for
WM-Plant/SLoc combinations are defined.
• Storage Location not in TR: This indicator is used to control whether the storage location from the
reference document (for example, material document or production order) is copied into the transfer
requirement. If the indicator is selected, the field Storage location in the transfer requirement remains
empty. When the system creates a transfer order for this kind of transfer requirement, it uses the
standard storage location defined for this plant in this warehouse number.
• Standard Storage Location: If a transfer requirement is created on the basis of a posting in Inventory
Management (IM) or on the basis of a production order, and if the respective storage location is
customized so that the storage location is not copied into the transfer requirement, the field for the
storage location in the transfer requirement remains set to the initial value.
49
IBM India Private Limited WM CookBook ECC 5.0
o When this transfer requirement is converted into a transfer order, this standard storage location is
then used.
o If you create transfer orders manually and do not specify a storage location, the system proposes
the standard storage location.
• Storage Location Reference:
o Depending on the storage location, this indicator influences the storage type search within the
transfer order as well as the interim storage type search in the IM posting.
• WM Movement Type
o Like Inventory Management Movement Types, WM has also some movement types which controls
process flow in the warehouse. In fact, WM movement type decides which Interim storage area
need to be used for a particular material movement.
o At the same time WM Movement type has various other control functions like Manual /Automatic
TO, Print code, GR Data to be updated in quant or not, information regarding TO confirmation,
Return storage type search for material returns and control indicators for Storage type search.
• Reference Movement Type determines
o WM Movement Type
o Stock Category for the Quant to be generated in WM
50
IBM India Private Limited WM CookBook ECC 5.0
51
IBM India Private Limited WM CookBook ECC 5.0
• WM Movement Interface to IM
52
IBM India Private Limited WM CookBook ECC 5.0
53
IBM India Private Limited WM CookBook ECC 5.0
This can be desirable, for example, if certain storage types are managed by an external system, and you
want to inform this external system about the stock change. The interface to the external system (WCU) is
activated solely during creation of transfer orders, not during IM postings.
6.2 Shipping
54
IBM India Private Limited WM CookBook ECC 5.0
55
IBM India Private Limited WM CookBook ECC 5.0
issue to cost centers. The requirement number is the originating document itself, for example, the
purchase order number or the cost center.
The activation and control of 2-step picking takes place for deliveries at warehouse number level. Set the
required parameters for 2-step picking in the specified sequence:
o The indicator 2-stMatl is ticked if 2 step picking is material dependent in a warehouse (In this case
the relevant indicator is checked from material master record). If this indicator is not selected, all the
materials will be considered for 2 step picking.
NOTE: For customer-specific requirements, you can use the user exit MWM2S001.
In this IMG Activity, interface WM-PP is defined. Set the necessary parameters for the PP interface in the
specified sequence:
56
IBM India Private Limited WM CookBook ECC 5.0
57
IBM India Private Limited WM CookBook ECC 5.0
58
IBM India Private Limited WM CookBook ECC 5.0
The production scheduling profile is copied into the order during order creation. Production scheduling
profile can be assigned to a material or production scheduler. The assignment to a material has a higher
priority.
59
IBM India Private Limited WM CookBook ECC 5.0
In connection with the component Quality Management, we can have the system check in the WMS for
stock placements with reference to a transfer requirement whether active inspection lots with
calculated sample quantities exist for the putaway quantities. If this is the case, the user is requested
through a dialog boy to make a decision on how the sample is to be treated in the WM system.
If set in foreground, there will be a dialog box for choosing the option for handling the inspection sample.
60
IBM India Private Limited WM CookBook ECC 5.0
61
IBM India Private Limited WM CookBook ECC 5.0
7 Hazardous Materials in WM
Hazardous Materials require special procedures for their handling in SAP. The necessary Activities for
activating Hazardous Materials Management include the following
• Activate the hazardous materials check in your storage types.(See section 7.2)
• Assign the region codes to a warehouse number: Assign a region code to the respective
warehouse numbers.
• Assign allowed storage classes to the storage type: The system checks during stock placement
(putaway) whether materials can be stored in certain storage types. Assign one or several storage
classes to each storage type. Required Storage classes can be created as defined in section 7.1.6
• Storage type search (determine search sequence): Storage type search sequence can be
influenced depending on the storage class and water pollution class. The storage class and Water
pollution class are derived from the hazardous material.
• Storage section search (determine search sequence): Storage section search sequence can be
influenced depending on the storage class and water pollution class. The storage class and Water
pollution class are derived from the hazardous material.
In order to work with hazardous materials , master data is required to be maintained along with
configuration activities. These two are explained in section 7.1 and 7.2 below.
62
IBM India Private Limited WM CookBook ECC 5.0
63
IBM India Private Limited WM CookBook ECC 5.0
64
IBM India Private Limited WM CookBook ECC 5.0
In this IMG Activity, Hazardous Material check is activated for each storage type. At the same time water
pollution class is also specified for the storage type in consideration.
65
IBM India Private Limited WM CookBook ECC 5.0
66
IBM India Private Limited WM CookBook ECC 5.0
Storage Unit Management must be activated at warehouse number level. As a result of this activation
additional fields are displayed on the various screens.
In this IMG Activity, Number ranges for storage Units are defined for your client. The number ranges for
SU management are not dependent on Warehouse Number.
67
IBM India Private Limited WM CookBook ECC 5.0
In this IMG Activity, Storage types are activated or SU Management. Only define physical warehouses as
storage types for storage unit management. It is not possible to define storage unit management for
interim storage types.
68
IBM India Private Limited WM CookBook ECC 5.0
Once the system has determined the storage type (by means of the storage type search) and, if
necessary, the storage section it is to use, it must find a suitable storage bin. This is carried out by
combining the storage bin type (SBT) and storage unit type (SUT) as well as the "putaway strategy" in the
storage type table.
69
IBM India Private Limited WM CookBook ECC 5.0
70
IBM India Private Limited WM CookBook ECC 5.0
In this IMG Activity transaction for putaway activities at ID Point are defined. Points to remember while
carrying out this activity:
o Define new movement types that contain the required parameters (for example, the destination
storage type).
o If you have only one ID point in your warehouse, change the default movement type of Transaction
LT09 to your new ID point movement type.
o If you have several ID points in your warehouse, define a separate ID point transaction for each ID
point and then define the default movement type for each ID point transaction.
o First define a new transaction within the SAP development environment. For this transaction, select
the same parameters as for Transaction LT09 (module pool, screen number, and so on).
o Now, in view V_T340 copy the parameters of Transaction LT09 into your new transaction.
o Change the default movement type to the required movement type
71
IBM India Private Limited WM CookBook ECC 5.0
In this IMG Activity, the additional settings are done for Printing Storage Units , apart from the standard
Print control settings. This configuration is in addition to the standard print control functions. Following
additional settings are required to be done for SU Management
72
IBM India Private Limited WM CookBook ECC 5.0
The configuration in this IMG Activity are carried out if storage units are managed in bulk storage areas.
To use SU Managed Bulk storage areas, there are additional settings required to be done in the system
73
IBM India Private Limited WM CookBook ECC 5.0
as compared to the standard Bulk storage area without Storage units. For each bulk storage type
managed with storage units, we must define the following data:
o At which level is the totals information to be managed? : Should the system optimize the removal of
partial storage units (storage type control, column "Round off")?
o Decide whether or not you want to use this stock placement strategy. Activate the stock placement
strategy in the detail screen for storage type control. (While Defining Storage Type Controls)
74
IBM India Private Limited WM CookBook ECC 5.0
75
IBM India Private Limited WM CookBook ECC 5.0
76
IBM India Private Limited WM CookBook ECC 5.0
77
IBM India Private Limited WM CookBook ECC 5.0
o Indicator "Write log?": Set this indicator if it is required to have a log created for the workload data
o Apart from this Control for update of LIS info structures are defined for various SAP Documents.
Note: that the system will only determine critical processes and situations for a warehouse monitor object
if you have defined the jobs for determining critical objects for this warehouse number and also planned
them.
78
IBM India Private Limited WM CookBook ECC 5.0
79
IBM India Private Limited WM CookBook ECC 5.0
Target data : The determination of target data in the transfer order refers to the calculation of the target
effort (with respect to time) required to execute a warehouse movement. The target time is calculated
using two formulas (for TO item and TO header) at the time of transfer order creation. This target time is
updated in the TO items and the TO header.
Actual data: WM transfer orders can be posted in the system by assigning a processor and creating a net
duration time. The following data in the TA header is actual data: processor (HR personnel number),
actual duration, starting time and date, and end time and date. The net duration time of a particular
transfer order can be expressed in the actual duration or with a combination of start and end time. You
may also leave it out.
80
IBM India Private Limited WM CookBook ECC 5.0
In this activity you define the entries for performance data processing control and transfer order splitting.
The entries are unique according to warehouse number, movement type, source storage type, and
destination storage type
Data used for performance evaluation in WM is contained in the TO header and include two components
Planned Data: This data is calculated, pre existing target data that belong to the processing of a WM
Transfer Order. This is the target time or the time expected for a work to be completed in the warehouse.
81
IBM India Private Limited WM CookBook ECC 5.0
Actual data: This data is the actual information about the processing of a Transfer Order. This data
includes the worker, duration, start and end date time/date etc.
• Details from TO
Plan Time WM: This is the total time in TO Header for processing time for the entire Transfer Order. This
time references the WM time Unit which is defined in the Control Parameters of the Warehouse in IMG
Logistics Execution WM Master Data Control Parameters for Warehouse Number.
Planned TO time for TO Item: This is the sum of a constant processing time and planned setup time for
stock removal or placement for a TO item (which is either quantity dependent or variable processing time.
Total Planned processing time for TO: This is the sum of planned processing time in WM plus the
processing time transferred from the external system.
82
IBM India Private Limited WM CookBook ECC 5.0
Maintain unit-of-measure load category: A unit-of-measure load category serves to group units of measure
and unit-of-measure categories from a load viewpoint.
o Assign UoM to UoM (Load Category): Here unit of measure in WM e.g. EA, PC etc are assigned to
respective load category
o Assign UoM Load Category to SUT: Here different SUTs are assigned to respective UoM Load
Categories.
o UoM Load Category Search: In this step, for each storage type, it is defined how UoM Load
category will be searched for stock removal and stock placement activities in the warehouse.
o Load Categories for Logistics: Logistical load categories are defined in this step. A logistical load
category serves to group materials from a load viewpoint in the warehouse. E.g. Load Category
NORM – Normal materials, BULK heavy materials etc.
o Maintain Warehouse Operations: Different warehouse Activities are defined in this step
o Maintain Warehouse Processes: Different warehouse processes are defined in this step.
o Maintain Warehouse Workload: Load table is maintained in this step. In the load table a constant
and a variable processing time is stored in seconds for each warehouse number, storage type,
warehouse activity, unit-of-measure load category, and logistical load category combination.
o The constant time can be interpreted as the setup time or transfer time.
o The variable time can/may exist, depending on the unit to be moved
83
IBM India Private Limited WM CookBook ECC 5.0
84
IBM India Private Limited WM CookBook ECC 5.0
11 Wave Picking
IMG Path IMG Logistics Execution Shipping Picking Wave Picks Number
Ranges for Wave Picks
Transaction Code SPRO/SM30
Table / View INRDP
IMG Path IMG Logistics Execution Shipping Picking Wave Picks Number
Ranges for Groups
Transaction Code SPRO/SM30
Table / View V_T340DA and INRDP
In this activity, Groups are defined for wave picks. Several control parameters are defined for this Group.
IMG Path IMG Logistics Execution Shipping Picking Wave Picks Define
Group Types for Wave Picks
Transaction Code SPRO/SM30
Table / View TVSA / V_TVSA
85
IBM India Private Limited WM CookBook ECC 5.0
IMG Path IMG Logistics Execution Shipping Picking Wave Picks Define
Group Types for Wave Picks
Transaction Code SPRO/SM30
Table / View V_T340DJ and V_TVLK_SPL
86
IBM India Private Limited WM CookBook ECC 5.0
In this IMG Activity, it is defined which time is to be considered while assigning a delivery to a wave.
Example if it is required to process deliveries together in a wave that are supposed to be dispatched from
the warehouse in the same time slot, the goods issue is selected as a comparison time in the respective
warehouse
IMG Path IMG Logistics Execution Shipping Picking Wave Picks
Maintain Time of Comparison for Forming Wave Picks
Transaction Code SPRO/SM30
Table / View V_T340D_W
87
IBM India Private Limited WM CookBook ECC 5.0
In this activity you can maintain one or several picking wave profiles for each warehouse number. In the
detailed screen you can enter data on capacity behavior and control:
o Capacity behavior:
o By setting an entry in the field CapRestriction, you define whether this is a profile for
picking waves with restricted capacity or a profile for picking waves without capacity
restriction.
o If you define a profile for waves with restricted capacity, you can define one or several
capacity restrictions. The capacity limit of the entire wave is reached as soon as one of
the capacity limits defined here has been reached.
o You maintain the units for the capacity limits Maximum Weight, Maximum Volume in
the section Control update of workload data in the field section for units of load data.
o Control:
o By making an entry in the field Create Type, you determine the type and method for
creating picking waves. At the moment, it is only possible to create waves using time
criteria (check point).
o With an entry in the field "Manual control", you determine whether the profile requires
the creation of picking waves with manual control (that is, background processing is not
allowed), or whether you can do without manual control (that is, background processing
is allowed).
Time slots are maintained in this activity and picking wave profile is assigned to each timeslot. If the start
time of a timeslot is higher than the end time (e.g. start 2200 hrs, end 0600 hrs), this is regarded as a
timeslot with a date change.
88
IBM India Private Limited WM CookBook ECC 5.0
In order to group together different timeslots , timeslot groups are defined in this activity. This allows
combining different timeslots
89