Sie sind auf Seite 1von 3

Curriculum Vitae

Hari Om Sharan Singh


H.No -48, 11 Main BTM ,1stage Banglore
E-Mail: hariom.ada@gmail.com; Contact No:9972680904, 9538875517

1.0 Executive Summary


Have an Engineering degree BTech in Electronics & Communication in first class from
Utterpradesh University (UP) with total 4.7 years experience in telecommunications.
Currently working as Transmission2G& 3G Planning Engineer in Integrated Wire Solutions
Pvt Ltd for Nokia Siemens Networks in Transmission Planning Team for the past 1.7 Year.
Previously was working in ADA Cell works Wireless Engineering Pvt Ltd in Transmission
Planning for the past 2 years.
Previously was working in Punj Star InfoTech in Transmission Engineer for the past 1 years.
Have specialized in Microwave Planning/designing/optimization of transmission
Networks for different circles across India for GSM, 3G Projects
For different customers like TATA Docomo, Airtel, Aircel, & Idea

2.0 Skill Set:


 Sound knowledge on designing various types of Microwave links
 Designing & Engineering PDH/SDH MW access links
 Optimization of microwave network for fiber ring protection
 Carrying out interference analysis and mitigating interference of co-channel, adjacent channel
& external interference
 SOI Map study and LOS feasibility
 Coordination for RF & Transmission survey
 Handling Customer Complaints regarding coverage & Quality problems and providing suitable
solutions.
 Tx Planning Support for 3G network.
 BW Creation for 3G network @ 4 E1 per site.
 Dual IUB Sites integration (21MBPS for TTSL Docomo 3G Sites)
 E-E- Coordination 3G sites
 Updating Sites / Link Database in Site plus Tool.
 Updating As-Built diagrams time to time.
 BSC Planning (Low & Hi Cap BSC) with Abis Interface & A-ter Interface Planning
 Rehoming sites plan & deciding BSC Boundary
 Monitoring Radio Network Quality & Coverage with Using Drive Test Tools and BO Reports
 PCM Planning
 NOC supporting for E1 configuration issues.

3.0 Software tools known


 PATH LOSS SOFTWARE 3.0 & 4.0.
 MAP INFO PROFESSIONAL 8.0&8.5 & 10
 Global Mapper.
 Google Earth.
 Go global for Unix (NM & RM )

3.1 Equipments worked on


 MW (NEC Pasolink, NEC NEOi, NSN Flexi Hopper, NSN Flexi Hybrid)
 MUX (ECI-XDM-100,BG-20,uSDM, ALU-1642,1662,1660)

4.0 Projects Handled:


4.1 TATA Docomo Project (Karnataka circle)
 Planning of Rings for Protection for 2500 sites.
 Check list and readiness of 3G planning for 2035 Sites.
 NOC supporting for E1 configuration issues for 3G.
 Alarm rectification for 3G integrated sites.
 End to End coordination for integrating 3G sites.
 Dual IUB Sites integration (21MBPS for TTSL Docomo 3G Sites) & E-E coordination for
integration.
 Alcatel nodes NMS visibility with DCC Plan.
 NM to RM Planning of Alcatel visible nodes with connectivity and E1 details
 Microwave link Engineering for SDH & PDH links & preparation of link budget
 BSC Planning (Low & Hi Cap BSC) with Abis Interface & A-ter Interface Planning
 Rehoming of sites according to new planned BSC’s
 PCM & ET Port and Connectivity Plan
 Updating Sites / Link Database in Site plus Tool.
 Updating As-Built diagrams For ALU Visibility time to time.
 Responsible for Capacity planning and configuration of SDH links between different node
 Co-ordination with other Telecom Service Provider for inter connectivity issues.
 Co-ordination with Vendors (Alcatel & NEC).
 Frequency plan, Link budget & interference calculations by using Path loss 4.0 Tool.
 BOQ generation for M/W & FOTS.
 Mux Planning of mux (ALU 1642, 1662, 1660) corresponding to MW and Backbone rings.
 MW planning of Nokia (Flexi Hopper/ Flexi Hybrid) MW equipment with NMS and IP planning.
 Network configuration of SDH network.
 Network support for E1, STM1/4/16 links and related H/w.
 Document all Network diagrams / Processes / implementation and changes.
 Optimization for better utilization & Performance of Transmission Network.

4.2 Zte- Airtel Project ( U.P (W))


 Microwave link Engineering for SDH & PDH links & preparation of link budget
 Nominal Connectivity Plan, floating changes on daily basis to team
 BSC location plan
 BSC Survey Report checking and submission to the Customer
 Back-Bone Link feasibility check
 Survey Co-ordination & Data Maintenance
 Profile generation for Height calculation.
 E1 management for SDH as well as PDH link
 Handling R.L tools for path profile

4.2.1 Airtel Project( Maharastra circle)


 Microwave link Engineering for SDH & PDH links & preparation of link budget
 Nominal Connectivity Plan, floating changes on daily basis to team
 BSC location plan
 BSC Survey Report checking and submission to the Customer
 Back-Bone Link feasibility check
 Survey Co-ordination & Data Maintenance
 Profile generation for Height calculation.
 E1 management for SDH as well as PDH link
 Handling R.L tools for path profile

4.3 Idea Project( Maharastra circle)


 Capacity sites Survey
 Backbone Survey
 Transmission & RF Survey Co-ordination
 Contour Map Study for terrain data fetching for typical Hop
 Site Database Preparation and auditing
 Repeater Site location, Installation & Commissioning of Microwave links
 Microwave site survey (Access), Path profile analysis, Tower height design

4.4 Professional Certificate


 Industrial Training in HAL Lucknow duration 6 weeks

4.5 Qualification:
2006 B. Tech Electronics & Communication, UPTU University, SITM College of Engineering
Lucknow, [60.6.%– ]
2000 12Th , UP Board, [Percentage – 73%]
1998 10Th , UP Board , [Percentage – 71%]

Personal Details:-

• Name: : HARIOM SHARAN SINGH


• DOB: : 25TH SEP. 1984
• Father’s name: : SRI RAM ANUJ SINGH
• Language Known: : ENGLISH, HINDI
• Marital status: :MARRIED
• Permanent Add: : 20/260 GULAB ROAD
RAIBAREILLY
(229001) (U.P.)

♦References will be provided on demand.

♦Declaration: All the above mentioned information is true as per my knowledge

SIGNATURE:

Hari Om Sharan Singh

PLACE: NSN-BANGALORE

Das könnte Ihnen auch gefallen