Sie sind auf Seite 1von 8

OBJECTIVE :

To find a progressive, challenging & responsible position in Instrumentation & control field,
that would use my skills / Capabilities & help to develop my career.

To work challenging position, INSTRUMENT ENGINEER/ E&I ENGINEER./E&I


TRAINEER / INSTURMENT SUPERVISOR / INSTRUMENT COMMISSIONING
SUPERVISOR , INSTRUMENT TECHNICIAN ,

Career Summary
Email: inst_technician@yahoo.com
Total 9 year experience Oil & Gas groups and Fertilizer Company,
Skype : inst.technician
L.N.G. Plant Gas Exploration , Oil Refinery , Power plant worked in
commissioning Contacts:
construction, Commissioning, Maintenance & projects(as a team member and),
00923003131500
Quality assurance, and Technical and Safety & audits
00923032811856
for Instrumentation and
Control Handsome safety awareness against personal safety as well as Gas plant
Permanent Address
related safety. Maintain very safe working environment through the international
Rub nawaz makkha ghot near degree
standards. Got the safety trainings
collage allonfurqan
specific safety topics
institute Sukkur like
cityBOSIET, HUET,
with EBS. See Survival Advance Fire Fighting,
sindh Pakistan . emergency First Aid, Confined
space Entry and Emergency Rescue, Hazardous Chemicals Handling, Self
PERSONAL
Contained Breathing Apparatus, DETAIL:
Safe Work at Height, Permit to Work etc.
Father’s
ESSENTIAL DUTIES AND Name Syed Masood Ahmed Shah
RESPONSIBLITIES
th
Date
or of Birth to a4build
April, 1987.
 Assembly instrument and modules schedule
 Perform instrument bring-up preliminary QC testing
CNIC # 43302-5212294-9
 Coordinate resolution of technical issued
 Recommends measuresMarital
to improve production
Status Singlemethods and quality of product.
 Support in house instrument as needed
 Work with other engineering disciplines in
Religion a team environment
Islam

SPECIFIC SKILL Passport# NH5142942

 Able to read assemblyNationality


drawings andPakistani
wring schematics
 Ability to use basic hand tools and electrical test instruments
 Proficient in soldering and the assembly of various wire crimps and connectors
 Mechanical assembly Personal Strengths
and electrical wiring skills
 Experience with computers
 Strong written and oral  communication skills
Self Confidence
 Team player  Quick Learner
 Work with minimal supervision
 Team Player
 Goal oriented  Goal oriented
 Effective English written  and oral communication skills
Optimitic
 Strong technical and leadership skills
 Ability to prioritizeLanguage
field maintenance with production needs
 Strong computer skills, including has applications
 willing to accept responsibility and accountability with a positive attitude
 English
 Knowledge of safety/environmental with a positive attitude
 Urdu
 Maturity  Sindhi
 Confidence  Punjabi
 Perseverance Web site link
 Patience Linkedin
 Excellent interpersonalhttps://www.linkedin.com/profile/view?
skills
 Commercial awarenessid=122431417&trk=nav_responsive_tab_profile_
pic
 IT skills
 Numerical skills
Qualification:
 Matriculation with 2nd Division from B.I.S.E. Larkana in year 2002.

 Diploma of Associate Engineer (03 Years DAE) in Electronics Technology from Govt. Poly Technical Institute Sukkur
from 2007 to 2009 securing 1st division.

 B.Tech (H) Electronics , from Newport institute. Pakistan Karachi 2013

 Electrical Wireman License Certificate from Govt. Electrical Licensing board Sukkur region in 2009.

H.S.E Training Onshore & Offshore

 ERP training from ADGAS Abu Dhabi LNG plant (Das Island) on October, 2010.
 H2S training from ADGAS Abu Dhabi LNG plant (Das Island) on September, 2011.
 Safety watchman training & 2 years certification from United Energy Pakistan Badin till 2013
 Fire watchman training & 2 years certification from United Energy Pakistan Badin till 2013
 See Survival
 HUET ,With EBS,
 Basic Fire Fighting
 Self Rescue
 Emergency First Aid
 Safety Indication
 BOSIET OFFSHORE training SMTC Institute KSA alkhobar OPITO approved 4 year 24-06-2013 till 2017

Computer Literacy  Windows,

 MS Word,
 MS Excel,
 Ms Power Point & Internet Browsing

Courses & Diploma

 2 Months Basic Electronic Course from Govt. Technical Training Centre North Nazimabad (Al-Hydery) Karachi in 2004.

 2 months Refrigeration & Air –Conditioning course from Technical Training Centre Sukkur in 2004.

 06 Months certificate in Information Technology from Technocrat College of IT & Business Administration, registered
with S.B.T.E. in 2004.

 06 Mont6hs Typing course from Pitman Institute Commercial College Sukkur in 2005. (Typing Speed 45 words per minute)

 PLC . HMI. & INSTRUMENTATION & HYDROLIC & ELECTRICAL Course (PCSIR, PAK SWISS) 2012\

 OIL & GAS DRILLING ,from Petroleum Technical Training center , 2014
L
E
V
E
L
Duties & Responsibilities

P The function of the Instrumentation Maintenance Technician is to provide front line hands on and technical support to commission and
R troubleshoot the facility's electrical and instrumentation related equipment.
2. Work closely with the facility Commissioning Manager, System Start-up Managers, Safety Engineer and the Mechanical Supervisor. A
E focus on schedule and the support of pre-commissioning activates is key to collectively working towards the projects collective goals.
S 3. Help ensure the on schedule loop checking and shut down validation of all site instrumentation and within the project schedule.
S PRINCIPAL ACCOUNTABILITIES:
U
R 1. Safety
* Ensure all maintenance work is carried out according to Air Products safety procedures, ensuring KPIs are met or exceeded
* Actively participate in department/plant safety programmes and promote safe working practices for contractors and AP staff alike.
F
L 2. Loop checking
O * Ensure all functional checks have been made with the correct documentation and validation procedures.
W ** Stroking of all site process valves and control systems.
Validating the shutdown and safety systems are operational before hand over to the next stage in the commissioning.

3. Troubleshooting
T * Determine root cause of failures and follow these up by recommending and implementing appropriate solutions to reduce re-occurrence
of/or eliminate the cause of failures.
E
M 4. Continued Commissioning support
P * Respond to un-planned (emergency) breakdown situations and use technical and hands-on skills to get the equipment operational with
E the minimal disruption to plant on-streams, whilst adhering to all safety procedures and cost control measures.
R 5. Reliability
A
T ** Recommend and specify alterations and revisions to improve equipment and/or system reliability
Identify and escalate issued with equipment that could ultimately affect the plant the schedule of the commissioning process.
U
R 6. Personal accountability and development
E * Ensure all individual KPIs are met or exceeded
* Maintain error free execution. Pay very close attention to detail and execute work to the highest possible standard. Apply a "Continuous
Improvement" philosophy to daily work.
* Keep abreast of and evaluate new methodologies, work practices, equipment, diagnostics, technology, etc., for application and use within
Q the plant, highlighting their potential to your supervisor
U The Instrumentation Maintenance Technician should have a completion of a formal Instrument related engineering apprenticeship,
A supplemented by post apprenticeship experience of maintenance within engineering environments such as the power, petrochemical, steel,
oil and gas industries, waste management or material handling.
L
I Handled Test Equipments
T (multi function Test bench), FLUKE Model 189& Model 87 V True RMS Mulitimeters, HART (Highway Addressable Remote
Y Transducer) Model 275 & 375 & 475 Communicator, SFC (Smart field Communicator) communicator for Honeywell Products, Digital
Pressure calibrator, Dead weight Tester ( Nagman, Burden Berg), U-tube Manometer, Digital Temperature calibrator, Micro processor
based oil bath heater (AMETEK), High Precision Decade Resistance Box, High Precision mV and mA source, DC power supply,
Integrated circuit tester, Capacitor tester, Megger, Temperature controlled Soldering station, High Precision Steel Rule & Dial Gages and
Etc,

Professional Experience

Current working FT Engineering 15/08/2013 Still


As a Instrument engineer
 Job Responsibility

Process variable, FLOW, LEVEL, PRESSURE, TEMPERATURE & Electrical


All Control Valve .Calibration, dismantle, installation repairing with overhauling like Ball valve butterfly valve Gate valve

Three way valve , Engle valve double seat valve On-Off Valves with different make. Fisher, Valtek , Mason élan total instrument

calibration with commissioning , repairing, dismantling, assembling , with proper diagram

Testing Pressure safety vale Repairing Pressure safety valve conventional & pilot operated PSV’s and SOV’s.

Total instrument calibration with commissioning, repairing, dismantling, assembling, with proper diagram

Calibration of Transducer I/P P/I I/I V/V SOV Converters Position transmitters. Repairing Dismantling

• 1) Inspects, tests, adjusts, and repairs electric, electronic, mechanical, and pneumatic instruments and systems used to indicate, record, and
control generating operations in conventional or nuclear power electric generating plant: Inspects meters, indicators, and gauges to
detect abnormal fluctuations.
• 2) Tests accuracy of flow meters, pressure gauges, temperature indicators, controllers, radiation counters or detectors, and other recording,
indicating or controlling instruments to locate defective components in system, using test equipment, such as pressure gauges, mercury
manometers, potentiometers, pulse and signal generators, oscilloscopes, transistor curve tracers, and ammeters, voltmeters, and
wattmeter’s
• 3) Traces out and tests electronic solid state and vacuum tube circuitry and components to locate defective parts in analog and digital,
protection, or radiation monitoring systems, using test equipment, schematics, and maintenance manuals.

1 Checking & maintenance & installation J.B & panel wiring

2 Worked on Bentley Nevada Vibration Monitoring system Series 3300

3 Checking and troubleshooting of Vibration probes and Proxy-meters

4 Checking and maintenance panel testing graphing, none graphing, same graphing

5 Calibration and maintenance of Level switches, Pressure switches Diff. Pressure switches. Temperature switch

6 Installation panel with drawing and cable laying, with Termination according to drawing

7 High voltage, and low voltage working,

Worked MCE Gulf Contracting Engineering Saudi Arabia 01-05-2013--to--01-08-2013


As A Instrument supervisor
Clint ; Sabic Petrochemicals Group &
Aramco oil and gas & Exploration

 Job Responsibility
Involved in Up gradation of Transmitters to Single loop controllers for flow, level, pressure, temperature and analytical measurements
and digital instruments like Limit switches, Pressure, level, flow and temperature switches Which includes fixation of cable trays,
conduits, termination, loop checking and commissioning.
Perform Checklist with assistance off instrument assistant. -Check preparation of loop folders for each loop test with instrument
assistant, in due time prior to loop test -After receipt of loop test folders from Instrument Coordinator, ask instrument assistant to
perform loop test. Supervise field loop checks. -Assure that all components in the loop meet specification &calibration requirement.
Verify right operation of loop including fail-safe valve actions. -Verify the correct interventions off alarms. -Verify action of
Interlocks& supervise simulation operations on the Instruments. -Incas loop is not functioning properly, immediately inform to
instrument coordinator. -Supervise repair of loops with instrument assistant & inform readiness of loop to Instrument coordinator.
-During Commissioning if some carry out troubleshooting. -Oversee the works of vendors and ensure efficient utilization of vendor
manpower. Coordination and planning of maintenance Supervised, directed and controlled electrical maintenance activities
QA/QC ISO 9002 implementation& training programs Commissioning of the projects Receiving work orders /schedules, reviewing
maintenance programs and assigning work to subordinates Preparation of the reports to senior management

Worked GASCO engineering 08-05-2012--to --28-04-2013


As a Instrument supervisor

Client: OMV Exploration


ENI Exploration

 Job Responsibility
maintenance. Installation, Repairing, Overhauling well head control panel supplied by Baker CAC, Autocon,Petrotech and
Wormald.Fire and Gas system supplied by MSA and Baker CAC, Well testing supplied by Well comp and Helliburton.Electrical
submersible pump supplied by Centiliter Baker Hughes. Field loop Checking and pre commissioning of DCS
maintenance, Shut down and start up activities of John Brown Gas Turbine (Frame 6) Supertonic Mark II, Calibration/Maintenance and
fault finding Installation, Maintenance of well Head hydraulic control surface safety system supplied by Baker, Otis, Briscoe and
Autocon.Calibration, Testing and overhauling of various type of Pneumatic and Electronic Instruments of different make such as Taylor,
Foxboro, Fisher, ITT Barton, Honeywell, Introl and Rosemount etc.Calibration and Maintenance of various types of Pneumatic and
Electronic Instruments used in water Injection facilities, Oil and gas processing, Oil separation/Storage/Export facilities and associated
utilities such as Power plant, Electro chlorination and Instrument air compressor etc. GEC Ahlstrom gas turbine Instruments like Bentley
Nevada vibration control system, Turbine hydraulic and lube oil system, Relay logic, Temperature controllers, RTD 100 ohms, Speed
switches, Control valves, Valve postioner, Level trolls, Relief valves, Pressure transmitters, DP cells, IP converter, Magnetic flow
switches, Dampers, Actuators and ESD and Fire and Gas detection system.
 Checking and maintenance
 panel testing graphing, none graphing, same graphing.
 Calibration , all instrument Process variable , level ,Pressure , flow, Temperature & Quality
 refurbishments, all Instrument
 Troubleshooting, all instrument
 Instrument Installation,
 Cable Gladding ,
 Penal Termination
 Pneumatic Tubing & hydraulic Tubing
 Instrument & electrical cable Try
 calibration all instrumentation like flow , level, pressure Temperature,
 Job safety analysis ,
 Instrument cable layouts, as per drawings ,
 Cable schedule as drawings ,

Worked STS Engineering Pakistan 08-01-2011-- to --08-02-2012


As a INSTRUMENT ENGINEER

Client : UEPL Exploration crude and gas wellhead site &


Moody international inspection

 Job Responsibility
Maintenance. Installation, Repairing, Overhauling well head control panel hand tools – power tools – metallurgy for instrumentation
instrumentation drawings – process control theory – detectors, secondary elements, transduction, and transmitters – controller, recorders,
and indicators – relays and timers – switches and photo electronic devices – panel mounted instruments – analyzers and monitors
performing loop checks – tuning loops – troubleshooting and commissioning a loop Working as instrument engineer on the startup team
for the Esso. Duties include punch listing, field engineering checks, drawing markups and inspection of system turnovers to the refinery.
Also field checking all design aspects ensuring correct installation & commissioning readiness.
 Checking and maintenance
 Panel testing graphing, none graphing, same graphing.
 Calibration , all instrument Process variable , level ,Pressure , flow, Temperature & Quality
 refurbishments, all Instrument
 Troubleshooting, all instrument
 Instrument Installation,
 Cable Gladding ,
 Penal Termination
 Pneumatic Tubing & hydraulic Tubing
 Instrument & electrical cable Try
 calibration all instrumentation like flow , level, pressure Temperature,
 Job safety analysis ,
 Instrument cable layouts, as per drawings ,
 Cable schedule as drawings ,

Worked with DESCON ENGINEERING 08-06-2009 TO 01-01-2011


As a Instrument Supervisor

 Client ,
 Bcyco oil refinery , Plant
 AD GAS Das island UAE plant
 PRL, Pakistan oil refinery Plant
 NRL. National oil refinery Plant
 PPL, Pakistan Petroleum limited Plant
 OGDCL, Oil & Gas Development Company limited Plant
 PTA, LOTTE PAKISTAN Chemical Plant
 Fatima Fertilizer Ltd Plant

 Job Responsibility

Calibration Maintenance Installation, Repairing, Overhauling

Process variable, FLOW, LEVEL, PRESSURE, TEMPERATURE & Electrical

All Control Valve .Calibration, dismantle, installation repairing with overhauling like Ball valve butterfly valve Gate valve

Three way valve , Engle valve double seat valve On-Off Valves with different make. Fisher, Valtek , Mason élan total instrument

calibration with commissioning , repairing, dismantling, assembling , with proper diagram

Testing Pressure safety vale Repairing Pressure safety valve conventional & pilot operated PSV’s and SOV’s.

Total instrument calibration with commissioning, repairing, dismantling, assembling, with proper diagram

Calibration of Transducer I/P P/I I/I V/V SOV Converters Position transmitters. Repairing Dismantling

• 1) Inspects, tests, adjusts, and repairs electric, electronic, mechanical, and pneumatic instruments and systems used to indicate, record, and
control generating operations in conventional or nuclear power electric generating plant: Inspects meters, indicators, and gauges to
detect abnormal fluctuations.
• 2) Tests accuracy of flow meters, pressure gauges, temperature indicators, controllers, radiation counters or detectors, and other recording,
indicating or controlling instruments to locate defective components in system, using test equipment, such as pressure gauges, mercury
manometers, potentiometers, pulse and signal generators, oscilloscopes, transistor curve tracers, and ammeters, voltmeters, and
wattmeter’s
• 3) Traces out and tests electronic solid state and vacuum tube circuitry and components to locate defective parts in analog and digital,
protection, or radiation monitoring systems, using test equipment, schematics, and maintenance manuals.

1 Checking & maintenance & installation J.B & panel wiring

2 Worked on Bentley Nevada Vibration Monitoring system Series 3300

3 Checking and troubleshooting of Vibration probes and Proxy-meters

4 Checking and maintenance panel testing graphing, none graphing, same graphing

5 Calibration and maintenance of Level switches, Pressure switches Diff. Pressure switches. Temperature switch
6 Installation panel with drawing and cable laying, with Termination according to drawing

7 High voltage, and low voltage working,

PLC, FESTO DIDACTIC Model 404 version 3,0

PLC, MISTUVISHI Model FXin series version 3.00 software fx GP wine

PLC, FATEK Model FBs 4A2D

Working LADER program & STL program .Working

Worked With SYSTEMATIC ENGINEERING 01-12-2003-- to --10-01-2006


As a Instrument Technician

Client
Oil & Gas, Exploration companions, Oil refinery
Fertilizer, Chemical plants

 Job Responsibility

Ø Servicing and calibration of electronic and pneumatic pressure measuring instruments like SMART pressure transmitter, pressure
switches, and pressure gauges of various makes.

Ø Servicing and calibration of flow meters like orifice and venturi based SMART differential pressure flow meters, flow switches,
variable area flow meter, vortex flow meter, positive displacement flow meters of various makes.

Ø Servicing and calibration of level measuring instruments like level gauges, level switches, differential Pressure type SMART level
transmitters, displacer type SMART level transmitters of various makes.

Ø Servicing and calibration of SMART temperature transmitters, temperature switches and testing of all types of thermocouples and
Resistance Temperature Detector’s.

Ø Dismantling, assembling, servicing and calibration of pneumatic and hydraulic operated control valves all sizes 1” to 42” and its
accessories of SMART Electro pneumatic positioner , position transmitter, air filter regulator, limit switches and solenoid operated
valve. Calibrating the SMART valve petitioners using HART communicator.

Ø Maintenance and trouble shooting of gas furnace.

Ø Performing high level critical instruments servicing and calibrating in field itself using HART (Highway Addressable Remote
Transducer) protocol supported Communicators and Foundation field bus Communicators.

Ø Preparing weekly, monthly reports and test certificates.

Ø Control Valve Accessories Like Air filter regulator, Positioner, Position Xtr. Limit switches and solenoid operated valve.
Calibrating the SMART valve positioners using HART communicator Carrying out project nature major / minor shutdown activities of
removing all field instruments, calibration, installing back, inspection, loop checking & commissioning, Carrying out day to day running
Maintenance and preventive .
Level gauge glass, Dipstick method, Float gauge, Buoyancy indicator,

Level Transmitter, Piezoelectric. Capstans, probe, Bubbler Method, Red switch L.T with interface

Level switches, total instrument calibration with commissioning, repairing, dismantling, assembling, with proper diagram

Dp Transmitter, P.D Flow meter, Turbine flow meter, Vortex flow meter, Magnetic flow meter,

Mass flow meter , Turbine flow meter, Pressure Transmitter, Pressure gauge, Compound gauge , pressure switch , DP Switch ,

Pressure recorder, Bimetallic Thermometer, Mercury in glass Thermometers, Pressure Spring Thermometers,
Resistance Temperature RTD, Thermocouples all types, Thermostat

PLC, FESTO DIDACTIC Model 404 version 3,0

PLC, MISTUVISHI Model FXin series version 3.00 software fx GP wine

PLC, FATEK Model FBs 4A2D

Working LADER program & STL program .Working

Das könnte Ihnen auch gefallen