Beruflich Dokumente
Kultur Dokumente
True/False
Question
After goods have been manufactured, route sheets and operation layouts should not be collected back.
Correct Answer
False
Your Answer
False
True/False
Question
In case of centralised inspection, inspection rooms generally become bottleneck and cause delay in taking action
regarding rejection or rework.
Correct Answer
True
Your Answer
True
True/False
Question
During set up of X bar-R control chart, control limts should be practically revised from time to time as additional
data is accumulated.
Correct Answer
True
Your Answer
False
True/False
Question
Floor inspection delays the identification of faults which can not be rectified immediately before large lots are
spoiled.
Correct Answer
False
Your Answer
False
True/False
Question
Cent percent inspection is required on WIP prior to the key, critical or costly operation.
Correct Answer
True
Your Answer
True
True/False
Question
Repetitive movements between work stations which are difficult to be traced on string diagrams can be
conveniently shown on flow diagrams.
Correct Answer
False
Your Answer
True
True/False
Question
An activity can share the same tail event and same head event with any other activity.
Correct Answer
False
Your Answer
True
True/False
Question
Independent float either affects the float of preceding activities or that of succeeding activities.
Correct Answer
False
Your Answer
False
True/False
Question
F W Taylor devised a system for classifying motions into basic divisions called Therbligs
Correct Answer
False
Your Answer
False
True/False
Question
In case of two handed process chart, the simultaneous activities of both hands are recorded opposite to each other
on the chart.
Correct Answer
True
Your Answer
True
True/False
Question
An activity should represent an operation or set of operations which can be performed using a particular kind of
equipment or a special skill.
Correct Answer
True
Your Answer
True
True/False
Question
In case of X bar, if the process is not under control indicated by some points falling outside the control limits, such
points outside the control limits are eliminated and new trial control limits for the remaining points are computed.
Correct Answer
True
Your Answer
True
True/False
Question
After goods have been manufactured, route sheets and operation layouts should not be collected back.
Correct Answer
False
Your Answer
False
True/False
Question
Planned lubrication is said to be the nervous system of the equipment.
Correct Answer
True
Your Answer
True
True/False
Question
An activity can share the same tail event and same head event with any other activity.
Correct Answer
False
Your Answer
True
True/False
Question
Only skilled worker can use the fixed limit gauge.
Correct Answer
False
Your Answer
False
True/False
Question
Breakdown of machines, absenteeism of worker does not dislocate the manufacturing activity in process layout
Correct Answer
True
Your Answer
True
True/False
Question
Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure of machinery.
Correct Answer
True
Your Answer
True
True/False
Question
Operation process charts though indicates the sequence of events but do not show movements.
Correct Answer
True
Your Answer
True
http://scdlpapers.blogspot.com
True/False
Question
The problems of congestion, bottlenecks and backtracking can not be visualized by using templates and models.
Correct Answer
False
Your Answer
False
True/False
Question
Skill of labour force in a product type layout is usually higher than in the process type of layout
Correct Answer
False
Your Answer
True
True/False
Question
Recording of movement is not necessary in case of method study in any form.
Correct Answer
False
Your Answer
True
True/False
Question
Inspection should be conducted on all incoming materials, semifinished items, bought out components, subcontract
items prior to any operation, assembly.
Correct Answer
True
Your Answer
True
True/False
Question
A load chart specifies the work to be carried out by each person of company during shift hours.
Correct Answer
False
Your Answer
False
Match The Following
Question
Correct Answer
Your Answer
Pessimistic time
b
b
Expected time
Te
Te
Optimistic time
a
a
Most likely time
m
m
True/False
Question
Breakdown is inversly proportional to the investment in W.I.P.
Correct Answer
False
Your Answer
True
True/False
Question
short cycle job should be studied for macroscopic motions.
Correct Answer
False
Your Answer
True
True/False
Question
Inspection Order can be a verbal order
Correct Answer
True
Your Answer
False
True/False
Question
In case of backward pass computation, the latest event time of the end event equals to the earliest event time
minus duration of that activity.
Correct Answer
False
Your Answer
True
True/False
Question
In Gantt Chart, the horizontal lines devide vertical lines into sections which represents either operations or work
centres.
Correct Answer
True
Your Answer
True
True/False
Question Expediting action is necessary if the delays and interruptions are abnormal and hence any subsequent
delay is bound to extend the promised delivery date.
Correct Answer True
Your Answer True
True/False
Question Breakdown of machines, absenteeism of worker does not dislocate the manufacturing activity in process
layout
Correct Answer True
Your Answer True
True/False
Question Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure of
machinery.
Correct Answer True
Your Answer True
True/False
Question All activities must not be tied up into the network
Correct Answer False
Your Answer False
True/False
Question Operation Process Chart provides information on time and distances
Correct Answer False
Your Answer False
True/False
Question Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling
available on shop.
Correct Answer False
Your Answer True
True/False
Question Feasibility of time schedule requires that an activity be scheduled before any of it's predecessors are
scheduled.
Correct Answer False
Your Answer True
True/False
Question Planned lubrication is said to be the nervous system of the equipment.
Correct Answer True
Your Answer True
True/False
Question A network should be progression of activities always moving forward.
Correct Answer True
Your Answer True
True/False
Question For p-chart, the central line of fraction defectives is determined by average percentage defectives.
Correct Answer True
Your Answer True
True/False
Question
As a general rule, the number of tail event of an activity is more than that of it's head event.
Correct Answer
False
Your Answer
False
True/False
Question
All activities must not be tied up into the network
Correct Answer
False
Your Answer
False
True/False
Question
In case of X bar, if the process is not under control indicated by some points falling outside the control limits, such
points outside the control limits are eliminated and new trial control limits for the remaining points are computed.
Correct Answer
True
Your Answer
True
True/False
Question
Cent percent inspection is often more practical and economical than sampling inspection.
Correct Answer
False
Your Answer
False
True/False
Question
A load chart specifies the work to be carried out by each person of company during shift hours.
Correct Answer
False
Your Answer
True
True/False
Question
Cellular layout is based on the concept of Group Technology
Correct Answer
True
Your Answer
True
True/False
Question
In case of forward pass computation, the earliest event time of the first event is zero.
Correct Answer
True
Your Answer
True
True/False
Question
As a general rule, a site five times the actual plant size is considered minimum for parking, access facilities and
future expansion.
Correct Answer
True
Your Answer
True
True/False
Question
Independent float either affects the float of preceding activities or that of succeeding activities.
Correct Answer
False
Your Answer
False
True/False
Question
As a general rule, the number of tail event of an activity is more than that of it's head event.
Correct Answer
False
Your Answer
False
True/False
Question
All activities must not be tied up into the network
Correct Answer
False
Your Answer
False
True/False
Question
In case of X bar, if the process is not under control indicated by some points falling outside the control limits, such
points outside the control limits are eliminated and new trial control limits for the remaining points are computed.
Correct Answer
True
Your Answer
True
True/False
Question
Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling available
on shop.
Correct Answer
False
Your Answer
False
True/False
Question
Cent percent inspection is often more practical and economical than sampling inspection.
Correct Answer
False
Your Answer
False
True/False
Question
A load chart specifies the work to be carried out by each person of company during shift hours.
Correct Answer
False
Your Answer
True
True/False
Question
Cellular layout is based on the concept of Group Technology
Correct Answer
True
Your Answer
True
True/False
Question
In case of forward pass computation, the earliest event time of the first event is zero.
Correct Answer
True
Your Answer
True
True/False
Question
As a general rule, a site five times the actual plant size is considered minimum for parking, access facilities and
future expansion.
Correct Answer
True
Your Answer
True
True/False
Question
Independent float either affects the float of preceding activities or that of succeeding activities.
Correct Answer
False
Your Answer
False
True/False
Question
Process Sheets for parts in batch production are not maintained as standard process sheet
Correct Answer
False
Your Answer
False
True/False
Question
Theoretical capacity equals number of normal working hours of that machine.
Correct Answer
True
Your Answer
True
True/False
Question
Skill of labour force in a product type layout is usually higher than in the process type of layout
Correct Answer
False
Your Answer
False
True/False
Question
Diversified labour is adequately available in rural area as compared to urban area.
Correct Answer
False
Your Answer
False
True/False
Question
In case of backward pass computation, the latest event time of the end event equals to the earliest event time
minus duration of that activity.
Correct Answer
False
Your Answer
True
True/False
Question
Suburban location provides the compromise netween rural and urban locations.
Correct Answer
True
Your Answer
True
True/False
Question
Even in a small set up wherein maintenance of a machine is looked after by a mechanic cum worker, he should
report directly to the person responsible for the manufacturing operations.
Correct Answer
True
Your Answer
True
True/False
Question
Kanban system is essentially a computer based system for production scheduling and control
Correct Answer
False
Your Answer
True
True/False
Question
For p-chart, p bar is the ratio of total number of units inspected to the total number of units defectives.
Correct Answer
False
Your Answer
True
True/False
Question
The control chart for number of defectives is more convenient to make than control chart for fraction defectives
sincethe fugure of number of defectives units can be directly taken from the inspection report.
Correct Answer
True
Your Answer
True
True/False
Question
Every network does not necessarily have a critical path.
Correct Answer
False
Your Answer
False
True/False
Question
Scrap allowance is added to net requirement of material while ordering for material
Correct Answer
True
Your Answer
True
True/False
Question
Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure of machinery.
Correct Answer
True
Your Answer
True
True/False
Question
It would not affect the project completion time if non-critical activities take little loner time than planned.
Correct Answer
True
Your Answer
True
True/False
Question
Flow process charts do record movements as well as visual pictures.
Correct Answer
False
Your Answer
False
True/False
Question
Process Planning is concerned with decisions regarding requirement of machines and manpower for meeting
customer demand
Correct Answer
False
Your Answer
False
True/False
Question
Objective of Work Study is to improve Productivity
Correct Answer
True
Your Answer
True
True/False
Question
Sampling inspection is best suited when cost of inspection is much higher than the loss arising from the acceptance
of a defective part.
Correct Answer
True
Your Answer
False
True/False
Question
F W Taylor devised a system for classifying motions into basic divisions called Therbligs
Correct Answer
False
Your Answer
False
True/False
Question
Maintenance function must be decentralised apart from a size of a manufacturing organisation for it's better
functioning.
Correct Answer
False
Your Answer
True
True/False
Question
Skill of labour force in a product type layout is usually higher than in the process type of layout
Correct Answer
False
Your Answer
True
True/False
Question
Repetitive movements between work stations which are difficult to be traced on string diagrams can be
conveniently shown on flow diagrams.
Correct Answer
False
Your Answer
True
True/False
Question
All activities lying on the non-critical paths must have total float and free float.
Correct Answer
False
Your Answer
False
True/False
Question
In case of X bar-R charts,it is ensured that the assignable causes are detected before the tolerances are violated,
upper and lower statistical limits are worked out and inserted into a chart.
Correct Answer
True
Your Answer
False
True/False
Question
Root cause of most of the breakdowns is failure of the lubrication system.
Correct Answer
True
Your Answer
True
True/False
Question
It is not necessary to know spare time available on the non-critical path to allow a little delay for noncritical
activity.
Correct Answer
False
Your Answer
False
True/False
Question
MRP software generates time periodwise requiremetn of subassemblies
Correct Answer
True
Your Answer
True
True/False
Question
In case of two handed process chart, the simultaneous activities of both hands are recorded opposite to each other
on the chart.
Correct Answer
True
Your Answer
True
True/False
Question
It would not affect the project completion time if non-critical activities take little loner time than planned.
Correct Answer
True
Your Answer
True
True/False
Question Expediting action is necessary if the delays and interruptions are abnormal and hence any subsequent
delay is bound to extend the promised delivery date.
Correct Answer True
Your Answer True
True/False
Question Breakdown of machines, absenteeism of worker does not dislocate the manufacturing activity in process
layout
Correct Answer True
Your Answer True
True/False
Question Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure of
machinery.
Correct Answer True
Your Answer True
True/False
Question All activities must not be tied up into the network
Correct Answer False
Your Answer False
True/False
Question Operation Process Chart provides information on time and distances
Correct Answer False
Your Answer False
True/False
Question Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling
available on shop.
Correct Answer False
Your Answer True
True/False
Question Feasibility of time schedule requires that an activity be scheduled before any of it's predecessors are
scheduled.
Correct Answer False
Your Answer True
True/False
Question Planned lubrication is said to be the nervous system of the equipment.
Correct Answer True
Your Answer True
True/False
Question A network should be progression of activities always moving forward.
Correct Answer True
Your Answer True
True/False
Question For p-chart, the central line of fraction defectives is determined by average percentage defectives.
Correct Answer True
Your Answer True
POM assgn
Select The Blank
Question
The ________ must ensure that the product satisfy the functional requirements of it's usage.
Correct Answer
Quality of design
Your Answer
Quality of design
True/False
Question
The event numbers as far as possible reflect the logical relationships of the activities.
Correct Answer
True
Your Answer
False
True/False
Question
Skill of labour force in a product type layout is usually higher than in the process type of layout
Correct Answer
False
Your Answer
True
True/False
Question
Repetitive movements between work stations which are difficult to be traced on string diagrams can be
conveniently shown on flow diagrams.
Correct Answer
False
Your Answer
True
True/False
Question
All activities lying on the non-critical paths must have total float and free float.
Correct Answer
False
Your Answer
False
True/False
Question
In case of X bar-R charts,it is ensured that the assignable causes are detected before the tolerances are violated,
upper and lower statistical limits are worked out and inserted into a chart.
Correct Answer
True
Your Answer
False
True/False
Question
It is not necessary to know spare time available on the non-critical path to allow a little delay for noncritical
activity.
Correct Answer
False
Your Answer
False
True/False
Question
MRP software generates time periodwise requiremetn of subassemblies
Correct Answer
True
Your Answer
True
True/False
Question
In case of two handed process chart, the simultaneous activities of both hands are recorded opposite to each other
on the chart.
Correct Answer
True
Your Answer
True
True/False
Question
It would not affect the project completion time if non-critical activities take little loner time than planned.
Correct Answer
True
Your Answer
True
POM assgn
Multiple Choice Single Answer
Question
MRP is based on the concept of inventory demand which is of following type
Correct Answer
Dependent and independent
Your Answer
Dependent and independent
True/False
Question
As a general rule, the number of tail event of an activity is more than that of it's head event.
Correct Answer
False
Your Answer
False
Select The Blank
Question
The ________ is the probability that a good lot will be rejected by the sampling plan.
Correct Answer
Producer's risk
Your Answer
Producer's risk
True/False
Question
All activities must not be tied up into the network
Correct Answer
False
Your Answer
False
True/False
Question
In case of X bar, if the process is not under control indicated by some points falling outside the control limits, such
points outside the control limits are eliminated and new trial control limits for the remaining points are computed.
Correct Answer
True
Your Answer
True
True/False
Question
Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling available
on shop.
Correct Answer
False
Your Answer
False
True/False
Question
A load chart specifies the work to be carried out by each person of company during shift hours.
Correct Answer
False
Your Answer
True
True/False
Question
Cellular layout is based on the concept of Group Technology
Correct Answer
True
Your Answer
True
True/False
Question
In case of forward pass computation, the earliest event time of the first event is zero.
Correct Answer
True
Your Answer
True
True/False
Question
As a general rule, a site five times the actual plant size is considered minimum for parking, access facilities and
future expansion.
Correct Answer
True
Your Answer
True
True/False
Question
Independent float either affects the float of preceding activities or that of succeeding activities.
Correct Answer
False
Your Answer
False
True/False
Question Floor inspection delays the identification of faults which can not be rectified immediately before large lots
are spoiled.
Correct Answer False
Your Answer False
True/False
Question Suburban location provides the compromise netween rural and urban locations.
Correct Answer True
Your Answer True
Scale model Layout analysis Technique for evolving and analysis of layouts
True/False
Question A sampling plan which perfectly discriminates will have vertical OC curve.
Correct Answer True
Your Answer False
True/False
Question Proper care and storage is not an essential part of a well planned lubrication system.
Correct Answer False
Your Answer False
True/False
Question Delay in completion of projects result in unwelcome additions to the fixed manufacturing expenses.
Correct Answer True
Your Answer True
True/False
Question Objective of Work Study is to improve Productivity
Correct Answer True
Your Answer False
True/False
Question As a general rule, the number of tail event of an activity is more than that of it's head event.
Correct Answer False
Your Answer False
True/False
Question Breakdown of a machine is normally accompanied by added machine setup cost such as resetting of jobs
or change of jobs.
Correct Answer True
Your Answer True
True/False
Question The problems of congestion, bottlenecks and backtracking can not be visualized by using templates and
models.
Correct Answer False
Your Answer False
True/False
Question Mixed layouts are generally used in case of product is to be produced in different sizes/types: contains
too many components
Correct Answer True
Your Answer True
True/False
Question In case of two handed process chart, storage symbol is used when either hand is used as grip or vice to
hold an object.
Correct Answer True
Your Answer True
True/False
Question It would not affect the project completion time if non-critical activities take little loner time than planned.
Correct Answer True
Your Answer True
True/False
Question Latest starting date is the latest finishing time minus activity duration.
Correct Answer True
Your Answer True
True/False
Question One major difference between CPM and PERT is the former's adaptability for the projects where high
degree of uncertainty prevails and activity times during performance are expected to vary considerably for certain
activities.
Correct Answer False
Your Answer False
True/False
Question Kanban system is essentially a computer based system for production scheduling and control
Correct Answer False
Your Answer False
True/False
Question A network should employ only those dummy activities which are absolutely necessary.
Correct Answer True
Your Answer True
True/False
Question Planned lubrication is said to be the nervous system of the equipment.
Correct Answer True
Your Answer True
True/False
Question In case of X bar-R charts,it is ensured that the assignable causes are detected before the tolerances are
violated, upper and lower statistical limits are worked out and inserted into a chart.
Correct Answer True
Your Answer True
True/False
Question
The event numbers as far as possible reflect the logical relationships of the activities.
Correct Answer
True
Your Answer
False
True/False
Question
Skill of labour force in a product type layout is usually higher than in the process type of layout
Correct Answer
False
Your Answer
True
True/False
Question
Repetitive movements between work stations which are difficult to be traced on string diagrams can be
conveniently shown on flow diagrams.
Correct Answer
False
Your Answer
True
True/False
Question
All activities lying on the non-critical paths must have total float and free float.
Correct Answer
False
Your Answer
False
True/False
Question
In case of X bar-R charts,it is ensured that the assignable causes are detected before the tolerances are violated,
upper and lower statistical limits are worked out and inserted into a chart.
Correct Answer
True
Your Answer
False
True/False
Question
Root cause of most of the breakdowns is failure of the lubrication system.
Correct Answer
True
Your Answer
True
True/False
Question
It is not necessary to know spare time available on the non-critical path to allow a little delay for noncritical
activity.
Correct Answer
False
Your Answer
False
True/False
Question
MRP software generates time periodwise requiremetn of subassemblies
Correct Answer
True
Your Answer
True
True/False
Question
In case of two handed process chart, the simultaneous activities of both hands are recorded opposite to each other
on the chart.
Correct Answer
True
Your Answer
True
True/False
Question
It would not affect the project completion time if non-critical activities take little loner time than planned.
Correct Answer
True
Your Answer
True
True/False
Question Three time estimates are transformed into expected time before using it into a network.
Correct Answer True
Your Answer True
True/False
Question During set up of X bar-R control chart, control limts should be practically revised from time to time as
additional data is accumulated.
Correct Answer True
Your Answer True
True/False
Question It is not necessary to know spare time available on the non-critical path to allow a little delay for
noncritical activity.
Correct Answer False
Your Answer False
True/False
Question While numbering as per Fulkerson's rule, arrows emerging from the initial event are deleted so as to
create one or more initial events.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question Inadequate production capacity ultimately leads to
Correct Answer Poor Customer Service
Your Answer Poor Customer Service
True/False
Question Objective of Work Study is to improve Productivity
Correct Answer True
Your Answer True
True/False
Question For p-chart, fraction defective units in each sample is calculated by dividing number of defectives by the
number of pieces in the sample.
Correct Answer True
Your Answer True
First off inspection First piece produced after tool change First piece produced after tool change
Critical operation inspection After whose no rework is possible After whose no rework is possible
Patrolling inspection Inspection at the place of actual production Inspection at the place of actual production
How much to inspect Sampling or cent percent inspection Sampling or cent percent inspection
True/False
Question Sampling inspection is best suited when cost of inspection is much higher than the loss arising from the
acceptance of a defective part.
Correct Answer True
Your Answer True
True/False
Question MRP software generates time periodwise requiremetn of subassemblies
Correct Answer True
Your Answer True
True/False
Question It pays in the long run to inform the customer regarding expected delays in the deliveries.
Correct Answer True
Your Answer True
True/False
Question Repetitive movements between work stations which are difficult to be traced on string diagrams can be
conveniently shown on flow diagrams.
Correct Answer False
Your Answer True
True/False
Question
Job life is one of the factors that influence Process Planning
Correct Answer
True
Your Answer
True
True/False
Question
Quality control determines what, when, and how much to inspect while inspection actually conducts examination of
goods.
Correct Answer
True
Your Answer
True
True/False
Question
All activities must not be tied up into the network
Correct Answer
False
Your Answer
False
True/False
Question
F W Taylor devised a system for classifying motions into basic divisions called Therbligs
Correct Answer
False
Your Answer
True
True/False
Question
The event numbers as far as possible reflect the logical relationships of the activities.
Correct Answer
True
Your Answer
False
True/False
Question
Cent percent inspection is often more practical and economical than sampling inspection.
Correct Answer
False
Your Answer
False
True/False
Question
Both, preventive and breakdown maintenance work must be assigned to the same team.
Correct Answer
False
Your Answer
False
True/False
Question
Objective of Work Study is to improve Productivity
Correct Answer
True
Your Answer
False
True/False
Question
Breakdown of machines, absenteeism of worker does not dislocate the manufacturing activity in process layout
Correct Answer
True
Your Answer
True
True/False
Question
Since value of c can never be negativee, hence" if LCLp works out to be negative, it is taken as zero."
Correct Answer
True
Your Answer
True
True/False
Question
The dispatching function is of very importance in flow and mass production units.
Correct Answer
False
Your Answer
True
POM assgn
True/False
Question
Site selection should also take into account topography and soil structure of the land.
Correct Answer
True
Your Answer
True
True/False
Question
Kanban system is essentially a computer based system for production scheduling and control
Correct Answer
False
Your Answer
False
True/False
Question
Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling available
on shop.
Correct Answer
False
Your Answer
False
True/False
Question
In case of X bar, if the process is not under control indicated by some points falling outside the control limits, such
points outside the control limits are eliminated and new trial control limits for the remaining points are computed.
Correct Answer
True
Your Answer
True
True/False
Question
Lubrication survey should never be done for a new machine.
Correct Answer
False
Your Answer
False
True/False
Question
In case of forward pass computation, the earliest event time of the first event is zero.
Correct Answer
True
Your Answer
True
True/False
Question
Feasibility of time schedule requires that an activity be scheduled before any of it's predecessors are scheduled.
Correct Answer
False
Your Answer
True
True/False
Question
Operation process charts though indicates the sequence of events but do not show movements.
Correct Answer
True
Your Answer
True
True/False
Question
One major difference between CPM and PERT is the former's adaptability for the projects where high degree of
uncertainty prevails and activity times during performance are expected to vary considerably for certain activities.
Correct Answer
False
Your Answer
False
True/False
Question
A network can have more than one starting event but completion event must be only one.
Correct Answer
False
Your Answer
True
True/False
Question Grouping of machines gives a lot of flexibility in loading
and scheduling
Correct Answer True
Your Answer True
True/False
Question Fixed cost is lower in case of continuous production than
intermittent production.
Correct Answer False
Your Answer False
True/False
Question Root cause of most of the breakdowns is failure of the
lubrication system.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question Which of the following are steps to identify the critical
path in a small network?
Correct Answer Compare the durations of all paths to identify the
longest path. , Sum up the durations of activities along each path. ,
Enumerate all paths in the network and list down activities on each path.
Your Answer Compare the durations of all paths to identify the longest
path. , Sum up the durations of activities along each path. , Enumerate all
paths in the network and list down activities on each path.
True/False
Question The event numbers as far as possible reflect the logical
relationships of the activities.
Correct Answer True
Your Answer True
True/False
Question Proper care and storage is not an essential part of a well
planned lubrication system.
Correct Answer False
Your Answer False
True/False
Question Theoretical capacity equals number of normal working hours
of that machine.
Correct Answer True
Your Answer True
True/False
Question It is not necessary to know spare time available on the
non-critical path to allow a little delay for noncritical activity.
Correct Answer False
Your Answer False
True/False
Question In case of X bar-R charts,it is ensured that the assignable
causes are detected before the tolerances are violated, upper and lower
statistical limits are worked out and inserted into a chart.
Correct Answer True
Your Answer True
True/False
Question Sampling inspection suffice to check the work of line
inspectors and stage inspectors.
Correct Answer True
Your Answer True
True/False
Question It pays in the long run to inform the customer regarding
expected delays in the deliveries.
Correct Answer True
Your Answer True
True/False
Question Cent percent inspection does not mean inspection of
component for 100% quality characteristics.
Correct Answer True
Your Answer False
True/False
Question Three time estimates are transformed into expected time
before using it into a network.
Correct Answer True
Your Answer True
True/False
Question Expediting action is necessary if the delays and interruptions are abnormal and hence any subsequent
delay is bound to extend the promised delivery date.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question Process Engineer does not get sufficient time for designing tooling for most economic production run
when
Correct Answer Delivery time is less
Your Answer Delivery time is less
True/False
Question Breakdown of machines, absenteeism of worker does not dislocate the manufacturing activity in process
layout
Correct Answer True
Your Answer True
True/False
Question Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure of
machinery.
Correct Answer True
Your Answer True
True/False
Question All activities must not be tied up into the network
Correct Answer False
Your Answer False
True/False
Question Operation Process Chart provides information on time and distances
Correct Answer False
Your Answer False
True/False
Question Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling
available on shop.
Correct Answer False
Your Answer True
True/False
Question Feasibility of time schedule requires that an activity be scheduled before any of it's predecessors are
scheduled.
Correct Answer False
Your Answer True
True/False
Question Planned lubrication is said to be the nervous system of the equipment.
Correct Answer True
Your Answer True
True/False
Question A network should be progression of activities always moving forward.
Correct Answer True
Your Answer True
True/False
Question For p-chart, the central line of fraction defectives is determined by average percentage defectives.
Correct Answer True
Your Answer True
True/False
Question Grouping of machines gives a lot of flexibility in loading and scheduling
Correct Answer True
Your Answer True
True/False
Question Fixed cost is lower in case of continuous production than intermittent production.
Correct Answer False
Your Answer False
True/False
Question Root cause of most of the breakdowns is failure of the lubrication system.
Correct Answer True
Your Answer True
True/False
Question The event numbers as far as possible reflect the logical relationships of the activities.
Correct Answer True
Your Answer True
True/False
Question Proper care and storage is not an essential part of a well planned lubrication system.
Correct Answer False
Your Answer False
True/False
Question Theoretical capacity equals number of normal working hours of that machine.
Correct Answer True
Your Answer True
True/False
Question It is not necessary to know spare time available on the non-critical path to allow a little delay for
noncritical activity.
Correct Answer False
Your Answer False
True/False
Question In case of X bar-R charts,it is ensured that the assignable causes are detected before the tolerances are
violated, upper and lower statistical limits are worked out and inserted into a chart.
Correct Answer True
Your Answer True
True/False
Question Sampling inspection suffice to check the work of line inspectors and stage inspectors.
Correct Answer True
Your Answer True
True/False
Question It pays in the long run to inform the customer regarding expected delays in the deliveries.
Correct Answer True
Your Answer True
True/False
Question Cent percent inspection does not mean inspection of component for 100% quality characteristics.
Correct Answer True
Your Answer False