Beruflich Dokumente
Kultur Dokumente
)
Registration No.& Date
Office Use
N.B i) Addition or omissions to the connected load/contract demand to be notified to the licensee and permission obtained
before effecting such changes.
ii) The wattage against Sl. No.(24) above may be estimated asstated above(In case of non-availability of rated
capacity of any item, the load shown in Annexure-II shall be considered).
Place:-
Date:-
Name-
Annexure- I
Name & Signature of the Owner Name & Signature of the Witness
With Con. No ( if any)
12. Way-leave / permission from the adjoining consumer, if premises does not face to road.
Service connection requiring Property Crossing (Format)
I hereby give consent for drawing electric line through my/our property mentioned below
for giving electric connection to Sri/Smt………………… ..
N.B :- The Service connection application should be submitted in complete shape along
with the above documents as applicable.
Annexure-II
Public Institution
CHARGES FOR NEW SERVICE CONNECTION
Govt. of orissa
Service
charges for Application
Category connection Security Deposit Charges(in Rs.) for K.W.(Applicable for the Fy-2010-11)
Electrical Processing Fees
charges
connection
Single Three Single Three
0.5 1 1.5 2 2.5 3 3.5 4 4.5 5
Phase Phase Phase Phase
Rs 1000/-
Domestic Rs 34 Rs 45 Rs 25 Rs 100 (Materials to be 141 242 400 623 876 1131 1456 1752 2077 2372
supplied by CESU,)
Rs200/-(Materials
G.P.S Rs 75 Rs 150 Rs 25 Rs 100 985 2130 3353 4628 5952 7226 8551 9828 11150 12424
to be supplied by
the consumer)
Public
Rs 75 Rs 150 Rs 25 Rs 100 1007 1914 2922 2328 4836 5743 6750 7658 8665 9572
Institution