Beruflich Dokumente
Kultur Dokumente
i
Course Title: Human Resource Management
Course Code: MGT-3122
Semester: Fall 2009
Sec: d
Term Paper on:
“Difference in Human Resource Management Practice in Small and
Large Branches on a banking organization and their performances”
Prepared for:
Mohammad Abdul Jabber
Senior Lecturer
Department of Business Administration,
United International University
Prepared by:
Group: Warrior
Name ID
Ishrat Akifa 111 072 091
Meskat Ibne Sharif 111 072 070
ii
ABSTRACT
iii
LETTER OF TRANSMITTAL
January10, 2010
Dear Sir,
We, the undersigned students of Human Resource Management (MGT-3122) course sec-
d, were assigned to submit a Term Paper on “Difference in Human Resource
Management Practice in Small and Large Branches on a banking organization and their
performances”.
We considered your instructions and remarks very carefully while preparing this Term
Paper. We tried our best to follow your schedule, format and discipline.
We tried to visualize all the areas related to this Term Paper. Cooperation among our
group was excellent. As a group, we shared our information, knowledge and skill with
each other. We would like to express our heartiest gratitude to you for your tiresome
effort for us, which provided us with the opportunity to prepare our Term Paper.
Sincerely Yours,
iv
Abdur Rahman ID: 111 073 039 _______________
Shamima Rahman ID: 111 072 236 _______________
ACKNOWLEDGEMENT
whom we are being able to prepare this Term Paper. We would like to
Without his kind advice and guidance we would not have been able to
prepare this Term Paper. We would also like to thank our senior brothers
and friends who have helped us by giving valuable advices and by sharing
appreciation to all of these people for their great cooperation, which will
v
DECLARATION
We here declare that the information that is provided in this term paper is
information that may violate the banking law or there is nothing inputted
that is against the nation’s welfare. It is only a part of our course Human
Resource Management.
vi
LETTER OF CAUTION
I sh rat A kifa
Afroza Sultana
ID: 111 072 047 _______________
Abdur Rahman
ID: 111 073 039 _______________
vii
Shamima Rahman
ID: 111 072 236 _______________
RESEARCH AREA
For our term paper we needed to survey two branches of any bank
organization, that’s why we surveyed “The City Bank”. This is a renowned
bank of Bangladesh, whose Head Office is at 136, Gulshan Avenue,
Gulshan-2 named “City Bank Center”. For our survey we selected two
branches of The City Bank they are---
(1) Dhaka Chamber Branch
Chamber Bhaban 65-06
Motijheel C/A, Dhaka-l000
Phone: 9563897 9571
(2) Foreign Exchange Branch
27 Dilkusha CIA, Dhaka-1000
Phone: 9564315, 9559388
RESEARCH QUESTION
For our survey we created a number of questions. We shorted the most
relevant and technical questions as our instructor advised. We tried to
utilize our work through this questioner that has twelve dimensions --
(1) Job Scope
(2) Task Assignment
(3) Supervision
viii
(4) Organizational Structure
(5) Learning
(6) Training
(7) Employee Role
(8) Status
(9) Employee Participation
(10) Decentralization
(11) Social Activities
(12) Basis of Payment
Through this dimensions we tried that that employees may express their
opinion freely.
TABLE OF CONTENTS
3.0 THEORIZING 7
6.0 Conclusion 13
7.0 References 14
8.0 Appendix 15
ix
1.0 INTRODUCTION
1.1 Origin of the Problem
x
1.3 Scope
This Term Paper having a great deal of issues has provided us a wide
range of scope of doing analysis &, interpretation. Here we have included
the present scenario of Difference in Human Resource Management
Practice in Small and Large Branches on a banking organization and their
performances”.
1.4 Methodology
This Term Paper is an exploratory type of study. We have used two type’s
primary and secondary data. It has made the Term Paper more realistic.
That is --
(1) Primary data :
We collected primary data by survey through
questioner.
(2) Secondary data:
We collected Secondary data through internet,
annual repot, text book, SPSS . It has made the Term Paper more realistic.
1.5 Limitation
xi
2.0 HISTORY OF THE ORGANIZATION
The City Bank Limited has started its operation that is; the date of incorporation is March
14, 1983 under the license issued by Bangladesh Bank as the first private sector Bank in
Bangladesh with authorized capital of Tk. 1.75 Billion. The bank is listed with Dhaka
Stock Exchange Limited and Chittagong Stock Exchange Limited in 1986 as a publicly
traded company for its general class of shares.
The City Bank Limited serves its customers at home with 83 branches spread over the
country with total manpower of 1991. The Bank has expanded its services over the years,
which covers wide diversified areas of trade, commerce & industry. They have always
tried to provide different products and services to the customers through their wide and
ever growing domestic network. [1]
xii
The vision of City Bank is to be the leading bank in the country with best practices and
highest social commitment. [2]
xiii
o Payment Service [1]
Emotions
Feelings Knowledge
Moods Meanings
Evaluations Beliefs
xiv
2.8 Major Borrowing: (Loan they collect)
The City Bank has borrowed cash in the year 2007 and they borrowed from the domestic
borrowing sources, not from the foreign sources. Actually this is a good sign that the
bank depending on the economy and thus contributing to it. The bank collected cash from
Janata Bank (88%) and DBBL (12%). From the total borrowing of Tk. 8 50,000,000/=,
Janata Bank Ltd. has provided TK. 7 50,000,000/= and Dutch-Bangla Bank Ltd has
provided TK. 1 00,000,000/=. , which was an unsecured borrowing. The borrowing was
very short-term, which is only for one month. [1]
xv
3.0 THEORIZING
3.1 Commitment:
Means to show loyalty, duty or pledge to something or someone, and can refer to:
xvi
• Involuntary commitment, the practice of using legal means or forms to commit a
person to a mental hospital, insane asylum or psychiatric ward against the will or
over the protests of that person.
• Ontological commitment, belief in an ontology in philosophy.
• Cell commitment, the molecular event that Leeds to cellular differentiation.
• Organizational commitment can mean something pledged by an organization as
opposed to its members. [3]
3.1 Control:
Control is one of the managerial functions like planning, organizing, staffing and
directing. It is an important function because it helps to check the errors and to take the
corrective action so that deviation from standards are minimized and stated goals of the
organization are achieved in desired manner. According to modern concepts, control is a
foreseeing action whereas earlier concept of control was used only when errors were
detected. Control in management means setting standards, measuring actual performance
and taking corrective action. Thus, control comprises these three main activities. [4][5]
4.0 Analyzing
In, this term paper we want to find out weather there is any difference in human resource
policy in large organization and small organization. In this table, there contains 12
dimension. Each dimension is divided into two parts:
1. Large organization.
2. Small organization.
In the following table we show the twelve dimensions result regarding control and
commitment policy.
One-Sample Test
xvii
Test Value = 0
95% Confidence Interval
of the Difference
Mean
t df Sig. (2-tailed) Difference Lower Upper
Js
6.725 9 .000 2.8000 1.8582 3.7418
(large)
Js
6.708 9 .000 2.0000 1.3256 2.6744
(small)
Ta
(large) 9.000 9 .000 3.0000 2.2459 3.7541
Ta
6.708 9 .000 3.0000 1.9883 4.0117
(small)
Sp
(large) 9.391 9 .000 3.5000 2.6569 4.3431
Sp
14.402 9 .000 4.4000 3.7089 5.0911
(small)
Os
(large) 4.583 9 .001 1.4000 .7089 2.0911
Os
5.056 9 .001 2.8000 1.5473 4.0527
(small)
L
10.142 9 .000 4.0000 3.1078 4.8922
(large)
L
8.593 9 .000 3.8000 2.7996 4.8004
(small)
T
13.038 9 .000 4.1000 3.3886 4.8114
(large)
T
16.837 9 .000 4.2000 3.6357 4.7643
(small)
Er
16.837 9 .000 4.2000 3.6357 4.7643
(large)
Er
16.517 9 .000 4.3000 3.7111 4.8889
(small)
S
7.660 9 .000 2.9000 2.0436 3.7564
(large)
S
8.573 9 .000 2.8000 2.0612 3.5388
(small)
Ep
6.091 9 .000 1.3000 .8172 1.7828
(large)
Ep
3.737 9 .005 1.5000 .5920 2.4080
(small)
D
9.099 9 .000 4.3000 3.2309 5.3691
(large)
D
3.375 9 .008 1.8000 .5935 3.0065
(small)
Sa
4.019 9 .003 1.7000 .7432 2.6568
(large)
Sa
4.243 9 .002 2.0000 .9336 3.0664
(small)
Bp
4.641 9 .001 2.3000 1.1790 3.4210
(large)
Bp
4.801 9 .001 2.6000 1.3748 3.8252
(small)
xviii
5.0 Findings
Our findings of whether City Bank’s activity is Control or Commitment are given below
In Task analysis part both of organizations p value is 0 which refers there is significant
difference. But as mean in large and small organization is 3 we can say
commitment policy is being used.
xix
Mean small = 4.4, 100% commitment policy.
Subsequently, if we look at all the p value of rest of the dimension it says it is 0 which
refers there is significant difference. But as the mean varies policy also varies and the
result is given bellow:
xx
(3+3+1+1+5+5+1+1+5+5+2+4+5+5+2+2+1+1+5+1+2+1+2+2)/24= 65/24= 2.708
Employee 2=
(5+1+3+4+3+5+1+1+5+5+4+4+4+4+3+3+1+1+5+1+1+1+1+1)/24= 67/24= 2.792
Employee 3=
(3+3+4+1+5+5+1+5+5+5+5+5+5+5+2+2+1+1+5+1+1+1+2+2)/24= 75/24= 3.125
Employee 4=
(4+1+3+4+3+4+4+2+5+5+4+3+5+5+5+4+3+5+5+5+4+2+5+5)/24= 95/24= 3.958
Employee 5=
(2+2+3+4+5+4+2+1+5+5+5+5+3+3+3+3+1+1+5+5+5+5+5+5)/24= 87/24= 3.628
16.208
Now 16.208/5= 3.242
As small branch shows the mean3.242 it shows the commitment policy uses into the
organization.
Big Branch
Employee 1=
(3+3+3+2+4+4+2+2+2+2+3+3+4+4+5+5+1+1+1+1+1+1+2+2)/24= 57/24= 2.375
Employee 2=
(2+2+2+2+3+5+1+5+4+3+4+4+3+3+3+2+1+1+5+1+3+3+3+2)/24= 67/24= 2.792
Employee 3=
(1+1+5+5+1+2+1+5+3+2+4+4+4+4+2+3+2+2+2+1+1+1+1+5)/24= 62/24= 2.583
Employee 4=
(1+3+3+4+4+4+1+1+2+2+5+5+5+5+2+2+1+1+5+1+1+1+1+1)/24= 61/24= 2.542
Employee 5=
(4+1+3+3+3+5+1+4+4+4+5+5+4+5+2+2+1+1+5+1+1+1+1+1)/24= 67/24= 2.792
13.084
Now 13.084/5= 2.617
As large branch shows the mean2.617 it shows the control policy uses into the
organization.
So our analysis says that policy differs according to the size of the
organization. [6]
xxi
6.0 Conclusion
xxii
7.0 REFERENCES
[1] ---- http://www.docstoc.com/docs/6190839/city-bank-project
Date: 07/01/2010 time: 11am
[3]---- http://en.wikipedia.org/wiki/Commitment
[4]---- http://en.wikipedia.org/wiki/Control#See_also
[5]---- http://en.wikipedia.org/wiki/Control_(management)
xxiii
xxiv
APPANDIX
Descriptive Statistics
N Std. Deviation
Statisti Statisti Statis Std. Statisti Statisti
c c Statistic Statistic Statistic tic Error c c
js 2.800
10 4.00 1.00 5.00 28.00 .4163 1.31656 1.733
0
js 2.000
10 2.00 1.00 3.00 20.00 .2981 .94281 .889
0
ta 3.000
10 4.00 1.00 5.00 30.00 .3333 1.05409 1.111
0
ta 3.000
10 4.00 1.00 5.00 30.00 .4472 1.41421 2.000
0
sp 3.500
10 4.00 1.00 5.00 35.00 .3727 1.17851 1.389
0
sp 4.400
10 3.00 2.00 5.00 44.00 .3055 .96609 .933
0
os 1.400
10 3.00 1.00 4.00 14.00 .3055 .96609 .933
0
os 2.800
10 4.00 1.00 5.00 28.00 .5538 1.75119 3.067
0
l 4.000
10 3.00 2.00 5.00 40.00 .3944 1.24722 1.556
0
l 10 3.00 2.00 5.00 38.00 3.800 .4422 1.39841 1.956
xxv
0
t 4.100
10 3.00 2.00 5.00 41.00 .3145 .99443 .989
0
t 4.200
10 2.00 3.00 5.00 42.00 .2494 .78881 .622
0
er 4.200
10 2.00 3.00 5.00 42.00 .2494 .78881 .622
0
er 4.300
10 2.00 3.00 5.00 43.00 .2603 .82327 .678
0
s 2.900
10 3.00 2.00 5.00 29.00 .3786 1.19722 1.433
0
s 2.800
10 3.00 2.00 5.00 28.00 .3266 1.03280 1.067
0
ep 1.300
10 2.00 1.00 3.00 13.00 .2134 .67495 .456
0
ep 1.500
10 4.00 1.00 5.00 15.00 .4014 1.26930 1.611
0
d 4.300
10 4.00 1.00 5.00 43.00 .4726 1.49443 2.233
0
d 1.800
10 4.00 1.00 5.00 18.00 .5333 1.68655 2.844
0
sa 1.700
10 4.00 1.00 5.00 17.00 .4230 1.33749 1.789
0
sa 2.000
10 4.00 1.00 5.00 20.00 .4714 1.49071 2.222
0
bp 2.300
10 4.00 1.00 5.00 23.00 .4955 1.56702 2.456
0
bp 2.600
10 4.00 1.00 5.00 26.00 .5416 1.71270 2.933
0
Val
id
N
10
(lis
twi
se)
One-Sample Statistics
Std. Error
N Mean Std. Deviation Mean
js 10 2.8000 1.31656 .41633
js 10 2.0000 .94281 .29814
ta 10 3.0000 1.05409 .33333
ta 10 3.0000 1.41421 .44721
sp 10 3.5000 1.17851 .37268
sp 10 4.4000 .96609 .30551
os 10 1.4000 .96609 .30551
os 10 2.8000 1.75119 .55377
l 10 4.0000 1.24722 .39441
l 10 3.8000 1.39841 .44222
t 10 4.1000 .99443 .31447
t 10 4.2000 .78881 .24944
er 10 4.2000 .78881 .24944
er 10 4.3000 .82327 .26034
s 10 2.9000 1.19722 .37859
xxvi
s 10 2.8000 1.03280 .32660
ep 10 1.3000 .67495 .21344
ep 10 1.5000 1.26930 .40139
d 10 4.3000 1.49443 .47258
d 10 1.8000 1.68655 .53333
sa 10 1.7000 1.33749 .42295
sa 10 2.0000 1.49071 .47140
bp 10 2.3000 1.56702 .49554
bp 10 2.6000 1.71270 .54160
One-Sample Test
Test Value = 0
95% Confidence
Interval of the
Difference
Mean
t df Sig. (2-tailed) Difference Lower Upper
js 6.725 9 .000 2.8000 1.8582 3.7418
js 6.708 9 .000 2.0000 1.3256 2.6744
ta 9.000 9 .000 3.0000 2.2459 3.7541
ta 6.708 9 .000 3.0000 1.9883 4.0117
sp 9.391 9 .000 3.5000 2.6569 4.3431
sp 14.402 9 .000 4.4000 3.7089 5.0911
os 4.583 9 .001 1.4000 .7089 2.0911
os 5.056 9 .001 2.8000 1.5473 4.0527
l 10.142 9 .000 4.0000 3.1078 4.8922
l 8.593 9 .000 3.8000 2.7996 4.8004
t 13.038 9 .000 4.1000 3.3886 4.8114
xxvii
t 16.837 9 .000 4.2000 3.6357 4.7643
er 16.837 9 .000 4.2000 3.6357 4.7643
er 16.517 9 .000 4.3000 3.7111 4.8889
s 7.660 9 .000 2.9000 2.0436 3.7564
s 8.573 9 .000 2.8000 2.0612 3.5388
ep 6.091 9 .000 1.3000 .8172 1.7828
ep 3.737 9 .005 1.5000 .5920 2.4080
d 9.099 9 .000 4.3000 3.2309 5.3691
d 3.375 9 .008 1.8000 .5935 3.0065
sa 4.019 9 .003 1.7000 .7432 2.6568
sa 4.243 9 .002 2.0000 .9336 3.0664
bp 4.641 9 .001 2.3000 1.1790 3.4210
bp 4.801 9 .001 2.6000 1.3748 3.8252
xxviii