Sie sind auf Seite 1von 12

DAILY REPORT FOR SITE ACTIVITIES (Qua

Name of Project :Construction&Upgradation of Railway Track Works for RSP Yards &InPlant New Lines
Infastructure Project Ltd.

Activity/Area Scope Schedule

Start
01) Earth work in formation.

NCCY 470700 cum Oct-10


OBBP 158000 cum Oct-10
DUMETRA LINK 110000 cum Nov-10
PLATE MILL AREA 100000 cum Feb-11
Total cum 838700
02) Blanketing
NCCY 80000 cum Jan-11
OBBP 5000 cum Jan-11
DUMETRA LINK 5000 cum Jan-11
PLATE MILL AREA 18000 cum Apr-11
Total cum 108000
03) Concreting(Construction of
Bridges)

NCCY M 35 4 nos ,5700 cum and Retaining wall Dec-10


OBBP 1 nos ,200 cum Jan-11
DUMETRA LINK 3 nos ,300 cum Jan-11
Total cum 6200 and 8 nos
04) Laying of track
NCCY 24000 mtr+ 28 P & C Feb-11
OBBP 30000 mtr + 56 P & C Feb-11
DUMETRA LINK 7 000 mtr + 6 P & C Feb-11
BF -5 to SMS -II 8000 mtr + 23 P & C in7 and 1 set Apr-11
diamond x ing
MY 7 Km + 33 P & C Mar-11
PLATE MILL AREA 7600 mtr + 18P & C Jul-11
Total 83.6 km and 164 nos p&c
05) Procurment of P. way materials

NCCY Rail=2969 MT, sleepers=33000 nos. Nov-10

OBBP Rail=3620 MT, sleepers=40000 nos. Nov-10


DUMETRA LINK Rail=917 MT, sleepers=10000 nos. Nov-10

BF -5 to SMS -II Rail=965 MT, sleepers=10000 nos. Feb-11

MY Rail=844 MT, sleepers=9000 nos. Feb-11


PLATE MILL AREA Rail=917 MT, sleepers=9000 nos. 11-Apr
Total Rail 10232 MT,Sleepers 111000 nos
06) Supply of 50mm ballast
NCCY 38700 cum Dec-10
OBBP 30000 cum Dec-10
DUMETRA LINK 12000 cum Dec-10
BF -5 to SMS -II 12800 cum Feb-11
MY 8500 cum Feb-11
PLATE MILL AREA 13000 cum May-11
Total cum 115000
CTIVITIES (Quantitative Physical Progress)
ards &InPlant New Lines Date :-17.04.2011 A
PMC -RITES LTD.

Schedule Cummul. Plan for Progress for the day Plan for Cummul. Cummul.
Till last APR 11 Next day APR 11 As on date
month

Finish plan Actual

May-11 399,899 25,101 1050 - 1050 43,779 443,678


Apr-11 53,656 66,786 2700 - 2700 1,500 55,156
Apr-11 7,710 102,290 4091 - 4091 3,220 10,930
May-11 85,000 0
461,265 279,177 7841 - 7,841 48,499 509,764

Jun-11 0 44,000 1,760 0 1,760 1900 1,900


May-11 0 4,000 200 200
May-11 0 4,000 200 200
Jun-11 0
0 52,000 2160 0 1900 1,900

Apr-11 413 3300 200 0 0 187 600


May-11 0 1400 75
Apr-11 0 1850 0
0 6550 275 0 0 187 600

Aug-11 0 5500 250


Aug-11 400 6500 270
Aug-11 0 2600 105
Aug-11 0 1800 0

Aug-11 0 700 50
Jan-12
100 set p&c 400 17100 675

Jul-11 11467
24000
Apr-11 13000 40000
Apr-11
10000
Jun-11
4700
Jul-11 9000 6300
Aug-11 1000
33467 85000

Jul-11 31696 0 0 0 0 0 31696


May-11 3525 24475 1000 0 1000 0 3525
May-11 4780 6720 300 0 300 0 4780
Jun-11 0 4300 0 0 0
Jul-11 0 7500 300 0 300
Nov-11
40001 42995 1600 0 1600 0 40001
Agency:ARSS

Remarks

No work due to front un available

Retainining wall+bridge 8

WORK FRONT NOT AVAILABLE

dismantling 800 mtr old track


SLEEPER LAYING 500 MTR
MOBILIZATION STATUS

Name of Project :Construction&Upgradation of Railway Track Works for RSP Yards & InPlant New Lines
Agency:ARSS Infastructure Project Ltd.

AREA MAN POWER MACHINARIE


Present Previous On Date Excavator Loader Transit
Requirement Day mixer

NCCY+OBBP+
dumitra link 425 276 198 1 1 0
ATUS

lant New Lines


PMC -RITES LTD.
Date :17.04.2011
MACHINARIES
Dozer Dumper Hydra Water Vibro Trailer Total
tanker Roller Station

2 0 0 1 2 0 1
Weekly
Name of Project Quality Report For
:Construction&Upgradation the Period
of Railway Fromfor11.04.2011(Monday)
Track Works RSP Yards &InPlant New L
Agency:ARSS Infastructure Project Ltd.
Sl. No Description of Test Referred Frequency of Permissible value as
Code Test per Referred Code

1 Compaction of Earth
1.1 In Situ Dry Density of Soil by 98% MDD at OMC
Core cutter method

1test/500m2
IS :2720

1.2 Procter Density Test 1test/5000m3


2 CEMENT Name of the manufacturer :
2.1 Intial Setting Time IS :455 Every batch >30 min
2.2 Final Setting Time <600 min
2.3 Fineness of Cement <10%
3 Fine Aggregates
3.1 Sieve Analysis IS :2386 Requirement
3.2 Silt Content
5 Coarse Aggregates
5.1 Sieve Analysis IS :2386 Requirement
5.2 Agreegate impact value
5.3 Water absorption
6 Track ballast
5.1 Sieve Analysis IS :2386 Requirement
5.2 Agreegate impact value
5.3 Water absorption
6 Concrete
6.1 Cube Test IS :516 Requirement 7 days =2/3 of 25
N/mm2

28 days =25 N/mm2


7 days =2/3 of 35
N/mm2

28 days =35 N/mm2

6.2 Slump Test As per required.

RSP: Witnessed By :

Project manager : RITES LTD.


Mr Ajit kumar sahu ( RITES )
2011(Monday)
ards to 17.04.2011(Sunday)
&InPlant New Lines PMC -RITES LTD.

No. of Average No. of Remarks


Samples for samples
taken upto week beyond
tilldate the
permissibl
e value

861 26 2

27 1 NIL
Batch No/Lot No :CM/L-1224734,1.02.2011
45 MINUTE
451 MINUTE

13 1 NIL
13 1 NIL

13 1 NIL

292 NIL
16 NIL
16 NIL
10 set 2 set

17set 3 set

21 2

Signature of Authorised Person of Agency


J.BABURAO ACHARYA

Das könnte Ihnen auch gefallen