Sie sind auf Seite 1von 10

SECTION B EXCAVATION, EMBEDMENT & TRENCH FILL, ANCHOR / THRUST BLOCKS

PAGE DRAWING NO. TITLE


B1 01 – 0008 – 01B Installation of Water Supply Pipes
B2 01 – 0010 – 01A Embedment of Water Supply Pipes in Road Reserves and Easements Using TS4 Sand
B3 01 – 0161 – 01A Reinstatement of Road Pavements, Hard Shoulders and Verges in Road Reserves
B4 01 – 0162 – 01A Reinstatement of Excavations after Bursts or Other Small Scale Repair Works
B5 02 – 0292 – 01A Soil Classification Guidelines
B6 Reserved
B7 02 – 0293 – 01 Thrust Block Details
B8 02 – 0294 – 01 Anchor Blocks
B9 02 – 0295 – 01 Restrained DI Joint System
B10 – B16 Reserved
B17 91 – 0054 – 01G Thrust and Anchor Blocks for Various Dead End Types

Section B Drg List


1 - TRENCH FLOOR PREPARATION
Ensure that the trench floor is smooth and firm, and within the design trench floor level limits of 80 mm minimum to 150 mm maximum 82
below the bottom of the pipe, before placing any of the bedding.
o lf the trench floor is in firm natural soil and an excavator is being used, it will normally be sufficient to trim it smooth with the excavator bucket.
. lf the trench floor is in rock, backfill between peaks over 30 mm high with sand compacted to 100% of SMDD* before placing any bedding.
. lf the trench floor has been over-excavated below design trench floor level, backfill with sand compacted to 100% of SMDD* to bring it back
up to design trench floor level before placing any bedding.
o Remove loose soil or rock rubble from the floor of the trench.
o lf the trench floor wholly or partially consists of: verv soft clay. loose sand. old or non-enqineered fill. or refuse, OR has isolated outcrops of Trench Fill Overlay
rock in it, OR has been disturbed by groundwater inflow, seek specialist geotechnical advice. 300 min finished fhickness

2- BEDDING PLACEMENT
Do not compact the bedding - simply rake or screed to grade. Dig out pockets to clear the pipe sockets. Side Supporú
Avoid walking down the centre of the bedding during placing or after it has been placed.

3 - PIPE INSTALLATION
Place the pipe firmly on the bedding, home it, and check that it is in contact with the bedding uniformly along its barrel.
o For small diameter pipes, lift the end of the pipe and inspect the contact with the bedding visually. For larger or heavier pipes, check the /
contact with the bedding by attempting to pass a hand under the pipe. Bedding
F ¡ lf it is found that the pipe barrel does not have uniform contact with the bedding, pack in additional embedment sand. Trench Floor

o
80 to 150 finished thickness

4 - SIDE SUPPORT AND OVERLAY PLACEMENT AND COMPACTTON (ROAD RESERVES): TERMINOLOGY

o
f:.
T o
O
N PIPE
TU First Layer Second Layer Third Layer Finishing
SIZE
F=
o;
oirt
Up to

DN IOO
Place all of side support and overlay sand in one layer.

Gompact using a vibrating plate over the full width of


the trench to give not less than 100% of SMDD* as
tested in the top 150mm.
Not applicable Not applicable Not applicable

FA Place a layer of embedment sand either side of the pipe P|ace the remainder of the side support and the first 150 mm, loose

oa DN 150 up to half height of the pipe (DN 100 and 150 pipes) or thickness, of the overlay sand.
100 mm loose thickness (DN 200 and 250 pipes).
Place the remainder of the overlay sand.
Gompact using an approved mechanical tamper with a plate not
to Gompact by "walking in" using the toe of the boot to exceeding 150 mm wide. Keep the tamper close to the trench wall Not applicable Compact using a vibrating plate over the full
push the sand under the curve of the pipe. Ensure that width of the trench to give not less than 100%
and avoid any compaction directly over the pipe. Complete
DN 250 the "footprints" are overlapping, and repeat until the sufficient passes to ensure no visible additional compaction on the of SMDD* as tested in the top 150 mm.
sand takes no more compaction. last pass.
Place the remainder of the side support and
Place additional embedment sand up to half height of the pipe.
Place a 100 mm thick (loose) layer of embedment sand the first 150 mm, loose thickness, of the
DN 3OO Gompact first by walking down each side of the trench with overlay sand.
either side of the pipe. Place the remainder of the overlay sand.
overlapping footprints.
Compact by "walking in" using the toe of the boot to Compact using an approved mechanical
to tamper with a plate not exceeding 150 mm
Gompact using a vibrating plate over the full
push the sand under the curve ofthe pipe. Ensure that Compact next using an approved mechanical or hand tamper with width of the trench to give not less than 100%
the "footprints" are overlapping, and repeat untilthe a plate not exceeding 75 mm wide. Do not compact within 50 mm of wide. Keep the tamper close to the trench wall
DN 375 of SMDD* as tested in the top 150 mm.
the pipe. Complete sufficient passes to ensure no visible additional and avoid any compaction directly over the
sand takes no more compaction.
pipe. Complete sufficient passes to ensure no
compaction on the last pass.
visible additional compaction on the last oass.
* Refer to Notes (4) and (6) on Drawing 01-0008-01 THIS DRAWING SUPERSEDES DRGS 01-OOO9-01 & 01.OO1O-01
chs A Amendment - Des EC SOUTH AUSTRALIAN
1. Standards updated. Not to Scale
Drn WG 2. Minimum Overlay now 300mm. Drn EC WATER CORPORATION WATER SUPPLY CONSTRUCTION MANUAL
ckd EC 3. Placement and Compaction Exm EC
notes changed. PAGE 82 EWS 5759/89
Unit 4. Title amended. Unit Gen. Man. E&PII¡pg ¡.27
IE 5. Page renumbered EMBEDMENT OF WATER SUPPLY PIPES IN
Ldr Ldr ENGINEERING & PROJECTS 2000
This drawing is the property of the South Australian Water Corporation
@sAWater ROAD RESERVES AND EASEMENTS
USING TS 4 SAND
@ and shall not be copied without permission. 01.0010-01A
lB3
SPRAY STAL (ó) I roo I sPRAY sEAL t6) I roo I I mo I sPRAY stAL (6) I mo I I roo I spRAy srAL (il) I roo I

n7t
BASE (9) 150 t50
I
BASE flo) 1_ ?0

BASE fl2) 70
I I
r50 t50
I
T-
I 70

SUB-BASE
(10 or ll) 5UB-BA5E
r50 (10 or ll) t50 5UB.BA5E
I 5UB-BASE
(10 o¡ ll)
I (10 o¡ ll)
TRTNTH FILL sEE PA6T 81 t- 150
I * Recycted moterioI shotI nol
TREN(H FILL sET PA6E 81 IREN(H FILI. be used ot lhe surfoce
tt STT PA6E 81

l.
I I

SPRAY SEAL SURFAIE I


¡
spR¡v sEAL suRFAiE
ÍRTN(H TILL sTE PA6E BI
SPRAY SIAL SURFAtE OPEN GRAt]Et) AI SURFAiE HARD SHOULDERS
L16HT TRAFFII (J) l.4Et]IUM TRAFFIi (4) HEAVY TRAFFIi (4) HEAVY TRAFFII (5) ALL TRAFFIi t]ENSITITS
FIGURE 1 , Fiqure l Figure 5 Figure 7 Figure 9
lmol I'ool lrool lrool I too I sPRAY sEAL (11) I too I

f
fl5) (151

T- T_ 60
.50
15 80
BASE (9}
BASE fl2) 60
t 75
BASE flz) 80
I 60
I ?5
I t25
I
I
80
5UB.BA5E
(10 or ll) 5UB-BASE
'll)
125
I
(10 or 125
t25 5UB-BA5T
I t25
(10 o¡ 1l)
TRENTH FILL sEE PA6I BI 125 reinslole brirk poving, bilumen o
"0¡pofh,
T-
IRENTH FILL SET PA6E B1
SET PA6T B1
I etr lo molch exisling.
t TRTN(H FILI sET PA6E 81

AT SURFATE AI SURFACE A( SURFAIE OPEN 6RADEt] AI SURFACE VER6ES


L16HT TRAFFIT ß) MEDIUM TRAFFII (4) HEAVY TRAFFIi (5) HEAVY TRAFFIi (5) ALL TRAFFII DENSITIES
Figure 2 Fiqure l* F iguie 6 F igure I Figure 10

1. PUITION THE ROAD

2, ¡ETI PAVEMENT

l.

5.

6.

O
l¡J
1.

8.

-)
ttl
t-at
9.
10.
'11.

12.
11. MATIH EXrsTtNc AT

11.
15. ES sHALL Bt

16. IS AIHIEVED.
il.

REVISIONS NYDII
OESCRIPTION

tg I'/ATER SUPPLY CONSTRUITION |*4ANUAL
REV f)ATE t)RN APPRV'O
E! SA PA6E B] A] B
Í! YbNAIURT I OAIT
NOI IO S(AIE
Èr I Êaoe¿¿ /^rnrs SoulHrsAusÏRÄrnfi
tne
0r'0HrnQ 0r Dt0Deily fne REINSTATE}4ENT OF ROAO PAVE}4ENTS,

I 2?.06.09 (r0 st(Iloils Rtvr$l¡ r0 Rtfr.t(r ffil sPt(F[AiloÎrs


ð:
.E¡
!9c
/ú5- rÊr NTTI^'ORK INFRASTRUITURT STANDARI)S
PRIN I NA[',IL
+/ond shotI
i¡ n¡rt
rdAItR tt¡RPoRATrol
nol
¡¡ ;ô -h^t"
be rooied or
-¡[^"[
modified
¡,,lÀ¡¡ir¡ll^n
HARD SHOULOERS AND VERGES IN
ROAD RESERVES 01 0161 -01
IIAR tlrtr¡ SrftT
o MINIMUM THRUST AREA FOR BLOCKS lN SQUARE METRES (m2)
=.
É
DESIGN PRESSURE 1000 kPa (NOM. 100 m HEAD)
87
U E
oo 90'& 60' 45'& 30' 22 5' I 1.25. TEES AND DEAD
ZJ ã-E IORIZONTAL BENDS IORIZONTAL BENO: IORITONTAI BFNDS IORIZONTAL BENDS ENDS
<<-i 7()4
3EH J J J
ÉÊËa
<(rc9 ?uE
U
>!
U
>Y
J J
U
>! U
>Y CORROSION PROTECTION
(JOþ È!Jo
c-Hõ -Ê9 U
-<ç
-El
ì(,al U
ìÉt
l(9& U U
:É8
ìo(l U
ì#8
l(9È
AS REOUIRED.
Í-- u)- J\. n\ 5ì. Y tn õìo
8= ^=
<ûloau z -¿- z.l :<
>O >u2
tt't
ZC -õc >o Y U1
zc
>u2 >o:<
zc
U)
zc
>(J > L!2 >O
Y
(ô< t 4u- <o <ô< -2.+
! <!l <o <o< ko <ô< rzu <o <ô< izo,is JÉ.
)È <o
".àÚs F=p
JU tE
o ô JIU JlV.
J>_ ;:E J IU =Ø! JIU ñ:E O
JÉ. JÉ
(J- =Ø9
n.¿ (J
o (J J>_ o ô (J-
ãi-'
o-ù
IO È ulc
YZa
Õz
É.) == > U¿
[ô¡. t/1C
v.zc
ãz iãf (nC õz
=z >YZC É.-
o > u1C '-Ë oz yz<) ãz
(tsf r=< >øro É.=
ô
ø)<o- -ôL
<o Èl
<o <o !ôu YZC <o JUU <o
ÞEä n>t duu
-u_ >ôc FU- JUL
-ln Ø>a >oc Í. u) =U:
n=c ftn -u_ !UL
n>a >ôc Íút ÉÊ:
Ø>c >oo T, tn DI, GRP OR PVC PIPE
PBH D
50 r00 200 50 r00 200 50 100 200 50 r00 200 50 r00 200
c) kPo
z.
ts
r00 034 o17 N 0r8 N N 0r0 N N N N N 0.24 012 N
LL r50 070 0.35 018 0.38 019 010 020 0r0 N 0r0 N N 0.50 0.25 0r3
L
o 200 120 0.60 0.30 065 0.J5 0 r7 0.35 017 N 0 r7 N N 085 0.43 0.22
æ. 225 t49 0.75 038 08r 041 021 o.42 021 0il 021 0lr N 106 0.53 o.27
Y2
Uô 250 182 09r 0.46 0.99 0.50 025 05r o26 0lJ o26 0 r3 N 129 0.65 033
300 263 t33 0.67 r43 0.72 0.36 0.73 o37 0r9 037 0 r9 010 187 0.94 0.47
ô 375 403 2.02 r0r 218 109 0.55 112 056 0.28 0.56 0.28 014 2.E5 t45 0.72
J

( ror o
=
z.
450
500
600
57r 2.86 143 309 r.55 0.78 158 079 040 060 040 0.20 4.04 202 r0t
696
9.88
348
4.94
1.7 4

2.47
3.77
5.35
189
2.68
0.95 l9J 0.97 049 0.97 0.49 0.25 4.93 2.47
r34 2.73 r37 069 t37 069 0.35 699 3.50 r75
124

ro) Lel
SEE NOTE SEE NOTE 7
750 | 5.15 7.58 3.78 E.20 4r0 2.05 4t8 209 r05 210 r05 0.53 r 0.7r 5.36 268
'N' DENoTES NoM|NAL THRUST AREA -
OR
(SEE NoTES 4&5)
PBH - ALLOWABLE HORIZONTAL BEARING PRESSURE ELEVATION ELEVATION

lt
cÐ:
NOTES:
I. ALL DIMENSIONS IN MILLIMETRES UNLESS OTHERWISE SPECIFIED.
THRUST BLOCK FOR TEES THRUSTBLOCK FOR BENDS
(FoR HoRTZoNTAL THRUST) (FoR HORTZONTAL THRUST)
CAST THE THRUST AREA OF ALL THRUST BLOCKS AGAINST A CLEAN FACE OF

O): Í UNDISTURBED NATURAL SOIL. THRUST BLOCKS NOT TO INTERFERE WTH OTHER SERVICES.

c\t
Oq
SOIL CLASSIFICATIONS USED ON THIS DRAìA/ING ARE EXPLAINED IN WAT-I2OO.
DO NOT USE STANDARD THRUST BLOCKS AS SPECIFIED IN THIS DRAWNG IN:
_ VERY SOFT, SOFT OR FIRM CLAY.
-
HALF THRUST AREA
EACH SIDE (SEE NOTE 8)\
r50
L.,llt
IMIN I

.8 -
LOOSE CLEAN SAND.
UNCOMPACTED FILL OR REFUSE \t-t DI PIPE
rw./.v..
N A GEOTECHNICAL ASSESSMENT AND INDIVIDUAL OESIGN IS REQUIRED FOR THESE SOILS.
THE NOMINAL THRUST AREA 'N. TO BE ACHIEVEO BY POURING CONCRETE THE FULL
CORROSION PROTECTION
BEARING AREA
300
l-
MrN

O 6
LENGTH OF THE FITTING AND EXTENDING FROM THE FLOOR OF THE TRENCH TO ABOVE
THE F|TT|NG (SEE ALSo NoTE 7).
DESIGN PRESSURES OTHER THAN 1000 kPo REDUCE 0R INCREASE IHE MINIMUM THRUST AREA
AS REOUIRED

-T
DI, GRP
PVC PIPE
OR
CORROSION PROTECTION
AS REQUIRED.

BY THE RATIO OF THE DESIGN PRESSURES EXCEPT WHERE:


-
MIN THRUST AREA IS <O.I m2, AND
'N' APPEARS lN THE TABLE AND DESIGN PRESSURE lS ABOVE 1000 kPo CALCULATE THE AREA.
-
FINISH THRUST BLOCKS APPROXIMATELY IOO ABOVE THE TOP OF THE FITTING OR T
BEARING ARTA
BEARING PAD AND EXTEND TO THE FLOOR OF THE TRENCH OR DEEPER IF NECESSARY TO JOO MIN
ACHIEVE THE REOUIREO THRUST AREA. MAXIMUM ENCASEMENT TO BE I8O'. NOTE
ELEVATION
THE MINIMUM THRUST AREA FOR TAPER THRUST BLOCKS TO BE EOUAL TO THE DIFFERENCE BETWEEN
THRUST AREAS FOR OEAD ENDS OF EOUIVALENT DIAMETER TO THOSE EACH SIDE OF TAPER.
PLAN FLUSHINGMASHOUT BEND THRUST BLOCK
TAPER THRUST BLOCK (FoR HoRtZoNTAL THRUST)
9. FOR DOW\WARO VERTICAL THRUST. THE ALLOWABLE BEARING PRESSURES FOR
VARIOUS SOILS MAY BE TAKEN AS TI!ìCE THAT FOR HORIZONTAL THRUST SHOW\. (FOR HOR|ZoNTAL THRUST) (MINIMUM REOUIRED THRUST AREA
AS PER DEAD END)
IO. W-IEN POURING CONCRETE AGAINST FITTINGS PLACE A MEMBRANE OF POLYETHYLENE,
PVC OR FELT BETWEEN THE FITTING AND CONCRETE TO PREVENT DAMAGE TO THE FITTING.
JOINTS TO BE CLEAR OF CONCRETE.
lI.CONCRETE THRUST BLOCKS AND ANCHORS FOR VALVES TO BE AS DETAILED
rN wAT-r207. THIS DRAWING REPLACES 94-0047 T0 94-0050
BASED ON WSAA WATER SUPPLY CODE OF AUSTRALIA DRAWINGS (WSA-03)
chs A Amendment -1. Alterotions to Des SOUTH AUSTRALIAN
Drn TDM Thrust Toble volues. Drn WATER CORPORATION WATER SUPPLY CONSTRUCTION MANUAL Not to Scole
ckd E Exm GRR
Unit Unit PAGE 87
2000
Ldr. ENGINEERING &
@sAWater
Ldr. PROJECTS
/Fì This drowing is the property of South Austrolio Woter Corporotion THRUST BLOCK DETAILS
\Y/ ond sholl not be copied without oermission. 02-0293-01A