Beruflich Dokumente
Kultur Dokumente
2.
02/40/C37W/Pkg-1/02 Installation of 700 TPD ASU-4 in OP_II-(Pkg-1)-M/s MECON’s Letter. RKG
3.
02/40/C37W/Pkg-1/03 Installation of 700 TPD ASU-4 in OP_II-(Pkg-1)-M/s BSP’ss Letter. RKG
4.
02/40/C37W/Pkg-1/04 Installation of 700 TPD ASU-4 in OP_II-(Pkg-1)-ISO:9001:2008 & MRM RKG
5.
02/40/C37W/Pkg-1/05 List of Design standards / norms RKG
Page 1 of 5
FSPD SECTION
5 02/40/C37W/04/05 ASU-4 –PKG-4-(ACVS)–M/s Saket /Blue star Ltd –Vol –II MEC/BH/011/034
6 02/40/C37W/04/06 ASU-4 –PKG-4-(ACVS)–Drawings Letter MEC/BH/011/034
7 02/40/C37W/04/07 ASU-4 –PKG-4-(ACVS)–Review Meetings MEC/BH/011/034
8 02/40/C37W/04/08 ASU-4 –PKG-3-(Ac & Ventilation System for pump house MEC/BH/011/034
5.)Replacement / Revamping of ATC 1&2 in Oxygen Plant-(WI-C37S)
1. 02/40/C37S/01-Vol-2 Replacement / Revamping of ATC 1&2 MEC/BH/011/33 Vol-1 closed
2. 02/40/C37S/02 Replacement / Revamping of ATC 1&2-Internal Correspondence MEC/BH/011/33
6.) Replacement of High Pressure Feed Water Pipeline(WI-C372)
1. 02/07/C372/01 Replacement of High Pressure Feed Water Pipeline-before Contract Signing MEC/BH/011/33
2. 02/40/C372/02 Replacement of High Pressure Feed Water Pipeline-After Contract Signing MEC/BH/011/33
7.) 7 MT Expansion projects (WI-9101)-Continuous Casting Plant-(Pkg-026)
1 02/40/9101/Pkg026/01 Continuous Casting Plan MEC/BH/011/33
8.) 7 MT Expansion projects (WI-9101)-External water System for SMS-3 -(Pkg-077-1)
1. 02/40/9101/077-1/01 External water System for SMS-3 MEC/BH/011/33
9.) 7 MT Expansion projects (WI-9101)-Makeup & Drinking water for 7 Mt Expansion -(Pkg-078)
1. 02/40/9101/078/01 Makeup & Drinking water for 7 Mt Expansion-General Correspondence MEC/BH/011/33
10.) Miscellaneous Files (Technical /Non technical)
1 02/40/9106/01 Miscellaneous (Technical) File MEC/BH/101/071
11.) BSP-7.0 MT Expansion -Interplant fuel & industrial gases Pipelines (Package-075)
1. 02/40/9101/075/01 Vol-1 IPPL- General (Aug 09 to May10) MEC/BH/102/030
2. 02/40/9101/075/01 Vol-2 IPPL- General (June 10 onwards) MEC/BH/102/030
3. 02/40/9101/075/02 Vol-1 IPPL- Electrical MEC/BH/101/071
4. 02/40/9101/075/03 Vol-1 IPPL- Civil MEC/BH/101/071
5. 02/40/9101/075/04 Vol-1 IPPL- Structural MEC/BH/101/071
Page 2 of 5
FSPD SECTION
6. 02/40/9101/075/05 Vol-1 IPPL- HSCL, Kolkata MEC/BH/102/030
7. 02/40/9101/075/06 Vol-1 IPPL- Mukand Limited MEC/BH/102/030
8. 02/40/9101/075/07 Vol-1 IPPL- SPCL, Kolkata MEC/BH/102/030
9. 02/40/9101/075/08 Vol-1 IPPL- U B Engineering, Pune MEC/BH/102/030
10. 02/40/9101/075/09 Vol-1 IPPL- TATA Projects, Kolkata MEC/BH/102/030
11. 02/40/9101/075/10 Vol-1 IPPL- NICCO Limited, Kolkata MEC/BH/102/030
12. 02/40/9101/075/11 Vol-1 IPPL- Blue Star, Kolkata MEC/BH/102/030
13. 02/40/9101/075/12 Vol-1 IPPL- commercial SPCL MEC/BH/102/030
14. 02/40/9101/075/13 Vol-1 IPPL- commercial General MEC/BH/101/071
15. 02/40/9101/075/14 Vol-1 IPPL- commercial U B Engg MEC/BH/101/071
16. 02/40/9101/075/15 Vol-1 IPPL- commercial Blue Star MEC/BH/101/071
17. 02/40/9101/075/16 Vol-1 IPPL- commercial Mukand Ltd. MEC/BH/101/071
18. 02/40/9101/075/17 Vol-1 IPPL- commercial NICCO MEC/BH/101/071
19. 02/40/9101/075/18 Vol-1 IPPL- commercial HSCL MEC/BH/101/071
12.) BSP-7.0 MT Expansion –SMS-II Augmentation & GCP Rectification (Package-038-03)
1. 02/40/9101/038-03/01 SMS-II Augmentation GCP Rectification (Package-038-03) MEC/BH/102/030
Page 3 of 5
FSPD SECTION
Volume 1 to 6 closed & at
1. 02/06/C359/01/01 Vol-VII Replacement of DN3000 B.F. Gas Header from BF 1 To 6 MEC/BH/102/030
MEC/BH/101/071
15.) BSP-7.0 MT Expansion –Gas Mixing & Boosting Station (Package- 076)
16.) BSP-7.0 MT Expansion –Installation of LT Substation at TAP HOLE MASS SHOP (Package-116B2)
17.) Replacement of BF GAS Pipeline DN 2200 for PP-1 & Additional Boiler of BSP (Package-011-02)
Replacement of BF GAS Pipeline DN 2200 for PP-1 & Additional Boiler of
1. 02/40/9101/011/01 Vol - I MEC/BH/102/030
BSP
18.) BSP-7.0 MT Expansion –Propane Storage Hand ling System (Package- 032)
19.) Replacement of wet type GAS Holder by dry type Gas Holder at SMS III of BSP (WI C37V)
Replacement of wet type GAS Holder by dry type Gas Holder at SMS II of
1. 02/06/C37V/01 Vol –I MEC/BH/102/030
BSP
Replacement of wet type GAS Holder by dry type Gas Holder at SMS II of
2. 02/06/C37V/01 Vol –II MEC/BH/102/030
BSP
BSP- Replacement of wet type GAS Holder by dry type Gas Holder at SMS
3 02/06/C37V/01 MEC/BH/102/033
II( After Receiving Offers)
20.) BSP 7.0 Mt Expansion – Replacement of Printing Press from old administrative building area to Timber Workshop Area (Package – 120N)
21.) Electrics & Automation system under Modernization of sinter Plant No-II (Pkg-021C)
22.) ESP Based De-dusting system under Modernization of sinter Plant No-II (Pkg-021D)
1. 02/40/9101/01/01 ESP Based De-dusting system under Modernization of sinter Plant No-II MEC/BH/011/034
Page 4 of 5
FSPD SECTION
(Pkg-021D)
23.) Mechanical Repair Shop (Package- 119) At Coke Oven
1. 02/40/9101/038-12/01 Revamping of De- dusting system at +47m level of Converter SMS-II MEC/BH/011/034
Page 5 of 5
Refractory
PP&M
1.) BSP-7.0 MT Expansion –Turbo Blower Station (Package-012)
1. 02/40/9101/012/01 Turbo Blower Station- General Correspondence MEC/BH/011/33 closed
2. 02/40/9101/012/ After signing of contract
1.) BSP-7.0 MT Expansion –Compressed Air Station No-4(Pkg-114)
3.
4.
5.
6.
Page 6 of 5
Refractory
LIST OF CURRENT DACUMENTS
S.N. Document Number Description location Remark
1. DGM/PCC/TK/2008/259 Contract for Pump House & Cooling Tower for 700 TPD ASU-4 MEC/BH/011/33
2. MEC/S/9101/11/40/10/24/078 R-6 Technical Specification of Make Up & Drinking water System(Pkg-078) MEC/BH/011/33
5. MEC/S/9101/11/40/10/24/075/R0 TS for Inter Plant fuel & industrial gases Pipe Lines (Pkg – 075) MEC/BH/102/030
8. MEC/S/9101/02/0/00/00/021D/R0 TS for ESP based De-dusting System at SP-II (Pkg – 21D) MEC/BH/071/002
9. DGM/PCC/TK/2010/311 Contract for ESP based De-dusting System at SP-II (Pkg – 21D) MEC/BH/071/002
13. DGM/PCC/TK/2008/286 Contract document of TAP HOLE MASS SHOP (116B1) MEC/BH/071/002
17. MEC/S/11/40/10/C37V/01 R1 TS for 60000m3 wigging type dry seal LD GAS HOLDER MEC/BH/071/002
Page 7 of 5
Refractory
FR of Revamping/ Replacement of Air Turbo Compressors at Oxygen
18. MEC/02/40/C375/01 R-01 MEC/BH/071/002
Plant -II
19. MEC/S/9101/11/13/0/00/00/028 TS for Lime and Dolomite Calcinations Plant RMP-III (Pkg- o28) MEC/BH/071/002
23. DGM/PCC/TK/2009/298 TS for Lime and Dolomite Calcinations Plant RMP-III (Pkg- 028) MEC/BH/071/002
Page 8 of 5
Refractory
LIST OF DRAWING FOLDERS