WORK ORDER
This Work Order is issued as per terms and condition given overleaf and you are requested to
execute the following work : - Jaora-Nayagoan Road Project for RTO Berier / Sale tax office &
Check Post officess at Nayagaon work.
Weigh Bridge
1 Providing & Laying Soling CuM Open 375.00
Providing & Laying Sand Leyar Cushioning 50 mm Thick Only CuM 555.00
2
Open
3 Providing & Fixing Tor Steel Kg Open 52.00
4 Providing & Laying Concrete 1:2:4 (6 Bags Per Cum) CuM Open 3150.00
1
Total
Payment Conditions:.
1 Payments will be made for certified quantities on monthly basis.
2 All the measurements will be taken jointly.
3 Deduction of Security deposit – N I L.
4 Reming Terms & Condition Previous Work Order
Service Tax & TDS:
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our records
as a token of acceptance.
Thanking you,
Recd.& Accepted
2
ASHOKA BUILDCON LTD.
WORK ORDER
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work : - Jaora-Nayagoan Road Project for mobilization work.
Non-Tender Item
1 Dept. Supply
Male Mazdoor Nos 2000 90 180000
Intensive for Male Mazdoor Nos 2000 10 20000
Total 222500
Recd.& Accepted
Project Director D.H.(E.Q.A.) By Sub-Contractor
Permanent Address :
Contact No.
Duration of Contract : 1 Months
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work : - Jaora-Nayagoan Road Project for Mobilization work.
Weigh Bridge
1 Providing & Laying Soling CuM 50.00 250.00 12500
Providing & Laying Sand Leyar Cushioning 50 mm Thick Only CuM 5.00 370.00
2
1850
3 Providing & Fixing Tor Steel Kg 300.00 35.00 10500
4 Providing & Laying Concrete 1:2:4 (6 Bags Per Cum) CuM 10.00 2100.00 21000
Total 357287.5
4
Payment Conditions:.
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our records
as a token of acceptance.
Thanking you,
Recd.& Accepted
5
ASHOKA BUILDCON LTD.
WORK ORDER
Name of Supplier : M/s. Rai Construction Company PAN No. AFYPR1 879P
Kind Attn. : - Mr. Vanktash Rai
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work : - Jaora-Nayagoan Road Project for Mobilization work.
Non-Tender Item
1 Dept. Supply
Male Mazdoor Nos 2000 90 180000
Intensive for Male Mazdoor Nos 2000 10 20000
Total 200000
Recd.& Accepted
6
ASHOKA BUILDCON LTD.
WORK ORDER
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work : - Jaora-Nayagoan Road Project for Tree Cutting, Stumps Removing
Total 954575
Payment Conditions:.
1 TDS will be deducted as per rule
2 Payment will be made on quantity as certified by MPRDC jointly verified by ABL
3 You will submit all the records prepered by Government Authority including Forest Pass etc.
4 Time period- within two month from the date of work order.
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
7
ASHOKA BUILDCON LTD.
WORK ORDER
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work : - Jaora-Nayagoan Road Project for Tree Cutting, Stumps Removing
Total 346250
Payment Conditions:.
1 TDS will be deducted as per rule
2 Payment will be made on quantity as certified by MPRDC jointly verified by ABL
3 You will submit all the records prepered by Government Authority including Forest Pass etc.
4 Time period- within two month from the date of work order.
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work : - Jaora-Nayagoan Road Project for Mobilization work.
Sr. Rate
Description Unit Qty. Amount
No. in Rs.
1 M.S. pipe, Angle, plat, Patti for Truss. Kgs 45 9016 405720
Providing & fixing of A.C. Sheet with J Bold and Damar
2
waiser(Everest Make) SqM 155 2800 434000
3 A.C. Ridge, (Mangri)(Everest) Rmt 135 220 29700
G.I. Sheet Tata 910 mm*.30mm with J Bold and damar
4
waiser SqM 190 3000 570000
5 G.I. Ridge, (Mangri) Rmt 145 50 7250
TOTAL 1446670
Payment Conditions:.
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
9
ASHOKA BUILDCON LTD.
WORK ORDER
Name of Supplier : M/s. Marshal Test Lab (I) Pvt. Ltd. PAN No. AADCM 5680N
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work : - Jaora-Nayagoan Road Project for Third Party Lab. Tests.
Sr. Rate
Description Unit Qty. Amount
No. in Rs.
TOTAL 108600
Payment Conditions:.
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
10
ASHOKA BUILDCON LTD.
WORK ORDER
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work : - Jaora-Nayagoan Road Project for Bridges Work at Shivana,
Bugliya, Harkiyakhal and ROB at Pipliyamandi of piles liner plate fabrication work.
Sr. Rate
Description Unit Qty. Amount
No. in Rs.
TOTAL 450000
Payment Conditions:.
1 No Mobilisation Adavance shall be paid to you.
2 Payments will be made for certified quantities on completed work basis.
3 All the measurements will be taken jointly.
4 Deduction of Security deposit – 5%
5 Steel is issued by ABL at working place to you and you will be held responsible for that
material to prevent it from any theft OR mis-use.
6 No wastage shall be allowed to you under any circumstanses.
7 The safety precautions shall be strictly followed by you and its your soully responsibility if any
accident will happened on work site for your workmen and work site.
8 The recovery rate of wastage should be made at issue rate plus 10% or prevailing market rate,
ehich ever is higher.
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
12
ASHOKA BUILDCON LTD.
WORK ORDER
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work : - Jaora-Nayagoan Road Project for Tree Cutting, Stumps Removing
Total 577500
Payment Conditions:.
1 TDS will be deducted as per rule
2 Payment will be made on quantity as certified by MPRDC jointly verified by ABL
3 You will submit all the records prepered by Government Authority including Forest Pass etc.
4 Time period- within two month from the date of work order.
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
13
ASHOKA BUILDCON LTD.
WORK ORDER
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work for C D Work Jaora-Nayagoan Road Project.
(Location as per our requirement)
C D Work
1 Excavation in hard murum CuM 50.00 100.00 5000
2 GSB Laying (Labour rate only) CuM 40.00 15.00 600
3 Prov. & Laying PCC Head Wall without Cement (M-15) CuM 1300.00 50.00 65000
4 Prov. & Laying PCC Head Wall without Cement (M-20) CuM 1300.00 50.00 65000
5 Prov. & fixing Shuttering SqM 120.00 50.00 6000
6 HP Pipe Laying with Joint Filling with Cement
a) 1000mm Dia Rmt 400.00 100.00 40000
b) 1200mm Dia Rmt 500.00 100.00 50000
7 Back Filling by avaialble earth (Labour rate) CuM 32.00 50.00 1600
Total 233200
Payment Conditions:.
1 TDS will be deducted as per Govt. Rule
2 Payment will be made on quantity as certified by jointly verified by ABL after Completion of work.
3 SD @ 5% shall be deducted from your every R.A.Bill & The same will be released after
12 Months after completion date of work.
4 W.C. Tax @ 2% shall be deducted as per Govt. Rule.
5 Sales Tax - if you have not having TIN No. then additaional deduction of 13.5% shall be
recoverd from your bill payment.
6 Shuttering Material and Curing of the concrete in your Scope.
7 You have to arrange all construction materials, Labour camp, Water etc. in your Scope.
8 If the strength of concrete cube shall not be observed as standards then payment shall be made
at reduced rate
9 All concreting works shall be done as per our Mix Design, by Concrete Mixer with Weigh Batcher
Terms and Conditions : - All works shall be done as per MoRTH Specifications
or as per direction by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
14
Project Director D.H.(E.Q.A.) By Sub-Contractor
15
ASHOKA BUILDCON LTD.
WORK ORDER
Permanent Address : Ahilya Marg, Neemuch City. PAN No. : - ACOPBO 691 C
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work for C D Works Jaora-Nayagoan Road Project.
(Location as per our requirement)
C D Works
1 Excavation in hard murum CuM 60.00 100.00 6000
2 GSB Laying (Labour rate only) CuM 40.00 15.00 600
3 Prov. & Laying PCC Head Wall with Cement (M-15) CuM 2150.00 50.00 107500
4 Prov. & Laying PCC Head Wall with Cement (M-20) CuM 2300.00 50.00 115000
5 HP Pipe Laying with Joint Filling with Cement
a) 1000mm Dia Rmt 400.00 160.00 64000
b) 1200mm Dia Rmt 500.00 160.00 80000
6 Back Filling by avaialble earth (Labour rate) CuM 40.00 300.00 12000
Harkiya Khal River Railing
1 Prov. & Fixing M.S. Pipe / Channel Fabrication Kg 51.00 500.00 25500
2 Concrete for pillars (M-15) CuM 2000.00 150.00 300000
3 Dismantinling of Existing Pillar (Harkiya Khal) L.S. 2000.00 1.00 2000
Chaldu River Railing
1 Repairing of Damage Railing L.S. 2000.00 1.00 2000
Existing Culvert's Parapet Walls
1 UCR Masonary With Available Stone CuM 700.00 10.00 7000
2 UCR Masonary With Material CuM 1300.00 40.00 52000
3 Pointing SqM 42.00 25.00 1050
4 Coping / DPC (M-15) CuM 2000.00 5.00 10000
Total 784650
Payment Conditions:.
1 TDS will be deducted as per Govt. Rule
2 Payment will be made on quantity as certified by jointly verified by ABL after Completion of work.
3 SD @ 5% shall be deducted from your every R.A.Bill & The same will be released after
12 Months after completion date of work.
4 W.C. Tax @ 2% shall be deducted as per Govt. Rule.
5 Sales Tax - if you have not having TIN No. then additaional deduction of 12.5% shall be
recoverd from your bill payment.
6 M.S. Steel ,Cement, Shuttering Material and Curing of the concrete in your Scope.
7 You have to arrange all construction materials, Labour camp, Water etc. in your Scope.
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
Permanent Address : Ahilya Marg, Neemuch City. PAN No. : - ACOPBO 691 C
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work for C D Works Jaora-Nayagoan Road Project.
(Location as per our requirement)
Total 34500
Payment Conditions:.
1 TDS will be deducted as per Govt. Rule
2 Payment will be made on quantity as certified by jointly verified by ABL after Completion of work.
3 SD @ 5% shall be deducted from your every R.A.Bill & The same will be released after
12 Months after completion date of work.
4 W.C. Tax @ 2% shall be deducted as per Govt. Rule.
5 Sales Tax - if you have not having TIN No. then additaional deduction of 12.5% shall be
recoverd from your bill payment.
6 M.S. Steel ,Cement, Shuttering Material and Curing of the concrete in your Scope.
7 You have to arrange all construction materials, Labour camp, Water etc. in your Scope.
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work for Patch Repairing Works Jaora-Nayagoan Road Project.
(Location as per our requirement)
Total 94500
Payment Conditions:.
1 TDS will be deducted as per Govt. Rule
2 Payment will be made on quantity as certified by jointly verified by ABL after Completion of work.
3 You have to arrange Labour camp, Water for labour etc. in your Scope.
4 Payable only for Mr. Bhati when he will present on site otherwise no payment shall be made
against skilled Supervisior.
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work for C D Works Jaora-Nayagoan Road Project.
(Locations-116/10, 117/2 & 118/10 'OR' as per our requirement)
C D Works
1 Excavation in hard murum CuM 50.00 100.00 5000
2 GSB Laying (Labour rate only) CuM 40.00 15.00 600
3 Prov. & Laying PCC Head Wall without Cement (M-15) CuM 1300.00 50.00 65000
4 Prov. & Laying PCC Head Wall without Cement (M-20) CuM 1300.00 50.00 65000
5 Prov. & fixing Shuttering SqM 120.00 50.00 6000
6 HP Pipe Laying with Joint Filling with Cement
a) 1000mm Dia Rmt 400.00 160.00 64000
b) 1200mm Dia Rmt 500.00 160.00 80000
7 Back Filling by avaialble earth (Labour rate) CuM 32.00 300.00 9600
Total 295200
Payment Conditions:.
1 TDS will be deducted as per Govt. Rule
2 Payment will be made on quantity as certified by jointly verified by ABL after Completion of work.
3 SD @ 5% shall be deducted from your every R.A.Bill & The same will be released after
12 Months after completion date of work.
4 W.C. Tax @ 2% shall be deducted as per Govt. Rule.
5 Sales Tax - if you have not having TIN No. then additaional deduction of 13.5% shall be
recoverd from your bill payment.
6 Shuttering Material and Curing of the concrete in your Scope.
7 You have to arrange all construction materials, Labour camp, Water etc. in your Scope.
8 If the strength of concrete cube shall not be observed as standards then payment shall be made
at reduced rate
9 All concreting works shall be done as per our Mix Design, by Concrete Mixer with Weigh Batcher
Terms and Conditions : - All works shall be done as per MoRTH Specifications
or as per direction by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
Moblisation Work
Fabrication & Errection of MS Angle Trusses, Purlins etc.
complete of Cement Godown by Cutting, Welding,
1 Grinding of Welding spot and Errection etc.Complete as
per detailed drawing & Specifications of MoRTH or as
directed by Engineer-in-Charge. (Only Labour Rate)
MT 10000 10.00 100000
Prov. & Applying one coat of Red Oxide and two coat of
Synthetic Enamel Oil Paint (Asian, Burger make) as per
2 approved colour shade to above fabricated work etc.
complete (with Material + Labour Rate) MT 1000.00 10.00 10000
Total 110000
Payment Conditions:.
1 TDS will be deducted as per Govt. Rule
2 Payment will be made on quantity certified by ABL after Completion of 100% of work.
3 SD @ 5% shall be deducted from your every R.A.Bill & The same will be released after
12 Months after completion date of work.
4 W.C. Tax @ 2% shall be deducted as per Govt. Rule.
5 Sales Tax - if you have not having TIN No. then additaional deduction of 13.5% shall be
recoverd from your bill payment.
6 No Mobilisation Adavance shall be paid to you.
7 Steel is issued by ABL at working place to you and you will be held responsible for that
material to prevent it from any theft OR mis-use.
8 No wastage shall be allowed to you under any circumstanses.
9 The safety precautions shall be strictly followed by you and its your soully responsibility if any
accident will happened on work site for your workmen and work site.
10 The recovery rate of wastage should be made at issue rate plus 10% or prevailing market rate,
which ever is higher.
11 All above Rates are inclusive of your DG set, Cutting M/c, Oxygen & LPG Cylinders, welding rodes
(ISI mark), electric wire cable etc.
12 Transportion charges on account of any head shall not be paid to you before start of work or after
completion of work.
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work for Trusses for Cement Godown Jaora-Nayagoan Road Project.
(Locations- At Pipaliyamandi Base Camp)
Moblisation Work
1 Fabrication & Errection of MS Angle Trusses, Purlins etc.
complete of Cement Godown by Cutting, Welding,
Grinding of Welding spot and Errection etc.Complete as
per detailed drawing & Specifications of MoRTH or as
directed by Engineer-in-Charge. (Only Labour Rate)
MT 7000 10.00 70000
2 Prov. & Applying one coat of Red Oxide and two coat of
Synthetic Enamel Oil Paint (Asian, Burger make) as per
approved colour shade to above fabricated work etc.
Complete as per detailed drawing & Specifications of
MoRTH or as directed by Engineer-in-Charge. (Only
Labour
MT 900.00 10.00 9000
Total 86800
Payment Conditions:.
1 TDS will be deducted as per Govt. Rule
2 Payment will be made on quantity certified by ABL after Completion of 100% of work.
3 SD @ 5% shall be deducted from your every R.A.Bill & The same will be released after
12 Months after completion date of work.
4 W.C. Tax @ 2% shall be deducted as per Govt. Rule.
5 Sales Tax - if you have not having TIN No. then additaional deduction of 13.5% shall be
recoverd from your bill payment.
6 No Mobilisation Adavance shall be paid to you.
23
7 Steel is issued by ABL at working place to you and you will be held responsible for that
material to prevent it from any theft OR mis-use.
8 No wastage shall be allowed to you under any circumstanses.
9 The safety precautions shall be strictly followed by you and its your soully responsibility if any
accident will happened on work site for your workmen and work site.
10 The recovery rate of wastage should be made at issue rate plus 10% or prevailing market rate,
which ever is higher.
11 All above Rates are inclusive of your DG set, Cutting M/c, Oxygen & LPG Cylinders, welding rodes
(ISI mark), electric wire cable etc.
12 Transportion charges on account of any head shall not be paid to you before start of work or after
completion of work.
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
24
ASHOKA BUILDCON LTD.
WORK ORDER
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work : - Jaora-Nayagoan Road Project for mobilization work.
Total 321125
Payment Conditions:.
Terms and Conditions : - All works shall be done as per MoRTH Specifications
or as per direction by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our records
as a token of acceptance.
Thanking you,
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work : - Jaora-Nayagoan Road Project for mobilization work.
Non-Tender Item
1 Dept. Supply
Sr. Approx.Q Rate In Amount
Description of work Unit
No. uantity Rs. In Rs.
Non-Tender Item
1 Dept. Supply
Male Mazdoor Nos 250 110 27500
Skilled Mason Nos 250 170 42500
Total 70000
Payment Conditions:.
From your monthally bill S.D. @ 5% will be deducted & will be refunded after 12 months from the
1 date from completion of work.
2 Company will be not responsible fro the payment of labour or any other supplier engaged by you.
3 Rates are fixed throughout the construction period.
If woerk not completed, & required to carryout by another agency with any extra charges the will be
4 debited to your account & will be recovered from your R.A. Bill.
5 TDS will be deducted as per prevailing applicable laws.
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our records
as a token of acceptance.
Thanking you,
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work : - Jaora-Nayagoan Road Project for Mobilization work.
Total 21450
Payment Conditions:.
1 Payments will be made for certified quantities on monthly basis.
2 All the measurements will be taken jointly.
3 5% deduction of Security Deposit.
4 Reming Terms & Condition Previous Work Order
Service Tax & TDS:
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our records
as a token of acceptance.
Thanking you,
28
ASHOKA BUILDCON LTD.
WORK ORDER
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work : - Jaora-Nayagoan Road Project for Blasting & Chiseling work.
Payment Conditions:.
1 Fuel shall be provided by company same will be recovered from your bill as per market rate.
2 Company will be responsible for the mucking of material.
3 Payment will made as per the monthly bill prepared.
4 Payment will be made as per work done details from site.
5 From your bill S.D.@ 5% & TDS as applicable will be deducted.
6 If any material issued by store dept. same will be recovered from your bill as per running market
rate with transportation charges.
7 Company will be not responsible fro the payment of labour or any other supplier engaged by you.
8 No blasting is permitted at site without permission of site Engg or site Incharge.
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our records
as a token of acceptance.
Thanking you,
29
ASHOKA BUILDCON LTD.
WORK ORDER
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work : - Jaora-Nayagoan Road Project for Blasting & Chiseling work.
Total 19985
Payment Conditions:.
1 Fuel shall be provided by company same will be recovered from your bill as per market rate.
2 Company will be responsible for the mucking of material.
3 Payment will made as per the monthly bill prepared.
4 Payment will be made as per work done details from site.
5 From your bill S.D.@ 5% & TDS as applicable will be deducted.
6 If any material issued by store dept. same will be recovered from your bill as per running market
rate with transportation charges.
7 Company will be not responsible fro the payment of labour or any other supplier engaged by you.
8 No blasting is permitted at site without permission of site Engg or site Incharge.
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our records
as a token of acceptance.
Thanking you,
30
Project Director D.H.(E.Q.A.) By Sub-Contractor
31
ASHOKA BUILDCON LTD.
WORK ORDER
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work : - Jaora-Nayagoan Road Project for Mobilization work.
Total 39375
Payment Conditions:.
1 Payments will be made for certified quantities on monthly basis.
2 All the measurements will be taken jointly.
3 5% deduction of Security deposit.
Service Tax & TDS:
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our records
as a token of acceptance.
Thanking you,
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work : - Jaora-Nayagoan Road Project for Mobilization work.
Total 242500
Payment Conditions:.
1 Payments will be made for certified quantities on monthly basis.
2 All the measurements will be taken jointly.
3 Deduction of Security Deposit – @ 5%
Service Tax & TDS:
1. TDS will be deducted as per prevailing applicable laws.
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our records
as a token of acceptance.
Thanking you,
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work : - Jaora-Nayagoan Road Project for Hume Pipe Culvert Works
From Cha. Km 185+00 to Cha. Km 187+000 (Mandsaur Bypass) & Urban Area Drain Work
C D Works
1 Excavation in hard murum CuM 50.00 95.00 4750
2 GSB Laying (Labour rate only) CuM 40.00 45.00 1800
3 Prov. & Laying PCC Head Wall without Cement (M-15) CuM 1300.00 15.00 19500
4 Prov. & Laying PCC Head Wall without Cement (M-20) CuM 1300.00 100.00 130000
5 Prov. & fixing Shuttering SqM 120.00 275.00 33000
6 HP Pipe Laying with Joint Filling with Cement
a) 1000mm Dia Rmt 400.00 175.00 70000
b) 1200mm Dia Rmt 500.00 50.00 25000
7 Back Filling by avaialble earth (Labour rate) CuM 32.00 100.00 3200
Hanuman Temple
1 Excavation in hard murum CuM 60.00 10.00 600
2 UCR Masonary CuM 1500.00 20.00 30000
3 PCC (1:3:6) CuM 2300.00 5.00 11500
4 Brick Masonry CuM 2050.00 15.00 30750
5 Plaster SqM 75.00 150.00 11250
6 Back Filling by avaialble earth (Labour rate) CuM 32.00 25.00 800
Drain Works
1 Excavation including Disposal of Excess Earth CuM 50.00 500.00 25000
2 PCC (1:3:6) CuM 1700.00 50.00 85000
3 UCR Masonary CuM 1800.00 150.00 270000
4 Coping (1:2:4) CuM 2050.00 25.00 51250
5 Back Filling CuM 32.00 100.00 3200
6 Pointing SqM 51.00 500.00 25500
7 25mm ThK. Red Stone Slab as a Slab 2 Ft. x 5 Ft. SqM 270.00 300.00 81000
8 PVC Pipe as a Weep Holes 75mm Dia. Rmt 50.00 200.00 10000
9 Labour Supply : -
Male Mazdoor Nos 110.00 25.00 2750
Female Mazdoor Nos 90.00 25.00 2250
Total 928100
Terms & Conditions : -. Attached Overleaf
ASHOKA BUILDCON LTD.
WORK ORDER
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work : - Jaora-Nayagoan Road Project for Temple & Darga Work only.
Total 304850
Payment Conditions:.
1 TDS will be deducted as per Govt. Rule
2 Payment will be made on quantity as certified by jointly verified by ABL after Completion of work.
3 SD @ 5% shall be deducted from your every R.A.Bill & The same will be released after
12 Months after completion date of work.
4 W.C. Tax @ 2% shall be deducted as per Govt. Rule.
5 Sales Tax - if you have not having TIN No. then additaional deduction of 13.5% shall be
recoverd from your bill payment.
6 Shuttering Material and Curing of the concrete in your Scope.
7 You have to arrange all construction materials, Labour camp, Water etc. in your Scope.
8 If the strength of concrete cube shall not be observed as standards then payment shall be made
at reduced rate
9 All concreting works shall be done as per our Mix Design, by Concrete Mixer with Weigh Batcher
10 This Work Order's rate applicable from 01.06.2008 for Temple & Dargah work only.
Terms and Conditions : - All works shall be done as per MoRTH Specifications
or as per direction by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work : - Jaora-Nayagoan Road Project for Mobilization work.
Total 242500
Payment Conditions:.
1 TDS will be deducted as per Govt. Rule
2 Payment will be made on quantity as certified by jointly verified by ABL after Completion of work.
3 SD @ 5% shall be deducted from your every R.A.Bill & The same will be released after
12 Months after completion date of work.
4 W.C. Tax @ 2% shall be deducted as per Govt. Rule.
5 Sales Tax - if you have not having TIN No. then additaional deduction of 13.5% shall be
recoverd from your bill payment.
6 Shuttering Material and Curing of the concrete in your Scope.
7 You have to arrange all construction materials, Labour camp, Water etc. in your Scope.
8 If the strength of concrete cube shall not be observed as standards then payment shall be made
at reduced rate
9 All concreting works shall be done as per our Mix Design, by Concrete Mixer with Weigh Batcher
Terms and Conditions : - All works shall be done as per MoRTH Specifications
or as per direction by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work for Repair Patch Works : - Jaora-Nayagoan Road Project
A) Dept Supply
1 Unskilled Labour Nos. 200.00 135.00 27000
2 Skilled Supervisior Nos. 200.00 300.00 60000
Total 87000
Payment Conditions:.
1 TDS will be deducted as per Govt. Rule
2 Payment will be made on quantity as certified by jointly verified by ABL after Completion of work.
3 Sales Tax - If you have not having TIN No. of MP then additional deduction of 13.5% shall be
made from your bill payment.
4 You have to arrange all construction materials, Labour camp, Water etc. in your Scope.
Terms and Conditions : - All works shall be done as per MoRTH Specifications or as per direction
by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
Permanent Address : - Goal Chauraha, Datt Mandir Road, PAN No. : - AUYPP3908 Q
Dist. - Mandsaur (M.P.) TIN No.
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work for Repair Patch Works : - Jaora-Nayagoan Road Project
A) Dept Supply
Total 21000
Payment Conditions:.
1 TDS will be deducted as per Govt. Rule
2 Payment will be made on quantity as certified by jointly verified by ABL after Completion of work.
3 Sales Tax - If you have not having TIN No. of MP then additional deduction of 13.5% shall be
made from your bill payment.
4 You have to arrange all construction materials, Labour camp, Water etc. in your Scope.
Terms and Conditions : - All works shall be done as per MoRTH Specifications or as per direction
by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work : - Jaora-Nayagoan Road Project for Drain Work only.
Drain Works
1 Excavation including Disposal of Excess Earth CuM 50.00 500.00 25000
2 PCC (1:3:6) CuM 1700.00 50.00 85000
3 UCR Masonary CuM 1800.00 150.00 270000
4 Coping (1:2:4) CuM 2050.00 25.00 51250
5 Back Filling CuM 32.00 100.00 3200
6 Pointing SqM 51.00 500.00 25500
7 25mm ThK. Red Stone Slab as a Slab 2 Ft. x 5 Ft. SqM 270.00 300.00 81000
8 PVC Pipe as a Weep Holes 75mm Dia. Rmt 50.00 200.00 10000
9 Labour Supply : -
Male Mazdoor Nos 110.00 25.00 2750
Female Mazdoor Nos 90.00 25.00 2250
Total 555950
Payment Conditions:.
1 TDS will be deducted as per Govt. Rule
2 Payment will be made on quantity as certified by jointly verified by ABL after Completion of work.
3 SD @ 5% shall be deducted from your every R.A.Bill & The same will be released after
12 Months after completion date of work.
4 W.C. Tax @ 2% shall be deducted as per Govt. Rule.
5 Sales Tax - if you have not having TIN No. then additaional deduction of 13.5% shall be
recoverd from your bill payment.
6 Shuttering Material and Curing of the concrete in your Scope.
7 You have to arrange all construction materials, Labour camp, Water etc. in your Scope.
8 This Work Order's rate applicable from 01.07.2008 for Drain work only.
Terms and Conditions : - All works shall be done as per MoRTH Specifications
or as per direction by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work : - Jaora-Nayagoan Road Project for Patch Work Work only.
1 Scarifying for Roadway in Bt.+Granular Layer up to 150 mm SqM 500.00 33.00 16500
2 P. & L. MSS SqM 50.00 165.00 8250
3 P. & L. BUSG SqM 150.00 220.00 33000
4 P. & L. Tack Coat SqM 25.00 11.00 275
5 P. & L. GSB CuM 100.00 450.00 45000
6 P. & L. WMM CuM 500.00 900.00 450000
7 Surface Dressing using Bitumen Emulsion
Case - 1 Nominal aggregate size 13.2 mm SqM 300.00 60.00 18000
Case - 1 Nominal Chapping size 9.5 mm SqM 200.00 54.00 10800
8 Repair to Pot Holes and Removal of Loose Material SqM 25.00 200.00 5000
Total 586825
Payment Conditions:.
1 TDS will be deducted as per Govt. Rule
2 Payment will be made on quantity as certified by jointly verified by ABL after Completion of work.
3 SD @ 5% shall be deducted from your every R.A.Bill & The same will be released after
12 Months after completion date of work.
4 W.C. Tax @ 2% shall be deducted as per Govt. Rule.
5 Sales Tax - if you have not having TIN No. then additaional deduction of 13.5% shall be
recoverd from your bill payment.
6 You have to arrange all construction materials, Labour camp, Water etc. in your Scope.
7 This Work Order's rate applicable from 01.07.2008 for Patch work only.
Terms and Conditions : - All works shall be done as per MoRTH Specifications
or as per direction by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work : - Jaora-Nayagoan Road Project for Drain Work in Urban
Area in Cha. Km 207+00 (Malhargarh Section)
Drain Works
1 Excavation including Disposal of Excess Earth CuM 50.00 500.00 25000
2 PCC (1:3:6) CuM 1700.00 50.00 85000
3 UCR Masonary CuM 1800.00 150.00 270000
4 Coping (1:2:4) CuM 2050.00 25.00 51250
5 Back Filling CuM 32.00 100.00 3200
6 Pointing SqM 51.00 500.00 25500
7 25mm ThK. Red Stone Slab as a Slab 2 Ft. x 5 Ft. SqM 270.00 300.00 81000
8 PVC Pipe as a Weep Holes 75mm Dia. Rmt 50.00 200.00 10000
9 Labour Supply : -
Male Mazdoor Nos 110.00 25.00 2750
Female Mazdoor Nos 90.00 25.00 2250
Total 555950
Terms and Conditions : - All works shall be done as per MoRTH Specifications
or as per direction by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work : - Jaora-Nayagoan Road Project for Drain Work in Urban
Area as per requirement of Ashoka Buildcon Ltd.'s Engineer - in - Charge
Drain Works
1 Excavation including Disposal of Excess Earth CuM 50.00 500.00 25000
2 PCC (1:3:6) CuM 1700.00 50.00 85000
3 UCR Masonary CuM 1800.00 150.00 270000
4 Coping (1:2:4) CuM 2050.00 25.00 51250
5 Back Filling CuM 32.00 100.00 3200
6 Pointing SqM 51.00 500.00 25500
7 25mm ThK. Red Stone Slab as a Slab 2 Ft. x 5 Ft. SqM 270.00 300.00 81000
8 PVC Pipe as a Weep Holes 75mm Dia. Rmt 50.00 200.00 10000
9 Labour Supply : -
Male Mazdoor Nos 110.00 25.00 2750
Female Mazdoor Nos 90.00 25.00 2250
Total 555950
Terms and Conditions : - All works shall be done as per MoRTH Specifications
or as per direction by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work for all Miscellaneous Works Jaora-Nayagoan Road Project.
Total 382200
Payment Conditions:.
1 TDS @ 1.133% will be deducted as per Govt. Rule
2 Payment will be made on quantity as certified by jointly verified by ABL after Completion of work
After 15 days 75% & monthly billing.
3 SD @ 5% shall be deducted from your every R.A.Bill & The same will be released after
12 Months after completion date of work.
4 W.C. Tax @ 2% shall be deducted as per Govt. Rule.
5 Labour Cess @ 1% shall be deducted as per Govt. Rule.
Terms and Conditions : - All works shall be done as per MoRTH Specifications
or as per direction by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
Permanent Address : - Ganesh Nagar, Balwadi Chowk, PAN No. APZPK 8037 K
Parera Nagar, Lokmanya Nagar, TIN No.
Pada No.-3 Thane (West)
Contact No. 9867953867
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work : - Jaora-Nayagoan Road Project the Drainage in Urban Area
Pipliyamandi Section Drain Work
Drain Works
1 Excavation including Disposal of Excess Earth CuM 50.00 500.00 25000
2 PCC (1:3:6) Without Cement CuM 1200.00 50.00 60000
3 UCR Masonary CuM 1800.00 150.00 270000
4 Coping (1:2:4) Without Cement CuM 1300.00 25.00 32500
5 Back Filling CuM 32.00 100.00 3200
6 Pointing SqM 51.00 500.00 25500
7 Red Flag Stone Slab as a Slab 2 Ft. x 5 Ft. (50 to 75mm Thk.) SqM 270.00 300.00 81000
8 PVC Pipe as a Weep Holes 75mm Dia. Rmt 50.00 200.00 10000
9 Labour Supply : -
Male Mazdoor Nos 110.00 25.00 2750
Female Mazdoor Nos 90.00 25.00 2250
Total 512200
Terms and Conditions : - All works shall be done as per MoRTH Specifications
or as per direction by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
Permanent Address : - Ganesh Nagar, Balwadi Chowk, PAN No. AWAPK 7994 H
Ganesh Nagar, Lokmanya Nagar, TIN No.
Pada No.-3 Thane (West)
Contact No. 9923511475
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work : - Jaora-Nayagoan Road Project the Drainage in Urban Area
Malhargarh Section Drain Work
Total 1167275
Terms and Conditions : - All works shall be done as per MoRTH Specifications
or as per direction by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
Permanent Address : - Ganesh Nagar, Balwadi Chowk, PAN No. AWAPK 7994 H
Ganesh Nagar, Lokmanya Nagar, TIN No.
Pada No.-3 Thane (West)
Contact No. 9923511475
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work : - Jaora-Nayagoan Road Project the Drainage in Urban Area
Malhargarh Section Drain Work
Drain Works
1 Excavation including Disposal of Excess Earth CuM 50.00 500.00 25000
2 PCC (1:3:6) With Cement CuM 2275.00 50.00 113750
3 UCR Masonary CuM 1800.00 150.00 270000
4 Coping (1:2:4) With Cement CuM 2375.00 25.00 59375
5 Back Filling CuM 32.00 100.00 3200
6 Pointing SqM 51.00 500.00 25500
7 Red Flag Stone Slab as a Slab 2 Ft. x 5 Ft. (50 to 75mm Thk.) SqM 270.00 300.00 81000
8 PVC Pipe as a Weep Holes 75mm Dia. Rmt 50.00 200.00 10000
9 Labour Supply : -
Male Mazdoor Nos 110.00 25.00 2750
Female Mazdoor Nos 90.00 25.00 2250
Total 592825
Terms and Conditions : - All works shall be done as per MoRTH Specifications
or as per direction by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
Permanent Address : - Ganesh Nagar, Balwadi Chowk, PAN No. AWAPK 7994 H
Ganesh Nagar, Lokmanya Nagar, TIN No.
Pada No.-3 Thane (West)
Contact No. 9923511475
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work : - Jaora-Nayagoan Road Project the Drainage in Urban Area
Malhargarh Section Drain Work
Drain Works
1 Excavation including Disposal of Excess Earth CuM 50.00 500.00 25000
2 PCC (1:3:6) Without Cement CuM 1200.00 50.00 60000
3 UCR Masonary CuM 1800.00 150.00 270000
4 Coping (1:2:4) Without Cement CuM 1300.00 25.00 32500
5 Back Filling CuM 32.00 100.00 3200
6 Pointing SqM 51.00 500.00 25500
7 Red Flag Stone Slab as a Slab 2 Ft. x 5 Ft. (50 to 75mm Thk.) SqM 270.00 300.00 81000
8 PVC Pipe as a Weep Holes 75mm Dia. Rmt 50.00 200.00 10000
9 Labour Supply : -
Male Mazdoor Nos 110.00 25.00 2750
Female Mazdoor Nos 90.00 25.00 2250
Total 512200
Terms and Conditions : - All works shall be done as per MoRTH Specifications
or as per direction by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work for C D Works Jaora-Nayagoan Road Project.
C D Works
1 Excavation in hard murum CuM 50.00 100.00 5000
2 GSB Laying (Labour rate only) CuM 40.00 15.00 600
3 Prov. & Laying PCC Head Wall without Cement (M-15) CuM 1300.00 50.00 65000
4 Prov. & fixing Shuttering SqM 120.00 50.00 6000
5 HP Pipe Laying with Joint Filling with Cement
a) 1000mm Dia Rmt 400.00 160.00 64000
b) 1200mm Dia Rmt 500.00 160.00 80000
6 Back Filling by avaialble earth (Labour rate) CuM 32.00 300.00 9600
Total 711450
Payment Conditions:.
1 TDS will be deducted as per Govt. Rule
2 Payment will be made on quantity as certified by jointly verified by ABL after Completion of work.
3 SD @ 5% shall be deducted from your every R.A.Bill & The same will be released after
12 Months after completion date of work.
4 W.C. Tax @ 2% shall be deducted as per Govt. Rule.
5 Sales Tax - if you have not having TIN No. then additaional deduction of 13.5% shall be
recoverd from your bill payment.
6 Labour Cess @ 1% shall be deducted as per Govt. Rule.
7 Shuttering Material and Curing of the concrete in your Scope.
8 You have to arrange all construction materials, Labour camp, Water etc. in your Scope.
9 If the strength of concrete cube shall not be observed as standards then payment shall be made
at reduced rate
10 All concreting works shall be done as per our Mix Design, by Concrete Mixer with Weigh Batcher
Terms and Conditions : - All works shall be done as per MoRTH Specifications
or as per direction by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
Payment Conditions:.
1 From your monthly bill S.D. @ 5% will be deducted & will be refunded after Twelve months
from the date of completion of work.
2 As per Govt. Rules follwing taxes will be deducted from your monthly R.A. Bill.
a) TDS @ 1.133 %
b) WC Tax @ 2%
c) Labour Cess Tax @ 1%
2 Company will be not responsible for the payment of Labour or any other supplier engaged by you.
3 Rates are fixed throughout the construction period.
4 All the materials like binding wire, shuttering, nails etc. will be provided by company.
5 If work not completed & required to carry out by another agency with any extra charges
they will be debited to your account & will be recoverd from your R.A. Bill.
6 Other Material issued from store on returnable basis.
Terms and Conditions : - All works shall be done as per MoRTH Specifications or
as per direction by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
Payment Conditions:.
1 From your monthly bill S.D. @ 5% will be deducted & will be refunded after Twelve months
from the date of completion of work.
2 As per Govt. Rules follwing taxes will be deducted from your monthly R.A. Bill.
a) TDS @ 1.133 %
b) WC Tax @ 2%
c) Labour Cess Tax @ 1%
2 Company will be not responsible for the payment of Labour or any other supplier engaged by you.
3 Rates are fixed throughout the construction period.
4 All the materials like binding wire, shuttering, nails etc. will be provided by company.
5 If work not completed & required to carry out by another agency with any extra charges
they will be debited to your account & will be recoverd from your R.A. Bill.
6 Other Material issued from store on returnable basis.
Terms and Conditions : - All works shall be done as per MoRTH Specifications or
as per direction by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work : - Jaora-Nayagoan Road Project for Blasting & Chiseling work.
Payment Conditions:.
1 Payment will made as per the monthly bill prepared.
2 Payment will be made as per work done details from site.
3 From your bill S.D.@ 5%,TDS @ 1.133% as applicable will be deducted.
4 W.C.Tax @ 2% & Labour Cess @ 1% shall be recovered from your monthly bill.
6 If any material issued by store dept. same will be recovered from your bill as per running market
rate with transportation charges.
7 Company will be not responsible fro the payment of labour or any other supplier engaged by you.
8 No blasting is permitted at site without permission of site Engg or site Incharge.
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our records
as a token of acceptance.
Thanking you,
58
ASHOKA BUILDCON LTD.
WORK ORDER
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work : - Jaora-Nayagoan Road Project the Drainage in Urban Area
Nayagaon Section Drain Work
Drain Works
1 Excavation including Disposal of Excess Earth CuM 50.00 500.00 25000
2 PCC (1:3:6) With Cement CuM 2275.00 50.00 113750
3 UCR Masonary With Cement CuM 1800.00 150.00 270000
4 Coping & Slab (1:2:4) Without Cement CuM 2375.00 25.00 59375
5 Back Filling CuM 32.00 100.00 3200
6 Pointing With Cement SqM 51.00 500.00 25500
7 Red Flag Stone Slab as a Slab 2 Ft. x 5 Ft. (50 to 75mm Thk.) SqM 270.00 300.00 81000
8 PVC Pipe as a Weep Holes 75mm Dia. Rmt 50.00 200.00 10000
9 Labour Supply : -
Male Mazdoor Nos 110.00 25.00 2750
Female Mazdoor Nos 90.00 25.00 2250
Total 592825
Terms and Conditions : - All works shall be done as per MoRTH Specifications
or as per direction by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
The above Contract is Lum-Sum Contract of amounting Rs.3,30,000/- (Rs. Three Lac Thirty Thousand)
Payment Conditions:.
1 TDS will be deducted as per Govt. Rule
2 Payment will be made by ABL after Completion of work.
3 SD @ 5% shall be deducted from your Bill & The same will be released after 12 Months after completion date of work.
4 W.C. Tax @ 2% shall be deducted as per Govt. Rule.
5 Work Should completed within 10 days. If not done after issued work order, 3% amount shall be deduct from your Bill.
6 You have to arrange all electrical materials, Labour camp etc. in your Scope.
7 You have to certified the material brought for completion of this work before start of the work.
8 If there shall be any change in material or quantum of work less than as listed above then, on pro - rate basis your value of
work done amount (Rs.3,30,000/-) shall be changed accordingly on lower side only.
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our records as a token of
acceptance.
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work for all Miscellaneous Works Jaora-Nayagoan Road Project.
Total 382200
Payment Conditions:.
1 TDS @ 1.133% will be deducted as per Govt. Rule
2 Payment will be made on quantity as certified by jointly verified by ABL after Completion of work
After 15 days 75% & monthly billing.
3 SD @ 5% shall be deducted from your every R.A.Bill & The same will be released after
12 Months after completion date of work.
4 W.C. Tax @ 2% shall be deducted as per Govt. Rule.
5 Labour Cess @ 1% shall be deducted as per Govt. Rule.
Terms and Conditions : - All works shall be done as per MoRTH Specifications
or as per direction by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
Payment Conditions:.
1 From your monthly bill S.D. @ 5% will be deducted & will be refunded after Twelve months
from the date of completion of work.
2 As per Govt. Rules follwing taxes will be deducted from your monthly R.A. Bill.
a) TDS @ 1.133 %
b) WC Tax @ 2%
c) Labour Cess Tax @ 1%
2 Company will be not responsible for the payment of Labour or any other supplier engaged by you.
3 Rates are fixed throughout the construction period.
4 All the materials like binding wire, shuttering, nails etc. will be provided by company.
5 If work not completed & required to carry out by another agency with any extra charges
they will be debited to your account & will be recoverd from your R.A. Bill.
6 Any material issued by ABL like Cement, HYSD Steel, Shuttering Material, if found loss, theft or
mis-used or damaged then, recovery of the material shall be done from your bill at the " Market
Rate + 10% extra".
7 You have to give reconciliation for the material issued by ABL like Cement & HYSD Steel etc.
8 If Shuttering Material provided by ABL then the recovery for the same is Rs. 1.75 kg / month.
Terms and Conditions : - All works shall be done as per MoRTH Specifications or
as per direction by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
Sr. Approx.Q
Description of work Unit Rate In Rs. Amount In Rs.
No. uantity
A) Structure Work
Concrete at all Levels, In Foundation, In Sub-Structure, in
1
Super-Structure. (RMC Supplied by ABL) CuM 100.00 275.00 27500.00
2 Shuttering Work
In Foundation SqM 100.00 175.00 17500.00
In Sub-structure SqM 100.00 190.00 19000.00
In Super-structure SqM 100.00 190.00 19000.00
3 P&F Weep Holes by PVC Pipe 4" Dia Rmt 50.00 50.00 2500.00
4 Fixing of HYSD Steel MT 10.00 4200.00 42000.00
5 Staging for Deck slab only
per CuM of
Concrete 200.00 400.00 80000.00
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work : - Jaora-Nayagoan Road Project for Blasting & Chiseling work.
Total 69985
Payment Conditions:.
1 Payment will made as per the monthly bill prepared.
2 Payment will be made as per work done details from site.
3 From your bill S.D.@ 5%,TDS @ 1.133% as applicable will be deducted.
4 W.C.Tax @ 2% & Labour Cess @ 1% shall be recovered from your monthly bill.
6 If any material issued by store dept. same will be recovered from your bill as per running market
rate with transportation charges.
7 Company will be not responsible fro the payment of labour or any other supplier engaged by you.
8 No blasting is permitted at site without permission of site Engg or site Incharge.
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our records
as a token of acceptance.
Thanking you,
70
G.M.(Projects) D.H.(E.Q.A.) By Sub-Contractor
71
ASHOKA BUILDCON LTD.
WORK ORDER
This Work Order is issued as per terms and condition given overleaf and you are requested to execute
the following work for Mics. work of Structure Retaining Wall Work for Jaora-Nayagoan Road Project.
Sr. Approx.Q
Description of work Unit Rate In Rs. Amount In Rs.
No. uantity
A) Structure Work
P&F Weep Holes by PVC Pipe 4" Dia. extending through the
full width of the structure with slope of 1V : 20H towards
2
drawing face complete as per drawing & technical
specifications and per clause 2706 of specifications. Rmt 50.00 50.00 2500.00
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
This Work Order is issued as per terms and condition given overleaf and you are requested to execute
the following work for Structure Work for Jaora-Nayagoan Road Project.
Sr. Approx.Q
Description of work Unit Rate In Rs. Amount In Rs.
No. uantity
A) Structure Work
# If Shuttering shall be supplied by ABL then the rate of hire charges of Shuttering Material is @ Rs. 1.75/ Kg / Month
the same shall be recovered form your monthly R.A. Bill
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
Sr. Approx.Q
Description of work Unit Rate In Rs. Amount In Rs.
No. uantity
4 Prov. & Fixng Weep Pipe holes PVC 4" Dia Rmt 40.00
Terms and Conditions : - All works shall be done as per MoRTH Specifications
or as per direction by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
Total Total
Payment Conditions:.
1 TDS will be deducted as per Govt. Rule
2 Payment will be made on quantity as certified by jointly verified by ABL after Completion of work.
3 SD @ 5% shall be deducted from your every R.A.Bill & The same will be released after
12 Months after completion date of work.
4 W.C. Tax @ 2% shall be deducted as per Govt. Rule.
5 Labour Cess @ 1%
6 Shuttering Material and Curing of the concrete in your Scope.
7 You have to arrange all construction materials, Labour camp, Water etc. in your Scope.
8 If the strength of concrete cube shall not be observed as standards then payment shall be made
at reduced rate
9 All concreting works shall be done as per our Mix Design, by Concrete Mixer with Weigh Batcher
10 If Shuttering shall be supplied by ABL then the rate of hire charges of Shuttering Material is @
Rs.1.75/- Kg / Month the same shall be recovered form your monthly R.A. Bill
Terms and Conditions : - All works shall be done as per MoRTH Specifications
or as per direction by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
2 Shuttering Work
In Foundation SqM 100.00 175.00 17500.00
In Sub-structure SqM 100.00 190.00 19000.00
In Super-structure SqM 100.00 190.00 19000.00
3 P&F Weep Holes by PVC Pipe 4" Dia Rmt 50.00 50.00 2500.00
4 Fixing of HYSD Steel MT 10.00 4200.00 42000.00
5 Thurmacoal fixing & Expansion Joint SqM 50.00 25.00 1250.00
Terms and Conditions : - All works shall be done as per MoRTH Specifications
or as per direction by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
Prov. & Laying Concrete M - 10 Grade for Kerb Ist Stage as per
1 Drawing, Specification or as directed by Engineer-in-Charge Rmt 1000.00 135.00 135000
etc.
Above Rate is including of Cost of Material, Labour &
Shuttering etc.
Terms and Conditions : - All works shall be done as per MoRTH Specifications
or as per direction by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
Sr. Approx.Q
Description of work Unit Rate In Rs. Amount In Rs.
No. uantity
A Structure Work
Concrete at all Levels, In Foundation, In Sub-Structure, in
1
Super-Structure. (RMC Supplied by ABL) CuM 100.00 300.00 30000.00
2 Shuttering Work
In Foundation SqM 100.00 175.00 17500.00
In Sub-structure SqM 100.00 190.00 19000.00
In Super-structure SqM 100.00 190.00 19000.00
3 Fixing of HYSD Steel MT 5.00 4200.00 21000.00
4 P&F Weep Holes by PVC Pipe 4" Dia Rmt 50.00 70.00 3500.00
5 P&F Thermocole at Expansion Joint SqM 50.00 50.00 2500.00
Payment Conditions :
Terms and Conditions : - All works shall be done as per MoRTH Specifications
or as per direction by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
This Work Order is issued as per terms and condition given overleaf and you are requested to execute
the following work for Miscellaneous Work for Jaora-Nayagoan Road Project.
A) Miscellaneous Work
Labour rate for Excavation of embankment, subgrade and drain
1
consisting of excavation, removal etc. complete for road work. CuM 40.00 0.00
Labour rate for Laying of D.L.C.(M - 10) incl. Channel shifting, fixing
2
Levelling, repair & other releted works of D.L.C. CuM 40.00 0.00
Labour rate for Laying of Constructing Crushed run macadam for
3 granular sub base / base course with graded agg. Etc. completed
thickness. CuM 30.00 0.00
4 Labour Charges for surface Dressing. SqM 2.50 0.00
Labour charges for laying of PQC including rail channal shifting,
5 fixing, levelling, hession cloth laying obstacles removal etc. as well
as repair & other releted work for PQC.(Mannually PQC Laying) CuM 80.00 0.00
Labour charges for laying of PQC including rail channal shifting,
6 fixing, levelling, hession cloth laying obstacles removal etc. as well
as repair & other releted work for PQC. (PQC Laid by Paver) CuM 80.00 0.00
7 Labour rate for Soil / Matel / Dust shifting work Trip 80.00 0.00
Labour rate for Kerb Laying work
8
( Excess consumption of material shall be debited from your bill.) Rmt. 25.00 0.00
9 Labour rate for Cutting & Fixing of Reinforcement work Kgs. 1.20 0.00
10 Dept. Supply for Heating of Bitumen drum for Patch work Nos. 130.00 0.00
11 Patch work / Pot holes filling by BUSG Method SqM 35.00 0.00
12 Cement begs Loading or unloading Nos. 1.00 0.00
13 HYSD (Steel) Loading or unloading MT 40.00 0.00
14 Bitumen Drum Unloading Drums 5.00 0.00
15 Bitumen Drum Loading Drums 15.00 0.00
16 Brick Masonary CuM 150.00 0.00
17 Plaster / Flooring SqM 40.00 0.00
18 PCC ( Manually) CuM 120.00 0.00
Total 0.00
Payment Conditions:.
1 TDS will be deducted as per Govt. Rule
2 Payment will be made on quantity as certified by jointly verified by ABL after Completion of work.
3 SD @ 5% shall be deducted from your every R.A.Bill & The same will be released after
12 Months after completion date of work.
4 W.C. Tax @ 2% shall be deducted as per Govt. Rule.
5 Labour Cess @ 1%
6 Shuttering Material and Curing of the concrete in your Scope.
7 You have to arrange all construction materials, Labour camp, Water etc. in your Scope.
Terms and Conditions : - All works shall be done as per MoRTH Specifications
or as per direction by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
Sr. Approx.Q
Description of work Unit Rate In Rs. Amount In Rs.
No. uantity
Payment Conditions :
Terms and Conditions : - All works shall be done as per MoRTH Specifications
or as per direction by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work : - Jaora-Nayagoan Road Project the Drainage in Urban Area
Section Drain Work.
Sr. Rate
Description of work Unit
No. in Rs.
Drain Works
1 Excavation including Disposal of Excess Earth CuM 60.00
2 PCC CuM 2100.00
3 RCC for Raft, Wall & Slab CuM 2500.00
4 Shuttering work SqM 110.00
5 Back Filling CuM 35.00
6 HYSD Steel Cutting & Fixing MT 4000.00
All above Rates are inclusive of Material, Labour, Plants &
Tolls etc.Complete
Terms and Conditions : - All works shall be done as per MoRTH Specifications or as per direction
by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
Terms and Conditions : - All works shall be done as per MoRTH Specifications
or as per direction by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
Terms and Conditions : - All works shall be done as per MoRTH Specifications
or as per direction by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work : - Jaora-Nayagoan Road Project the Drainage in Urban Area
Section RCC Drain Work.
Sr. Rate
Description of work Unit
No. in Rs.
Drain Works
1 Excavation including Disposal of Excess Earth CuM 60.00
2 PCC (M-10) 4 Bags/CuM CuM 2160.00
3 RCC for Raft, Wall & Slab (M-15) 5 Bags/CuM CuM 2400.00
4 Shuttering work SqM 140.00
5 Back Filling CuM 32.00
6 HYSD Steel Cutting & Fixing MT 4000.00
7 PVC Weep Holes 4" Dia. Rmt 50.00
8 Dressing upto 150mm Excavation if required for Gredient SqM 15.00
All above Rates are inclusive of Material, Labour, Plants &
Tolls etc.Complete
Terms and Conditions : - All works shall be done as per MoRTH Specifications or as per direction
by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work : - Jaora-Nayagoan Road Project
Road Work :- Earthwork, Subgrade, Hard Shoulders from Km.195.000 to Km. 199.000
2.2 Clearing and grubbing road land including uprooting rank vegetation, grass, bushes,
shrubs, saplings and trees girth up to 300 mm., removal of stumps of tree cut earlier
and disposal of unserviceable materials and stacking of serviceable material to be
used or auctioned up to a lead of 1000 meters including removal and disposal of top
organic soil not exceeding 150mm thickness if required and as per relevant clauses of
section-200.
3.1 Excavation for roadway in soil / Hard Murrum including loading in truck for carrying
of cut earth to embankment site with all lifts and lead and as per relevant clauses of
section – 300. CuM 40.00 5520 220800.00
3.10 (I) Constructions of embankment with approved material / selected soil obtained from
excavation of borrow pits including all lifts & leads including grading to required slope &
camber and compacting using vibratory roller of 80 to 100 kN static weight to meet
requirement of Table 300.1, 300.2 and as per relevant clause of section 300.
CuM 81.00 8580 694980.00
3.10 (Ii) Constructions of subgrade / Hard Shoulder with approved material / selected soil
having CBR >10 obtained from borrow pits including all lifts & leads including grading
to required slope & camber and compacting using vibratory roller of 80 to 100 kN static
weight to meet requirement of Table 300.1, 300.2 and as per relevant clause of section
300.
Total 1667020
Terms and Conditions : - All works shall be done as per MoRTH Specifications or as per direction by Engr.-In-Charge
& Other Terms & Conditions attached herewith.
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
This Work Order is issued as per terms and condition given overleaf and you are requested to execute
the following work : - Jaora-Nayagoan Road Project .
Mainatainance of Road Work :- From Km.195+000 to Km. 222+000
1 Scarifying for Roadway in Bt.+Granular Layer up to 150 mm SqM 33.00 54000 1782000
2 P. & L. MSS SqM 165.00 54000 8910000
3 P. & L. BUSG SqM 220.00 54000 11880000
4 P. & L. Tack Coat SqM 11.00 54000 594000
5 P. & L. GSB CuM 450.00 8100 3645000
6 P. & L. WMM CuM 900.00 8100 7290000
7 Surface Dressing using Bitumen Emulsion
Case - 1 Nominal aggregate size 13.2 mm SqM 60.00 54000 3240000
Case - 1 Nominal Chapping size 9.5 mm SqM 54.00 54000 2916000
Total 40257000
Payment Conditions:.
1 TDS will be deducted as per Govt. Rule
2 Payment will be made on quantity as certified by jointly verified by both the parties after Completion of work.
3 SD @ 5% shall be deducted from your every R.A.Bill & The same will be released after 12 Months after
completion date of work.
Terms and Conditions : - All works shall be done as per MoRTH Specifications or as per direction by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
For Ashoka DSC Katni By Pass Co.Pvt. Ltd. For Ashoka Buildcon Ltd.
This Work Order is issued as per terms and condition given overleaf and you are requested to execute
the following work for Structure & HPC Work for Jaora-Nayagoan Road Project.
NOTE: - All above rates are including Material Shuttering etc. Only Cement & Steel shall be supplied by
ABL free of Cost, Transportation Shall be at your Cost.
Payment Conditions:.
1 TDS will be deducted as per Govt. Rule
2 Payment will be made on quantity as certified by jointly verified by ABL after Completion of work.
3 SD @ 5% shall be deducted from your every R.A.Bill & The same will be released after
12 Months after completion date of work.
4 W.C. Tax @ 2% shall be deducted as per Govt. Rule.
5 Labour Cess @ 1%
6 Shuttering Material and Curing of the concrete in your Scope.
7 You have to arrange all construction materials, Labour camp, Water etc. in your Scope.
8 If the strength of concrete cube shall not be observed as standards then payment shall be made
at reduced rate
9 All concreting works shall be done as per our Mix Design, by Concrete Mixer with Weigh Batcher
10 If Shuttering shall be supplied by ABL then the rate of hire charges of Shuttering Material is @ Rs. 1.75/ Kg / Month
the same shall be recovered form your monthly R.A. Bill
11 If RMC Supplied by ABL then Recovery Rate Rs. 1100/- per CuM shall be recovered from your R.A. Bill
12 Excess, theft & Loss of Cement & Steel shall be recovered from your R.A. Bill @ Corrent Market Rate +
10% Extra Charges.
Terms and Conditions : - All works shall be done as per MoRTH Specifications
or as per direction by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
Sr. Approx.Q
Description of work Unit Rate In Rs. Amount In Rs.
No. uantity
4 Prov. & Fixng Weep Pipe holes PVC 4" Dia Rmt 40.00
Terms and Conditions : - All works shall be done as per MoRTH Specifications
or as per direction by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work : - Jaora-Nayagoan Road Project the Drainage in Urban Area
Section Drain Work.
Sr. Rate
Description of work Unit
No. in Rs.
RCC Drain Works
1 Excavation including Disposal of Excess Earth & Back Filling CuM 75.00
2 Dressing Work (If Excavation done by ABL) SqM 25.00
3 Back Filling (If Excavation done by ABL) CuM 35.00
4 PCC Work (M - 10) 4 Bag per CuM Including Cement. CuM 2260.00
Concreting Work RCC for Raft, Wall & Slab Work (M - 15)
5 CuM 2475.00
5 Bag per CuM Including Cement.
6 Shuttering work SqM 160.00
7 HYSD Steel Cutting & Fixing with widening wire MT 4500.00
8 PVC Weep Holes 4" Dia Rmt 60.00
9 Thermocole / Expansion Joint SqM 50.00
Terms and Conditions : - All works shall be done as per MoRTH Specifications or as per direction
by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
Sr. Approx.Q
Description of work Unit Rate In Rs. Amount In Rs.
No. uantity
Road Furniture
Reinforced Cement Concrete Kilometre Stone (Pre-Cast) of
standard design as per IRC:8-1980, Supplying, Transportation,
1
Fixing in position including Painting and Printing. Lettering etc.
complete.
(The Detailed Drawing of the same is attached herewith. According you have to cast the stones as per
mentioned concrete grade & shall be fixed on the site as per mentioned in the drawing)
NOTE: - All above rates are including Supplying, Transportation, Fixing in position including Finishing,
Painting with Letter Writing etc.Complete.
Payment Conditions:.
1 TDS will be deducted as per Govt. Rule
2 50% Payment will be made on quantity supplied on site as certified / verified jointly by ABL and balance
50% Payment will be made after completion of fixing, painting & letter writing etc. on site as certified / verified
jointly by ABL and Consultant.
3 SD @ 5% shall be deducted from your every R.A.Bill & The same will be released after 12 Months after
completion date of work.
4 W.C. Tax @ 2% shall be deducted as per Govt. Rule.
5 Labour Cess @ 1% shall be deducted as per Govt.Rule.
6 Curing of the concrete after fixing the stone in ground in your Scope.
7 You have to arrange all construction materials, Labour camp, Water etc. for your work scope.
8 If the stone shall not be observed as standards then payment shall not be be made of Rejected Stones.
Terms and Conditions : - All works shall be done as per MoRTH Specifications or as per direction by
Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work : - Jaora-Nayagoan Road Project the Shuttering and
Reinforcement Work of Structure Work.
Sr. Rate
Description of work Unit
No. in Rs.
Shuttering and Reinforcement Work
If company engaged for any other works regarding shuttering and bar bendig works the
following wages will be paid.
Terms and Conditions : - All works shall be done as per MoRTH Specifications or as per direction
by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work for all Miscellaneous Works Jaora-Nayagoan Road Project.
Total 56000
Payment Conditions:.
1 TDS @ 1.133% will be deducted as per Govt. Rule
2 Payment will be made on quantity as certified by jointly verified by ABL after Completion of work
After 15 days 75% & monthly billing.
3 SD @ 5% shall be deducted from your every R.A.Bill & The same will be released after
12 Months after completion date of work.
4 W.C. Tax @ 2% shall be deducted as per Govt. Rule.
5 Labour Cess @ 1% shall be deducted as per Govt. Rule.
Terms and Conditions : - All works shall be done as per MoRTH Specifications
or as per direction by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
Structures
1 Laying of Filter Media with Material Brought from Out Side CuM Q.R 300.00
NOTE: - All above rates are including Material, Labour and Taxes etc.
Payment Conditions:.
1 TDS will be deducted as per Govt. Rule
2 Payment will be made on quantity as certified by jointly verified by ABL after Completion of work.
3 SD @ 5% shall be deducted from your every R.A.Bill & The same will be released after
12 Months after completion date of work.
4 W.C. Tax @ 2% shall be deducted as per Govt. Rule.
5 Labour Cess @ 1%
6 You have to arrange all construction materials, Labour camp, Water etc. in your Scope.
Terms and Conditions : - All works shall be done as per MoRTH Specifications
or as per direction by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
This Work Order is issued as per terms and condition given overleaf and you are requested to execute
the following work for Dept. Supply Work for RMC Plant.
Dept. Supply
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
NOTE: - All above rates are including Material Shuttering etc. Only Cement & Steel shall be supplied by
ABL free of Cost, Transportation Shall be at your Cost.
Payment Conditions:.
1 TDS will be deducted as per Govt. Rule
2 Payment will be made on quantity as certified by jointly verified by ABL after Completion of work.
3 SD @ 5% shall be deducted from your every R.A.Bill & The same will be released after
12 Months after completion date of work.
4 W.C. Tax @ 2% shall be deducted as per Govt. Rule.
5 Labour Cess @ 1%
6 Shuttering Material and Curing of the concrete in your Scope.
7 You have to arrange all construction materials, Labour camp, Water etc. in your Scope.
8 If the strength of concrete cube shall not be observed as standards then payment shall be made
at reduced rate
9 All concreting works shall be done as per our Mix Design, by Concrete Mixer with Weigh Batcher
10 If Shuttering shall be supplied by ABL then the rate of hire charges of Shuttering Material is @
Rs. 1.75/ Kg / Month the same shall be recovered form your monthly R.A. Bill
11 If RMC Supplied by ABL then Recovery Rate Rs. 1100/- per CuM shall be recovered from your R.A. Bill
12 Excess, theft & Loss of Cement & Steel shall be recovered from your R.A. Bill @ Corrent Market Rate +
10% Extra Charges.
Terms and Conditions : - All works shall be done as per MoRTH Specifications
or as per direction by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
ROB
1 Only Laying of Concrete at all levels CuM Q.R 130.00
6 Dept.Supply : -
Skilled Mazdoor No Q.R 160.00
Un-Skilled Mazdoor No Q.R 125.00
Terms and Conditions : - All works shall be done as per MoRTH Specifications
or as per direction by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
This Work Order is issued as per terms and condition given overleaf and you are requested to execute
the following work for ROB-Pipliyamandi Structure for Jaora-Nayagoan Road Project.
Road Work
1 Only Dressing of Existing Road Shoulders SqM Q.R 5.00
Terms and Conditions : - All works shall be done as per MoRTH Specifications
or as per direction by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
Total 630000.00
Payment Conditions:.
1 TDS will be deducted as per Govt. Rule
2 Payment will be made on quantity as certified by jointly verified by ABL after Completion of work.
3 SD @ 5% shall be deducted from your every R.A.Bill & The same will be released after
12 Months after completion date of work.
4 Labour Cess @ 1%
5 Labour accommodation at camp location will be provided to you by ABL.
6 Measurment for payment will be measured as per latest MORTH Specifications.
Kindly acknowledge reciept of work and send us duly signed copy of the same for our records
as a token of acceptance
Terms and Conditions : - All works shall be done as per MoRTH Specifications
or as per direction by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work : - Jaora-Nayagoan Road Project the Drainage in Urban Area
Section RCC Drain Work.
Sr. Rate
Description of work Unit
No. in Rs.
Drain Works
1 Excavation including Disposal of Excess Earth & Back Filling CuM 70.00
2 PCC (M-10) 4 Bags/CuM including Cement CuM 2160.00
RCC for Raft, Wall & Slab (M-15) 5 Bags/CuM including
3 CuM 2400.00
Cement
4 Shuttering work SqM 135.00
5 HYSD Steel Cutting & Fixing MT 4000.00
6 PVC Weep Holes 4" Dia. Rmt 25.00
7 P & Fixing G.I.Grating (with Material) Nos 95.00
All above Rates are inclusive of Material, Labour, Plants &
Tolls etc.Complete
Terms and Conditions : - All works shall be done as per MoRTH Specifications or as per direction
by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work : - Jaora-Nayagoan Road Project the Drainage in Urban Area
Section RCC Drain Work at Nayakheda Cha. Km 173+620 To 173+820.
Sr. Rate
Description of work Unit
No. in Rs.
Terms and Conditions : - All works shall be done as per MoRTH Specifications or as per direction
by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work : - Jaora-Nayagoan Road Project the Base camp at
Pipliyamandi.
Fabrication Works
1 Only modification, Fabrication of Bitumen Tank for Road work Kgs 7.50 3500 26250.00
2 Only cutting of plates Nos 20.00 250 5000.00
All above Rates are inclusive of Material, Labour, Plants &
Tolls etc.Complete
Total 31250.00
Terms and Conditions : - All works shall be done as per MoRTH Specifications or as per direction
by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work : - Jaora-Nayagoan Road Project the Base camp at
Pipliyamandi.
Fabrication Works
Only modification, Fabrication of Shuttering for Road work &
1 Kgs 10.00 8500 85000.00
Godown/Garage etc
2 G.I.Sheets only Fixing Nos 55.00 500 27500.00
3 Making Drill in Shuttering Plates 14mm Dia. Nos 10.00 250 2500.00
4 Making Drill in Shuttering Plates 18mm Dia. Nos 15.00 50 750.00
5 Making Drill in Shuttering Plates 32mm Dia. Nos 25.00 50 1250.00
6 Straightening of old steel materials Kgs 4.00 1500 6000.00
All above Rates are inclusive of Material, Labour, Plants &
Tolls etc.Complete
Total 123000.0
Terms and Conditions : - All works shall be done as per MoRTH Specifications or as per direction
by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work : - Jaora-Nayagoan Road Project the Base camp at
Pipliyamandi.
Fabrication Works
Only modification, Fabrication of Shuttering for Road work &
1 Kgs 10.00 8500 85000.00
Godown/Garage etc
2 Only modification, Fabrication of Shuttering for Bridge work Kgs 13.00 4000 52000.00
2 G.I.Sheets only Fixing Nos 55.00 500 27500.00
3 Making Drill in Shuttering Plates 14mm Dia. Nos 10.00 250 2500.00
4 Making Drill in Shuttering Plates 18mm Dia. Nos 15.00 50 750.00
5 Making Drill in Shuttering Plates 32mm Dia. Nos 25.00 50 1250.00
6 Straightening of old steel materials Kgs 4.00 1500 6000.00
All above Rates are inclusive of Material, Labour, Plants &
Tolls etc.Complete
Total 175000.0
Terms and Conditions : - All works shall be done as per MoRTH Specifications or as per direction
by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work : - Jaora-Nayagoan Road Project.
Sr. Rate
Description of work Unit
No. in Rs.
ROW Trench
Excavation including Disposal of Excess Earth for ROW trench
1 as per specification or instruction by Engineer-in-Charge (Width Rmt 13.00
of Trench 600mm & 1000mm Deep)
Road Work
Excavation for roadway in soil / Hard Murrum including
loading in truck for carrying of cut earth to embankment site
1 with all lifts and lead and as per relevant clauses of section – CuM 45.00
300 of MoRTH Specifications.
Terms and Conditions : - All works shall be done as per MoRTH Specifications or as per direction
by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work : - Jaora-Nayagoan Road Project.
Sr. Rate
Description of work Unit
No. in Rs.
ROW Trench
Excavation including Disposal of Excess Earth for ROW trench
1 as per specification or instruction by Engineer-in-Charge (Width Rmt 13.00
of Trench 600mm & 1000mm Deep)
Above Rate is inclusive of Material, Labour, Plants & Tools
etc.Complete
Terms and Conditions : - All works shall be done as per MoRTH Specifications or as per direction
by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
This Work Order is issued as per terms and condition given overleaf and you are requested
to execute the following work : - Jaora-Nayagoan Road Project the Drainage in Urban Area
Section RCC Drain Work.
Sr. Rate
Description of work Unit
No. in Rs.
Terms and Conditions : - All works shall be done as per MoRTH Specifications or as per direction
by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
Permanent Address : - Vill. - Giriya, Tal. - Barahi, PAN No. - AJAPV 1142 R
Distt. - Katni - (M.P.) TIN No. -
Mobile No. 091798 34695
This Work Order is issued as per terms and condition given overleaf and you are requested to execute
the following work for Dept. Supply Work for RMC Plant.
Dept. Supply
Total 320000
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
This Work Order is issued as per terms and condition given overleaf and you are requested to execute
the following work for Dept. Supply Work for RMC Plant.
Dept. Supply
Work Order for Operation & Maintenance for Asphalt Hot Mix MT /
1 12500.00 8.00 100000
Plant. Month
Total 100000
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
Permanent Address : - 6,1/2 Vill. - Kanvan, Tah. - Badnawar, PAN No. - ARXPR 2407 C
Distt. - Dhar - 454 - 665 (MP) TIN No. -
Contact No. 094240 - 75740, 099810 - 84918
This Work Order is issued as per terms and condition given overleaf and you are requested to execute
the following work for Dept. Supply Work for Store Dept & RMC Plant.
Dept. Supply
2nd Night Shift 5 Nos Mazdoor (8:00 PM to 7:00 AM) Nos. 750.00 140.00 105000.00
Dept. Supply in Store Dept. at Pipaliya Camp.
2 (6 No. of Mazdoor 8:00 AM to 7:00 PM) Nos. 900.00 130.00 117000.00
Over shall be consider after 7:00 PM)
369000.00
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
ROB
1 Only Laying of Concrete at all levels CuM 250.00 130.00 32500.00
6 Dept.Supply : -
Skilled Mazdoor No 200.00 160.00 32000.00
Un-Skilled Mazdoor No 200.00 125.00 25000.00
Total 182750.00
Terms and Conditions : - All works shall be done as per MoRTH Specifications
or as per direction by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
Permanent Address : - Village - Bichor, The. - Beghu, PAN No. : - AXPPM 7613 M
Distt. - Chittodgarh - 312 022 (Rajasthan) TIN No. -
Terms and Conditions : - All works shall be done as per MoRTH Specifications
or as per direction by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
This Work Order is issued as per terms and condition given overleaf and you are requested to
execute the following work for Mics. work of Water Pipe Line Work for Jaora-Nayagoan Road Project.
Tree Cutting
1 Tree Cutting
a Girth from 300mm to 600mm Nos 10.00 112.00 1120.00
b Girth from 600mm to 900mm Nos 10.00 250.00 2500.00
c Girth from 900mm to 1800mm Nos 25.00 437.00 10925.00
d Girth above 600mm Nos 15.00 687.00 10305.00
Total 64697.04
Terms and Conditions : - All works shall be done as per MoRTH Specifications
or as per direction by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
Laying PVC Pipe line 110mm dia. With Excavation & Back
1
Filling etc. Complete Rmt. 1250.00 25.00 31250.00
Terms and Conditions : - All works shall be done as per MoRTH Specifications
or as per direction by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
Permanent Address : - Vill. - Simkheda, Post - Chaldu, PAN No. - CKLPS 1693 A
Tah. & Distt. - Neemuch - 458 - 441 (MP) TIN No. -
Mobile No. - 099777 - 93282
This Work Order is issued as per terms and condition given overleaf and you are requested to execute
the following work for Dept. Supply Work for Execution Work.
Civil Supply
1 Miscellaneous Work
Unskilled Nos. 200.00 100.00 20000.00
Unskilled Nos. 200.00 110.00 22000.00
Total 68500.00
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,
ROB
1 Only Laying of Concrete at all levels CuM 250.00 130.00 32500.00
6 Dept.Supply : -
Skilled Mazdoor Nos 200.00 160.00 32000.00
Un-Skilled Mazdoor Nos 200.00 125.00 25000.00
Total 182750.00
Terms and Conditions : - All works shall be done as per MoRTH Specifications
or as per direction by Engineer-in-Charge
Kindly acknowledge receipt of Work Order and send us duly signed copy of the same for our
records as a token of acceptance.
Thanking you,