Sie sind auf Seite 1von 26

GE Healthcare

HiSpeed Dual, ProSpeed FII: Slave Monitor Option


Installation
Service Documentation

5192252-100
Rev 1
© 2006, General Electric Company,
All Rights Reserved.
GE HEALTHCARE
DIRECTION 5192252-100, REVISION 1 HISPEED DUAL, PROSPEED FII: SLAVE MONITOR OPTION INSTALLATION

Page 2
GE HEALTHCARE
DIRECTION 5192252-100, REVISION 1 HISPEED DUAL, PROSPEED FII: SLAVE MONITOR OPTION INSTALLATION

LEGAL NOTES

TRADEMARKS
Adobe, the Adobe logo, Acrobat, the Acrobat logo, Exchange, and PostScript are trademarks of
Adobe Systems Incorporated or its subsidiaries and may be registered in certain jurisdictions.
Microsoft is a registered trademark and Windows is a trademark of Microsoft Corporation.
All other products and their name brands are trademarks of their respective holders.

COPYRIGHTS
All Material, Copyright © 2006 by General Electric Company, Inc. All rights reserved.

Legal Notes Page 3


GE HEALTHCARE
DIRECTION 5192252-100, REVISION 1 HISPEED DUAL, PROSPEED FII: SLAVE MONITOR OPTION INSTALLATION

Page 4 Legal Notes


GE HEALTHCARE
DIRECTION 5192252-100, REVISION 1 HISPEED DUAL, PROSPEED FII: SLAVE MONITOR OPTION INSTALLATION

IMPORTANT PRECAUTIONS

LANGUAGE

• THIS SERVICE MANUAL IS AVAILABLE IN ENGLISH ONLY.


• IF A CUSTOMER’S SERVICE PROVIDER REQUIRES A LANGUAGE OTHER
THAN ENGLISH, IT IS THE CUSTOMER’S RESPONSIBILITY TO PROVIDE
TRANSLATION SERVICES.
• DO NOT ATTEMPT TO SERVICE THE EQUIPMENT UNLESS THIS SERVICE
MANUAL HAS BEEN CONSULTED AND IS UNDERSTOOD.
• FAILURE TO HEED THIS WARNING MAY RESULT IN INJURY TO THE SERVICE
PROVIDER, OPERATOR OR PATIENT FROM ELECTRIC SHOCK,
MECHANICAL OR OTHER HAZARDS.

• CE MANUEL DE MAINTENANCE N’EST DISPONIBLE QU’EN ANGLAIS.


• SI LE TECHNICIEN DU CLIENT A BESOIN DE CE MANUEL DANS UNE AUTRE
LANGUE QUE L’ANGLAIS, C’EST AU CLIENT QU’IL INCOMBE DE LE FAIRE
TRADUIRE.
• NE PAS TENTER D’INTERVENTION SUR LES é QUIPEMENTS TANT QUE LE
MANUEL SERVICE N’A PAS é Té CONSULTé ET COMPRIS.
• LE NON-RESPECT DE CET AVERTISSEMENT PEUT ENTRAîNER CHEZ LE
TECHNICIEN, L’OPé RATEUR OU LE PATIENT DES BLESSURES DUES à DES
DANGERS é LECTRIQUES, Mé CANIQUES OU AUTRES.

• DIESES KUNDENDIENST-HANDBUCH EXISTIERT NUR IN ENGLISCHER


SPRACHE.
• FALLS EIN FREMDER KUNDENDIENST EINE ANDERE SPRACHE BENö TIGT,
IST ES AUFGABE DES KUNDEN Fü R EINE ENTSPRECHENDE ÜBERSETZUNG
ZU SORGEN.
• VERSUCHEN SIE NICHT, DAS GERä T ZU REPARIEREN, BEVOR DIESES
KUNDENDIENST-HANDBUCH ZU RATE GEZOGEN UND VERSTANDEN
WURDE.
• WIRD DIESE WARNUNG NICHT BEACHTET, SO KANN ES ZU
VERLETZUNGEN DES KUNDENDIENSTTECHNIKERS, DES BEDIENERS ODER
DES PATIENTEN DURCH ELEKTRISCHE SCHLä GE, MECHANISCHE ODER
SONSTIGE GEFAHREN KOMMEN.

Important Precautions Page 5


GE HEALTHCARE
DIRECTION 5192252-100, REVISION 1 HISPEED DUAL, PROSPEED FII: SLAVE MONITOR OPTION INSTALLATION

• ESTE MANUAL DE SERVICIO Só LO EXISTE EN INGLé S.


• SI ALGú N PROVEEDOR DE SERVICIOS AJENO A GEMS SOLICITA UN IDIOMA
QUE NO SEA EL INGLé S, ES RESPONSABILIDAD DEL CLIENTE OFRECER UN
SERVICIO DE TRADUCCIó N.
• NO SE DEBERá DAR SERVICIO Té CNICO AL EQUIPO, SIN HABER
CONSULTADO Y COMPRENDIDO ESTE MANUAL DE SERVICIO.
• LA NO OBSERVANCIA DEL PRESENTE AVISO PUEDE DAR LUGAR A QUE EL
PROVEEDOR DE SERVICIOS, EL OPERADOR O EL PACIENTE SUFRAN
LESIONES PROVOCADAS POR CAUSAS ELé CTRICAS, MECá NICAS O DE
OTRA NATURALEZA.

• ESTE MANUAL DE ASSISTê NCIA Té CNICA Só SE ENCONTRA DISPONíVEL


EM INGLê S.
• SE QUALQUER OUTRO SERVIç O DE ASSISTê NCIA Té CNICA, QUE Nã O A
GEMS, SOLICITAR ESTES MANUAIS NOUTRO IDIOMA, é DA
RESPONSABILIDADE DO CLIENTE FORNECER OS SERVIç OS DE
TRADUç ã O.
• Nã O TENTE REPARAR O EQUIPAMENTO SEM TER CONSULTADO E
COMPREENDIDO ESTE MANUAL DE ASSISTê NCIA Té CNICA.
• O Nã O CUMPRIMENTO DESTE AVISO PODE POR EM PERIGO A SEGURANç A
DO Té CNICO, OPERADOR OU PACIENTE DEVIDO A‘ CHOQUES ELé TRICOS,
MECâ NICOS OU OUTROS.

• IL PRESENTE MANUALE DI MANUTENZIONE è DISPONIBILE SOLTANTO IN


INGLESE.
• SE UN ADDETTO ALLA MANUTENZIONE ESTERNO ALLA GEMS RICHIEDE IL
MANUALE IN UNA LINGUA DIVERSA, IL CLIENTE è TENUTO A PROVVEDERE
DIRETTAMENTE ALLA TRADUZIONE.
• SI PROCEDA ALLA MANUTENZIONE DELL’APPARECCHIATURA SOLO DOPO
AVER CONSULTATO IL PRESENTE MANUALE ED AVERNE COMPRESO IL
CONTENUTO.
• NON TENERE CONTO DELLA PRESENTE AVVERTENZA POTREBBE FAR
COMPIERE OPERAZIONI DA CUI DERIVINO LESIONI ALL’ADDETTO ALLA
MANUTENZIONE, ALL’UTILIZZATORE ED AL PAZIENTE PER
FOLGORAZIONE ELETTRICA, PER URTI MECCANICI OD ALTRI RISCHI.

Page 6 Important Precautions


GE HEALTHCARE
DIRECTION 5192252-100, REVISION 1 HISPEED DUAL, PROSPEED FII: SLAVE MONITOR OPTION INSTALLATION

Important Precautions Page 7


GE HEALTHCARE
DIRECTION 5192252-100, REVISION 1 HISPEED DUAL, PROSPEED FII: SLAVE MONITOR OPTION INSTALLATION

DAMAGE IN TRANSPORTATION
All packages should be closely examined at time of delivery. If damage is apparent write “Damage
In Shipment” on ALL copies of the freight or express bill BEFORE delivery is accepted or “signed
for” by a GE representative or hospital receiving agent. Whether noted or concealed, damage
MUST be reported to the carrier immediately upon discovery, or in any event, within 14 days after
receipt, and the contents and containers held for inspection by the carrier. A transportation
company will not pay a claim for damage if an inspection is not requested within this 14 day period.
Call Traffic and Transportation, Milwaukee, WI (262) 785 5052 or 8*323 5052 immediately after
damage is found. At this time be ready to supply name of carrier, delivery date, consignee name,
freight or express bill number, item damaged and extent of damage.
Complete instructions regarding claim procedure are found in Section S of the Policy And
Procedures Bulletins.
14 July 1993

CERTIFIED ELECTRICAL CONTRACTOR STATEMENT


All electrical Installations that are preliminary to positioning of the equipment at the site prepared
for the equipment shall be performed by licensed electrical contractors. In addition, electrical feeds
into the Power Distribution Unit shall be performed by licensed electrical contractors. Other
connections between pieces of electrical equipment, calibrations and testing shall be performed by
qualified GE Medical personnel. The products involved (and the accompanying electrical
installations) are highly sophisticated, and special engineering competence is required. In
performing all electrical work on these products, GE will use its own specially trained field
engineers. All of GE’s electrical work on these products will comply with the requirements of the
applicable electrical codes.
The purchaser of GE equipment shall only utilize qualified personnel (i.e., GE’s field engineers,
personnel of third-party service companies with equivalent training, or licensed electricians) to
perform electrical servicing on the equipment.

IMPORTANT...X-RAY PROTECTION
X-ray equipment if not properly used may cause injury. Accordingly, the instructions herein
contained should be thoroughly read and understood by everyone who will use the equipment
before you attempt to place this equipment in operation. The General Electric Company, Medical
Systems Group, will be glad to assist and cooperate in placing this equipment in use.
Although this apparatus incorporates a high degree of protection against x-radiation other than the
useful beam, no practical design of equipment can provide complete protection. Nor can any
practical design compel the operator to take adequate precautions to prevent the possibility of any
persons carelessly exposing themselves or others to radiation.
It is important that anyone having anything to do with x-radiation be properly trained and fully
acquainted with the recommendations of the National Council on Radiation Protection and
Measurements as published in NCRP Reports available from NCRP Publications, 7910 Woodmont
Avenue, Room 1016, Bethesda, Maryland 20814, and of the International Commission on
Radiation Protection, and take adequate steps to protect against injury.
The equipment is sold with the understanding that the General Electric Company, Medical Systems
Group, its agents, and representatives have no responsibility for injury or damage which may result
from improper use of the equipment.
Various protective materials and devices are available. It is urged that such materials or devices be
used.

Page 8 Important Precautions


GE HEALTHCARE
DIRECTION 5192252-100, REVISION 1 HISPEED DUAL, PROSPEED FII: SLAVE MONITOR OPTION INSTALLATION

LITHIUM BATTERY CAUTIONARY STATEMENTS

CAUTION Danger of explosion if battery is incorrectly replaced. Replace only with the same or
Risk of equivalent type recommended by the manufacturer. Discard used batteries according to the
Explosion manufacturer’s instructions.

ATTENTION Il y a danger d’explosion s’il y a replacement incorrect de la batterie. Remplacer uniquement


Danger avec une batterie du même type ou d’un type recommandé par le constructeur. Mettre au
d’Explosion rébut les batteries usagées conformément aux instructions du fabricant.

OMISSIONS & ERRORS


Customers, please contact your GE Sales or Service representatives.
GE personnel, please use the GEMS CQA Process to report all omissions, errors, and defects in
this publication.

Important Precautions Page 9


GE HEALTHCARE
DIRECTION 5192252-100, REVISION 1 HISPEED DUAL, PROSPEED FII: SLAVE MONITOR OPTION INSTALLATION

Page 10 Important Precautions


GE HEALTHCARE
DIRECTION 5192252-100, REVISION 1 HISPEED DUAL, PROSPEED FII: SLAVE MONITOR OPTION INSTALLATION

Table of Contents
Chapter 1
Introduction............................................................................................................ 15
Section 1.0
System Requirement........................................................................................ 15
Section 2.0
Material List ...................................................................................................... 15

Table of Contents
Section 3.0
Flowchart .......................................................................................................... 16

Chapter 2
Installation Procedure........................................................................................... 17
Section 1.0
Overview ........................................................................................................... 17
Section 2.0
Installation Procedure...................................................................................... 17
2.1 Preparation ...................................................................................................................... 17
2.2 Hardware Installation ....................................................................................................... 18
2.2.1 For including VSPL ............................................................................................. 18
2.2.2 For no VSPL ....................................................................................................... 20
Section 3.0
Function Check ................................................................................................ 22

Chapter 3
Finish Installation .................................................................................................. 23
Section 1.0
Attach Rating Plate .......................................................................................... 23
Section 2.0
Return Installation Card................................................................................... 24

Table of Contents Page 11


GE HEALTHCARE
DIRECTION 5192252-100, REVISION 1 HISPEED DUAL, PROSPEED FII: SLAVE MONITOR OPTION INSTALLATION

Page 12 Table of Contents


GE HEALTHCARE
DIRECTION 5192252-100, REVISION 1 HISPEED DUAL, PROSPEED FII: SLAVE MONITOR OPTION INSTALLATION

Revision History

Revision History
Revision Date Reason for change
1 11/03/06 Initial release.

Revision History Page 13


GE HEALTHCARE
DIRECTION 5192252-100, REVISION 1 HISPEED DUAL, PROSPEED FII: SLAVE MONITOR OPTION INSTALLATION

Page 14 Revision History


GE HEALTHCARE
DIRECTION 5192252-100, REVISION 1 HISPEED DUAL, PROSPEED FII: SLAVE MONITOR OPTION INSTALLATION

Chapter 1
Introduction

Section 1.0
System Requirement
This option is available for the System with HiSpeed Dual, ProSpeed FII.

Section 2.0
Material List

1 - Introduction
Verify that the contents of this option kit are correct according to the Material List below.
Slave Monitor Option Kit (2214498-3)

ITEM PART NO. DESCRIPTION QTY.


PRODUCT LOCATOR CARD FORM FOR RATING
46-303268P1 PLATES, PRINTED BY DUPLITECH 1.0

1 5178602 CHILIN 19 INCH COLOR LCD MONITOR 1.0

2 2219946 P9231SN VIDEO BNC CABLE (25m) 1.0

3 2219945 P9231SM LCD POWER CABLE (25m) 1.0

5 U0215AC BAND 20.0

6 5192252-100 SLAVE MONITOR OPTION INSTALLATION 1.0

7 2179582 U0282EE POWER SUPPLY 100V 1.2A 12V 1.0

8 2245636 P2001LS VSPL W PANEL ASSY 1.0

9 2400995 VIDEO CABLE ASSY 1.0

10 2400970 POWER CABLE 1.0

11 2400971 POWER CABLE 1.0

12 2400972 POWER CABLE 1.0

13 2400975 POWER CABLE 1.0

14 2400978 POWER CABLE 1.0

15 2400982 VSPL PWR CBL ASSY 1.0

16 2234879 P2001KT RV PS BRKT B 1.0

17 N9306HR SCREW 2.0

18 2103585 SCREW 2.0

Chapter 1 - Introduction Page 15


GE HEALTHCARE
DIRECTION 5192252-100, REVISION 1 HISPEED DUAL, PROSPEED FII: SLAVE MONITOR OPTION INSTALLATION

Section 3.0
Flowchart
The Illustration below shows the main flow of the installation procedures of the option.
START

Preparation

Slave Monitor Installation

Functional Check

END

Page 16 Section 3.0 - Flowchart


GE HEALTHCARE
DIRECTION 5192252-100, REVISION 1 HISPEED DUAL, PROSPEED FII: SLAVE MONITOR OPTION INSTALLATION

Chapter 2
Installation Procedure

Section 1.0
Overview
This instruction describes the hardware installation procedure.

Section 2.0
Installation Procedure

NOTICE For systems powered from a power distribution box which has a lockout capability, perform

2 – INSTALLATION
the following steps at appropriate timings in each component replacement procedure:

PROCEDURE
..........
Turn off and lock out the system power at the main input (Power Distribution Box)
...........
Restore system power
...........

2.1 Preparation
Understand and follow the Safety Guidelines Manual.
1.) Turn OFF the Operator Console main power.
2.) Turn OFF the breaker in the Power Distribution Box (hospital supply).
3.) Remove the OC Front Cover and Rear Cover.
4.) Remove the PDU rear window cover by unscrewing its 4 screws.
Figure 2-1 Remove the PDU Rear Window Cover
Rear View

Rear Window Cover

5.) Unpack the LCD monitor.


Chapter 2 - Installation Procedure Page 17
GE HEALTHCARE
DIRECTION 5192252-100, REVISION 1 HISPEED DUAL, PROSPEED FII: SLAVE MONITOR OPTION INSTALLATION

2.2 Hardware Installation

2.2.1 For including VSPL


1.) Connect the following cables: (Refer to Figure 2-2, Figure 2-3 and Figure 2-4)
- Slave Monitor Signal Cable ................ LCD Monitor (VGA) <_> VSPL Assy, J2
- Slave Monitor Power Cable ................ LCD Monitor (Power) <_> PDU
LBLU: TM2-9
BRN: TM2-10
GRN: TB1, GND
Figure 2-2 Signal Cable Connection (Big OC)
Chilin
Slave Monitor Rear View

DVI VGA

Chilin
Monitor
Rear View
OC Rear View

DVI VGA
PDU

REAR CN2 L= 25mm


DASIFN2
VGA VGA
VSPL J3
Monitor
J2
Slave Monitor

REAR CN1

HOST ASSY

Route the Power Cable through the hole


to connect the AC Box
Power Cable
Signal Cable (VGA VGA)

Page 18 Chapter 2 - Installation Procedure


GE HEALTHCARE
DIRECTION 5192252-100, REVISION 1 HISPEED DUAL, PROSPEED FII: SLAVE MONITOR OPTION INSTALLATION
Figure 2-3 Signal Cable Connection (Small OC)
Chilin
Slave Monitor Rear View
Monitor
Chilin
DVI VGA

Rear View
OC Rear View

PDU
DVI VGA

L= 25mm

VGA

J2
Slave Monitor

VGA

J3
REAR CN2 Monitor

REAR CN1
DASIFN2
VSPL

2 – INSTALLATION
PROCEDURE
Power Cable
Signal Cable (VGA VGA)

Figure 2-4 Power Cable Connection


Rear View

TM2-9 TB1
TM2-10

2.) Verify that wires are correctly connected.

Chapter 2 - Installation Procedure Page 19


GE HEALTHCARE
DIRECTION 5192252-100, REVISION 1 HISPEED DUAL, PROSPEED FII: SLAVE MONITOR OPTION INSTALLATION

2.2.2 For no VSPL


1.) For Big OC, remove the Front Panel Assy by unscrewing its two screws.
For Small OC, remove the PS Front Cover by unscrewing its six screws.
Figure 2-5 Remove the Front Panel Assy for Big OC

Screw (x 2)

Front Panel Assy

Figure 2-6 Remove the PS Front Cover for Small OC

PS Front Cover

2.) Assemble the PS Bracket (2234879) to the Power Supply (-12VDC, 2179582) with two screws
(M3).

Page 20 Chapter 2 - Installation Procedure


GE HEALTHCARE
DIRECTION 5192252-100, REVISION 1 HISPEED DUAL, PROSPEED FII: SLAVE MONITOR OPTION INSTALLATION
3.) Refer to the schematic diagram Figure 2-8 to connect power cables to the Power Supply Unit.
Figure 2-7 Connect Power Cables to Power Supply Unit
-12V Power
Supply

+V 14
13

-V
12
FG
L 11
10
N

2 – INSTALLATION
PROCEDURE
PS Bracket
4.) Assemble the Power Supply Unit (-12VDC) to the Power Supply Holder with two screws (M4).
5.) Install the VSPL Panel Assy to the Connector Assy by screw its two screws.
6.) Refer to the schematic diagram shown as below to connect Power Cables among Power
Supply Units, NPD and VSPL.
Figure 2-8 Cables Connection (Item# refer to Material List)
J16
L +V +5V
N +5V PS
-V 15
PG GND

ORG
BLK
BLK

BLK
YEL

VIO
ORG
BLK
BLK

BLK
YEL

VIO

J17
J4
L
+V +12V J2
3
4
1
2

5
6
+12V PS
1
2
3
4
5
6

N V V V V V V
-V V V V V V V
PG GND
VSPL
10
7 16 13
11 14 J15
L -12V
12 +V
N -12V PS
-V
PG
GND
NPD Board

PDU 1
+12V Power
3
TM2-9 Slave Supply
TM2-10 Monitor
+S

+V
-V

-S
-12V Power FG
Supply

N
Chapter 2 - Installation Procedure Page 21
GE HEALTHCARE
DIRECTION 5192252-100, REVISION 1 HISPEED DUAL, PROSPEED FII: SLAVE MONITOR OPTION INSTALLATION

7.) Disconnect the Monitor Signal Cable (VGA <_> DVI) from the Monitor and Host PC.
8.) Use the new Signal Cable (VGA <_> VGA) shipped with the Chilin 19" LCD Monitor (5178602),
then connect it between the Monitor and VSPL (J3).
9.) Connect the Video Cable Assy (2400995) between the Host PC and VSPL (J1).
10.) Connect the following cables: (Refer to Figure 2-2 & Figure 2-3 and Figure 2-4)
- Slave Monitor Signal Cable ................ LCD Monitor (VGA) <_> VSPL Assy, J2
- Slave Monitor Power Cable ................ LCD Monitor (Power) <_> PDU
LBLU: TM2-9
BRN: TM2-10
GRN: TB1, GND
11.) Restore the OC and PDU to original configuration

Section 3.0
Function Check
1.) Perform Power On Self Test:
a.) Switch ON the main switch of the OC.
The test progress information is displayed on the LCD monitor.
b.) Verify that the system starts up normally.
2.) Perform the following adjustment and test:
- MONITOR SET UP .............................. according to user guide that shipped with monitor.
- MONITOR FUNCTION CHECK ......... according to Functional Check/Adjustment manual.

Page 22 Chapter 2 - Installation Procedure


GE HEALTHCARE
DIRECTION 5192252-100, REVISION 1 HISPEED DUAL, PROSPEED FII: SLAVE MONITOR OPTION INSTALLATION

Chapter 3
Finish Installation

Section 1.0
Attach Rating Plate
1.) Attach the provided rating plate to the following location of OC.
Figure 3-1 Rating Plate for Big OC

OC Rear Side

INSTALLATION
3 – FINISH
Label area Rating plate

Figure 3-2 Rating Plate for Small OC


Rear View

Label

Chapter 3 - Finish Installation Page 23


GE HEALTHCARE
DIRECTION 5192252-100, REVISION 1 HISPEED DUAL, PROSPEED FII: SLAVE MONITOR OPTION INSTALLATION

Section 2.0
Return Installation Card
1.) Complete and verify the site-specific information on the Red Product Locator Installation Card.
2.) Send the Product Locator Card to the appropriate address provided belowl:
- Address for GEMS-AM sites:
Send to the address printed on the Product Locator Card.
- Address for GEMS-E sites:
Send to the address Printed on the Product Locator Card.
- Address for GEMS-A sites:
Send to the local PLS or Service Administrator.

Page 24 Chapter 3 - Finish Installation


CT
3000 N. Grandview Blvd.,
Waukesha, WI 53188 U.S.A.

www.gehealthcare.com

Imagination at work

Das könnte Ihnen auch gefallen